N00253-13-R-0013_Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to TECHNOLOGY INSERTION HARDWARE (TIH 16/18), newest first.
File Type Posted
N00253-13-R-0013-0005.pdf PDF
N00253-13-R-0013-0003.pdf PDF
N00253-13-R-0013-0002.pdf PDF
N00253-13-R-0013-0001.pdf PDF
Section_J_-_Attachment_3_-_Clause_Applicability_Matrix_FINAL.doc DOC document
N00253-13-R-0013_RFP_FINAL.pdf PDF
Section_J_-_Attachment_4_-_Government_Furnished_Information_NAVSEA_Form_4340-2.doc DOC document
Section_J_-_Attachment_6_-_Government_Furnished_Material_NAVSEA_Form_4205-19.doc DOC document
Section_J_-_Attachment_2_-_DD254.pdf PDF
N00253-13-R-0013_RFP.pdf PDF
Section_J_-_Attachment_5_-_Government_Furnished_Property_NAVSEA_Form_4205-19.doc DOC document
Section_J_-_Attachment_12A_B_Cost_Summary_Per_Contract_Year.xls XLS spreadsheet
Section_J_-_Attachment_1_TIH_Statement_of_Work_20130819.doc DOC document
Section_J_-_Attachment_10_Industry_Question_-_Government_Response_Form.doc DOC document
Section_J_-_Attachment_3_-_Clause_Applicability_Matrix.doc DOC document
Section_J_-_Attachment_14A_B_C_Contract_Totals_Tables.xls XLS spreadsheet
Section_J_Attachment_9_SUBCONTRACTING_PLAN_COVER_SHEET.docx DOCX document
Exhibit_A_Contract_Data_Requirements_List_-_DD_Form_1423.doc DOC document
Section_J-_Attachment_11_Labor_Hour_Breakdown.xls XLS spreadsheet
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0004 is issued to provide Government response to contractor-submitted questions.

1. CONTRACT ID CODE PAGE OF PAGES

L 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00253-13-R-0013

X 9B. DATED (SEE ITEM 11)

19-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2013

CODE

NAVAL UNDERSEA WARFARE CENTER

ATTN: KATIE HARRIGAN

KATHLEEN.HARRIGAN@NAVY.MIL

610 DOWELL STREET, BLDG 206

KEYPORT WA 98345

N00253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00253-13-R-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004 Q&A

1. The following questions and responses are provided:

No. RFP

Section

Sub-

Section

Page Title Requirements

Description

Comment/ Question Government

Response

RFP

Change

1 Section

L

2.3 110 IMS

Requir ements

Table 2 IMS requirement Row

3.e states

“identification of resources for tasks”.

Collectively, the

IMS and associated documents

(BOEs, CWBS, and Attachment

11 Labor Hour

Breakdown) accurately summarize all of the resources and effort required for every task and proposed activity.

As an alternative to full resource and labor code loading of the

IMS, can the resource requirements of the IMS be satisfied by referencing

/correlating the

IMS to the

BOEs, CWBS, and the

Attachment 11

Labor Hour

Breakdown that are specified in the preceding

Paragraph (Row

2) of the RFP?

The resource requirement s of the IMS can be satisfied by referencing/ correlating the IMS to the BOEs, CWBS, and the

Attachment

11 Labor

Hour

Breakdown.

No

2 Section

L

2.3 110 BOE

Requir ements

The RFP states

“The BOE is not part of the

Volume I page count; however, the BOEs shall not exceed 100 pages for all

Sample Tasks combined.”

Please confirm this means the offeror should provide BOEs for Sample Tasks

(CLINs 1000 &

1002), not to exceed 100 pages in total.

A BOE is required in response to all five

Sample

Tasks. The

BOE page count has been revised from 100 to

150 pages.

This page limit encompasse s the combined response to all five

Sample

Yes, see below.

Sub-

Section

Page Title Requirements

Description

Comment/ Question Government

Response

RFP

Change

Tasks.

3 Section

L

2.3 110 BOE

Requir ements

The RFP states

“The BOE is not part of the

Volume I page count; however, the BOEs shall not exceed 100 pages for all

Sample Tasks combined.”

Please confirm the offeror should not provide BOEs for any CLINs other than 1000 &

1002.

