N00167-17-R-0007.pdf

PDF 977 KB Posted

Attached to
Waterfront Operations Sppt Norfolk VA
Solicitation number
N00167-17-R-0007
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
ATT06R1_17-R-0007_Cost_Summary_Format.xls XLS spreadsheet
ATT14_17_R-0007_Industry_Questions_Amendment_0004.docx DOCX document
N00167-17-R-0007_Amendment_4.docx DOCX document
N00167-17-R-0007_Amendment_3.pdf PDF
ATT06R_17-R-0007_Cost_SummaryFormat.xls XLS spreadsheet
ATT13R_17_R-0007_Site_Visit_and_Industry_Questions.docx DOCX document
ATT11R_17-R-0007_DOL_Wage_Deter_15_4342_General.pdf PDF
ATT05R_17-R-0007_Previous_Contracting_Efforts.doc DOC document
ATT10R_17-R-0007_DOL_Wage_Deter_07_0134_Diver.pdf PDF
ATT08R_17_R_0007_Historical_Labor_and_Sample_listing_of_ESH_Hazmat_Reports.xlsx XLSX spreadsheet
N00167-17-R-0007_Amendment_2.docx DOCX document
ATT03R_17-R-0007_Staffing_Plan_With_Cost.xlsx XLSX spreadsheet
ATT04R_17-R-0007_Past_Performance_Questionnaire.doc DOC document
ATT07R-17-R-0007_DirectLaborRateSubstantiationTable.xls XLS spreadsheet
N00167-17-R-0007_Amendment_2_Conformed.docx DOCX document
ATT02R_17-R-0007_Staffing_Plan_No_Cost.xlsx XLSX spreadsheet
N00167-17-R-0007_Amendment_0001.docx DOCX document
Solicitation_Questions_2017_07_18.docx DOCX document
ATT01_17-R-0007 DD254 Waterfront Rev 2-22-2017.pdf PDF
ATT10_17-R-0007_DOL Wage_Deter_07-0134_Diver.txt TXT text file
ATT04_17-R-0007_Past_Performance_Questionnaire.doc DOC document
ATT03_17-R-0007_Staffing_Plan_With_Cost.xlsx XLSX spreadsheet
A012 CDRL.pdf PDF
ATT08_17-R-0007_Historical_Labor_Hours_Report.xlsx XLSX spreadsheet
ATT05_17-R-0007_Previous_Contracting_Efforts.doc DOC document
A001 CDRL.pdf PDF
A006 CDRL.pdf PDF
A002 CDRL.pdf PDF
ATT11_17-R-0007_DOL_Wage_Deter_15-4342_General.txt TXT text file
ATT12_17-R-0007_DOL_Wage_Deter_15-0213.txt TXT text file
A010 CDRL.pdf PDF
A013 CDRL.pdf PDF
A008 CDRL.pdf PDF
A011 CDRL.pdf PDF
A007 CDRL.pdf PDF
A009 CDRL.pdf PDF
N00167-17-R-0007.pdf PDF
A004 CDRL.pdf PDF
ATT07-17-R-0007_DirectLaborRateSubstantiationTable.xls XLS spreadsheet
A003 CDRL.pdf PDF
ATT06_17-R-0007_Cost_SummaryFormat.xls XLS spreadsheet
A005 CDRL.pdf PDF
ATT09-17-R-0007_DDForm1861.pdf PDF
ATT02_17-R-0007_Staffing_Plan_No_Cost.xlsx XLSX spreadsheet
pdp30872_17_02_03.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 04:00 PM local time 18 Aug 2017

X

A

X B

X C X D

EX

X

G

F 58 - 78

79 - 105

X H 106 - 111 pamela.gregorczyk@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-C9 1 111

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00167 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and via e-mail conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

PAMELA G GREGORCYK 757-462-4500

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 5

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

6 - 27

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

30 - 31 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 32 - 35 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 36 - 39 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

40 - 55

PART II - CO NTRACT CLAUSES

NAVAL SURFACE WARFARE CENTER CARDEROCK

2600 TARAWA COURT

VIRGINIA BEACH VA 23459-3239

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

56 - 57

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

06 Jul 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N00167-17-R-0007

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 60 Months

PROGRAM MANAGEMENT AND ADMINISTRATION

IN SUPPORT OF THE STATEMENT OF WORK, SECTION 3.1

FFP

FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED Hours

WATERFRONT OPERATIONS SUPPORT

CPFF

IN SUPPORT OF THE STATEMENT OF WORK, SECTION 3.2

MAX COST

FIXED FEE

TOTAL MAX COST + FEE

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED Lot

OTHER DIRECT COSTS (ODC)

COST

ODCs INCLUDING TRAVEL AND MATERIALS

NOT TO EXCEED $2,680,678.14.

UNIT UNIT PRICE MAX AMOUNT

0004 UNDEFINED

CONTRACT DATA REQUIREMENTS LIST (CDRL)

COST

Data Deliverables DD Form 1423

Data as specified in the attached DD Form 1423s (Section J, Exhibit A). This

CLIN is not separately priced.

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the

Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS LANGUAGE

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

HQ B-2-0015 PAYMENTS OF FEE(S) (LEVEL OF EFFORT – ALTERNATE 1) (NAVSEA) (MAY 2010)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts for level of effort type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST

AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or

"INCENTIVE FEE" clause, as applicable, and shall be paid at the hourly rate(s) specified above per man-hour performed and invoiced. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

Fee per Hour Table:

CLIN/SLINs Hours Fixed Fee per Hour

0002 First Year of Performance TBD* TBD

0002 Second Year of Performance TBD TBD

0002 Third Year of Performance TBD TBD

0002 Fourth Year of Performance TBD TBD

0002 Fifth Year of Performance TBD TBD

* To Be Determined

HQ B-2-0020 TRAVEL COSTS - ALTERNATE I (NAVSEA) (APR 2015)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs determined to be allowable, allocable and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer or their duly authorized representative, as advised by DCAA.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.

(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;

however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the

Contractor's or employee's convenience.

HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE COST/FIXED PRICE)

(FEB 1997)

This contract includes the following mixture of cost reimbursement and fixed price line items:

CLIN Type*

0001 FP

0002 CPFF

0003 CR

* FP – Fixed Price

CPFF – Cost Plus Fixed Fee

CR – Cost Reimbursement

(End of Text)

Section C - Descriptions and Specifications

STATEMENT OF WORK

SECTION C DESCRIPTION AND SPECIFICATIONS

The tasking under this Statement of Work (SOW) falls under Product Service Code (PSC) R425.

Title: Naval Surface Warfare Center Carderock Division – Combatant Craft Division (NSWCCD-CCD) Detachment

Norfolk Waterfront Operations.

1.0 Background

The NSWCCD-CCD Detachment Norfolk provides full spectrum support for combatant craft, boats, patrol coastal ships, life rafts, other watercraft, and associated hull, mechanical, electrical, and electronic systems. This includes full life cycle engineering, research and development (R&D), concept feasibility, design, test and evaluation, and integrated logistic support. NSWCCD-CCD Detachment Norfolk’s clients include the U.S. Navy, Special

Operations Command, U.S. Army, U.S. Air Force, U.S. Marine Corps, U.S. Coast Guard, U.S. Customs and Border

Protection, National Oceanic and Atmospheric Administration, Defense Intelligence Agency, Drug Enforcement

Agency, U.S. Immigration and Customs Enforcement, U.S. Department of Homeland Security, U.S. Central

Intelligence Agency, U.S. Department of Energy, Federal Bureau of Investigation, and the National Aeronautics and

Space Administration. NSWCCD-CCD Detachment Norfolk conducts waterfront operations at Building V-47, Naval Station Norfolk, Virginia. The purpose of this requirement is to obtain contractor support for these operations.

2.0 Scope of Work

The scope of work falls into two broad categories: General Program Requirements and Waterfront Operations.

General Program Requirements includes, transition, program management, operations management of Building V-

47, reporting, and safety compliance oversight. Waterfront Operations includes the operation of small watercraft, industrial maintenance and repair, and Research and Development, Test and Evaluation (RDT&E) project support.

Small watercraft assigned to NSWCCD-CCD Detachment Norfolk shall include boats, watercraft, and vessels ranging in length from 1 foot to 200 feet.

The contractor shall accomplish the work on site at NSWCCD-CCD Detachment Norfolk’s facilities in Norfolk, VA, at remote test sites, at the contractor’s facilities, and on deployed small watercraft.

The contractor shall provide the facilities necessary to accomplish the work that cannot be performed on site at

NSWCCD-CCD Detachment Norfolk’s facilities.

3.0 Requirements

3.1 General Program Requirements (CLIN 0001 - FFP)

3.1.1 Transition Periods (Phase-In and Phase-Out):

a. Phase-In Period - Upon award, the phase-in period begins. During the phase-in period, the contractor shall provide full performance within thirty calendar days by implementing its proposed transition plan. The contractor shall take all actions necessary for a smooth transition of the contracted operations from the incumbent contractor.

b. Phase-Out Period - The contractor shall affect a smooth and orderly transfer of contract responsibility to a successor, if any, at the end of all contract performance.

Additionally, as part of the phase out period, the contractor and the Government shall jointly conduct a comprehensive final inventory of property, equipment and supplies.

3.1.2 Program Management

The contractor shall provide administrative support to complete both the program and waterfront operations requirements.

The contractor shall identify a Program Manager (PM) who is responsible for the oversight of all tasks required by this SOW. The PM shall have the knowledge, expertise, authority, and resources to perform efficient and timely program execution. The PM shall be the primary point of contact regarding overall operations management and performance issues. Performance issues may include cost or financial concerns, or any potential problems that, if unresolved, will adversely affect the contractor’s performance, schedule, or costs. The PM shall take all appropriate measures to mitigate adverse impacts and be prepared to discuss long term solutions as applicable.

The contractor shall provide a Site Manager (SM) at Building V-47 to coordinate and manage waterfront operation requirements. The SM shall be the COR’s primary point of contact regarding daily operations and the assignment of project and work priorities. The SM shall be responsible for the quality of work performed at Building V-47 on all small watercraft and projects. The contractor shall also designate an Alternate SM (ASM), who shall act in place of the SM during any periods the SM is absent.

The contractor shall provide progress, status and management reports. (CDRLs A001, A002).

Program Document Library (PDL)

The contractor shall maintain a PDL containing all documents, reports, and data generated under this contract. The

PDL may be digital, physical hard copy, or a combination of both media. The contractor shall maintain a list of the

PDL documents in a document library index. The contractor shall provide Government personnel access to the

PDL.

Program Management Reviews (PMRs)

PMRs are briefings that the contractor shall conduct monthly at the Government’s office located at Naval Station

Norfolk Building V-47, Joint Expeditionary Base Little Creek-Fort Story Building 1602, or at any other location upon mutual agreement of both the Government and contractor.

The contractor’s PMRs shall present, at a minimum, the following:

(1) Overview of key accomplishments completed during the reporting period;

(2) Review of completed and outstanding action items;

(3) Detailed contract status which includes the status of each Task Order (TO) to include:

(a) Summary of TO Scope;

(b) Review planned and actual performance against TO requirements and Plan of Action and

Milestones (POA&M) schedule:

i. Contractor actions completed during the reporting period; and

ii. Contractor actions scheduled for completion during the next reporting period.

(c) Contractor programmatic and technical issues and/or problem areas associated with performance;

and

(d) Contractor cost performance relative to cost ceilings set forth in issued TOs, including:

i. Contractor expended ODC’s for the reporting period;

ii. Contractor actions to decrease ODC use; and

iii. Status on submitted purchase requests.

(4) Address status of invoices issued against each TOs;

(5) Address compliance with Contract Safety, Training, and Environmental Requirements;

(6) Address contract administration issues such as contract administrative actions (e.g. modifications that are outstanding and were closed during the reporting period);

(7) Address opportunities for process improvement to increase efficiency and reduce costs;

(8) Address status of trained forklift and crane operators

(9) Address Small Business Utilization Goals relative to goals and actual dollars/percentage for the reporting period;

(10) Status of monthly training on Environmental Health, Safety (ESH) topics;

(11) Status of Government mandatory training;

(12) Status of Enterprise-wide Contractor Manpower Reporting Application and Electronic Cost Reporting and Financial Tracking reporting; and

(13) Address any mishaps, corrective actions and lessons learned.

The PMR presentation shall include: (a) a graph comparing costs incurred to work effort accomplished and include estimates of costs for completion of each TO and at a contract summary level; (b) a comparison of the estimated man-hour expenditure rate to the actual man-hour expenditure rate and explain variances between the estimated and actual expenditure rates. (CDRL A003).

The contractor shall prepare and submit the PMR agenda for Government review at least five business days prior to each PMR. The contractor shall prepare and submit minutes of each PMR to the Government within five business days following each PMR. (CDRL A004). The contractor shall prepare PMR presentation materials for each PMR and the presentation materials shall be made available at the PMR for all participants (CDRL A005).

Weekly Project Status Report

The contractor shall track each project (typically an individual small watercraft, mission, test, or other task) separately to maintain strict accountability of the man-hours and ODCs chargeable to each project. The weekly

Project Status Report shall also include, but not be limited to, information such as the contractor’s weekly schedule status, the identification of problem areas affecting technical, scheduling, or cost elements, the results (positive or negative) obtained from previously identified problem areas with conclusions and recommendations, all trips with results, changes in personnel status, and contractor plans for activities during the upcoming week. (CDRL A001).

Daily Team Meetings

The contractor shall conduct daily team meetings from Monday through Friday at 07:15 in Building V-47. The contractor shall address the day’s projected work schedule, identify recently completed work, work in progress, and future work with expected completion dates and status. (CDRL A006).

3.1.3 ESH Compliance

The contractor shall comply with all applicable Federal, State, local, and Navy ESH directives and regulations.

The contractor shall conduct daily ESH monitoring on all work operations, personnel, facilities, storage locations, and equipment.

The contractor shall document and report any discrepancies immediately to the COR.

The contractor shall prepare and maintain ESH documentation and records.

The contractor shall maintain the standard operation procedures on ESH policies such as safety plans, weight/material handling equipment, energy control (lock-out/tag-out), training, small watercraft, condition survey reports, inventory control reports, Hazardous Material (HAZMAT)/waste reports, asset transfer reports, marine survey reports, and Occupational Safety and Health Administration (OSHA) reports. (CDRL A007).

The contractor shall conduct a monthly one-hour training ESH session for personnel on-site at Building V-47.

(CDRL A008).

The contractor shall report all ESH incidents (e.g. injury and accidents) to the COR within 2 hours of occurrence.

