The provided file is a Bid Form for Solicitation Number N00253, related to a naval base project at Naval Base Kitsap in Keyport, WA. The bid form is a template designed for contractors to detail their pricing, labor, materials, and equipment costs for a specific project involving UPS power head installation. The template includes example rows demonstrating how to break down costs across different categories such as air handler installation, site mobilization, labor (HVAC technicians, electricians, general laborers), equipment rental, and miscellaneous materials.

The associated federal contract opportunity (Solicitation Number N0025325Q0014) is a small business set-aside project for the Naval Undersea Warfare Center Division (NUWC) Keyport. The scope involves removing two existing UPS power heads and replacing them with two new government-provided units, including electrical conduit and conductor modifications. The project is estimated to cost between $75,000 and $150,000, with a target award date of August 11, 2025. It will be awarded as a firm fixed-price construction contract using Low Price Technically Acceptable evaluation factors, targeting electrical contractors under NAICS code 238210.

View the file

Other files for this federal contract opportunity

Other files attached to Bldg 1003 UPS Head Unit Install, newest first.
File Type Posted
C24_N0025325Q00140001.pdf PDF
C12_Att_04-Kpt_EV_Guide_for_Contractors_Jan_2025.pdf PDF
C11b_Att_02_WA20250109_20250606_Mod3.pdf PDF
C12_Att_06-Schedule_of_Values.xlsx XLSX spreadsheet
C12_Att_11-OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf PDF
C12_Att_03-Safety_Requirements_for_Contractors_and_Subcontractors.pdf PDF
C11d_Att_07-Past_Performance_References.docx DOCX document
C12_Att_05-OPSEC_Guide_for_Defense_Contractors.pdf PDF
C12_Att_01-Material_Equipment_In_Place_List.xlsx XLSX spreadsheet
C12_Att_10-Safety_Data_Sheet.docx DOCX document
N0025325Q0014.pdf PDF
C12_Att_09-PPI_Form.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N00253<>Contractor:
PID Description:Date:
Project Location:Naval Base Kitsap, Keyport, WA
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
0
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount