C12_Att_08-Bid_Form.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Bldg 1003 UPS Head Unit Install Federal contract opportunity
- Solicitation number
- N0025325Q0014
About this file
The provided file is a Bid Form for Solicitation Number N00253, related to a naval base project at Naval Base Kitsap in Keyport, WA. The bid form is a template designed for contractors to detail their pricing, labor, materials, and equipment costs for a specific project involving UPS power head installation. The template includes example rows demonstrating how to break down costs across different categories such as air handler installation, site mobilization, labor (HVAC technicians, electricians, general laborers), equipment rental, and miscellaneous materials.
The associated federal contract opportunity (Solicitation Number N0025325Q0014) is a small business set-aside project for the Naval Undersea Warfare Center Division (NUWC) Keyport. The scope involves removing two existing UPS power heads and replacing them with two new government-provided units, including electrical conduit and conductor modifications. The project is estimated to cost between $75,000 and $150,000, with a target award date of August 11, 2025. It will be awarded as a firm fixed-price construction contract using Low Price Technically Acceptable evaluation factors, targeting electrical contractors under NAICS code 238210.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C24_N0025325Q00140001.pdf | ||
| C12_Att_04-Kpt_EV_Guide_for_Contractors_Jan_2025.pdf | ||
| C11b_Att_02_WA20250109_20250606_Mod3.pdf | ||
| C12_Att_06-Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_11-OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_03-Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C11d_Att_07-Past_Performance_References.docx | DOCX document | |
| C12_Att_05-OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_01-Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_10-Safety_Data_Sheet.docx | DOCX document | |
| N0025325Q0014.pdf | ||
| C12_Att_09-PPI_Form.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N00253<> | Contractor: | |
| PID Description: | Date: | ||
| Project Location: | Naval Base Kitsap, Keyport, WA | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 - Base Bid | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | |
| 0 | ||||||||
| ITEM | DESCRIPTION OF TASKS | |||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||
| B (example) | Site mobilization/demobilization | $0.00 | ||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | |||||||
| Subcontractor Performance Value | ||||||||
| Prime Contractor & Project Management Costs | ||||||||
| Subtotal | ||||||||
| General Home Office Overhead (%) | ||||||||
| General Field Overhead (%) | ||||||||
| General and Administrative (%) | ||||||||
| Profit (%) | ||||||||
| Bond | ||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount |