AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0005 is issued to provide Government response to contractor-submitted questions.
1. CONTRACT ID CODE PAGE OF PAGES
L 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00253-13-R-0013
X 9B. DATED (SEE ITEM 11)
19-Aug-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2013
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: KATIE HARRIGAN
KATHLEEN.HARRIGAN@NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00253-13-R-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005 Q&A
1. The following questions and responses are provided:
No. RFP
Section
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change
1 Section
L
2.3 105 1st paragraph on page
Duplicated information within a given factor may be included in full once and by reference thereafter, as long as there is a clear reference to the duplicated information. If the duplicated information is for different evaluation factors, it must be included in full text individually under each factor.
Since an IMS is required by requirements of Section L, Volume I, Section 1.0
Sample Task
1, 2, 3, and 4
(FACTOR 1,
SUB
FACTOR 1)
and Volume I
Section 2.0
Management and Control
(FACTOR 2,
SUB
FACTOR 2),
does the IMS have to be duplicated and be included in full text individually under each factor?
FACTOR 2,
SUB FACTOR 2
does not require an IMS.
FACTOR 2,
SUB FACTOR 2
requires a CWBS tied to the IMS, but not the IMS itself. The offeror shall provide one IMS for FACTOR 1.
No
2 Section
L
2.3 110 Table 2, Item 3
Offeror shall provide an
Integrated
Master
Schedule that includes the following items:
a. proposed design reviews, testing, deliveries of hardware, Although not one of the TIH
16/18 referenced documents, the
Department of
Defense
Integrated
Master Plan and Integrated
Master
Schedule
Preparation
The IMS is excluded from the Technical
Volume page count.
Yes; see below.
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change testing software, and documentation in accordance with SOW;
b. identification of the most critical schedule risk items, critical and key events for each
Sample Task;
c. identification of the “critical path” as determined by the Offeror;
d. identification of all assumptions and supporting information;
and
e. identification of resources required for tasks.
and Use Guide
(http://www.ac q.osd.mil/se/do cs/IMP_IMS_
Guide_v9.pdf ) states in part
“The initial
IMS will typically have four levels of indenture:
events, accomplishme nts, criteria, and tasks.” It also warns that requesting hardcopy formats as part of the proposal
“can easily drive page size and page count to an unwieldy level.” With the complexity of all five TIH
Sample Tasks, the IMS becomes rather large. Would the
Government consider having the
IMS as an attachment and not included in the Technical
Volume page count?
3 Section
L
2.3 109 Sample
Task 4
Tasking to support the production effort includes, but is not limited to, program and contract management, program reviews, participation on
The Statement of Work also details the scope of these efforts and others. Can the
Government provide further details and definition concerning
Please see
Section 1.3 of the SOW for the delineation of which CLINS are associated with each activity.
No http://www.acq.osd.mil/se/docs/IMP_IMS_Guide_v9.pdf http://www.acq.osd.mil/se/docs/IMP_IMS_Guide_v9.pdf http://www.acq.osd.mil/se/docs/IMP_IMS_Guide_v9.pdf http://www.acq.osd.mil/se/docs/IMP_IMS_Guide_v9.pdf
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change
Integrated
Product Teams, production planning, resolution of production problems, configuration control, change management, and quality assurance.”
these support activities by indicating which paragraphs in the SOW should be proposed FPI and which will become CPIF?
4 Section
L
2.1.1 105 Paper
Format nd paragraph th sentence
“Text within tables, diagrams, pictorial charts, or graphic material may use Times New
Roman 8-point font.”
To provide for clearer representation of details within the proposal, would the
Government consider allowing Arial
6-point font for tables, diagrams, pictorial charts, and graphic material?
The minimum font size for text within tables, diagrams, pictorial charts, or graphic material remains at Times New
Roman 8-point.
No
5 Section
B
21 HQ B-2-
Limitation of Cost or
Limitation of Funds
Language
The end of the clause has
“Error!
Bookmark not defined”.
Please confirm if the clause in its entirety is shown on page
21.
The error is a function of the contract writing software, and does not impact the content of the clause. HQ B-2-
0007 is shown in its entirety on page 21.
No
6 Section
J
75 HQ J-2-
Contract
Language for
Section J
The end of the clause has
“Error!
Bookmark not defined”.
Please confirm if the clause in its entirety is shown on page
75.
Clause HQ J-2-
0002 should read
"The following document(s), exhibit(s), and other attachment(s) form a part of this contract:"
before the table.
Yes, see below.
7 Section
L
2.2 (a) 107 Solicitatio n Package
Proposal
The offer shall consist of and must include
In which
Volume and section should
SF 33, RFP
Section K, and
RFP shall be
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change
Content the following:
- Standard
Form 33, “Solicitati on, Offer and Award
- RFP
Section K, “Represent ation, Certificati ons and
Other
Statements of Offerors
- RFP: The
Offeror must fill in all areas of the RFP listed as
Offeror fill-ins and provide any other informatio n or data required by the solicitation the Standard
Form 33, RFP
Section K, and
RFP fill-ins should be provided?
Does the
Government desire a stand-alone Contract volume to include the
Standard Form
33, Sections B
–J with all fill-ins completed, and RFP
Section K?
provided in the quantities listed on page 107 separately from
Volumes I through V.
