Attachment_P2_Workforce_Hour_Matrix.xls

XLS spreadsheet 48 KB Posted

Attached to
Air Combat Environment Test and Evaluation Facility (ACETEF)
Solicitation number
N00421-15-R-0016
Issued by

About this file

DRAFT Attachment P2 Workforce Matrix

View the file

Other files

File Type Posted
ACETEF_RFP_Question_and_Answers_for_Amendment_0006.docx DOCX document
Conformed_Copy_N00421-15-R-0016_Amendment_0006.docx DOCX document
N00421-15-R-0016_Amendment_0006.docx DOCX document
N00421-15-R-0016-0005_Conformed_Copy.docx DOCX document
ACETEF_RFP_Question_and_Answers_for_Amendment_0005.docx DOCX document
ACETEF_N00421-15-R-0016_Amendment_0005.docx DOCX document
N00421-15-R-0016-0004_ACETEF.docx DOCX document
Q A_12_18_15.docx DOCX document
N00421-15-R-0016-0003_ACETEF.docx DOCX document
Q A_N00421-15-R-0016_11_24_15_.docx DOCX document
Solicitation_Amendment_0002.docx DOCX document
Conformed_Copy_of_N00421-15-R-0016_Amendment_0002.docx DOCX document
Attachment_P5_Past_Performance_Questionnaire_Package.doc DOC document
Q A_for_ACETEF_RFP_N00421-15-R-0016.docx DOCX document
N00421-15-R-0016_Amendment_0001.docx DOCX document
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_3_-_Scheduled_GFP.pdf PDF
Attachment_P5_Past_Performance_Questionnaire_Package.doc DOC document
Attachment_P8_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Attachment_P6-_Prime_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Exhibit_A_CDRLs_DD-1423_6_29_15(signed).pdf PDF
Attachment_P7-_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_4_-_Requisitioned_GFP.pdf PDF
Attachment_1_DD254.pdf PDF
N00421-15-R-0016.doc DOC document
Attachment_2_ACETEF_QASP.docx DOCX document
Pre_Solicitation_Industry_Day_Attendee_List.docx DOCX document
AIR_5_4_Pre-Solicitation_Industry_Day_Brief.pptx PPTX presentation
DRAFT_RFP_N00421-15-R-0016.doc DOC document
Attachment_P06_CPFF_OT_FFP_Breakout_PRIME.xls XLS spreadsheet
Attachment_P11_Sample_Task_Order_2_PBSOW_.docx DOCX document
Attachment_3_NMCI_Access.doc DOC document
Attachment_P3_Past_Performance_Questionnaire.doc DOC document
Attachment_4-_Incurred_Cost_and_Progress_Report.xls XLS spreadsheet
Attachment_1_PBSOW.docx DOCX document
Attachment_6_-_Requisitioned_GFP.pdf PDF
Attachment_P08_CPFF_OT_FFP_Breakout_InitialSample_Task_Order.xls XLS spreadsheet
Attachment_P10_Sample_Task_Order_1_PBSOW_.docx DOCX document
Attachment_2_DD254_-_N00421-15-R-0016.pdf PDF
Attachment_P12_Sample_Task_Order_3_PBSOW.docx DOCX document
Attachment_5_-_Scheduled_GFP.pdf PDF
Attachment_P09_Fully_Burdened_Prime__Subcontractor_Labor_Rates.xls XLS spreadsheet
Attachment_P07_CPFF_OT_FFP_Breakout_Subcontractor.xls XLS spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

Example of Workforce Hour Matrix
PBSOW sectionLabor CategoryBase Period HoursOption Period I HoursOption Period 2 HoursOption Period 3 HoursOption Period 4 HoursOption Period 5 HoursTotal Hours
3.1Chicken Analyst2,4004,8004,8004,8004,8002,50024,100
3.1Jr Chicken Analyst18,00036,00036,00036,00036,00024,000186,000
3.1Sr Chicken Analyst1,0402,0802,0802,0802,0802,08011,440
Subtotal21,44042,88042,88042,88042,88028,580221,540
3.2Chicken Analyst4,7009,8009,8009,8009,8005,40049,300
3.2Jr Chicken Analyst18,00036,00036,00036,00036,00026,000188,000
3.2Sr Chicken Analyst5701,0401,0401,0401,0402,0806,810
Subtotal23,27046,84046,84046,84046,84033,480244,110
3.3Chicken Analyst2,4004,8004,8004,8004,8003,60025,200
3.3Jr Chicken Analyst18,00036,00036,00036,00036,00028,000190,000DRAFT
3.3Sr Chicken Analyst1,0402,0802,0802,0802,0801,80011,160
3.4Chicken Analyst2,6005,6005,6005,6005,6004,50029,500
3.4Jr Chicken Analyst42,00072,00072,00072,00072,00048,000378,000
3.4Sr Chicken Analyst9,0406,0406,0406,0406,0404,80038,000
Subtotal75,080126,520126,520126,520126,52090,700671,860
Total119,790216,240216,240216,240216,240152,7601,137,510
Instructions:
The Workforce Hour Matrix should be formatted as portrait or landscape for printing on letter size paper. Data in cells may be wrapped, if necessary.
Do not employ any special reduction or formatting for printing to reduce the size or font of the worksheet.
Under "PBSOW section" insert the sections of the PBSOW. Then for each PBSOW section insert the titles of all the labor categories to be utilized to support the specific PBSOW section in the column "Labor Category."
Under "CLIN" indicate the Contract Line Item Number from Section B of the solicitation that the specific labor category will be supporting, If the labor category is supporting multiple PBSOW sections and/or CLINS, it should be annotated individually for each instance.
Under the heading for each period of performance, annotate the total number of hours being proposed for the specific labor category. Utilize whole numbers only. Pay particular attention to the periods of performance as indicated in the solicitation, as there are occasions when the base period is less than twelve months, and a fifth option period may be utilized for a period of less than twelve months. If a fifth option period is not utilized insert "zeros" in the column.
At the end of each row insert a total for all periods of performance. Then, after each grouping of labor by CLIN, insert a subtotal for each of the periods of performance, and the entire CLIN. At the conclusion of all CLINs insert a total that tabulates the total number of hours per period of performance.
Utilization of colors in the matrix to highlight rows or columns is at the discretion of the Offeror. However, be advised that most Government printers only print black/grey on white.

&RAttachment P2 &RAIR-2.5.1 Form September 2008

WorkForce Hour Matrix

Workforce Hour Matrix
PBSOW sectionLabor CategoryBase Period HoursOption Period I HoursOption Period 2 HoursOption Period 3 HoursOption Period 4 HoursTotal Hours
DRAFT

&CN00421-15-R-0016&RAttachment P2 &RAIR-2.5.1 Form May 2015

File details come from the government source that posted it. Updated .