C24_N0025325Q00140001.pdf
PDF 598 KB Posted
- Attached to
- Bldg 1003 UPS Head Unit Install Federal contract opportunity
- Solicitation number
- N0025325Q0014
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Naval Undersea Warfare Center's solicitation N0025325Q0014. The amendment extends the proposal response date from 16-Jul-2025 02:00 PM to 18-Jul-2025 11:00 AM and provides clarifications regarding a UPS head unit installation project. Key updates include answers to potential proposer inquiries about replacing existing UPS units, testing responsibilities, disposal requirements, installation details, and scheduling. The government anticipates new UPS head units will be delivered in mid-September 2025, with work to be completed after hours or on weekends, and individual UPS units to be replaced separately starting with the unit on the north wall.
The amendment also updates the Exhibit/Attachment Table of Contents, specifically modifying Attachment 2's date from 12-JUN-2025 to 09-JUL-2025. The solicitation remains a 100% small business set-aside for electrical contractor services at NUWC Keyport, WA, with an estimated contract value between $75,000 and $150,000. The target award date is August 11, 2025, using the NAICS code 238210 and Product Service Code Z2AZ for repair and alteration of administrative facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C12_Att_04-Kpt_EV_Guide_for_Contractors_Jan_2025.pdf | ||
| C11b_Att_02_WA20250109_20250606_Mod3.pdf | ||
| C12_Att_06-Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_11-OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_03-Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C11d_Att_07-Past_Performance_References.docx | DOCX document | |
| C12_Att_05-OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_01-Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_10-Safety_Data_Sheet.docx | DOCX document | |
| C12_Att_08-Bid_Form.xlsx | XLSX spreadsheet | |
| N0025325Q0014.pdf | ||
| C12_Att_09-PPI_Form.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is to provide answ ers to PPI, incorporate current WDOL, and to extend the proposal due date. The point of contact for this amendment is james.k.w asson.civ@us.navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jul-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0025325Q0014
X 9B. DATED (SEE ITEM 11)
16-Jun-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jul-2025
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: JAMES WASSON
JAMES.K.WASSON.CIV@US.NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0025325Q0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-Jul-2025 02:00 PM to 18-Jul-2025 11:00 AM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
PPI AND ANSWERS
1. Are the new UPS like and kind? Meaning the same Amperage, Voltage and approx. Same location of termination lugs? If so, we will not be needing new conductors, conduit or breakers, please confirm.
New UPS heads are designed to replace existing unit, but are a few inches taller. Replace/install new conductors, conduit or breakers in accordance with the statement of work.
2. Who is responsible for testing? Will the manufacturer be testing? Normally the entity purchasing is responsible for testing. Please confirm.
Please see VIII. Work Description 15, 16, and 17.
15: “Perform complete testing of installation as practicable without placing UPS units on-line and remaining in bypass mode. Provide written results to the Government.”
16: “Commissioning of the two UPS systems will not be completed under this contract. Place the units in bypass for commissioning.”
17: “Provide an electrician on site during commissioning for troubleshooting. Commissioning to be completed by others.”
3. Should we include disposal of the UPS that has been removed?
Yes, see section V. 5. “Disposal of any material resulting from demolition shall be per applicable Environmental regulations, including all documentation (Waste Designation Tables, Waste Generation Record WGRs, and documented in accordance with Attachment 04.”
4. Will the existing UPS be locked out by the Authority Having Jurisdiction?
See section II. Submittals 3: “Required outages shall adhere to Ref (A) and routed through the COR for information on scheduling. The COR is not responsible for outage coordination, obtaining signatures, or vetting outage requests, including Hot Work permits or Fire Alarm outages.
Contractor pricing shall include all Contractor support and associated costs in their proposal.”
5. Under section VIII number 11, can we get a diagram or approximate distance from the UPS that the EPO switches will be located? Room locations are 112 and 134.
See VIII. Work Description 11. “Provide and install two (2) Remote Emergency Power-off (REPO) switch in B1003 RM 112 and RM 134 near Inergen system activation mechanism.”
Room 112: The approximate distance is 30’. Location will be by entry door next to unit A (North wall).
Room 134: The approximate distance is 200’. EPO wiring must be ran through hallway above ceiling panels.
EPO switches must have appropriate cover to prevent accidental activation and be labeled with a phenolic label.
6. Do you have a shutdown preference for the A & B systems and are these ASI’s scheduled separately or as a whole?
All outages will be scheduled for after hours or on weekends 10 days prior. See VIII. Work Description 3 and 4.
3: “All work requiring outages shall be completed after hours or on weekends. Outages requests shall be submitted a minimum of 10 days prior to the outage.”
4: “Each unit shall be replaced individually on separate scheduled outages. UPS A on the north wall shall be replaced first.”
7. Can you please provide a estimated date on when the new UPS will be onsite?
The Government anticipates the new head units will be delivered mid- September, 2025.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Att_01-
Material_Equipment_In_ Place_List
12-JUN-2025
Attachment 10 Att_10- Safety_Data_Sheet
12-JUN-2025
Attachment 11 Att_11- OSHA_Calculating_Injur y_and_Illness_Incident_R ate
12-JUN-2025
Attachment 2 Att_02_WA20250109_20 250606_Mod3
12-JUN-2025
Attachment 3 Att_03- Safety_Requirements_for _Contractors_and_Subcon tract
12-JUN-2025
Attachment 4 Att_04- Kpt_EV_Guide_for_Cont ractors_Jan_2025
12-JUN-2025
Attachment 5 Att_05- OPSEC_Guide_for_Defe nse_Contractors
12-JUN-2025
Attachment 6 Att_06- Schedule_of_Values
12-JUN-2025
Attachment 7 Att_07- Past_Performance_Refere nces
12-JUN-2025
Attachment 8 Att_08-Bid_Form 12-JUN-2025
Attachment 9 Att_09-PPI_Form 12-JUN-2025 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Att_01-
Material_Equipment_In_ Place_List
12-JUN-2025
Attachment 10 Att_10- Safety_Data_Sheet
12-JUN-2025
Attachment 11 Att_11- OSHA_Calculating_Injur y_and_Illness_Incident_R ate
12-JUN-2025
Attachment 2 Att_02_WA20250109_20 250627_Mod4
09-JUL-2025
Attachment 3 Att_03- Safety_Requirements_for _Contractors_and_Subcon tract
12-JUN-2025
Attachment 4 Att_04- Kpt_EV_Guide_for_Cont ractors_Jan_2025
12-JUN-2025
Attachment 5 Att_05- OPSEC_Guide_for_Defe nse_Contractors
12-JUN-2025
Attachment 6 Att_06- Schedule_of_Values
12-JUN-2025
Attachment 7 Att_07- Past_Performance_Refere nces
12-JUN-2025
Attachment 8 Att_08-Bid_Form 12-JUN-2025 Attachment 9 Att_09-PPI_Form 12-JUN-2025