Questions_ _Answers_from_DRAFT_RFP_ _Industry_Day.docx

DOCX document 20 KB Posted

Attached to
AIR 5. 4. 3 Engineering and Technical Support Services
Solicitation number
N00421-15-R-0011
Issued by

About this file

This document contains the Questions Answers. These questions were received in response to the DRAFT RFP and Pre-Solicitation Conference (Industry Day). Questions may have been condensed or rephrased to ensure clarity and avoid redundancy.

View the file

Other files

File Type Posted
N00421-15-R-0011-0002_ETS.docx DOCX document
N00421-15-R-0011-0002_ETS_QA.docx DOCX document
N00421-15-R-0011-0001.docx DOCX document
Attachment_2_-_Personnel_Qualifications.pdf PDF
N00421-15-R-0011-0001_ETS_QA.docx DOCX document
Attachment_1_-_Labor_Categories_and_Requirements.pdf PDF
CDRL_A002_-_Project_Financial_Summary_ENG.pdf PDF
CDRL_A004_-_OPSEC_Plan_ENG.pdf PDF
CDRL_A001_-_Monthly_Financial_Summary_ENG.pdf PDF
CDRL_A003_-_Monthly_Status_Report_ENG.pdf PDF
CDRL_A005_-_Technical_Reports__ENG.pdf PDF
N00421-15-R-0011_ETS_RFP11-6-2015.docx DOCX document
Attachment_P6-_Prime_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_2_-_Personnel_Qualifications.pdf PDF
Attachment_3_-_DD254.pdf PDF
Attachment_7-_QASP.docx DOCX document
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Attachment_P8_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Attachment_4_-_CDRL_A001_Format.xlsx XLSX spreadsheet
Attachment_1_-_Labor_Categories_and_Requirments.pdf PDF
Attachment_5_-_CDRL_A002_Format.xlsx XLSX spreadsheet
Attachment_P7-_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
AIR_543_Engineering_Pre-Solicitation_Conference-Industry_Day_Brief.pptx PPTX presentation
Attachment_3_-_DD254.pdf PDF
Attachment_6_-_Funding_Types.docx DOCX document
N00421-15-R-0011_ETS_DRAFT_RFP.docx DOCX document
CDRL_A003_-_Monthly_Status_Report_ENG.pdf PDF
Attachment_P8_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
CDRL_A005_-_Technical_Reports__ENG.pdf PDF
Attachment_1-_Labor_Categories_and_Requirements.pdf PDF
CDRL_A004_-_OPSEC_Plan_ENG.pdf PDF
Attachment_7-_QASP.docx DOCX document
CDRL_A001_-_Monthly_Financial_Summary_ENG.pdf PDF
Attachment_P7_-Subcontractor_Cost_Breakout_Spreadsheet.xlsx XLSX spreadsheet
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Attachment_P6-_Prime _Subcontractor_Cost_Breakout_Spreadsheet.xlsx XLSX spreadsheet
Attachment_4_-_CDRL_A001_Format.xlsx XLSX spreadsheet
CDRL_A002_-_Project_Financial_Summary_ENG.pdf PDF
Attachment_2_-_Personnel_Qualifications.pdf PDF
Attachment_P4_Past_Performance_Matrix.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS

These questions were received in response to the DRAFT RFP and Pre-Solicitation Conference (Industry Day). Questions may have been condensed or rephrased to ensure clarity and avoid redundancy.

1. Question

Why is the period of performance three years and not five years?

Answer:

A 36 month ordering period sufficiently meets NAVAIR’s requirement for this effort.

2. Question This contract was initially posted with a NAICS code of 541330, but later changed to 541712. What was the motivation for this change in designation? Did the scope of work change as part of the NAICS code modification?

Answer:

The Sources Sought notification was originally posted with NAICS code 541330, however, after further review NAVAIR determined the NAICS 541712 accurately reflected this requirement. Therefore, a modified Sources Sought was posted to include the NAICS change. The scope of the work did not change as a result of the NAICS code modification.

3. Question:

Why has the Government required 32 key personnel resumes and assurance that proposed personnel will be provided at contract start (per Section H, 5252.237-9501(a))? Does the Government expect a significant number of employees to be unavailable for the follow-on contract effort?

Answer:

The requirement for 32 key personnel positions is needed to ensure effective completion of the effort.

4. Question:

Given that the three predecessor task orders to this contract were procured through the Seaport-e contract vehicle, why has the Government chosen to not use Seaport-e for this procurement?

Answer:

Seaport-e is a Multiple Award Contracting vehicle; however, this effort is for a Single-Award Task Order Contract.

5. Question:

How will the government ensure qualified non-incumbents will be fairly evaluated?

Section M of the Draft RFP provides the criteria for evaluating Offerors. The Government will evaluate offers for this contract on a best-value basis.

6. Question:

Reference Section L, 3.1. of the Draft RFP shows specific page allocations for each section of the proposal. For example, per the Draft RFP, the Offeror has 5 pages for the Management Approach response. Will the government consider giving the Offerors a maximum page limit for each volume and allowing the Offeror to use its discretion for page allocation?

Answer No, NAVAIR has provided the requisite amount of pages per section of each proposal volume. Offerors shall comply with the requirements for submissions as detailed in the final RFP.

7. Question:

The NAICS code listed in the Draft RFP (page 77) is 541712, which indicates a small business size limit of 500 employees. However there are three exceptions for that code, one of which might apply, specifically Auxiliary Equipment. Can you please confirm whether any of the exceptions apply and the size standard being used.

Answer:

The NAICS code for this requirement is 541712 with a Small Business size limitation of 1,500.

8. Question:

Is there any consideration being given to making this work a full and open competition?

Answer:

NAVAIR has determined this requirement to be a Small Business Set-Aside. This will be a full and open competition under the Small Business Set-Aside procedures.

9. Question:

Will a list of Industry Day attendees be posted or distributed?

No, the attendees list will not be posted or distributed.

Technical Questions

10. Question :

Who makes the motion seats?

Answer:

Moog

11. Question:

What is different between TFPS 1 and TFPS 22

Upgraded projectors, IG, and host computers.

12. Question:

Do we do T&E for the CH-47F?

Answer: No

13. Question: What company's IG are we using

Answer: Aechelon