4.06 Solicitation Amendment N0018926QL4110002 SF 30.pdf

PDF 551 KB Posted

Attached to
Remediation and Specialty Cleaning Services
Solicitation number
N0018926QL411
Issued by

About this file

This is a Standard Form 30 Amendment to a solicitation for above-ceiling remediation, specialty cleaning, and HVAC air system cleaning services at Naval Station Norfolk, Virginia. Amendment 0002, effective 18 September 2026, revises the Performance Work Statement (PWS) REV1.6 and incorporates Q&As and drawings as attachments.

The contract covers two distinct facilities requiring specialized biohazard remediation and mechanical cleaning services. Task 1 addresses Building R-50 (Strike Group Oceanography Team Norfolk), a two-story, 13,000-square-foot administrative building requiring above-ceiling remediation including rodent contamination cleanup, loose paint mitigation, HEPA vacuuming, sanitization, and ceiling tile assessment/replacement. Task 2 addresses Building U-117 (Fleet Weather Center Norfolk), a single-story, 30,000-square-foot facility requiring targeted above-ceiling biohazard extraction in identified rooms and comprehensive HVAC air system cleaning and sanitization of two primary air handling units, approximately 45 variable air volume boxes, 10 secondary air handling units, 4 return air fans, bathroom exhaust systems, and all associated ductwork in accordance with NADCA standards. Work shall be performed as a non-personal services, one-time project during standard government working hours (Monday–Friday, 0700–1630) or weekend alternative schedules (Friday 1400/1600 hours to Sunday 2200 hours) as coordinated with the technical point of contact. The contractor must provide all personnel, PPE (including NIOSH N95 or P100 respirators), specialized equipment, HEPA-certified vacuums, negative pressure machines, containment materials, EPA-registered disinfectants, and waste disposal services. Compliance is required with OSHA, CDC, EPA, DoD/Navy, and NADCA standards, with stringent containment engineering controls, biological pathogen handling protocols, and comprehensive performance requirements surveillance outlined in the PRS table, including 100% compliance verification for containment integrity, biohazard remediation, waste management, base security protocols, and post-project cleanliness standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

List of Contract Documents, Exhibits, or Attachments

Miscellaneous text in this section has been modified to:

Performance Work Statement (PWS) REV1.6

Above-Ceiling Remediation, Specialty Cleaning, and HVAC Air System Cleaning Services Locations:

Strike Group Oceanography Team Norfolk (SGOT-N), Building R-50, Naval Station Norfolk

Fleet Weather Center (FWC) Norfolk, Building U-117, Naval Station Norfolk

1. General Information

1.1 Background and Objective

The Department of the Navy requires professional, specialized biohazard remediation, specialty cleaning, and mechanical HVAC air system cleaning services across two separate facilities at Naval Station Norfolk, Virginia: Building R-50 and Building U-117.

Building R-50 (SGOT-N): This facility is a two-story administrative and logistics support building measuring approximately 13,000 square feet in footprint (over two floors). The area above the drop-ceiling grid has accumulated general dirt, flaking paint from structural components, and biological contamination consisting of rodent (rat) feces, urine, and nesting materials.

Building U-117 (FWC-N): This facility is a single-story administrative and operational support building measuring approximately 30,000 square feet. The area above the drop-ceiling grid has accumulated general dirt and biological contamination consisting of rodent (rat/pest) feces, urine, and nesting materials. A Navy Environmental and Preventive Medicine Unit TWO (NEPMU-2) Technical Assist Visit (TAV) conducted on June 25, 2026, confirmed these biological hazards above the drop-ceiling grid in several administrative offices and hallways. This contract ensures the thorough extraction of biological contaminants, sanitization of above-ceiling spaces, and professional mechanical cleaning and disinfection of the building's air distribution and ventilation equipment.

The objective is to restore a safe, sanitary, and healthy working environment that protects active duty, civilian, and contractor personnel in compliance with Department of Defense (DoD), Department of the Navy (DoN), OSHA, and CDC standards. All work shall comply with DoD, DoN, OSHA, CDC, and EPA standards.

1.2 Scope of Work

The Contractor shall provide all management, supervision, labor, licensed/certified personnel, specialized equipment (including high-powered and certified HEPA-filtered vacuums, negative pressure machines, containment systems, and mechanical duct cleaning tools), Personal Protective Equipment (PPE), sanitizing and antimicrobial agents, tools, containment materials, waste disposal, and transportation necessary to execute this project. The procurement is structured into two distinct task areas based on facility requirements:

Task 1: Building R-50 (SGOT-N) Above-Ceiling Remediation & Specialty Cleaning

Physical containment and HVAC isolation.

