This document provides a draft request for proposal for communication systems integration support services. The Naval Air Systems Command intends to award an indefinite-delivery/indefinite-quantity contract to provide engineering, integration, technical, and logistical support services for the Ship and Air Integrated Warfare Communications Systems Integration Support division. Services include local integration, research and development, engineering, technical, logistics, quality management, and technical management support for programs managed by Naval Sea Systems Command, Naval Air Systems Command, and other federal agencies. The North American Industry Classification System code is 541330 with a small business size standard of $38.5 million. The Product Service Code is N059. The Navy seeks industry input on the draft solicitation and will consider comments but not provide direct responses. Any resulting solicitation will be released on FEDBIZOPPS.
Quality Assurance Surveillance Plan
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-15-R-0002
Attachment 2
Quality Assurance Surveillance Plan and Contract Surveillance Plan for Communication
Systems Integration Support (CSIS)
1. Purpose
This CSIS IDIQ contract requirement consists of both Level of Effort (LOE) and non-LOE tasks;
therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan (CSP are required. The LOE tasks for engineering and logistics are non-performance based; which requires a CSP. Whereas, the non-LOE tasks for production utilizes the QASP.
A QASP is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration and surveillance of performance based tasking under the Communication Systems Integration Support (CSIS) contract. The intent is to ensure that the contractor performs in accordance with the performance metrics and the
Government receives the quality of services called for in the each Task Order Statement of Work
(SOW).
A CSP is a Government developed and applied document used to make sure the systematic quality assurance surveillance methods are used in the evaluation of LOE aspects of the SOW. The intent is to ensure that the Government receives the quality of services and products for tasks called for in the SOW.
This contract is for integration support, advanced research and development support, engineering and technical support, logistics management support, and technical management support of final end item products. The scope of the contract encompasses rapidly developed engineering designs and systems integration for end products intended for immediate warfighter operation use, and may include strategic and tactical airborne, land-based, and mobile, sea-based surface and sub-surface, and space-based platforms. The following are representative of the programs, systems, and technology areas to which the requested engineering and technical services may be applied:
Military and commercial radio communication systems
Information and computer network systems
Command and control systems
Unmanned Aerial Systems
This IDIQ contract will have LOE CLINs that will allow for cost plus fixed fee labor and CLINs for Other Direct Charges (ODCs) (cost only), Firm Fixed Price (FFP) CLINs for Integration work. The contract will establish a single 6 year ordering period. A properly executed hybrid
QASP/CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this combined QASP/CSP is provided under Federal Acquisition Regulation
(FAR) Subpart 46.4 – Government Contract Quality Assurance, which requires quality assurance, inspection and acceptance of the services, and the associated documentation called for in service contracts to be executed by the Contracting Officer or a duly authorized Government representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP/CSP. The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth in the contract and all resultant orders.
The QASP and/or CSP provides Government surveillance oversight of the contractor’s efforts to assure they are timely, effective, and delivering the results specified in the contract and each
Task Order.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer (CO): A person duly appointed with the authority to enter into Procuring
Contracting Officer (PCO) contract or administer Administrative Contracting Officer (ACO) contracts and make related determinations and findings on behalf of the Government. The PCO for this contract is Mr. Thomas E. Stann, AIR-2.5.1.3. The ACO will be designated in the resulting order. Contracting officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Project Leads: The COR designates an individual Government Project Leads to assist in administering of specific efforts under the contract.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this
QASP/SAC Surveillance Plan:
Contracting Officer: The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The
Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance
Contracting Officer Representative (COR): The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
Alternate Contracting Officer’s Representative (ACOR): The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
Government Project Leads: The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project Lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the
Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for advanced research and development, systems engineering, and life-cycle support of electronics, communications, and information systems services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the midpoint of each period of performance. This evaluation will be one determinant in the award of future contracts or task orders. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of CDRLs. As this information may affect future source selections throughout DoD as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the
QASP/CSP.
b. QASP/CSP: The document listed methods of surveillance that shall be used by the
COR, ACOR, and government project leads in the technical administration of this
QASP/CSP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the hybrid Checklists provided herein.
7. Surveillance
Enclosures (1) and (2) set forth the performance standards, incentives, and surveillance methods for the contractor, the COR and Government Project Leads while enclosure (3) provides the checklist and means for the COR to document the results of the surveillance and shall be provided to the Contracting Officer.
