Attachment_6_-_Funding_Types.docx

DOCX document 28 KB Posted

Attached to
AIR 5. 4. 3 Engineering and Technical Support Services
Solicitation number
N00421-15-R-0011
Issued by

About this file

Attachment (6)- Funding Types

View the file

Other files

File Type Posted
N00421-15-R-0011-0002_ETS_QA.docx DOCX document
N00421-15-R-0011-0002_ETS.docx DOCX document
N00421-15-R-0011-0001_ETS_QA.docx DOCX document
N00421-15-R-0011-0001.docx DOCX document
Attachment_2_-_Personnel_Qualifications.pdf PDF
Attachment_1_-_Labor_Categories_and_Requirements.pdf PDF
CDRL_A001_-_Monthly_Financial_Summary_ENG.pdf PDF
CDRL_A003_-_Monthly_Status_Report_ENG.pdf PDF
CDRL_A002_-_Project_Financial_Summary_ENG.pdf PDF
CDRL_A004_-_OPSEC_Plan_ENG.pdf PDF
CDRL_A005_-_Technical_Reports__ENG.pdf PDF
Attachment_3_-_DD254.pdf PDF
Attachment_7-_QASP.docx DOCX document
Attachment_P6-_Prime_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_P8_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Attachment_1_-_Labor_Categories_and_Requirments.pdf PDF
Attachment_P7-_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_5_-_CDRL_A002_Format.xlsx XLSX spreadsheet
Attachment_4_-_CDRL_A001_Format.xlsx XLSX spreadsheet
N00421-15-R-0011_ETS_RFP11-6-2015.docx DOCX document
Attachment_2_-_Personnel_Qualifications.pdf PDF
Questions_ _Answers_from_DRAFT_RFP_ _Industry_Day.docx DOCX document
AIR_543_Engineering_Pre-Solicitation_Conference-Industry_Day_Brief.pptx PPTX presentation
CDRL_A003_-_Monthly_Status_Report_ENG.pdf PDF
Attachment_1-_Labor_Categories_and_Requirements.pdf PDF
CDRL_A005_-_Technical_Reports__ENG.pdf PDF
Attachment_P6-_Prime _Subcontractor_Cost_Breakout_Spreadsheet.xlsx XLSX spreadsheet
Attachment_4_-_CDRL_A001_Format.xlsx XLSX spreadsheet
N00421-15-R-0011_ETS_DRAFT_RFP.docx DOCX document
Attachment_7-_QASP.docx DOCX document
Attachment_P7_-Subcontractor_Cost_Breakout_Spreadsheet.xlsx XLSX spreadsheet
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
CDRL_A002_-_Project_Financial_Summary_ENG.pdf PDF
Attachment_P8_Fully_Burdened_Labor_Rates.xls XLS spreadsheet
CDRL_A004_-_OPSEC_Plan_ENG.pdf PDF
CDRL_A001_-_Monthly_Financial_Summary_ENG.pdf PDF
Attachment_2_-_Personnel_Qualifications.pdf PDF
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_3_-_DD254.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5.4.3 Engineering and TechnicalAttachment 62015-08-14
N00421-15-R-0011Funding Types

The information in this attachment is intended to assist Government Comptrollers in determining the appropriateness of using Appropriated funding on this contract, and is provided for reference only. Provided below are definitions of the use of appropriated funding on this contract, which can be compared with the Task Order (TO) work statement and appropriation type.

A map between appropriation types and the functional performance requirements in the Performance Work Statement (PWS) is also provided.

Uses of Appropriate Funds Listed below are the approved uses of appropriated and non-appropriated funds on this contract.

1. Research, Design, Test and Evaluation (RDT&E) Appropriations. (RDT&EN, RDT&EA, RDT&EAF)

· Engineering and technical support of the operation of Simulation Division RDT&E laboratories and facilities.

· Engineering and technical support of the maintenance and improvement of infrastructure (laboratories, equipment, systems and software) supporting basic and applied research efforts and test and evaluation.