Extraction and disposal of rodent droppings, nesting materials, and associated biological contaminants.

Removal and HEPA capture of loose, flaking paint from structural members and decking.

HEPA vacuuming, sanitization, and ceiling tile assessment/replacement.

Ceiling tile assessment

Task 2: Building U-117 (FWC-N) HVAC Air System Cleaning

Physical containment and HVAC isolation.

Targeted above-ceiling biohazard extraction in identified rooms/hallways.

N0018926QL4110002

Inspection and photographic documentation of structural penetrations for pest exclusion.

Comprehensive mechanical cleaning and sanitization of the building's entire air distribution network in accordance with NADCA standards.

1.3 Period of Performance (PoP)

The work shall be performed as a non-personal services, one-time project. Each building has a designated performance window:

Building R-50 (SGOT-N): The Period of Performance shall be IAW designated CLIN.

Building U-117 (FWC-N): The Period of Performance shall be IAW designated CLIN.

1.4 Hours of Operation and Scheduling Protocols

Standard Work Hours Preference and Local Command Coordination: Performing work during standard Government working hours (Monday through Friday, 0700 to 1630 hours) is both permitted and preferred. The Contractor shall closely coordinate all weekday work schedules, phasing plans, and access requirements with the technical point of contact (TPOC), Facility Managers, and local command leadership (SGOT-N and FWC-N) to ensure active military operations, watch standing, and administrative functions are minimally disrupted.

Sealed Containment Protocols for Weekday Work: Due to the hazardous nature of biological agents (Hantavirus, rodent urine/feces), flaking lead-safe paint chips, and airborne particulates, working during normal business hours requires that all necessary technical steps are rigorously executed to isolate the active work areas:

The Contractor shall establish fully sealed, negative-pressure containment zones (utilizing minimum 6-mil poly sheeting and critical barriers) prior to disturbing any building components or ceiling grid elements.

All air handling equipment servicing the active zone shall be locked out and isolated to prevent cross-contamination to occupied spaces.

Stringent containment integrity must be maintained not only during active biohazard extraction and duct cleaning, but also throughout the entire demobilization, bag-out, and waste load-out process. Removal of containment sheeting, biohazard waste bags, HEPA equipment, and accumulated dust must be carried out in sealed transition chambers or double-bagged transit routes to guarantee zero contaminant release into corridors, adjacent occupied offices, or HVAC supply paths.

Alternative Weekend Schedule: In the event that weekday work is determined by the Government or Contractor to be non-feasible, unsustainable, or causes unacceptable disruption to mission-critical operations, an alternative weekend execution schedule is fully authorized and acceptable. Weekend shift windows shall be coordinated and approved by the TPOC and Facility Manager as follows:

Building R-50 (SGOT-N): Friday 1400 hours to Sunday 2200 hours.

Building U-117 (FWC-N): Friday 1600 hours to Sunday 2200 hours.

Turnover Requirements: Regardless of whether work is executed during standard working hours or weekend shifts, the Contractor shall ensure that all active workspaces are fully de-contained, cleaned, sanitized, and cleared for occupancy prior to the start of normal business activities each workday morning.

1.5 Recognized Federal Holidays

The Contractor is not required to perform services on Federal Holidays unless designated otherwise by the Contracting Officer (KO). The following holidays are observed:

New Year's Day

Martin Luther King Jr.'s Birthday

Washington's Birthday

Memorial Day

Juneteenth National Independence Day

Independence Day

Labor Day

Columbus Day

Veterans Day

Thanksgiving Day

Christmas Day

2. Specific Tasks and Technical Requirements

2.1 Task 1: Building R-50 (SGOT-N) Above-Ceiling Remediation & Specialty Cleaning

The Contractor shall execute the following phases of work systematically across both floors of Building R-50 (Refer to Section 7 for facility layout and ceiling grid drawings):

Phase 1: Site Preparation and Containment

Containment Barriers: Before disturbing any ceiling tiles, the Contractor shall establish physical plastic sheeting (minimum 6-mil poly) containment barriers, drop cloths, and negative-pressure enclosures to prevent dust, paint chips, and biohazardous particulates from migrating into the occupied space below.

HVAC Isolation: The Contractor shall coordinate with the Technical Point of Contact (TPOC) and the Facility Manager to isolate and shut down HVAC systems serving Building R-50 during active remediation to prevent cross-contamination.

