Q_A 2.docx

DOCX document 22 KB Posted

Attached to
EMI Chamber Federal contract opportunity
Solicitation number
N0017825RC613
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a Questions and Answers (Q&A) file for an Electromagnetic Interference (EMI) Shielded Chamber solicitation. The Q&A provides detailed technical specifications and clarifications about the chamber's construction, including confirmation that CLIN 0001 and CLIN 0002 are base bids for 100 dB attenuation enclosures without anechoic properties. Key technical details include: the chamber will require a concrete board base, have a structural steel frame anchored to the finished concrete floor, include brass nipples for power filter mounting, and require RF testing. Additional site-specific requirements include special badging for the crew, available lay down space, and no need for chilled water penetrations or additional electrical hook-ups. The chamber's interior will use standard sheet metal panel finishing, and no acoustic silencers or door maintenance kits are requested.

View the file

Other files for this federal contract opportunity

Other files attached to EMI Chamber, newest first.
File Type Posted
EMI Chamber Soliciitation Modification.pdf PDF
EMI Chamber Conform Document.pdf PDF
SF30 Extend Closing Date.pdf PDF
Q_A 3.docx DOCX document
Q_A.docx DOCX document
SF1449 Solicitation Draft.pdf PDF
0130-01 EMI Chamber SOW_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 is a base bid for just a 100 dB attenuation enclosure, no anechoic properties included correct?

YES

CLIN 0002 looks to be the same requirement as CLIN 0001, please confirm no anechoic absorbers needed for base bid of CLIN 0002.

YES

Hat and flat style enclosure leave about a 1/8" gap, we typically put a filler tile to make the floor level. Would you like this option included?

NO

What is the timeline for design approval and construction turn around?

Our team should only require (1) week for design review. Construction turnaround should follow design approval.

Is there lay down space at the site?

YES

Any special badging needed for crew?

YES

Is the finish for the inside to just be the sheet metal panel?

CLIN1 and CLIN 2 – YES

Does this unit have seismic requirements, or will it sit on sheets of Masonite on the ground, or is pedestal system required?

The contractor should provide concrete board base (protection from moisture) under chamber floor. Chamber structural steel frame should be anchored to the finish concrete floor.

Are there any acoustic requirements, such a silencers on the vents?

NO

Is there a need for chilled water penetrations to go into the unit? If mechanical equipment is being installed, it will also need a condensate waveguide.

NO

Should Brass nipples be included for power filter mounting?

YES

Are we required to hook up any of the electrical? Any wire mold or other electrical accessories?

NO

In the past we have provided bolted unitstrut on the interior Hat and Flats for mounting without shield line penetration, should this be included?

NO

Do you want door maintenance kit included? (Fingerstock, fingerstock pusher, bearings)

NO

Is contractor to provide RF testing?

YES

Will any fiber penetrations need to be provided in patch panel (WGF4, WGF6, etc).

NO