PRB_Case_Number_027_Attachment5_CostSummaryFormat.xlsx

XLSX spreadsheet 92 KB Posted

Attached to
Multiple Launch Rocket System (MLRS) M26 Rocket Motor Reclamation and Flight Testing Federal contract opportunity
Solicitation number
N0017418R0017
Issued by
Department of the Navy Naval Sea Systems Command

About this file

N0017418R0017 Attachment 5 - Cost Summary Format

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Launch Rocket System (MLRS) M26 Rocket Motor Reclamation and Flight Testing, newest first.
File Type Posted
N0017418R00170001.docx DOCX document
PRB_Case_Number_027_ExhibitA_CDRLs.pdf PDF
PRB_Case_Number_027_Attachment8_SF1408Survey.pdf PDF
N0017418R0017-RFP_Final.pdf PDF
PRB_Case_Number_027_Attachment3_PastPerformanceMatrix.doc DOC document
PRB_Case_Number_027_Attachment6_DemilCert.pdf PDF
PRB_Case_Number_027_Attachment1_CAP.doc DOC document
PRB_Case_Number_027_Attachment4_QASP.docx DOCX document
PRB_Case_Number_027_Attachment2_PastPerformanceQuest.doc DOC document
PRB_Case_Number_027_Attachment7_GFP.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Analyses

COMPANY NAME:______________________________________
CORPORATE ADDRESS:________________________________
______________________________________________________
POC AND PHONE NUMBER:_____________________________
SOLICITATION NUMBER:_______________________________
COST SUMMARY FORMAT
All offerors (Prime, Subcontractor, and Consultant) shall provide the employee name, number of hours, and the hourly rate for each labor category listed below in their cost proposal (i.e., the Offeror shall provide a name for each man-year). The same information is required for all personnel who are proposed under letters of intent.
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor *
Total Pass Through Amount (including fee)
Maximum Pass Through Allowed by SeaPort-e IDIQ Contract8.00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime Contractor
Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract8.00%
*When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor and consultant price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor and consultant price is a fee element rather than a cost element. Prime offeror fee on subcontractor and consultant price should be included in the fee column (rather than the cost column) of Section B.

Cost

COMPANY NAME:___________________________________COST SUMMARY FORMAT
CITY, STATE, ZIP:___________________________________All offerors (prime, subcontractor and consultant) shall provide the employee name, number of hours, and the hourly rate for each labor category listed below in their cost proposal (i.e., the offeror shall provide a name for each man-year). The same information is required for all personnel who are proposed under letters of intent.
SOLICITATION NUMBER:_____________________________
Attachment 8
ELEMENT/CATEGORYBASE YEAR - PHASE 1OPTION YEAR 1 - PHASE 2OPTION YEAR 2 - PHASE 3TOTALS
TO BE COMPLETED BY THE PRIMETO BE COMPLETED BY THE PRIMETO BE COMPLETED BY THE PRIME
Escalation Rate0.00%Escalation Rate0.00%
HoursRateAmountHoursRateAmountHoursRateAmountHoursRateAmount
DIRECT LABOR - PRIME
Contractor Site

Total Contractor Site

Government Site

Total Government Site
TOTAL DIRECT LABOR - PRIME- 0- 0- 0

INDIRECT LABOR - PRIME

TOTAL INDIRECT LABOR - PRIME

TOTAL LABOR COST - PRIME

DIRECT LABOR - SUBCONTRACTOR A

Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE Contractor Site

Total Contractor Site

Government Site

Total Government Site
TOTAL LABOR COST - SUBCONTRACTOR A
DIRECT LABOR - SUBCONTRACTOR B
$ - 0
Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE$ - 0
Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE$ - 0

Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE Contractor Site

Total Contractor Site

Government Site

Total Government Site
TOTAL LABOR COST - SUBCONTRACTOR B
DIRECT LABOR - SUBCONTRACTOR C
$ - 0

Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Numbering and calculations contained in this worksheet are limited to a maximum of two decimal places.

Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE $ - 0 Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE $ - 0 Funkhouser, Charles G CIV IHDIV, NSWC, CD13: Rates should reflect subcontractor's fully burdened labor rate EXCLUDING FEE Contractor Site

Total Contractor Site 0 $ - 0 0 $ - 0 0 $ - 0 0 $ - 0

Government Site

Total Government Site
TOTAL LABOR COST - SUBCONTRACTOR C
TOTAL SUBCONTRACTOR(S) LABOR COST
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
TOTAL SUBCONTRACTOR(S) COST

TOTAL LABOR COST (PRIME + SUB(S))

Total Labor Hours
Fixed Fee on Subcontractors
Fixed Fee on Prime Labor

TOTAL LABOR COST PLUS FIXED FEE (CPFF)

Other Direct Costs
Travel
Materials/Supplies/Training
Total ODC cost without G&A
Any adders to ODCs such as G&A (cost only-no fee)
Total ODCs

Total CPFF (Labor and ODCs)

*When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor and consultant price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B however, prime offeror fee on subcontractor and consultant price is a fee element rather than a cost element. Prime offeror fee on subcontractor and consultant price should be included in the fee column (rather than the cost column) of Section B.

Option III

COMPANY NAME:__________________
CITY, STATE, ZIP:__________________
COST SUMMARY FORMATSOLICITATION NUMBER:____________
All offerors (prime, subcontractor and consultant) shall provide the employee name, number of hours, and the hourly rate for each labor category listed below in their cost proposal (i.e., the offeror shall provide a name for each man-year). The same information is required for all personnel who are proposed under letters of intent.

Attachment ? - Option III

ELEMENT/CATEGORYProposedDCAAGovernment Position
TO BE COMPLETED BY THE PRIMETO BE COMPLETED BY THE GOVERNMENTTO BE COMPLETED BY THE GOVERNMENT
HoursRateAmountHoursRateAmountHoursRateAmount
Direct Labor - Prime
Program Manager (K)0ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Project Manager (K) 0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Senior Engineer (K) 0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Engineer C4I (K) 0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Senior Analyst 0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Analyst 0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Junior Engineer 0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

0 ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This hourly rate is automatically calculated using OPTION YEAR II hourly rate multipled by a 3% cost of living increase ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION….

As this amount is automatically calculated

Senior Logistician0ERROR:#REF!ERROR:#REF!0ERROR:#REF!ERROR:#REF!0ERROR:#REF!ERROR:#REF!
LogisticianERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Graphics ArtistERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Instructional DeveloperERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ProgrammerERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Training SpecialistERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Administrative Assistant0ERROR:#REF!ERROR:#REF!0ERROR:#REF!ERROR:#REF!0ERROR:#REF!ERROR:#REF!

Total Direct Labor Cost ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This number is automatically calculated ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This number is automatically calculated ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This number is automatically calculated ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Prime Contractor Indirect Labor Cost
Overhead0.00%

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Fringe Benefits 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

G&A 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This number is automatically calculated Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Indirect Labor Cost ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Direct and Indirect Labor cost
Cost of Money (COM)0.00%

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Prime Contractor Labor Cost ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Direct Labor - Subcontractor A
Sub-Contractor Labor - unburdened- 0

Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. A Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated $ - 0 Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. A for OPTION YEAR II only

- 0
Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. A$ - 0

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. A for OPTION YEAR II only

- 0
Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. A$ - 0

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. A for OPTION YEAR II only

Overhead ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. A ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Fringe Benefits ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

G&A ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. A for OPTION YEAR II only

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. A Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Indirect Labor Cost ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Subcontractor A Direct and Indirect Labor Cost ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. A for OPTION YEAR II only

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Direct Labor - Subcontractor B
Sub-Contractor Labor - unburdened- 0

Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. B Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated $ - 0 Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. B for OPTION YEAR II only

- 0
Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. B$ - 0

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. B for OPTION YEAR II only

- 0
Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. B$ - 0

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. B for OPTION YEAR II only

Overhead ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. B ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Fringe Benefits ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

G&A ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. B for OPTION YEAR II only

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed LABOR HOURS for SUB. B Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Indirect Labor Cost ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Subcontractor B Direct and Indirect Labor Cost ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed unburdened LABOR $ amount for SUB. B for OPTION YEAR II only

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Total Proposed Subcontractor Labor Cost $ - 0

This amount is automatically calculated $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Prime contractor pass through (not including fee) 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Handling 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

G&A 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Other (if any) 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total pass through (not including fee) ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total Subcontractor and Consultant Cost including pass through ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Total Labor Cost (Prime, Subcontractor(s) and Consultant) ERROR:#REF!

This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Total Labor Hours ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This number is automatically calculated Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This number is automatically calculated Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION...

This number is automatically calculated

Fixed Fee

Total Labor Cost Plus Fixed Fee (CPFF) ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Prime Contractor Other Direct Costs
Travel$ - 0

Kris & Deanna Shnayer: Enter the proposed MATERIAL $ amount for PRIME for the BASE YEAR only $ - 0 Kris & Deanna Shnayer: Enter the proposed MATERIAL $ amount for PRIME for the BASE YEAR only $ - 0 Kris & Deanna Shnayer: Enter the proposed MATERIAL $ amount for PRIME for the BASE YEAR only

Materials/Supplies/Training $ - 0 Kris & Deanna Shnayer: Enter the proposed LONG DISTANCE TRAVEL $ amount for PRIME for the BASE YEAR only $ - 0 Kris & Deanna Shnayer: Enter the proposed LONG DISTANCE TRAVEL $ amount for PRIME for the BASE YEAR only $ - 0 Kris & Deanna Shnayer: Enter the proposed LONG DISTANCE TRAVEL $ amount for PRIME for the BASE YEAR only

Total ODC cost without G&A $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Any adders to ODCs such as G&A (cost only-no fee) 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed MATERIAL $ amount for PRIME for the BASE YEAR only $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed LONG DISTANCE TRAVEL $ amount for PRIME for the BASE YEAR only 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated 0.00% Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Total ODCs $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: Enter the proposed MATERIAL $ amount for PRIME for the BASE YEAR only

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated $ - 0 Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated $ - 0

Total CPFF (Labor and ODCs) ERROR:#REF!

This amount is automatically calculated

Kris & Deanna Shnayer: Enter the proposed LONG DISTANCE TRAVEL $ amount for PRIME for the BASE YEAR only

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This rate is automatically populated from the rate keyed in on the BASE YEAR spreadsheet

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

Kris & Deanna Shnayer: DO NOT ENTER INFORMATION… This amount is automatically calculated

ERROR:#REF!

THIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLYTHIS IS A SAMPLE ONLY
PLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURSPLEASE REFER TO SECTION L FOR ACTUAL LABOR CATEGORIES AND HOURS
ODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION LODCs SHALL NOT EXCEED AS SPECIFIED IN SECTION L