Furniture Protection: The Contractor shall cover all stationary office furniture, electronics, and carpeting directly beneath the work zones with protective plastic sheeting.

Phase 2: Rodent Contamination Remediation (Biohazard Cleanup)

The Contractor must follow CDC, OSHA, and Navy Bureau of Medicine (BUMED) guidelines for cleaning rodent contamination:

Pre-Treatment/Misting: To prevent the aerosolization of pathogens (including Hantavirus), the Contractor shall not sweep or dry-vacuum droppings initially. The Contractor shall apply an EPA-registered disinfectant/sterilant labeled for biohazard remediation to wet the materials before extraction.

Extraction: The Contractor shall manually scoop and bag wetted feces, nesting materials, and organic debris into heavy-duty biohazard disposal bags.

HEPA Vacuuming: Once primary biohazards are removed, certified HEPA-filtered vacuums must be utilized to clean fine residues and dust.

Phase 3: Loose Paint Mitigation

Scraping: The Contractor shall carefully scrape loose, peeling, and flaking paint from structural beams, decking, joists, or pipes above the ceiling grid.

Lead-Safe Standards: Because Building R-50 is an established military structure and may contain legacy lead-based paint, all paint scraping, containment, and cleanup must be executed in accordance with EPA Lead-Safe Certification standards and OSHA Lead in Construction Standard

(29 CFR 1926.62).

Capture: All scraped paint chips must be collected immediately via HEPA vacuuming. No paint debris is permitted to remain on top of ceiling tiles or within the grid framework.

Phase 4: General Dirt Removal & Disinfection

Detail Cleaning: The Contractor shall wipe down structural members, conduits, pipes, and ductwork exteriors to remove accumulated general dirt and soot.

Sanitization: The Contractor shall apply an EPA-registered disinfectant/sanitizer to all surfaces that showed evidence of rodent activity.

Ceiling Tile Assessment: Contaminated porous ceiling tiles (water-damaged, heavily soiled with rodent waste, or physically broken) shall be removed, bagged, and disposed of by the Contractor. Non-contaminated tiles shall be carefully wiped down and reinstalled. The Government will not supply replacement ceiling tiles; any damaged tiles requiring replacement shall be provided by the Contractor matching existing specifications.

Phase 5: Post-Remediation Clean & Demobilization

Airborne Settling: The Contractor shall allow sufficient time for airborne dust to settle before removing containment barriers.

Occupied Space Post-Clean: After dismantling containment, the Contractor shall HEPA-vacuum and wipe down immediate surfaces directly beneath work zones (desks, floors) to guarantee no residual dust or paint chips remain in user workspaces.

Waste Disposal: The Contractor shall securely double-bag, label, and manifest all biohazardous and paint debris. The Contractor shall transport and dispose of all waste off-site in accordance with local, state, federal, and Navy Environmental Protection program guidelines.

2.2 Task 2: Building U-117 (FWC-N) Above-Ceiling Rodent Remediation and HVAC Air System Cleaning

The Contractor shall execute the following phases of work systematically across the designated spaces of Building U-117 (Refer to Section 7 for facility room layout drawing):

Phase 1: Site Preparation, Containment, and HVAC Isolation

Containment Barriers: Prior to disturbing any ceiling tiles, the Contractor shall establish localized physical plastic sheeting (minimum 6-mil poly) containment barriers, drop cloths, and negative-pressure enclosures. These barriers must isolate the work zones to prevent dust, mold spores, and biohazardous particulates from migrating into adjacent occupied office spaces or hallways.

HVAC Isolation: The Contractor shall coordinate with the TPOC and the Facility Manager to isolate and temporarily shut down local HVAC air handling units serving active work areas to prevent the spread of airborne contaminants during disturbance.

Furniture and Equipment Protection: The Contractor shall completely cover all stationary office furniture, IT equipment, desktop electronics, and carpeting directly beneath the work zones with protective plastic sheeting.

Phase 2: Above-Ceiling Rodent Contamination Remediation (Biohazard Cleanup)

The Contractor shall perform targeted biological remediation in the above-ceiling spaces of specific rooms and hallways identified with rodent activity during the NEPMU-2 inspection.