ESH HAZMAT and hazardous waste management

The contractor is responsible for the management of all HAZMAT located at Building V-47. The contractor shall provide a monthly HAZMAT compliance report to the COR and to the NSWCCD-CCD Detachment Norfolk’s

Environmental Coordinator. The report will identify the purchase, storage, use and disposal of HAZMAT. The report shall include disposal receipts with verification(s) that the disposal(s) was conducted in accordance with appropriate Federal, State, local and applicable Navy rules. (CDRL A007).

3.1.4 Operations Management Building V-47 Naval Station Norfolk, VA

The contractor shall provide personnel in Building V-47 located at Naval Station Norfolk during normal hours of operation as listed in section 3.3. At a minimum, contractor personnel must physically monitor personnel entering/exiting the building, respond to incoming phone calls and respond to marine band radio communications.

For personnel entering Building V-47, the contractor shall check personnel identification, document arrival/departure time, and issue temporary visitor badges to approved personnel.

The contractor shall provide a contractor roster of on-site personnel including names, telephone numbers, and e-mail addresses. The contractor roster shall be updated monthly. (CDRL A009).

3.1.5 Building V-47 Naval Station Norfolk, VA Supply and Inventory Management

The contractor shall be responsible for the management of the supply and inventory systems located at Building V-

47, Naval Station Norfolk. The contractor shall also travel to various vendor or local Government locations to pick-up or deliver materials.

The contractor is responsible for maintaining the supply system and placing shipping orders using Navy Enterprise

Resource Planning (ERP).

The contractor shall maintain and control inventory and accountability of assets; including small watercraft, trailers, forklifts, and vehicles under NSWCCD-CCD Detachment Norfolk’s custody.

The contractor shall maintain an asset transfer reporting system to document the transfer of assets both to and from

NSWCCD-CCD Detachment Norfolk. The contractor shall use a Requisition and Invoice/Shipping Document (DD-

1149) or similar type document to record all transfers. The current NSWCCD-CCD Detachment Norfolk inventory of items in the supply department exceeds 10,000 individual items.

The contractor shall maintain an inventory of tools, repair parts, consumables, HAZMAT, and other items. The current NSWCCD-CCD Detachment Norfolk inventory of tools, and other equipment exceeds 3,000 items. (CDRL

A007).

The contractor shall receive, track, inventory, and distribute supplies, equipment, and other types of property shipped to NSWCCD-CCD Detachment Norfolk.

The contractor shall pack and ship supplies, equipment, and other types of property to continental United States

(CONUS) and outside continental United States (OCONUS) locations using a variety of shipping providers.

3.1.6 Equipment and Maintenance Scheduling

The contractor shall plan, track, schedule, and execute all maintenance and calibration requirements for NSWCCD-

CCD Detachment Norfolk’s equipment. Scope includes equipment such as test equipment, forklifts, rolling stock

(trailers), floating assets, and electronics. Reports documenting compliance shall be provided to the COR monthly.

(CDRL A007)

Test Equipment and Tools:

The contractor shall be responsible for the accountability, maintenance and calibration of test equipment and tools.

There are approximately 500 items requiring periodic calibration.

Equipment requiring calibration shall be maintained in a calibrated and ready to issue status.

The contractor shall have an equipment management process which includes the use of an equipment log. The log shall contain the equipment name and description, manufacturer, model number, part number, serial number, identification number, storage location, indication that an item is checked out for use and name of user, date item checked back in/returned to storage, date of inventory, barcode number, and minor plant property tag number (if applicable). For equipment requiring calibration, the contractor shall maintain a log documenting the last calibration date, who performed the calibration, and the next calibration due date. Additional information may be required.

Reports documenting calibration of electronics and test equipment shall be provided to the COR monthly. (CDRL

A010)

3.1.7 Materials Management and Purchasing

During performance of this contract, the contractor shall identify materials, equipment, and supplies needed for procurement in support of waterfront operations.

Approval from the Procuring Contracting Officer (PCO) or COR must occur prior to the contractor initiating procurements through its purchasing system. Supporting documentation that purchases are made in accordance with the FAR and Defense Federal Acquisition Regulation Supplement (DFARS) shall be provided to the COR and/or

PCO upon request.

The contractor shall maintain a status report on all materials, equipment, and supplies being procured in support of this contract’s requirements. Status reports shall include information such as item description, quantity, price, vendor name, procurement submittal date, date of order, shipping schedule, estimated delivery date, and actual delivery date. (CDRL A001).

Government Fleet Card and Government Swipe SEA Card Usage

Contractor personnel may be authorized to utilize Government Fleet Card(s) and/or Government Swipe SEA Card(s) while performing waterfront operations on Government owned small watercraft under this contract.

To obtain authority to use such cards, the contractor shall complete all mandatory training, complete required forms, and submit a written authorization request to the Naval Supply Authority, via the PCO.

Contractor personnel authorized to use Government Fleet Cards and/or Government Swipe SEA Cards shall remain compliant with the Department of the Navy’s Fleet Card policy, NAVSUPINST 4200.98 (series) and Swipe SEA

Card policy, NAVSUPINST 4200.101 (series).