8 Section
L
2.1.2
Electron ic Files
105 Electronic
Files
Electronic files shall only consist of the following extensions:
….doc for
Microsoft®
Word 2010™ files, ….xls for
Microsoft®
Excel 2010™ files
….ppt for
Microsoft®
PowerPoint
2010™ files
Microsoft
Office Suite
2010 uses
.docx extension; do we need to save files with a .doc extension to be read in
Microsoft
2003 or earlier versions?
As an example, when
Microsoft®
Word 2010™ files are saved with a .doc extension
(option says
Offerors may provide the files in 2010 .docx, .xlsx, and .pptx formats.
Yes, see below.
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change
"Save a copy of the document that is fully compatible with Word 97-
2003"), we experienced objects moving to a different position on the page, this may indicate other issues from
Word 2010 may surface when we save in compatibility mode.
9 Section
2.3 108 2 paragraph, th bullet and sub-bullets
SAMPLE
TASK 1,
sentence
The assumptions state in part:
“For the purpose of these sample tasks, the only critical milestones are:
award August
25th, 2014.
-16 overarching design process kickoff October
1st, 2014”
“Description shall include the necessary hours, and mix of personnel required for the first three (3) months of effort.”
There seems to be a discrepancy between the assumption provided and the requirement.
When would
Sample Task 1 start, at contract award or October 1 st
2014? If
Sample Task 1 starts on contract award, does the
Government also want all of the contract start up activities included in this Task, such as Post Award
Conference, Program
Reviews, Status reports, Assume that
Sample Task 1 starts at contract award. Note that
TI-16
overarching design process kickoff will still occur on October
1st, 2014.
The government cannot prescribe in the solicitation what other specific activities or reviews shall be addressed in the offeror’s response. This information speaks to the offeror’s approach and understanding of the solicitation requirements and is part of the
Government’s technical evaluation of the
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change etc.?
Does the
Government have any additional milestones
(SFR,PDR,
etc.) or assumptions that should be included as critical milestones?
offeror’s response.
10 Section
J
2.3
Attach ment
12-A
110 Table 2, Item 3
Cost
Summary per
Contract
Year
“The Offeror shall provide a
Basis of
Estimate (BOE) for labor associated with each sample task reflecting level of effort and the basis for the estimates.”
Only refers to
Labor and not any other categories of costs, such as material.
If direct costs other than labor (travel, material, etc.)
are anticipated by the Offeror for any of the
Sample Tasks, where should those cost estimates be identified?
A BOE is only required for labor associated with the Sample
Tasks.
To address direct costs other than labor when responding to the
Sample Tasks, the offeror may add lines for those costs to
Attachments
12A and 12B, as necessary, and discuss rationale for those costs within its cost proposal.
No
11 Section
J
Attach ment 8
2.3
Combat
Control and Sonar
Sample
Task Rack
Stack
Ups.pdf
Sample
Task 5
“For the purposes of this sample task, the
Government will order the units in 2 lots of
50 each
ECDWS kits, 50 each SECD units, . . . . “
This attachment identifies two(2) configurations of ECDWS and two(2) configurations for the SECD.
The Sample
Task description doesn’t delineate which of these configurations are going to be ordered or if a
For purposes of the Sample Task, 100% of the
TI10 ECDWS
V11 units/kits required will be upgraded to TIH
ECDWS Vxx and 100% of the
TI10 SECD
Sonar 1 units/kits required will be upgraded to TIH
SECD Sonar 1.
Offerors may disregard the
TIH ECDWS
Vyy configuration
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change portion of the order will be split between the two(2) configurations.
Can the
Government please clarify their intentions?
shown on slide 3 and the TIH
SECD Sonar 2 configuration shown on slide 4.
2. Section L, Section 2.2.1, final paragraph is revised from:
The page count shall include all material with printed matter and figures except (i) title pages, (ii) table of contents,
(iii) lists of figures, (iv) list of tables, (v) list of appendices, (vi) glossary of abbreviations and acronyms, (vii) lists of
Government Furnished Information/Property/Material provided in Attachments 4/5/6, (viii) Offeror’s cross-referenced matrix to Annex I, and (ix) index pages and tabs. Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked "Intentionally Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC. Every page, except those marked as blank, will be numbered.
Pages exceeding the page count shall be removed from the end of the volume that exceeds the page count and will not be evaluated.
To:
The page count shall include all material with printed matter and figures except (i) title pages, (ii) table of contents,
(iii) lists of figures, (iv) list of tables, (v) list of appendices, (vi) glossary of abbreviations and acronyms, (vii) lists of
Government Furnished Information/Property/Material provided in Attachments 4/5/6, (viii) Offeror’s cross-referenced matrix to Annex I, (ix) Integrated Master Schedule (IMS), and (x) index pages and tabs. Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked "Intentionally
Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC. Every page, except those marked as blank, will be numbered. Pages exceeding the page count shall be removed from the end of the volume that exceeds the page count and will not be evaluated.
3. Section L, Section 2.1.2, electronic file extensions are revised as follows:
….doc and/or ….docx for Microsoft® Word 2010™ files, ….xls and/or ….xlsx for Microsoft® Excel 2010™ files
….ppt and/or ….pptx for Microsoft® PowerPoint 2010™ files
….mpp for Microsoft® Project 2007™ files
4. Clause HQ J-2-0002, the following statement is inserted prior to the table: The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
(End of Summary of Changes)