Target Areas (Reference Drawing BLDG U-117 Room Layout):

Conference Room

Executive Officer's (XO) Office

Command Master Chief's (CMC) Office

N5 Back Office

Room 135A

N7 Hallway

Room 120 and adjacent main hallway

General administrative ceiling crawl spaces/plenums associated with these areas

Execution Steps:

Pre-Treatment / Misting: To prevent aerosolization of dangerous pathogens (including Hantavirus and other rodent-borne diseases), the Contractor shall not sweep or dry-vacuum droppings initially. The Contractor shall apply a fine mist of an EPA-registered disinfectant /sterilant labeled specifically for biohazard and rodent remediation to thoroughly wet all feces, nesting materials, and organic debris prior to handling.

Extraction: Once wetted, the Contractor shall manually extract and place feces, nesting materials, and contaminated materials into heavy-duty biohazard disposal bags.

HEPA Vacuuming: Following manual extraction, the Contractor shall utilize certified HEPA-filtered vacuums to clean fine dust, dander, and residual particulate matter from the upper surface of ceiling tiles (where reusable), structural framing, conduits, and piping.

Exclusion Inspection and Reporting: During above-ceiling operations, the Contractor shall inspect the interstitial space and exterior-facing boundary walls for structural penetrations, gaps, or holes (including the western exterior wall and interior baseboard penetrations highlighted in the TAV memo). The Contractor shall document these entry points with photographs and provide a written report to the TPOC within forty-eight (48) hours of discovery to facilitate government coordination with NAVFAC for sealing and exclusion.

Phase 3: HVAC Air System and Specialty Components Cleaning

The Contractor shall perform a complete, comprehensive cleaning and sanitization of the building's air distribution system and mechanical components in strict accordance with the National Air Duct Cleaners Association (NADCA) Assessment, Cleaning, and Restoration (ACR) Standard.

Items to be Cleaned (Equipment Inventory):

Two (2) Primary Air Handling Units (AHUs): Clean the interior of two (2) primary AHUs and all associated internal components, consisting of fans, blower assemblies, evaporator coils, mixing boxes, filter racks, condensate drain pans, drain lines, panels, and dampers.

Evaporator Coils: Coils within each of the two (2) AHUs shall be cleaned with an approved non-acidic coil cleaner and thoroughly rinsed free of any chemical residue.

Acoustic Lined Surfaces: Any internally lined surfaces within the AHUs shall be contact vacuumed using a HEPA-filtered vacuum and specialized brush attachments to prevent damage to the lining material.

Intake Grilles, Supply Registers, and Diffusers: Completely clean and sanitize all intake grilles, supply registers, and air diffusers throughout the facility.

Ductwork Systems: Clean all Outside Air (OA) ductwork, Supply Air ductwork, and Return Air ductwork. (Note: The Open Plenum Ceiling area itself will NOT be cleaned under this contract; cleaning is strictly limited to the interior of the duct systems.)

Approximately Forty-Five (45) Variable Air Volume (VAV) Boxes: Clean the interiors, dampers, and controls of all forty-five (45) VAV boxes.

Ten (10) Other Air Handling Units and Heat Pumps: Comprehensive mechanical cleaning of ten (10) secondary AHUs and heat pump units.

Four (4) Return Air Fans: Cleaning of return air fan assemblies, blades, and housings.

Bathroom Exhaust Systems: Clean all bathroom Exhaust Fans, including fan blades, housings, and associated short run exhaust duct terminals.

Methods of Cleaning and Disinfection:

Vent Cover and Grille Cleaning: The Contractor shall carefully remove all supply and return vent covers, registers, and grilles. Each cover shall be hand-washed, sanitized using an EPA-registered antimicrobial solution, and returned to its original position upon completion of internal duct line cleaning.

Mechanical Agitation and Extraction: The Contractor shall access the ductwork via strategic access points using a high-powered, HEPA-filtered collector unit to pull a continuous negative pressure on targeted lines. The Contractor shall utilize mechanical agitation tools, including air whips, pneumatic brushes, or motorized brushes (tailored to duct type, e.g., sheet metal or flexible ductwork), to dislodge dust, biological residues, rodent dander, and debris from internal duct surfaces, drawing loosened material directly into the HEPA collection system.

System Sanitization: Once mechanical components and duct lines are physically clean of debris, the Contractor shall apply an EPA-registered sanitizer/disinfectant labeled for use in HVAC systems throughout all serviced equipment and ductwork using an ultra-low volume (ULV) fogger or automated spray system. This sanitizer must be formulated to eliminate residual bacteria, viruses, and odors associated with rodent infestation.