8. Documentation
In addition to providing reports to the Contracting Officer, the COR will maintain a complete
Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. In addition to providing monthly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the
CORT (Contracting Officer’s Representative Tool) system. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) Performance Based & Level of Effort Quality Standards/CDRL Performance
Standards
Enclosure (2) Incentives
Enclosure (3) Contract Surveillance Plan
Enclosure (4) Annual Evaluation by Task Order
Enclosure (5) Surveillance by CDRLs
Enclosure (6) Annual Surveillance Summary
Enclosure (1)
PERFORMANCE BASED QUALITY STANDARDS – INTEGRATION CLINS
Required
Service
(Performance
Requirements)
Standard (Performance
Standards)/ Maximum Allowable
Degree of Deviation Requirement
(AQL)
Method of
Surveillance
(Quality
Assurance)
Incentives
Provide
Integration of
C4I Systems support IAW
SOW Para 3.2
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely and technically acceptable.
Metrics are provided in the SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
Enclosure
QUALITY STANDARDS – LEVEL OF EFFORT CLINS
Required
Service
Standard (Performance
Standards)/ Maximum Allowable
Degree of Deviation Requirement
(AQL)
Method of
Surveillance
Incentives
Engineering
Requirements
Research support IAW
SOW Para
3.1.1.1
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
Hours delivered at 3% variance.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
Enclosure
Engineering
Requirements
Definition support IAW
SOW Para
3.1.1.2
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
Hours delivered at 3% variance.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
Enclosure
Provide
Engineering
Design &
Drawing
Management support IAW
SOW Para
3.1.1.3
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
Hours delivered at 3% variance.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
Enclosure
Provide
Engineering
Configuration
Control support
IAW SOW Para
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
3.1.1.4 Hours delivered at 3% variance.
Testing
Requirements support IAW
SOW Para
3.1.1.5
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
Hours delivered at 3% variance.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
Enclosure
Provide
Engineering
Change
Management support IAW
SOW Para
3.1.1.6
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
Hours delivered at 3% variance.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
Enclosure
Provide
Engineering
Software support IAW
SOW Para
3.1.1.7
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
Hours delivered at 3% variance.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
Enclosure
Provide
Integrated
Logistics support IAW
SOW Para 3.1.2
Based upon feedback from the
Government Project Leads, 95% of the services/deliverables provided must be deemed comprehensive, timely and technically acceptable.
Hours delivered at 3% variance.
100% Inspection by COR/ACOR and/or
Government
Project Leads.
See
CDRL DATA PERFORMANCE STANDARDS
Description
Standard
AQL
Surveillance/
Method/Measure
Incentives
Contractor's
Progress, Status and
Management
Report A001
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
2.
Systems
Management
Plan (SEMP)
A002
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Installation
Control
Drawings
A003
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Technical
Report –
Study /
Services A004
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Technical and
Management
Work Plan
A005
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Product
Drawings /
Models &
Associated
Lists A006
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Status Report
- Info. Tech.
Personnel
Security
Report A007
Submission is in accordance with the DID cited in the
CDRL.
A once-annual deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Test Plan
A008
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Test
Procedure -
Validation
Test
Procedure
A009
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Scientific and
Reports -
Elements, Organization and Design
A010
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Validation
Report -
Validation of
Technical
Manual
Changes A011
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Contractors
Configuration
Management
Plan A012
Submission is in accordance with the DID cited in the
CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Audit
Summary
Report A013
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Report, Record of
Meeting/
Minutes A014
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Training
Conduct
Support
Document
A015
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Quality
System Plan -
Quality
Management/
Assurance
Plan A016
Submission is in accordance with the DID cited in the
CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Production
Status Report
A017
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Drawings and
Associated
Lists - Space
Arrangement
Drawings /
Equipment
Elevation
Drawings
A018
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Associated
Lists - Cable
Block
Diagrams
A019
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Associated
Lists - Cable
Run Sheets
A020
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Information
Report -
Readiness
Test Report
A021
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Integrated
Program
Management
Report -
Integrated
Master
Schedule
A022
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Scientific and
Reports -
Configuration
Change
Request
Document
A023
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Contractor's
Risk
Management
Plan A024
Submission is in accordance with the DID cited in the
CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Ship's
Maintenance and Material
Management
(3-M) Manual
A025
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Information
Report –
Project Close-
Out Report
A026
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Operations
Security
(OPSEC) Plan
A027
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Detailed
Project
Schedule
A028
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Inspection and
Test Plan -
Inspection
System Plan
A029
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Segregation of
Costs and
Invoice
Requirements
Reporting
A030
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Enclosure
2.
Technical
Report -
Study/
Services -
Integration
Completion
Summary
Report A031
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Enclosure
2.
Scientific and
Technical
Reports - Test
Reports/
Results A032
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
Enclosure
2.
Funds and
Man-Hours
Expenditure
Report A033
Submission is in accordance with the DID cited in the
CDRL.
95% of required deliverable provided on time.
No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or
Government
Project Leads.
See
N00421-15-R-0002Enclosure (2)
INCENTIVES
The following incentives shall apply to performance under this contract.