Government Fleet Card and Swipe SEA Card training and policy are available electronically at https://www.navsup.navy.mil/public/navsup/ccpmd/.

The contractor shall be liable for any misuse, abuse, or fraud incurred by the contractor and/or its employees, subcontractors, representatives, or agents.

3.1.8 Emergency Contact information

Upon notice of award, the contractor shall provide the COR an emergency contact number and a secondary contact number during non-working hours, weekends and holidays for emergency service. The contractor is to maintain this emergency contact throughout performance and return emergency phone calls within 15 minutes.

3.2 Waterfront Operations (CLIN 0002- CPFF)

3.2.1 Technical

The contractor shall provide the following:

a) The contractor shall support the installation, testing, and operation of instrumentation and test equipment

(mechanical and electrical) in accordance with the applicable items’ installation procedures.

Instrumentation and test equipment include items such as flow meters, torque meters, accelerometers, strain gages, gyros, heading sensors, GPS receivers, data acquisition systems, and radar systems.

The contractor shall verify and document instrumentation and test equipment installation, operation and configuration. Upon completion, the contractor shall submit a copy of the installation, test, checkout, and configuration to the COR. (CDRL A011)

b) The contractor shall operate and test all NSWCCD-CCD Detachment Norfolk’s small watercraft on a monthly basis to verify and document proper performance. Operation and testing of small watercraft systems shall include conducting a pre-launch check, launching, running (operating) all systems for one hour, recovery, post operational checks, and returning to a storage condition. The contractor shall document operational concerns and/or issues, the individual notified of the concern and/or issue, and the actions taken to correct the concern and/or issue using the Craft Test Status Report. (CDRL A012). Written pre-approval must be obtained from the PCO or the COR to exempt any of NSWCCD-CCD Detachment

Norfolk’s small watercraft from this requirement. (CDRL A012).

c) The contractor shall assemble and install prototype systems and alterations on various small watercraft and as specified in the individual TOs. The prototype systems may be fabricated from various materials including metals of all types, plastics, fiberglass, and carbon fiber.

d) The contractor shall define manpower requirements, setups, procedures, and support equipment to be https://my.navsup.navy.mil/webcenter/content/conn/owc_content/path/Enterprise%20Libraries/ccpmd_ssc/Policies/Instructions/NAVSUPINST%204200.101_Swipe%20SEA%20CARD_14NOV16.pdf https://www.navsup.navy.mil/public/navsup/ccpmd/ utilized for each test effort.

e) The contractor shall define manpower requirements, mission objectives, small watercraft setups, procedures, and support equipment necessary to conduct tasking(s).

f) The contractor shall provide support, data compilation, and reports on tests and special projects. Test reports shall include results, conclusions, lessons learned, and recommendations. The contractor shall submit a test report within 30 calendar days after test completion to the Government for review and approval. (CDRL A007).

g) Emergency Medical Technician (EMT) support is required during all waterfront operations including testing evolutions while underway. The Government maintains an EMT supply inventory at Building V-

47. The contractor shall track and identify the EMT supplies, and identify items needing to be restocked, replenished, or replaced. This includes supplies needing replacement due to upcoming expiration dates.

h) The contractor shall survey and document the condition of small watercraft. Surveys shall identify the services and materials needed to maintain safe operation and seaworthiness. (CDRL A013).

i) The contractor shall perform routine corrective and preventive maintenance, overhauls, major repairs, and other yard work, and shall be responsible for all work and workmanship. The contractor is required to track the progress and record all labor hours performed and material purchases made. (CDRL A007)

j) The contractor shall deploy and recover test sensors and cables at locations specified in individual TOs.

The contractor shall recover test sensors within 12 hours of test completion or as otherwise specified in the

TO or by the COR. The contractor shall mark and recover instrumentation and test equipment that detaches from small watercraft while in transit or during operations (e.g. testing).

k) The contractor shall generate training plans and provide training on the operation of small watercraft systems. Contractor generated training plans may include fleet introduction, crew familiarization, small watercraft operations, and/or maintenance. (CDRL A008)

3.2.2 Small Watercraft Operations

The contractor shall perform general waterfront operations such as: launching and retrieving small watercraft, handling lines, tying and untying small watercraft, pumping fuel, maintaining clean and orderly small watercraft and test sites, controlling access to small watercraft and facilities, and other functions as may be required for safe and efficient waterfront operations. This work shall include preparation for, and recovery from hurricanes and other severe weather, maintenance of storage containers, maintenance of range equipment (buoys, moorings, rigging, cables, cable reels, and associated equipment), and preparing excess equipment for transfer to Defense Logistics

Agency Disposition Services (DLADS).

a) During waterfront operations, the contractor shall maintain, sustain, and repair, maritime diesel engines, maritime gasoline engines, outboard engines, generators, auxiliary equipment, and supporting systems.