Phase 4: Ceiling Tile Assessment and Specialty Disinfection

Detail Cleaning: The Contractor shall wipe down all non-porous structural members, utility conduits, pipes, and ductwork exteriors within the remediation zones using an EPA-registered sanitizer to eliminate residual biological film.

Ceiling Tile Assessment: The Contractor shall inspect all acoustic ceiling tiles removed or disturbed during the process:

Contaminated Tiles: Porous ceiling tiles showing visible water damage, heavy dust accumulation, staining, or direct contamination from rodent feces/urine shall be carefully removed, bagged, and disposed of as biohazardous waste.

Replacement: The Contractor shall supply and install new acoustic ceiling tiles to replace those discarded. Replacement tiles must match existing ceiling tiles in material, fire rating, size, texture, and color.

Cleanable Tiles: Non-contaminated, lightly dusty tiles shall be HEPA-vacuumed, wiped down, and reinstalled in the grid.

Phase 5: Post-Remediation Cleaning, De-containment, and Demobilization

Airborne Settling Period: The Contractor shall allow sufficient time (minimum of 2 hours) for any suspended airborne dust to settle within containment zones before dismantling plastic sheeting.

Occupied Space Post-Clean: Following dismantling of containment barriers, the Contractor shall perform a detailed post-remediation clean of immediate administrative areas beneath work zones. This includes HEPA vacuuming floors/carpets and damp-wiping desks, office furniture, and horizontal surfaces with a light disinfectant to guarantee zero residual dust, debris, or chemical odor remains in workspaces.

Waste Disposal: All biohazardous debris, contaminated ceiling tiles, PPE, and cleaning materials shall be securely double-bagged in heavy-duty poly bags, labeled, and manifested. The Contractor shall transport and legally dispose of all waste off-site at an approved municipal or specialized disposal facility in accordance with local, state, federal, and Navy Environmental Protection guidelines. No waste shall be stored in Navy dumpsters or left on the installation overnight.

3. Contractor-Furnished and Government-Furnished Items

3.1 Contractor-Furnished Property and Services (CFP/CFS)

Except for items specifically stated in Section 3.2, the Contractor shall furnish everything required to perform this contract, including:

Personnel and PPE: Certified personnel equipped with appropriate personal protective equipment (PPE). In accordance with CDC/BUMED guidelines for rodent cleanup, PPE must include, at a minimum, NIOSH-approved N95 respirators (half-face HEPA/P100 respirators are highly recommended), disposable protective suits (e.g., Tyvek), heavy-duty rubber or nitrile gloves, and protective eyewear.

Equipment: High-powered mechanical duct cleaning units, air whips/brushes, negative air machines, certified HEPA vacuums, scrapers, hand tools, 6-mil plastic containment sheeting, and waste disposal bags.

Chemicals and Disinfectants: All EPA-registered disinfectants, antimicrobial solutions, and sanitizers. Safety Data Sheets (SDS) for all chemical compounds brought on-site must be submitted to and approved by the TPOC prior to commencing work.

3.2 Government-Furnished Property, Material, and Services (GFP/GFM/GFS)

The Government will provide the following to the Contractor:

Utilities: Reasonable access to electrical power and water sources at no cost to the Contractor, solely for the execution of the tasks outlined in this PWS.

Emergency Medical Care: Emergency medical services will be limited to first-aid or stabilization treatment of life-threatening injuries at the Navy Branch Health Clinic (BHC) on the installation. The cost of such treatment and subsequent transport shall be borne by the Contractor.

Base Access Liaison: Assistance with the administrative processing of base access credentials through the TPOC.

4. Security, Base Access, and Operational Protocols

4.1 Base and Facility Access (DoD Standard)

Defense Biometric Identification System (DBIDS): The Contractor shall comply with all local installation security requirements for access.

Contractor personnel must obtain DBIDS credentials for base entry.

Access Credentials: The Contractor shall submit a completed SECNAV Form 5512/1 (Local Population ID Card/Base Access Pass Registration) for each employee to the TPOC at least ten (10) business days prior to the start of work.

Roster Submittal: The Contractor shall submit a final employee roster to the TPOC forty-eight (48) hours prior to the project start. Only employees on the approved roster with matching, valid Government-issued photo identification will be permitted entry.

Foreign National Restrictions: Access by Foreign National personnel is strictly prohibited unless specifically vetted and authorized in writing by the Base Security Officer and the Contracting Officer.

4.2 Building Entry, Key Control, and Sign-In Protocols

Sign-In/Sign-Out: All Contractor personnel shall sign in and out of the facility logbook located at the Quarterdeck Security Desk of the respective facility (Building R-50 or Building U-117) upon daily arrival and departure.