The BOE submittal requirement applies to the Sample

Tasks, not the CLINs.

However, CLINs 1000 and 1002 are the only

CLINs associated with the sample task that include labor. Thus, it is reasonable that the

BOEs will focus on these

CLINs.

Yes, see below.

4 Section

L

2.0

Table

104 BOE

Requir ements

BOEs are limited to 100 pages in total.

The Offeror recommends changing the

BOE page limit from 100 to 150 in order to ensure all content requirements are addressed within the BOEs.

The BOE page limit is revised from

100 to 150 pages.

Yes, see below.

5 Section

J

Attach ment 1 -

SOW

3.3.4.4

.4

36 System

Confid ence

Test

TIH (16/18)

component system level tests shall include a

72-hour confidence test period; with the last 24 hours being fault free.

Confidence test shall be completed prior to the performance of

FAT (CDRL

A024 - Test

Procedure;

The term

“component system level tests” is ambiguous. Is the 72-hour confidence test required for all components in each production kit, unit and spare?

In this instance, “TIH 16/18 component system” means a production kit, production unit, and/or spares delivered as part of TI-16 or TI-18.

The 72-hour confidence test

No

Sub-

Section

Page Title Requirements

Description

Comment/ Question Government

Response

RFP

Change

CDRL A025 -

Test/Inspection

Report).

mentioned in SOW paragraph

3.3.4.4.4 is applicable to these production kits, units, and spares.

There is no

72-hour confidence test required for the individual component parts of the production kits, units, and spares.

6 Section

I

52.217

-9 (a)

68 Option

To

Extend

The

Term of the

Contra ct (Mar

2000)

(NAV

SEA

Variati on)

(Sep

2009)

For Items 2000-

2011, the “Latest

Option Exercise

Date” is specified as 731 days after contract award.

Please provide the “Earliest

Option Exercise

Date”.

The earliest

Option

Exercise is date of contract award.

However, as the Navy schedule for

TI-18 does not kick-off until FY17, it is unlikely that the option would be exercise too far in advance of

TI-18 kick-off.

No

7 Section

B

NOTE

19 Minim um guaran tee

Solicitation states “The minimum guarantee for the resulting contract is

$1,000,000.00.”

This number was modified by RFP

Amendment 3 to read $350,000.

This provision conflicts with

Section B, 52.216-19 (page

67) in which a minimum order is specified at

$10,000.

The minimum guarantee represents the minimum amount that the government would pay under the resulting

Sub-

Section

Page Title Requirements

Description

Comment/ Question Government

Response

RFP

Change

IDIQ

contract; in this case, $350,000.

52.216-19 sets forth individual delivery/task order limitations;

in this case, the

Government is not obligated to purchase, nor is the

Contractor obligated to furnish, supplies or services under the contract when the value of the order is less than

$10,000.

The minimum guarantee is at the total contract level, while

52.216-19 addresses minimum and maximum order limitations.

The provisions do not conflict.

8 Section

L

Annex

114 Key

Person nel

Job Descriptions The scope of some job descriptions encompasses more than the title represents.

a) Is it the intent

a) There is no limit on the number of key personnel an offeror proposes.

Sub-

Section

Page Title Requirements

Description

Comment/ Question Government

Response

RFP

Change of the

Government to limit the number of Key

Personnel an offeror proposes?

b) Further, is it the intent of the

Governnment that the offeror add Key

Personnel to fulfill all of the attributes of the

Job Descriptions provided in alignment with their organizational structure?

At a minimum, the offeror must identify the program manager, chief engineer, contracts manager, production manager, and manufacturi ng engineer or their equivalents as key.

b) The positions an offeror identifies as key must cover at a minimum all attributes of the job descriptions in Annex I for program manager, chief engineer, contracts manager, production manager, and manufacturi ng engineer.

2. Section L, Section 2.0, Table 1 is revised to change the page limit for Volume I – BOE, from 100 pages to 150 pages.

3. Section L, Section 2.0, Table 1 is revised to change the number of CD-ROM copies for all volumes from 2 to 3.

4. Section L, Section 2.3, Table 2, Item 2 is revised to change the BOE page limit from 100 pages to 150 pages.

(End of Summary of Changes)