AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 is issued to provide Government response to contractor-submitted questions.
1. CONTRACT ID CODE PAGE OF PAGES
L 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Sep-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00253-13-R-0013
X 9B. DATED (SEE ITEM 11)
19-Aug-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Sep-2013
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: KATIE HARRIGAN
KATHLEEN.HARRIGAN@NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00253-13-R-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003 Q&A
1. The following questions and responses are provided:
No. RFP
Section or Att
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change
1 Section
L
2.3 111 Volume I
Technical, Table 2, Item 5
Provide a list of all
Government
Furnished
Information, Property, and
Material requirements deemed necessary to accomplish the requirements of the resultant contract using Attachments
4, 5, and 6 respectively.
When, and if approved following contract award, these listings will ultimately serve as attachments in the resultant contract.
We recommend that
Attachments 4, 5, and 6 be excluded from the page count
Attachments 4, 5, and 6 are excluded from the page count.
Yes, see below.
2 Section
L
2.4. c 113 Volume II
Managem ent, Item c
If the Offeror’s titles and job descriptions differ from Annex I, Standardized Labor
Category
Descriptions List, the Offeror shall provide the company’s equivalent titles and description in a cross-referenced matrix.
Given that
Annex I
Standardized
Labor
Category
Descriptions
List is 11 pages, we estimate that this cross reference matrix will easily take up a minimum of
20 pages of the
35 page limit
The cross-referenced matrix of an offeror’s equivalent titles and job descriptions corresponding to
Annex I will be excluded from the page count.
Yes, see below.
or Att
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change for Volume II.
As such, we request that the required cross-reference matrix be excluded from the page count.
3 Section
L
2.1.1 105 Paper
Format
Index pages and
Tabs are required and shall be cross-referenced to the
TOC.
Please verify that the Index pages and tabs are excluded from the page count.
The Index pages and tabs are excluded from the page count.
Yes, see below.
4 Section
L
2.7 127 VOLUME
V – COST
PROPOS
AL
For informational purposes only, the
Offeror shall provide in list format the “Price
Group” and
“Estimated Total
Price” information contained on the
Offeror’s submission of
Exhibit A, Contract
Data Requirements
List for CLIN
1006.
Section B, CLN 1006, pg
8 says Data
Items are not separately priced. Section
B, Note 5, pg
19 says the
Offeror shall complete the
“Estimated
Total Price” block of each data item on the Contract
Data
Requirements
List(s), attached as
Exhibit A hereto.
Also, pg 127 says to provide the “Price
Group” and
“Estimated
Total Price” information in list format, while pg 8 implies that all of Exhibit A needs to be submitted, with the
“Estimated
Total Price” block of each
Section B is correct in that
Data Items are not separately priced.
However, as specified on pages 19 and
127, offerors are required to provide the estimated price for informational purposes only.
The estimated price must be provided in
Exhibit A and in list format.
No or Att
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change data item on the Contract
Data
Requirements
List(s) completed.
Please clarify which instructions are correct--the instructions on page 8, 19, or
127.
5 Section
M
3.2 147 Evaluatio n
Methodol ogy
Step 5 of Table 5 says, “Proposed or
Government
Estimated Cost of
ICP, TD, CS,
CSD” and “Cost of
ICP, TD, CS,
CSD”.
In Table 2, (Section L, pg
111), “ICP”
is cited in Item
(Background
Inventions and
Licensing) rather than in
Item 9
[restrictions on
Technical Data
(TD),
Computer
Software (CS), and Computer
Software
Documentatio n (CSD)].
In Table 5 on page 147, should ICP be in Step 6 rather than in
Step 5?
If not, please explain its context in Step
5.
The costs of the items themselves are to be included in Step
5 of Table 5.
The costs of licenses related to the items are to be included in
Step 6 of Table
5.
No
6 Section
L
1.0 102 General The TDP posted on
E-TIC does not contain individual part drawings for the COTS components in an upgrade kit (e.g., drawing numbers
We request that complete drawing package be provided.
79C drawings associated with modified COTS will be posted by
11 September
2013. The other
79C drawings are publicly or Att
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change starting with
“79C”). The features and configurations for these COTS items are needed to estimate the scope of updating them for TI-16.
available and will not be provided on E-
TIC.
Note that complete TDPs associated with the sample tasks were provided on
19 August via E-
TIC. Other technical data
(e.g. the 79C drawings) are considered ancillary material and not part of the TDP.