Key Control: The Government will issue temporary electronic access badges or provide physical escorts/keys to the Contractor's on-site supervisor for the duration of the work shift. The Contractor shall safeguard all access control devices. Under no circumstances shall keys or badges be duplicated or removed from the installation overnight.

Loss of Badges/Keys: The Contractor shall immediately report any lost keys or badges to the TPOC and the Base Security Office within one

(1) hour of discovery. The Contractor shall be liable for the total cost of rekeying the facility or replacing security locks should Contractor negligence result in loss.

4.3 Restricted Areas and Operations Security (OPSEC)

Designated Work Zones: Contractor personnel shall remain strictly within designated work zones, transit paths, and authorized restrooms in Building R-50 and Building U-117.

Unescorted Access Prohibited: Under no circumstances shall Contractor personnel enter restricted military offices, IT/Server rooms, secure communications vaults, or command offices without a continuous Government escort.

OPSEC Compliance: Contractor personnel shall not take photographs, record videos, or sketch facility layouts except as strictly authorized in writing by the TPOC for documenting remediation progress. No information regarding facility operations, schedules, or personnel shall be disclosed.

4.4 End-of-Shift Lockup and Security Controls

At the conclusion of each shift, the Contractor's supervisor shall verify and execute the following security checklist:

All temporary containment sheeting is secure and poses no safety hazard for daytime staff.

All windows in the work zone are closed and locked.

All non-essential lights are turned off.

All exterior exit doors are fully latched and locked.

The facility security alarm system is armed (in coordination with building security).

All issued temporary access badges and keys are returned to the Quarterdeck Security Desk.

5. Environmental and Safety Compliance

5.1 Comprehensive Regulatory Framework (OSHA, DoD, DON, and Interagency)

The Contractor shall comply with all applicable Federal, Department of Defense (DoD), Department of the Navy (DON), and interagency occupational safety, environmental, and biological remediation standards throughout contract execution, including but not limited to:

OSHA Standards:

29 CFR 1910 Subpart I & 29 CFR 1926 Subpart E: Personal Protective Equipment (General Industry and Construction).

29 CFR 1910.134: Respiratory Protection (written program, medical clearance, and annual fit testing).

29 CFR 1910.1200: Hazard Communication Standard (Safety Data Sheets, chemical safety, container labeling).

29 CFR 1910.145: Specifications for Accident Prevention Signs and Tags (Biological and regulated area warnings).

29 CFR 1926.62: Lead in Construction Standard (paint scraping, containment, air monitoring, and HEPA capture).

29 CFR 1926.1101 & 29 CFR 1926 Subpart C: Regulated work zones, negative pressure containment principles, and general safety/health provisions.

Occupational Safety and Health Act Section 5(a)(1) (General Duty Clause): Applied to aerosolizable biological pathogen control where specific non-human biohazard standards do not exist.

Department of Defense & Navy Standards:

US Army Corps of Engineers Safety and Health Requirements Manual (USACE EM 385-1-1): Mandatory for all Navy/NAVSUP service contracts. Full compliance with Section 06 (Hazardous Substances, Agents, and Environments) and Section 13 (Hand and Power Tools).

OPNAVINST 5100.23 Series: Navy Safety and Occupational Health (SOH) Program Manual (specifically biohazard mitigation and indoor air quality standards).

Navy Bureau of Medicine and Surgery (BUMED) Technical Guidance & NAVMED P-5010-8: Manual of Naval Preventive Medicine, Chapter 8 (Navy Arthropod and Pest Control Technology and Rodent-Borne Pathogen Clean-up).

Navy Consolidated Hazardous Material Reutilization and Inventory Management Program (CHRIMP): Full HAZMAT tracking and authorization compliance.

Public Health & Interagency Guidelines:

Centers for Disease Control and Prevention (CDC) & NIOSH Protocols: Specifically CDC Guidelines for "Cleaning and Disinfection for Rodent-Contaminated Areas" (Hantavirus pulmonary syndrome, Arenaviruses, and Leptospirosis prevention).

EPA Lead-Safe Certification / Renovation, Repair, and Painting (RRP) Rules: (40 CFR Part 745).

National Air Duct Cleaners Association (NADCA) ACR Standard: Assessment, Cleaning, and Restoration of HVAC Systems.

5.2 Specific Guidelines for Sealed Work Zones and Containment Engineering

To ensure zero particulate, dust, lead, or biological pathogen migration into occupied areas during operations, the Contractor shall establish and maintain sealed work zones complying with the following engineering controls:

Critical Barriers: Physical barriers constructed of flame-retardant polyethylene sheeting (minimum 6-mil thickness) shall completely seal all doors, windows, HVAC diffusers, return grilles, and penetrations in the remediation boundary. Drop cloths and horizontal poly barriers must cover all flooring, stationary furniture, and electrical equipment beneath active drop ceilings.

Negative Pressure Enclosures (NPE): Containment zones must be maintained under negative pressure relative to adjacent occupied areas using certified HEPA-filtered Air Filtration Devices (AFDs). The enclosure shall achieve and sustain a minimum pressure differential of -0.02 inches

, verified via continuous differential pressure monitoring or daily smoke testing. The negative air machines must of water column (-5.0 Pascals) deliver a minimum of , exhausting outdoors wherever structurally and logistically feasible.four (4) to six (6) air changes per hour (ACH)

Airlock / Transition Chambers: Entry and egress points to the sealed zone must utilize zippered or multi-flap poly airlocks (minimum two-stage airlock consisting of a clean room/PPE vestibule and a contaminated equipment transition zone).

Controlled Demobilization and Bag-Out: All waste, tools, ladders, and HEPA equipment exiting the sealed work area must be surface-decontaminated (wet-wiped with an EPA-registered disinfectant) before removal. All contaminated 6-mil poly containment barriers must be misted down prior to removal, folded inward to trap settled dust, and double-bagged inside the containment enclosure.

5.3 Specific Guidelines for Biological Contaminant and Rodent Remediation

The Contractor shall adhere to strict biological handling and pathogen containment controls:

Prohibition of Dry Disturbances: Dry sweeping, dusting, standard vacuuming, or compressed-air blowing of rodent droppings, urine stains, or nesting materials is .strictly prohibited

Pre-Treatment and Dwell Time: Prior to physical disturbance, the Contractor shall thoroughly mist all biological contaminants using an EPA-registered hospital-grade disinfectant/sterilant labeled effective against rodent-borne pathogens. The disinfectant must remain wet on surfaces for the manufacturer-mandated dwell contact time (minimum ten (10) minutes) to eliminate pathogen aerosolization risk.

Wet-Extraction and Containment: Wetted feces, carcasses, and nesting debris shall be extracted using disposable spatulas, damp disposable towels, or mechanical scoops and immediately deposited into heavy-duty biohazard poly bags (minimum 3-mil thickness or double-bagged 2-mil).

HEPA Extraction: Only certified HEPA vacuums (operating at 99.97% efficiency at 0.3-micron particulate capture) equipped with sealed canisters may be used for secondary particulate extraction and above-grid detailing after primary wet removal is complete.

Biohazard Signage: Warning signs complying with 29 CFR 1910.145 shall be posted at all containment entrances reading: "CAUTION:

BIOLOGICAL WORK ZONE -- AUTHORIZED PERSONNEL ONLY -- FULL PPE REQUIRED."

5.4 Personal Protective Equipment (PPE) & Respiratory Protection Mandates

Respiratory Protection Program (29 CFR 1910.134 & EM 385-1-1): All personnel entering the containment zone shall be medically cleared, fit-tested, and enrolled in a written respiratory protection program.

Minimum Requirement: NIOSH-approved N95 air-purifying respirators.

Preferred/Heavy Operations: Tight-fitting half-mask or full-face respirators equipped with certified P100 (HEPA) particulate filters or combination organic-vapor/P100 cartridges when handling biocidal chemical foggers.

Dermal and Eye Protection (29 CFR 1910.132 / 133):

Impermeable full-body disposable coveralls with integrated hoods and boots (e.g., DuPont Tyvek or equivalent).

Heavy-duty chemical- and puncture-resistant rubber or nitrile gloves (taped to coverall sleeves).

Indirect-vented safety goggles or full-face protection to guard mucous membranes against chemical misting and biological droplets.

5.5 Safety Plans and Hazardous Materials Management (HAZMAT)

Accident Prevention Plan (APP) / Activity Hazard Analysis (AHA): Pursuant to USACE EM 385-1-1 Section 01.A, the Contractor shall submit a job-specific Abbreviated APP and detailed AHAs to the Contracting Officer and TPOC for review and written acceptance prior to beginning work. The AHA must specifically detail: containment assembly, biological cleanup procedures, ladder/scaffold safety, and waste load-out.

HAZMAT Inventory (CHRIMP): The Contractor shall submit a complete inventory list of all hazardous chemicals, disinfectants, biocides, and coil-cleaning agents along with their respective Safety Data Sheets (SDSs) for approval in accordance with Navy CHRIMP regulations.

Spill Response: The Contractor shall maintain dedicated spill response kits on-site tailored to the chemicals utilized. Any inadvertent chemical release or breach of biological containment must be reported immediately to the TPOC, Facility Manager, and Base Fire Department.

6. Performance Requirements Summary (PRS) The Performance Requirements Summary (PRS) table below outlines the Performance Standard, the Acceptable Quality Level (AQL), and the Method of Government Surveillance for tasks across both locations.

Perform ance Obj ective / D eliverabl e

Performance Standard Acceptable Quality Level

(AQL)

Method of Surveillance

1. Contai nment Integrity Negative Pressure

(PWS

Para 1.4, 2.1, 2.2, & 5.2)

Sealed containment barriers fully intact; differential pressure ; zero dust, paint chips, mold, or biohazard migration into occupied zones.

100% compliance. Zero visible dust or breach outside containment boundaries.

100% Visual Inspection and negative-pressure verification by TPOC prior to and during shifts.

2.

Rodent & Biohaz ard Rem ediation

(PWS

Para 2.1, 2.2, & 5.3)

Interstitial space completely cleared of feces, nests, carcasses, and debris following pre-wetting protocols.

Surfaces fully disinfected.

100% removal of visible biohazards; zero residual rodent odor. Zero dry sweeping/vacuuming violations.

100% Post-Remediation Visual Inspection by

TPOC.

3. Loose Paint Mit igation (Bldg R- 50 only)

(PWS

Para 2.1 & 5.1)

Structural elements scraped free of loose, peeling, or flaking paint; debris captured via HEPA collection per 29

CFR 1926.62.

95% of loose paint removed. No debris remaining on ceiling grid.

Visual and physical sampling of structural steel, decking, and grid by

TPOC.

4.

HVAC

Air System Cleaning (Bldg U- 117 only)

(PWS

Para 2.2 & 5.1)

Complete cleaning and sanitization of AHUs, coils, registers, OA/supply /return ductwork, VAV boxes, and auxiliary systems in accordance with NADCA standards.

100% compliance with NADCA cleaning standards; zero debris, dust, or microbial contamination remaining inside systems.

Random visual inspection of components (using borescopes, physical access openings, and removable grilles) by

TPOC.

5. Exclus ion Repo rting (Bldg U- 117 only)

(PWS

Para 2.2)

Inspection of work areas for penetrations, with photographic /written documentation delivered to the TPOC within 48 hours.

100% compliance; all observed penetrations reported.

Review of submitted contractor reports by TPOC

6. Waste Manage ment & Demobili zation

(PWS

All biohazard, paint, and duct waste double-bagged, manifested, decontaminated during exit, and disposed of off-base. No waste left on-station overnight.

100% compliance. Zero administrative or transit waste violations.

Verification of disposal manifests and visual site inspection by TPOC.

Para 2.1, 2.2, 5.2, & 5.3)

7. Post- Project C leanlines s

(PWS

Para 2.1 & 2.2)

Occupied offices below work zones left free of fallen dust, ceiling/paint debris, or chemical residues.

100% clean; matching or exceeding baseline pre-work cleanliness.

Visual and tactile inspection of desks, electronics, and floors by TPOC before normal business hours.

8. Base Security & Key Control

(PWS

Para 4.1- 4.4)

Strict adherence to DBIDS access, building logs, badge/key security, and end-of-shift lockup checklists.

100% compliance. Zero security violations, lost badges, or unreturned keys.

100% Auditing of logs, badge returns, and security alarm logs by TPOC.

IDCode: J
Page: 1
Pages: 12
AmendNo: 0002
EffDate: 18 Sep 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N00189
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR NORFOLK

ATTENTION CODE 301, 1968 GILBERT STREET SUITE 600

NORFOLK, VA 23511-3392

UNITED STATES

Connie Totaro, Email: connie.m.totaro.civ@us.navy.mil Telephone: 771-229-3627 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N0018926QL411
SolDate: 09 Sep 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Continuation
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of amendment 00002 is to revise the PWS, incorporate Q&A's, and provide drawings as attachments.
ContNameTitle:
CoNameTitle: Amber Geusic
ContDate:
CODate: 18 Sep 2026

File details come from the government source that posted it. Updated .