· Direct support of test and evaluation activities for air-vehicles, air-vehicle systems, and supporting systems and equipment.

· Direct support of research and development of pre-production air-vehicle systems and air-vehicle modifications/upgrades.

· Development of simulation systems, software and databases for use in the support of air-vehicle system research, development, test and evaluation.

· Development of prototype training systems for pre-production air-vehicles and supporting equipment.

· Support for research and development of non-platform specific initiatives and standards, such as distributed simulation, open architecture avionics, and database standardization.

2. Aircraft Procurement (AP) Appropriations. (APN, APA, APAF)

· Development of systems, software and databases to be used to support fleet training.

· Improvement of simulation systems and software used for fleet training.

· Verification, validation and accreditation (VV&A) of aircraft support systems and software, including training products.

3. Operations and Maintenance (O&M) Appropriations. (O&MN, O&MA, O&MAF) Note: O&M funding shall not be used for operation and maintenance of RDT&E infrastructure and systems.

· Maintenance and repair of deployed out-of-production simulation training systems and software.

· Operational support of deployed out-of-production simulation training systems and software.

4. Foreign Military Sales (FMS) Funding.

· Development and implementation of simulation systems, training devices, software, and databases in support of FMS efforts.

· Support of research, design, test, and evaluation activities in support of foreign military sales efforts.

Funding of Functional Performance Requirements Functional performance requirements – the functions required to execute TO requirements – are outlined below in Section 4.0 of the Performance Work Statement (PWS). The applicability of each functional performance requirement to funding types is indicated in the table below.

SOW #
Description
RDT&E
AP
O&M
FMS
4.1
General Requirements
-
-
-
-
4.2
Program and Project Management
-
-
-
-
4.2.1
Program Management
X
X
X
X
4.2.2
Project Support
X
4.2.3
Project Management Support
X
X

X

4.2.4
Business Development
X
4.3
Facility and Operations Support
-
-
-
-
4.3.1
Technical Tours
X
4.3.2
Visitor Escorting
X
X

X

4.4
Project Support
-
-
-
-
4.4.1
Configuration Management
X
X

X

4.4.2
Logistics Support
X
X

X

4.4.3
Requirements Tracking
X
X

X

4.4.4
Scheduling / EVM
X
X

X

4.4.5
Technical Writing Support
X
X

X

4.4.6
Testing Support
X
X

X

4.4.7
Project Technical Support
X
X
X
4.5
General Engineering Support Requirements
-
-
-
-
4.5.1
Systems Engineering
X
X

X

4.5.2
Documentation
X
X

X

4.5.3
RDT&E Test and Training Support
X
4.5.4
Technical Support
X
X
X
4.5.5
Technical Research Studies
X
4.5.6
Technical Exchanges
X
X
4.5.7
Training
X
4.6
Hardware Engineering Support
-
-
-
-
4.6.1
Electrical Engineering
X
X
X
X
4.6.2
Mechanical Engineering
X
X
X
X
4.6.3
Drafting
X
X

X

4.7
Software Development and Engineering Support
-
-
-
-
4.7.1
Aerospace Engineering
X
X

X

4.7.2
Avionics Modeling
X
X

X

4.7.3
Battlespace Modeling
X
X
X
X
4.7.4
Simulation Systems Software Development
X
X
X
X
4.7.5
Flight Test Data Analysis and Processing
X
4.7.6
RDT&E Software Development
X
4.8
Specialized Technical Support
-
-
-
-
4.8.1
Subject Matter Expertise
X
X

X

4.8.2
Warfighting Scenario Development
X
X
4.8.3
Tracking Expertise
X

X

4.8.4
Verification, Validation and Accreditation
X
X
X
4.8.5
Visual and Sensor Database Development
X
X

X

4.9
Information Technology
-
-
-
-
4.9.3
Enterprise Software Programming
X

File details come from the government source that posted it. Updated .