Contractor sustainment effort shall include performance of scheduled preventative maintenance. These actions shall be documented in the associated small watercraft or component log books. A monthly report documenting compliance with the maintenance schedule shall be provided to the COR. (CDRL A007). A listing of typical small watercraft assigned to NSWCCD-CCD Detachment Norfolk is provided in paragraph 3.2.3(k). This list is provided as a guide and is not all inclusive.

b) The contractor shall captain and crew small watercraft undergoing testing, trials, safety evaluation(s), and shall perform range support, and chase boat operations.

c) The contactor shall survey and document underwater damage, hull cleaning, repair inspection(s), and shall provide underwater test support for small watercraft. (CDRL A013)

d) The contractor shall support small watercraft recovery and rescue operations to include providing divers/emergency swimmers, EMTs, and crews as necessary to save small watercraft and embarked personnel and equipment.

3.2.3 Industrial and Repair

The contractor shall maintain small watercraft and associated equipment assigned to NSWCCD-CCD Detachment

Norfolk. This shall include the full range of maintenance; from routine daily upkeep, planned maintenance and minor repairs, to major repairs, overhauls, modernization, and equipment turn in. The contractor shall perform inspections and surveys to assess the material condition of the small watercraft and associated equipment, diagnose and make suggestions for needed work, and perform the work as authorized. Small watercraft and associated equipment shall be maintained and repaired to the same standards and specifications to which they were built and in accordance with Original Equipment Manufacturer (OEM) recommendations. The contractor shall document, in the small watercraft’s log book, all inspections, surveys, repairs, testing operations, and maintenance performed.

Tasking may include:

a) The contractor shall perform receipt inspections of small watercraft, machinery, propellers, repair parts, tools and equipment.

b) The contractor shall prepare small watercraft; machinery, propellers, repair parts, tools and equipment for testing, trials, and delivery to fleet activities. Contactor effort shall include de-preservation, outfitting, minor repairs, and routine maintenance.

c) The contractor shall retrieve/deliver small watercraft, machinery, propellers, repair parts, tools and equipment from/to fleet activities, shipyards and repair activities, or storage facilities.

d) The contractor shall pack, unpack, and prepare small watercraft; machinery, propellers, repair parts, tools and equipment for shipping, return to stock, or transfer to DLADS. This shall include cleaning and preservation, lay-up for long-term storage, minor repairs, shrink wrapping, routine maintenance, and demilitarization when required for DLADS turn-in.

e) The contractor shall perform repairs and fabrication of composite materials including fiberglass, Kevlar, and carbon fiber reinforced plastics for small watercraft.

f) The contractor shall perform repairs to inflatable fabric items for small watercraft.

g) The contractor shall perform repairs and fabrication of textile items such as small watercraft and equipment covers, canopies, awnings, and bags.

h) The contractor shall perform repairs and fabrication of all types of metals on small watercraft.

i) The contractor shall perform welding, bending and machining of metals for repairs and fabrication. Welding shall be in accordance with NAVSEA 0900-LP-060-4010 series standards.

j) The services of OEM authorized personnel may be required. OEM authorized service personnel shall have the training, qualifications, and experience required by the OEM for the work to be performed. Personnel working as OEM representatives shall have OEM certifications on file with the contractor. It is anticipated that

OEM authorized service personnel will be required from the following marine equipment manufacturers:

MTU

Detroit Diesel

Cummins

Caterpillar

Yanmar

Steyr

Mercury

Rolls Royce

Kamewa

Hamilton Jet

Twin Disc, ZF

Furuno

This list is not all inclusive.

k)The numbers and types of small watercraft assigned to NSWCCD-CCD Detachment Norfolk changes periodically and include 30 to 50 small watercraft of the following types:

i) 13 ft. Workboats

ii) Various inflatable boats

iii) 22 ft. Utility Boats

iv) 24 ft. Rigid Inflatable Boats

v) 24 ft. Workboats

vi) 11m Rigid Inflatable Boats

vii) 24 ft. to 40 ft. Unmanned Sea Surface Vehicles

viii) 38 ft. Riverine Patrol Boats

ix) 41 ft. Utility Boats

x) 80 ft. Special Projects Craft

xi) 82 ft. Special Operation Craft

xii) 85 ft. Patrol Boats

xiii) Other small watercraft, up to 200 feet in length and 400 long tons, as may be required for various projects.

l) Trailers: The contractor shall be responsible for maintaining the entire fleet of trailers and rolling stock associated with the small watercraft assigned to or in the custody of NSWCCD-CCD Detachment Norfolk.

Documentation shall include recommended maintenance schedules and complete real time records of all actions performed on each individual trailer. (CDRL A001)

The contractor shall maintain trailers and rolling stock, that are available for road use, in a Department of

Transportation (DOT) certified condition.

The contractor shall obtain any required DOT permits, complete all required paperwork, licenses, and registrations needed for the transportation of any assigned small watercraft.

m) Forklifts, tractors, and other heavy lift equipment listed in Section 3.4.2: The contractor shall maintain the entire fleet of forklifts, tractors, and other heavy lift equipment assigned to or temporarily in the custody of

NSWCCD-CCD Detachment Norfolk. The contractor shall maintain a process documenting whether all forklifts, tractors and other heavy lift equipment are in a certified condition and available for unrestricted use.