7 Section
I
56 &
Clauses
Incorporat ed By
Reference
52.227-10
Filing Of Patent
Applications--
Classified Subject
Matter
DEC 2007
and
252.227-7039
Patents--Reporting
Of Subject
Inventions
APR 1990
Section I of the solicitation includes
52.227-10
(Filing Of
Patent
Applications--
Classified
Subject
Matter), and
DFARS
252.227-7039
(Patents--
Reporting Of
Subject
Inventions).
However, FAR
52.227-11
(Patent Rights:
Ownership by the Contractor) is not in the solicitation.
We believe it should be added because the effort contains development.
In accordance with DFARS
227.303, DFARS
252.227-7038 shall be used instead of FAR
52.227-11.
DFARS
252.227-7038 is included in the solicitation by reference.
No
8 Att J 3.3.1.6 31 Technical
Data
Package
The TDP shall contain all data
(commercial drawings, product drawings, and
As part of this contract will the native 3D
CAD files be provided?
The task orders issued under this contract will specify the file types required or Att
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change interface control drawings), specifications, and supplementary information (index files) necessary and sufficient for a third party to manufacture and provide life cycle support for TIH
(16/18) configurations developed and qualified under this contract.
for the TDP.
Depending on funding availability, the file type may or may not be 3D
CAD files.
9 Att J 3.3.1.6 31 Technical
Data
Package
The Contractor shall provide developmental design/engineering drawings and associated lists in accordance with
American Society of Mechanical
Engineers (ASME)
Y14.100 and governing CDRL to support the
Preliminary Design
Review (PDR) and
Critical Design
Review (CDR).
ASME-
Y14.41 Digital
Product
Definition
Data Practices is contained in
ASME
Y14.100 2013.
Is it acceptable to use the
Model and
Drawing in accordance with section
3.3.2 of ASME
Y14.41 where the annotation may be applied to the model, or on the drawing or a combination thereof.
Yes, it is acceptable to use the Model and
Drawing in accordance with section 3.3.2 of
ASME Y14.41
where the annotation may be applied to the model, or on the drawing, or a combination thereof.
No
10 Att J 3.3.1.6 31 Technical
Data
Package
The TDP shall contain all data
(commercial drawings, product drawings, and interface control drawings), specifications, and supplementary information (index files) necessary and sufficient for a third party to
How will the
Design
Activity responsibilities be contractually transferred from the current incumbent to another contractor in order to make
The vehicle for assigning Design
Activity responsibilities for TI-16 and TI-
18 drawings is the signed contract. All new or modified drawings in the
TI-16 and TI-18 packages will be the responsibility or Att
Sub-
Section
Page Title Requirements
Description
Comment/
Question
Government
Response
RFP
Change manufacture and provide life cycle support for TIH
(16/18) configurations developed and qualified under this contract. The incumbent Design
Activity on the drawing name and cage code is responsible for the design. The drawings include a note stating “CAD maintained changes shall be incorporated by the design activity”.
TIH (16/18)
drawing updates, and what assumptions should an
Offeror make in their proposal about this transfer?
Reference
ASME
Y14.35M paragraph 3.7.
of the Design
Activity.
Please assume that a TDP in a form similar to that provided for the sample tasks will be provided upon issuance of the relevant task order.
2. Section L, Section 2.2.1, final paragraph is revised from:
The page count shall include all material with printed matter and figures except (i) title pages, (ii) table of contents,
(iii) lists of figures, (iv) list of tables, (v) list of appendices, and (vi) glossary of abbreviations and acronyms. Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked
"Intentionally Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC. Every page, except those marked as blank, will be numbered. Pages exceeding the page count shall be removed from the end of the volume that exceeds the page count and will not be evaluated.
To:
The page count shall include all material with printed matter and figures except (i) title pages, (ii) table of contents,
(iii) lists of figures, (iv) list of tables, (v) list of appendices, (vi) glossary of abbreviations and acronyms, (vii) lists of
Government Furnished Information/Property/Material provided in Attachments 4/5/6, (viii) Offeror’s cross-referenced matrix to Annex I, and (ix) index pages and tabs. Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked "Intentionally Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC. Every page, except those marked as blank, will be numbered.
Pages exceeding the page count shall be removed from the end of the volume that exceeds the page count and will not be evaluated.
3. Section B Notes, Note 1, is revised to reduce the minimum guarantee for the resulting contract from $1,000,000 to $350,000
(End of Summary of Changes)