C12_Att_10-Safety_Data_Sheet.docx
DOCX document 27 KB Posted
- Attached to
- Bldg 1003 UPS Head Unit Install Federal contract opportunity
- Solicitation number
- N0025325Q0014
About this file
The file is a Safety Data Sheet (SDS) for a federal contract opportunity related to electrical work at Naval Undersea Warfare Center Division (NUWC) Keyport. The document requires offerors to provide detailed safety information, including OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) rates and Total Recordable Case (TCR) rates for the past five calendar years. Contractors must explain any negative safety trends and provide a comprehensive safety narrative describing their Safety Management System, subcontractor selection process, and safety compliance oversight.
The associated federal contract opportunity involves removing and replacing two UPS power heads at Building 1003 in Keyport, WA. The solicitation (N0025325Q0014) is a 100% small business set-aside with an estimated value between $75,000 and $150,000. The target award date is August 11, 2025, and the contract will be a firm fixed-price construction type. The project falls under NAICS code 238210 for Electrical Contractors, with a small business size standard of $19.0 Million. The solicitation will be evaluated using Low Price Technically Acceptable factors, and an organized site visit is included in the requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C24_N0025325Q00140001.pdf | ||
| C12_Att_04-Kpt_EV_Guide_for_Contractors_Jan_2025.pdf | ||
| C11b_Att_02_WA20250109_20250606_Mod3.pdf | ||
| C12_Att_06-Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_11-OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_03-Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C11d_Att_07-Past_Performance_References.docx | DOCX document | |
| N0025325Q0014.pdf | ||
| C12_Att_09-PPI_Form.docx | DOCX document | |
| C12_Att_05-OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_01-Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_08-Bid_Form.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAFETY DATA SHEET
This form is to be completed by the offeror. Use this form to provide safety information for the Safety factor. DART and TRC rates shall not be submitted for subcontractors.
Joint Venture (JV) or Partnership: Provide a Safety Data Sheet for each contractor who is part of the JV or partnership; however, only one safety narrative is required.
1. Offeror Name:
Name of JV partner providing the information below (if applicable):
2. Insurance Carrier Information:
Insurance Carrier Name:
Agent’s name:
Phone No.:
Email:
Offeror’s Five Previous Complete Calendar Years of Reported Safety Data:
Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.
3. OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
| 2020 |
| 2021 |
| 2022 |
| 2023 |
| 2024 |
3a. If you do not have a DART Rate for a given year, affirmatively state so here and explain why:
3b. Explain any negative trend above moderate risk (DART Rates of 3.0 or greater), an acceptable/detailed explanation is required that includes any corrective actions taken for improvement:
4. Total Recordable Case (TCR) Rate
| 2020 |
| 2021 |
| 2022 |
| 2023 |
| 2024 |
4a. If you do not have a TCR Rate for a given year, affirmatively state so here and explain why:
4b. Explain any negative trend above moderate risk (TCR Rates of 4.5 or greater), an acceptable/detailed explanation is required that includes any corrective actions taken for improvement:
SAFETY DATA SHEET (Continuation)
5. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed 2 pages. Any additional pages will not be considered.
a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
b. Describe the evaluation process used to select potential subcontractors.
c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).