Assessment Period Acceptable
Performance
Definition
How Measured Incentives
Ordering Year 1:
Not more than 1 of the measurement areas rated below
“Satisfactory”.
None of the measurement areas are rated below
“Marginal”.
End of the first assessment period
(6 months into performance) using the CPARS format.
(+) Meet the acceptable performance definition as a condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 2: Not more than 1 of the measurement areas rated below
“Satisfactory”.
None of the measurement areas are rated below
“Marginal”.
End of the second assessment period
(6 months into Year
2 ordering period) using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 3: 2 or more of the measurement areas rated “Very Good” or above. None rated below
“Satisfactory”.
End of the third assessment period
(6 months into Year
3 ordering period) using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 4: 2 or more of the measurement areas rated “Very Good” or above. None of
End of the fourth assessment period
(6 months into Year
4 ordering period)
(+) Meet the acceptable performance definition as a
Enclosure (2) the measurement areas are below
“Satisfactory”.
evaluation using the
CPARS format covering the previous 12 months.
condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 5: 2 or more of the measurement areas rated “Very Good” or “exceptional”.
None of the measurement areas are rated “Marginal” or below.
See below.
End of the fifth assessment period
(6 months into Year
5 ordering period) using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better
Final CPARS rating.
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.
* The Government may not award additional tasking (orders) unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following.
Quality of Product or Service: Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives.
Assess how successfully the contractor meets program quality.
Schedule: Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control: Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations: Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management: Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. Identify management areas that are unique to the contract to include the staffing ramp up needs of this contract.
Utilization of Small Business: The RFP and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting
Program. Assess whether the contractor provided maximum practicable opportunity for
Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes)
(including Small Disadvantaged Businesses (which also includes ANCs and Indian
Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled
Veteran Owned Small Business, and ANCs and Indian Tribes that are not Small
Disadvantaged Businesses or Small Businesses) to participate in contract performance consistent with efficient performance of the contract. Evaluation will focus on the metrics of actual small business utilization as compared to the contract required targets.
Other areas: Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional: Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the contract and awarded orders being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good: Performance meets contractual requirements and exceeds some to the
Government’s benefit. The contractual performance of the contract and awarded orders being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory: Performance meets contractual requirements. The contractual performance of the contract and awarded orders contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal: Performance does not meet contractual requirements. The contractual performance of the contract and awarded orders being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
For LEVEL OF EFFORT Task Orders, hours delivered by each order as compared to the order required hours will be evaluated and will influence the ratings awarded above.
Hour variances greater than 10% (triggering Tripwire concerns) cannot earn an
Exceptional or Very Good for Cost Control evaluation criteria.
Enclosure (3)
CONTRACT SURVEILLANCE PLAN – LEVEL OF EFFORT & PERFORMANCE BASED
Quarterly and Annual Surveillance:
The COR will perform a quarterly and annual assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure 3.
QUARTERLY AND ANNUAL EVALUATION PERIOD – BY SOW
Surveillance
Method/
Measure
Dates
Hours
Bid vs.
Actual
Quality*
Assessment
Schedule
Assessment
Cost
Control
Assessment
Business
Relations
Assessment
Mgmt.
Assessment
Util. of Small
Business Assessment Other
Assessment
3.1.1.1
Provide
Engineering
Requirements
Research support IAW
SOW
100%
Inspection by
COR/ACOR
and/or
Government
Project Leads.
3.1.1.2
Engineering
Requirements
Definition support IAW
SOW
requirements.
100%
Inspection by
COR/ACOR
and/or
Project Leads
3.1.1.3
Engineering
Design &
Drawing
Management support IAW
SOW
100%
Inspection by
COR/ACOR
and/or requirements.
3.1.1.4
Engineering
Configuration
Control support IAW
SOW
requirements.
100%
Inspection by
COR/ACOR
and/or
3.1.1.5
Engineering
Testing
Requirements support IAW
SOW
requirements
100%
Inspection by
COR/ACOR
and/or
3.1.1.6
Engineering
Change
Management support IAW
COR/ACOR
and/or
3.1.1.7
Engineering
Software support IAW
COR/ACOR
and/or
3.1.2 Provide 100%
Contract Requirements in accordance with the Statement of Work. Quarterly Assessments form the basis of Annual
Assessments, which form the basis of the CPARS.
*Use Enclosure (s) for Quality Assessment Ratings
Integrated
Logistics support IAW
SOW
requirements.
Inspection by
COR/ACOR
and/or
Government
Project Leads
3.2 Provide
Integration of
C4I Systems support IAW
SOW
100%
Inspection by
COR/ACOR
and/or
Project Leads.
Enclosure (4)
ANNUAL EVALUATION PERIOD – BY TASK ORDER
Task
Order No.