Documentation shall include recommended maintenance schedules and complete real time records of all actions/maintenance performed on each individual forklift, tractor, and other heavy lift equipment used.

n) Small watercraft and associated equipment assigned to or temporarily in the custody of NSWCCD-CCD

Detachment Norfolk: The contractor shall be responsible for maintaining the entire fleet of small watercraft and associated equipment assigned to, or temporarily in the custody of, NSWCCD-CCD Detachment Norfolk. The contractor shall have a process to identify and document the required work to maintain NSWCCD-CCD

Detachment Norfolk small watercraft in a certified, OEM condition unless otherwise directed by the COR.

Documentation shall include the recommended OEM maintenance schedule for each small watercraft and a complete real time record of all actions performed on small watercraft assigned to NSWCCD-CCD Detachment

Norfolk.

o) Vehicles assigned to or temporarily in the custody of NSWCCD-CCD Detachment Norfolk: The contractor shall identify and document the required work necessary to maintain NSWCCD-CCD Detachment Norfolk vehicles in a certified, OEM condition. Documentation shall include the recommended OEM maintenance schedule for the vehicles and a complete real time record of all actions performed on each individual vehicle assigned to NSWCCD-CCD Detachment Norfolk.

3.3 Hours of Operation

The contractor shall maintain the following normal hours of operation Monday through Friday at Building V-47, Naval Station Norfolk Virginia: 7:00 AM to 5:00 PM.

Holidays: The contractor shall not operate in Building V-47, except for emergencies, on the federally observed holidays listed below:

New Year’s Day

Martin Luther King’s Birthday

President’s Day

Memorial Day

Independence Day

Labor Day

Columbus Day

Veteran’s Day

Thanksgiving Day

Christmas Day

Prior to contractor personnel working any Saturday, Sunday, or holiday, the contractor must obtain written pre-approval from the PCO or the COR.

The contractor is not required to work during hours of base closure. Due to emergency situations if work is required the contractor must obtain written pre-approval from the PCO or the COR to work during base closure period(s).

3.4 General Requirements

Contractor personnel shall operate various Government vehicles, material handling equipment, and small watercraft during contract performance.

Contractor personnel shall operate and maintain the following Government heavy equipment in support of issued

TOs:

1) 4K forklift

2) 6K forklift

3) 15K forklift

4) 4000 lb. crane

5) 500 lb. crane

6) Man lift

Contractor personnel operating any Government equipment shall meet all applicable Federal, State, and local motor vehicle, material handling equipment, small watercraft, forklift, and crane operator licensing requirements, including holding a Class A Commercial Driver’s License (when applicable).

Contractor personnel shall be covered by and/or have appropriate insurance, permits, and DOT certifications when operating equipment.

Contractor personnel who operate the heavy equipment shall comply with the training and certification requirements of NAVSUP PUB 538 for forklifts

(http://www.public.navy.mil/navsafecen/Documents/afloat/Surface/DckAr/Deck_REF/NAVSUP_Pub_538.pdf) and

NAVFAC Instruction P-307 for cranes (https://www.navfac.navy.mil/ncc).

Contractor personnel are required to maintain these qualifications current during contract performance.

All small watercraft operators shall have a current Merchant Mariner license with the appropriate endorsement.

Overtime may be required to meet waterfront operations workload requirements and shall only be performed as authorized by the PCO or the COR at the TO level. The Government will aim to provide the contractor one calendar day advance notice of an overtime requirement; however it is the Government’s intent to schedule and provide the contractor as much notice as possible. Under emergent circumstances, the contractor shall be required to work overtime without advanced notice. Emergent circumstances may be due to critical equipment failures, extreme weather, or any other emergency conditions as determined by the PCO or the COR. The contractor shall provide personnel to accomplish emergency work when directed by the PCO or the COR. The contractor shall be onsite within one hour of notification or at a time mutually agreed upon by the PCO or the COR and the contractor.

The contractor shall operate and test small watercraft in extreme weather conditions, all sea states, and in every season. The contractor shall ensure the small watercraft operators and crew are safely outfitted with the proper personnel safety equipment such as life jackets, maverick suits, dry suits, safety eyewear, and face masks. This equipment shall not be charged to the government. Under certain circumstances, the need for extraordinary personnel safety equipment may arise. In such instances, the contractor shall request that the Government provide the required extraordinary personal safety equipment and/or request Government authorization to procure it. The

Government shall review these expenses on a case by case basis prior to equipment purchase.

The contractor shall obtain all necessary Federal, State and local permits as required to perform the requirements in this contract, including transportation requirements. The contractor shall be responsible for the safe transportation and delivery of small watercraft undergoing testing to any location within CONUS.

Travel under this contract may be required with very short lead time. The contractor shall have personnel capable of: (a) conducting testing at remote locations; and (b) performing rescue, retrieval, and repair of disabled small watercraft.

