A006_IT_Personnel_Security_for_NAVAIR_CDRL.pdf

PDF 693 KB Posted

Attached to
Propulsion and Power Department (AIR 4. 4) Lab Support
Solicitation number
N00421-16-R-0007
Issued by

About this file

A006

View the file

Other files

File Type Posted
N00421-17-R-0007_Amendment_0002.docx DOCX document
P7_-_CPARS_UPDATE_QUESTIONNAIRE.doc DOC document
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
N00421-17-R-0007_Amendment_0001.docx DOCX document
Attachment_P1_Workforce_Qualifications.xls XLS spreadsheet
Attachment_P4_-_Past_Performance_Information_Sheet.docx DOCX document
Attachament__J2__QASP.docx DOCX document
Attachcment__J1_DD_254_Security_Requirments.pdf PDF
Attachment_P2_Workforce_Hour_Matrix_(2).xls XLS spreadsheet
N00421-17-R-0007.docx DOCX document
A001_Monthly_Report_CDRL.pdf PDF
Attachment__J3__Wage_Determination.pdf PDF
A002_Funds_MH_Report_CDRL.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet_N00421-17-R-0007.xlsx XLSX spreadsheet
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Attachment__J4__contractor_base_access_form.doc DOC document
Attachment_J5_Organizational_Conflict_of_Interest_List.docx DOCX document
Attachament__J4__contractor_base_access_form.doc DOC document
N00421-16-R-0007.docx DOCX document
A002_Funds_MH_Report_CDRL.pdf PDF
Attachament__J2__QASP_01_May_16.docx DOCX document
A005_IT_Personnel_Security_CDRL.pdf PDF
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_P2_Workforce_Hour_Matrix_(2).xls XLS spreadsheet
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Attachment_J5_Organizational_Conflict_of_Interest_List.docx DOCX document
Attachment_P6_CLIN_Breakout_spreadsheet_N00421-16-R-0007.xlsx XLSX spreadsheet
Attachment_P1_Workforce_Qualifications.xls XLS spreadsheet
Attachament__J3__Wage_Determination.PDF PDF
Attachcment__J1_DD_254_Security_Requirments.pdf PDF
A001_Monthly_Report_CDRL.pdf PDF
A003_OPSECt_CDRL.pdf PDF
A004_Tech_Reports_CDRL.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A006
title: Status Report
sub: Information Technology Personnel Security Report for NAVAIR Security
auth: DI-MGMT-80368
ref: SOW Para. 5.0
req_ofc: AIR4.4
dd250: DD
appcode: A
dist: D
freq: See BLK 16
asof: O
firstsub: See BLK 16
subsub: See BLK 16
addressee1: AIR/AD 7.4.1
draft1: 0
reg1: 1
repro1: 0
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks:

Block 4: Digital media to be in IBM compatible Microsoft Excel 2000 or later format.

Contractor to submit IT Personnel Security Report for all employees requiring access to Government IT systems. Ensure that only the following information is included:

User’s Last Name; First Name; MI; Suffix; Exact Sigma User Name (if none – leave blank); Employee Type: Civ/Mil/CSS/FN; Contract No.; Customer AIR/PMA/PEO Code; Org: Hdqtrs/NAWC/NATEC, etc.; Duty Location; Work Email Address; IA Training Date (Verified by Transcript); Date of User Signature (SAAR Blk 12); Type of Investigation (SAAR Blk 28); Date Investigation Finalized (SAAR Blk 28a); Date Interim IT Level Designation (Stamp) Granted (SAAR Blk 28c) --do not put pending; Highest IT Level (SAAR Blk 28c); Date Security Verified Clearance/Investigation (SAAR Blk 32); Date COR Signature (SAAR Blk 19); COR Name (SAAR Blk 20); COR Email; Date Rec’d Sigma Customer Support Ctr.; Date System Access Granted & COR Notified; Date System Access No Longer Required; N-ERP IT System (if applic., put N-ERP); Other IT System/s (separate by comma’s); Company Name, SS# (only for NAVAIR Security)

Block 10: Updated report required within (30) days of gain or loss of employee(s) that have or will access Government IT systems Block 12: First report is required (30) days after contract award Block 13: Subsequent reports due (365) days after first report Block 14: Electronic Encrypted Copy shall be provided Note: Send Spreadsheet report only to NAVAIR Security.

group:
total_price:
prep_name: AIR4.4.6
prep_sign:
prep_date: 20 Feb 14
app_by:
app_sign:
app_date:
Page:
app: Adobe Professional 7.0
line_item:
exhibit: A
xtdp: Off
xtm: Off
othercat: X
system: IT Personnel Security Information
ctr_no:
contr:
remarksb:
Page2:
of_pages:
Reset:

File details come from the government source that posted it. Updated .