Surveillance
Method/
Measure
Date
Awarded
Hours
Bid vs.
Actual
Quality
Assessment
Schedule
Assessment
Cost
Control
Assessment
Business
Relations
Assessment
Mgmt.
Assessment
Util. of Small
Business Assessment Other
Assessment
001 100%
Inspection by
COR/ACOR
and/or
002 100%
COR/ACOR
and/or
003 100%
COR/ACOR
and/or
004 100%
COR/ACOR
and/or
Enclosure (4)
*Use Enclosure (s) for Quality Assessment Ratings
COR/ACOR
and/or
COR/ACOR
and/or
007 100%
COR/ACOR
and/or
Enclosure (5)
Contract Surveillance by Contract Data Requirements Lists
(CDRLs) Form DD 1423- By Task Order
Surveillance
Method/
Measure
Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Comments
Contractor's Progress, Status and Management
Report A001
100% Inspection by
COR/ACOR and/or
Government Project
Leads.
Systems Engineering
Management Plan
(SEMP) A002
100% Inspection by
COR/ACOR and/or
Installation Control
Drawings A003
100% Inspection by
COR/ACOR and/or
Technical Report –
Study / Services A004
100% Inspection by
COR/ACOR and/or
Technical and
Management Work Plan
A005
100% Inspection by
COR/ACOR and/or
Product Drawings /
Models & Associated
Lists A006
100% Inspection by
COR/ACOR and/or
Leads
Status Report - Info.
Tech. Personnel Security
Report A007
100% Inspection by
COR/ACOR and/or
Test Plan A008 100% Inspection by
COR/ACOR and/or
Test Procedure -
Validation Test
Procedure A009
100% Inspection by
COR/ACOR and/or
Scientific and Technical
Reports - Elements, Organization and Design
A010
100% Inspection by
COR/ACOR and/or
Validation Report -
Validation of Technical
Manual Changes A011
100% Inspection by
COR/ACOR and/or
Contractors
Management Plan A012
100% Inspection by
COR/ACOR and/or
Configuration Audit
Summary Report A013
100% Inspection by
COR/ACOR and/or
Report, Record of
Meeting/ Minutes A014
100% Inspection by
COR/ACOR and/or
Training Conduct
Support Document
A015
100% Inspection by
COR/ACOR and/or
Quality System Plan -
Quality
Management/Assurance
Plan A016
100% Inspection by
COR/ACOR and/or
Production Status
Report A017
100% Inspection by
COR/ACOR and/or
Product Drawings and
Associated Lists - Space
Arrangement Drawings /
Equipment Elevation
Drawings A018
100% Inspection by
COR/ACOR and/or
Product Drawings and
Associated Lists - Cable
Block Diagrams A019
100% Inspection by
COR/ACOR and/or
Associated Lists - Cable
Run Sheets A020
100% Inspection by
COR/ACOR and/or
Technical Information
Report - Readiness Test
Report A021
100% Inspection by
COR/ACOR and/or
Integrated Program
Management Report -
Integrated Master
Schedule A022
100% Inspection by
COR/ACOR and/or
Reports - Configuration
Change Request
Document A023
100% Inspection by
COR/ACOR and/or
Contractor's Risk
Management Plan A024
100% Inspection by
COR/ACOR and/or
Ship's Maintenance and
Material Management
(3-M) Manual A025
100% Inspection by
COR/ACOR and/or
Technical Information
Report – Project Close-
Out Report A026
100% Inspection by
COR/ACOR and/or
Operations Security
(OPSEC) Plan A027
100% Inspection by
COR/ACOR and/or
Detailed Project
Schedule A028
100% Inspection by
COR/ACOR and/or
Inspection and Test Plan
- Inspection System Plan
A029
100% Inspection by
COR/ACOR and/or
Segregation of Costs and
Invoice Requirements
Reporting A030
100% Inspection by
COR/ACOR and/or
Technical Report -
Study/ Services -
Integration Completion
Summary Report A031
100% Inspection by
COR/ACOR and/or
Reports - Test Reports/
Results A032
100% Inspection by
COR/ACOR and/or
Funds and Man-Hours
Expenditure Report
A033
100% Inspection by
COR/ACOR and/or
N0042-15-R-0002
Enclosure (6)
Annual Surveillance Summary:
The COR/ACOR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions. This assessment frequency will be conducted per this agreement.
Description Surveillance
Method/
Measure
Date
Planned
Date
Completed
Summary
Rating/Results
Quality of
Product or Service Review of Ratings.
Schedule Review of Ratings.
Cost Control Review of Ratings.
Business Relations Review of Ratings.
Management Review of Ratings.
Utilization of
Small Business Review of Ratings.
Other Areas Review of Ratings.