Cost_Summary_Spreadsheet_(Subcontractor)_Attachment_P7.xls
XLS spreadsheet 429 KB Posted
- Attached to
- AIR-4. 11, N00421-15-R-0002 Communications Systems Integration Support (CSIS) supporting AD-4. 11. 3
- Solicitation number
- N00421-15-R-0002
About this file
This document provides a draft solicitation for communications systems integration support services. The Naval Air Warfare Center Aircraft Division is seeking to procure engineering, integration, technical, and logistical services to support the Ship and Air Integrated Warfare Communications Systems Integration Support division. Services will include local integration support, advanced research and development, engineering and technical support, logistical and quality management support, and technical management of end products supporting various federal agencies involved in C4I programs. The North American Industry Classification code is 541330 with a small business size standard of $38.5 million. The Product Service Code is N059. Any resultant solicitation will be posted on FEDBIZOPPS.
P7 Cost Summary Spreadsheet (Subcontractor)
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions | |
| (Please note that the cells referenced below correspond to the Cost Type sheets. The Summary sheet is numbered slightly differently. ) | |
| Contractor: | |
| 1 | On Header Tab for each worksheet, insert the Offeror's Name and Subcontractor's Name. |
| 2 | On Footer Tab for the worksheet, insert the Proposal Number. |
| 3 | A worksheet should be prepared for each Ordering Period. The tab name should match the period of performance of the Ordering Year. A summary sheet exists for each CLIN Type. The information in the summary tab should automatically carry over from the other tabs. Verify that the summary sheet is correct after completing the separate tabs. |
| 4 | Every worksheet should have items 1 and 2 completed. |
| 5 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 6 | Within the work sheet any cell colored "blue" contains a formula that should not be edited. |
| 7 | All dollar figures shall be carried out no further than two decimal places. Values with additional decimal places shall not be used within any calculations. |
| 9 | In column A, starting at row 5, the Government Labor Categories for this effort have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. The Offeror is not required to utilize the Government's labor categories. However, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. This applies to the Prime Contractor's section and those sections for its subcontractors. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| 10 | In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces. |
| 11 | In column E, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 12 | In column F, enter the name of the proposed individual for that position. |
| 13 | In column G: |
| (a) Enter the unburdened labor rate for each individual | |
| (b) In Cell G75 the Offeror shall insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (c) In Cell G76 the Offeror should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank. | |
| (d) In Cell G79, the Offeror should insert its overhead rate for work performed at the contractor's facility. | |
| (e) In Cell G80, the Offeror should insert its overhead rate for work performed at the Client/Government's facility. | |
| (f) In Cell G82, the Offeror should insert its G&A rate being applied. | |
| (g) In Cell G88, the Offeror should insert the fixed fee rate applied to its cost | |
| 14 | In column H: |
| (a) The Offeror shall enter the hours associated with individual labor category | |
| (b) In Cell H75, the Offeror should input the base its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (c) In Cell H76, the Offeror should input the base its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (d) In Cell H79, the Offeror should insert the base its overhead rate is being applied to for work performed at the contractor's facility. | |
| (e) In Cell H80, the Offeror should insert the base its overhead rate is being applied to for work performed at the Client/Government's facility. | |
| (f) In Cell H82, the Offeror should insert the base its G&A rate is being applied to. | |
| (g) In Cell H88, the Offeror should insert the labor base its fixed fee rate is being applied to | |
| 15 | Column H automatically calculated the total hours for all the CLINS. |
| 16 | Column K is a summation of the costs. |
| 17 | If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the prime is only utilizing two subcontractors, then the rows concerning sub 3 through 8 would be hidden. |
| 18 | When submitting this file, the instructions may be deleted. |
| 19 | If necessary Offerors may add additional lines for indirect rates as required. |
&R&F
TOTAL SUMMARY
| Hours | Total | |
| Labor (CPFF LOE) | 11520 | $ 239,616.00 |
| Fee (CPFF LOE) | $ - 0 | |
| Total (CPFF LOE) | $ 239,616.00 | |
| Labor (CPFF Completion) | 11520 | $ 239,616.00 |
| Fee (CPFF Completion) | $ - 0 | |
| Total (CPFF Completion) | $ 239,616.00 | |
| TOTAL EFFORT | $ 479,232.00 |
&C&8Solicitation N00421-15-R-0002, Attachment P7 CPFF LOE Summary (Years 1 through 6) Prime/Subcontractor:
CPFF LOE Year 1
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||
| Period of Performance: | 12/9/2018 - 12/8/2019 | CLIN | 0007 | ||||||||
| Services | Contractor | hrs | subtotal | ||||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |||
| Computer Hardware Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | Example Category | k | f | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | |||
| Computer Network Support Specialist (Information Management and Technology Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Computer Network Support Specialist (Information Management and Technology Analyst), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineer (Systems), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Program Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Clerk I (SCA) | |||||||||||
| (Contractor Offiste) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Illustrator II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Junior | |||||||||||
| Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Maintenance and Repair Worker, General (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Configuration Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Quality Control Inspector (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Truck Driver, Medium (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Warehouse Specialist (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||||
| Base | |||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Overhead | Base | ||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Total Labor | $ 39,936.00 | $ - 0 | |||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | ||||||||
| Grand Total Cost | $ 39,936.00 | $ 39,936.00 | |||||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||||
| Grand Total Labor Cost Plus Fee/Profit | $ 39,936.00 | $ 39,936.00 |
&C&8 Solicitation N00421-15-R-0002, Attachment P7 CPFF LOE Year 1 Prime/Subcontractor:
&L&9Subcontractor Proposal
CPFF LOE Year 2
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||
| Period of Performance: | 12/9/2019 - 12/8/2020 | CLIN | 0007 | ||||||||
| Services | Contractor | hrs | subtotal | ||||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |||
| Computer Hardware Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | Example Category | k | f | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | |||
| Computer Network Support Specialist (Information Management and Technology Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Computer Network Support Specialist (Information Management and Technology Analyst), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineer (Systems), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Program Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Clerk I (SCA) | |||||||||||
| (Contractor Offiste) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Illustrator II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Junior | |||||||||||
| Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Maintenance and Repair Worker, General (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Configuration Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Quality Control Inspector (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Truck Driver, Medium (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Warehouse Specialist (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||||
| Base | |||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Overhead | Base | ||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Total Labor | $ 39,936.00 | $ - 0 | |||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | ||||||||
| Grand Total Cost | $ 39,936.00 | $ 39,936.00 | |||||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||||
| Grand Total Labor Cost Plus Fee/Profit | $ 39,936.00 | $ 39,936.00 |
&C&8Solicitation N00421-15-R-0002, Attachment P7 CPFF LOE Year 2 Prime/Subcontractor:
&LProposal Number:
CPFF LOE Year 3
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||
| Period of Performance: | 12/9/2020 - 12/8/2021 | CLIN | 0007 | ||||||||
| Services | Contractor | hrs | subtotal | ||||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |||
| Computer Hardware Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | Example Category | k | f | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | |||
| Computer Network Support Specialist (Information Management and Technology Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Computer Network Support Specialist (Information Management and Technology Analyst), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineer (Systems), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Program Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Clerk I (SCA) | |||||||||||
| (Contractor Offiste) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Illustrator II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Junior | |||||||||||
| Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Maintenance and Repair Worker, General (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Configuration Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Quality Control Inspector (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Truck Driver, Medium (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Warehouse Specialist (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||||
| Base | |||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Overhead | Base | ||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Total Labor | $ 39,936.00 | $ - 0 | |||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | ||||||||
| Grand Total Cost | $ 39,936.00 | $ 39,936.00 | |||||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||||
| Grand Total Labor Cost Plus Fee/Profit | $ 39,936.00 | $ 39,936.00 |
&C&8Solicitation N00421-15-R-0002, Attachment P7 CPFF LOE Year 3 Prime/Subcontractor:
&LProposal Number:
CPFF LOE Year 4
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||
| Period of Performance: | 12/9/2021 - 12/8/2022 | CLIN | 0007 | ||||||||
| Services | Contractor | hrs | subtotal | ||||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |||
| Computer Hardware Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | Example Category | k | f | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | |||
| Computer Network Support Specialist (Information Management and Technology Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Computer Network Support Specialist (Information Management and Technology Analyst), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineer (Systems), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Program Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Clerk I (SCA) | |||||||||||
| (Contractor Offiste) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Illustrator II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Junior | |||||||||||
| Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Maintenance and Repair Worker, General (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Configuration Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Quality Control Inspector (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Truck Driver, Medium (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Warehouse Specialist (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||||
| Base | |||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Overhead | Base | ||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Total Labor | $ 39,936.00 | $ - 0 | |||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | ||||||||
| Grand Total Cost | $ 39,936.00 | $ 39,936.00 | |||||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||||
| Grand Total Labor Cost Plus Fee/Profit | $ 39,936.00 | $ 39,936.00 |
&C&8Solicitation N00421-15-R-0002, Attachment P7 CPFF LOE Year 4 Prime/Subcontractor:
&LProposal Number:
CPFF LOE Year 5
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||
| Period of Performance: | 12/9/2022 - 12/8/2023 | CLIN | 0007 | ||||||||
| Services | Contractor | hrs | subtotal | ||||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |||
| Computer Hardware Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | Example Category | k | f | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | |||
| Computer Network Support Specialist (Information Management and Technology Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Computer Network Support Specialist (Information Management and Technology Analyst), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineer (Systems), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Program Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Clerk I (SCA) | |||||||||||
| (Contractor Offiste) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Illustrator II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Junior | |||||||||||
| Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Maintenance and Repair Worker, General (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Configuration Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Quality Control Inspector (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Truck Driver, Medium (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Warehouse Specialist (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||||
| Base | |||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Overhead | Base | ||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Total Labor | $ 39,936.00 | $ - 0 | |||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | ||||||||
| Grand Total Cost | $ 39,936.00 | $ 39,936.00 | |||||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||||
| Grand Total Labor Cost Plus Fee/Profit | $ 39,936.00 | $ 39,936.00 |
&C&8Solicitation N00421-15-R-0002, Attachment P7 CPFF LOE Year 5 Prime/Subcontractor:
&LProposal Number:
CPFF LOE Year 6
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||
| Period of Performance: | 12/9/2023 - 12/8/2024 | CLIN | 0007 | ||||||||
| Services | Contractor | hrs | subtotal | ||||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |||
| Computer Hardware Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | Example Category | k | f | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | |||
| Computer Network Support Specialist (Information Management and Technology Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Computer Network Support Specialist (Information Management and Technology Analyst), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Opeartor II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Data Entry Operator III (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Drafter V (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical and Electronic Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Electrical Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineer (Systems), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Government Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician III (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician IV (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician V (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Engineering Technician VI (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Financial Analyst, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Project Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General & Operations Manager (Program Manager), Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Clerk I (SCA) | |||||||||||
| (Contractor Offiste) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Illustrator II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Junior | |||||||||||
| Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Government Onsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Logistician, Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Maintenance and Repair Worker, General (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Configuration Manager), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Management Analyst (Project Analyst), Senior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Journeyman | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Junior | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Mechancial Engineer, Senior * | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Quality Control Inspector (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Supply Technician (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Technical Writer II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Truck Driver, Medium (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Warehouse Specialist (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor I (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Word Processor II (SCA) | |||||||||||
| (Contractor Offsite) | $ - 0 | $ - 0 | $ - 0 | ||||||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||||
| Base | |||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Overhead | Base | ||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | |||||||||
| Total Labor | $ 39,936.00 | $ - 0 | |||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | ||||||||
| Grand Total Cost | $ 39,936.00 | $ 39,936.00 | |||||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||||
| Grand Total Labor Cost Plus Fee/Profit | $ 39,936.00 | $ 39,936.00 |
&C&8Solicitation N00421-15-R-0002, Attachment P7 CPFF LOE Year 6 Prime/Subcontractor:
&LProposal Number:
CPFF LOE SUMMARY
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||
| Period of Performance: | 12/9/2018 - 12/8/2024 | CLIN | 0007 | |||||||
| Services | Contractor | hrs | subtotal | |||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Labor | Total | |||
| Computer Hardware Engineer, Journeyman | ||||||||||
| (Contractor Offsite) | Example Category | k | f | John Doe | 11520 | $ 239,616.00 | $ 239,616.00 | |||
| Computer Network Support Specialist (Information Management and Technology Analyst), Journeyman | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Computer Network Support Specialist (Information Management and Technology Analyst), Senior * | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Data Entry Operator I (SCA) | ||||||||||
| (Government Onsite) | 0 | $ - 0 | $ - 0 | |||||||
| Data Entry Opeartor II (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Data Entry Operator I (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Data Entry Opeartor II (SCA) | ||||||||||
| (Government Onsite) | 0 | $ - 0 | $ - 0 | |||||||
| Drafter I (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Drafter II (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Drafter III (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Drafter IV (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical and Electronic Engineering Technician I (SCA) (Government Onsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical and Electronic Engineering Technician II (SCA) | ||||||||||
| (Government Onsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical and Electronic Engineering Technician III (SCA) | ||||||||||
| (Government Onsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical and Electronic Engineering Technician I (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical and Electronic Engineering Technician II (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical and Electronic Engineering Technician III (SCA) | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical Engineer, Journeyman | ||||||||||
| (Government Onsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical Engineer, Journeyman | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical Engineer, Junior | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Electrical Engineer, Senior * | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Engineer (Systems), Senior * | ||||||||||
| (Contractor Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Engineering Technician I (SCA) | ||||||||||
| (Government Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Engineering Technician II (SCA) | ||||||||||
| (Government Offsite) | 0 | $ - 0 | $ - 0 | |||||||
| Engineering Technician III (SCA) |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .