Att 3_Cost_Proposal_Spreadsheet.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
H Dept Weapons Control and Integration Prototyping and Fabrication
Solicitation number
N0017826R0010
Issued by

About this file

This is a Cost Proposal Spreadsheet template for Solicitation No. N0017827R4402 (Draft Solicitation No. N0017826R0010), issued by the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) under the Department of the Navy Naval Sea Systems Command. The spreadsheet serves as Attachment J.3 and is designed to capture comprehensive cost data for prime contractors and subcontractors responding to this requirements contract.

The template is structured to accommodate a base period of four years plus five option years, with detailed cost breakdowns across multiple categories. Prime contractor cost elements include direct labor (by individual employee), indirect labor (overhead, fringe benefits, G&A), materials, and other direct costs (ODCs). The spreadsheet incorporates subcontractor labor costs and pass-through fees, with designated fields for surge labor and related fixed fees. The template includes analytical sections for pass-through cost analysis and fee analysis, with built-in calculations to compare proposed fees against maximum rates allowed under the SeaPort-e IDIQ contract vehicle. The document specifies that prime contractor fee on subcontractor pricing must be reported in the fee column rather than the cost column per Section B requirements of the applicable MAC (Multiple Award Contract). This is a blank template without completed cost data.

View the file

Other files

File Type Posted
SAM_Q_and_A_Updated_6.4.2026.xlsx XLSX spreadsheet
SAM_Questions_and_answers.xlsx XLSX spreadsheet
Solicitation Amendment N0017826R00100001 SF 30.pdf PDF
Solicitation Amendment - N0017826R00100001.pdf PDF
Contract Data Requirements List_DD1423.pdf PDF
DO 0002 SOW Final.pdf PDF
DO 0001 SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Spreadsheet

SOLICITATION NO. N0017827R4402 - ATTACHMENT J.3
COST PROPOSAL SPREADSHEEET
Prime Offeror Name:
Subcontractor Name (if applicable):
DCAA Point of Contact Information:
KEY?SiteTotal for All YearsBase Period Year 1Base Period Year 2Base Period Year 3Base Period Year 4Base Period Year 4Option Year 1Option Year 2Option Year 3Option Year 4Option Year 5
Cost ElementsLabor CategoryY/NGOV/CTRHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 1
Employee Name 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Materials

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF (Labor, Materials, and ODCs)

Surge Labor
Fixed Fee on Surge Labor
Surge Total Labor Plus Fixed Fee
Surge ODCs
Any Adders to Surge ODCs
Surge Total CPFF

Total CPFF all CLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor *
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Maximum Pass Through Allowed by SeaPort-e IDIQ ContractN/A
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section B Maximum Rates Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

File details come from the government source that posted it. Updated .