The contractor may be required to temporarily assign personnel to perform at non-Government facilities and locations in support of operations, testing, and maintenance evolutions on equipment assigned to, or temporarily in http://www.public.navy.mil/navsafecen/Documents/afloat/Surface/DckAr/Deck_REF/NAVSUP_Pub_538.pdf https://www.navfac.navy.mil/ncc the custody of, NSWCCD-CCD Detachment Norfolk.

Contractor personnel located at Building V-47 shall attend on-site training.

3.5 Personnel Qualifications

The contractor shall employ technically qualified personnel to perform the requirements of this contract. The

Government reserves the right to request work histories on any contractor employee for purposes of verifying compliance with these requirements.

a) Physical Qualifications: Contractor personnel in the following labor categories will be required to serve onboard small watercraft operated at high speeds in rough water and must be physically able and conditioned to endure the rigors of these operations:

(1) Engineering Technicians (all levels)

(2) Boat Captains

(3) EMTs

(4) Electricians

(5) Electronic Technicians

(6) Mechanics

(7) Divers

(8) Able Seaman

(9) Ordinary Seaman

(10) Engine Utility man

b) Key Personnel – Key Personnel are essential to the performance of this effort and cannot be replaced without prior notice to the Government in accordance with Component Clause 5252.237-9106, Substitution of

Personnel (Sep 1990). Under this effort, the following labor categories are Key Personnel:

1) Engineering Technician, Mechanical, Level V

Required qualifications:

o High School Diploma o A minimum of five years’ small watercraft mechanical experience including;

o Testing, maintenance, repairs, operations, and troubleshooting; and o At least two years of experience leading a mechanical team.

2) Engineering Technician, Electrical, Level V o A minimum of five years’ small watercraft electrical experience including;

o Testing, maintenance, repairs, operations, and troubleshooting; and o At least two years of experience leading an electrical team.

3) Boat Captain A o United States Merchant Mariner Credential with endorsement for Master of 25 tons or greater o A minimum of five years’ experience working with military small watercraft including:

o High speed rough water operation of military small watercraft;

o Military, commercial, or emergency diving operation support;

o Emergency salvage and rescue operation support; and o Maritime operations planning and execution.

Desired qualifications:

Class A Commercial Driver’s License

4) Marine Surveyor o Accreditation by the Society of Accredited Marine Surveyors or the National Association of Marine Surveyors o Open Water Diver certification.

o A minimum of 10 years of experience conducting underwater marine surveys and underwater photography for marine survey services including:

o Documenting the condition of craft;

o Identifying required repairs;

o Developing work requirements; and o Overseeing overhauls, major repairs, and other yard work.

5) Site Manager o Technical knowledge of small watercraft including:

o A minimum of 10 years of experience managing the testing and maintenance of small watercraft; and o At least 10 years of experience leading a team of skilled technical and support personnel.

6) Program Manager o Bachelor's degree from an accredited educational institution in a business or managerial field;

o A minimum of 10 years of experience in program management; and o A minimum of five years of experience with military small watercraft.

Desired qualifications:

o Project Management Professional certification.

c) Contractor Personnel at Government Site:

It is anticipated that the following types of personnel will be required for work which can be accomplished on site at

NSWCCD-CCD Detachment Norfolk and occasionally at remote test sites in CONUS and on deployed small watercraft:

Key Personnel for Government Site:

Waterfront Operations Support:

Site Manager

Engineering Technicians, Mechanical, Level V

Engineering Technicians, Electronic, Level V

Boat Captain A

Non-Key Personnel for Government Site

Waterfront Operations Support:

Boat Captain B

Diver

EMT

Environmental, Safety & Health Technician

Electrician

Electronic Technician

Engineering Technicians, Mechanical, Level IV

Engineering Technicians, Electronic, Level IV

Laborer

Mechanic

Machinist, Maintenance

Seaman, Able

Seaman, Ordinary

Tool & Parts Attendant

Truck Driver

Warehouse Specialist

Welder

Utility man, Engine

4.0 Government Furnished Information

The contractor shall be furnished with relevant Government Furnished Information (GFI) as necessary for the execution of the work to be performed. Information may include drawings, scheduling requirements, test plans, technical documentation on small watercraft, and equipment, etc.

5.0 Government Furnished Facilities

The Government shall furnish facilities at Building V-47 on Naval Station Norfolk.

The Government shall provide the following Government-furnished facility/services/equipment to the contractor:

a. The Navy facility at Building V-47 on Naval Station Norfolk is approximately, 30,000 square feet and is comprised of approximately 3,200 square feet of office space, 1,900 square feet of warehouse storage area, and

24,900 square feet of shop space. The shop space includes common machine tools and welding equipment.

b. Utilities: heat, electricity, water, sewage removal, and pest control services.

c. Garbage collection services to include: one dumpster for paper/plastics, one dumpster for scrap metals, and one dumpster for cardboard.

d. Communications: 30 local phone/phone lines with Defense Switched Network (DSN) capability.

e. Air-conditioned office spaces.

f. All Class 2 maintenance to the facilities. Class 2 maintenance is defined as structural maintenance, i.e., windows, doors, roof, walls, plumbing fixtures, and lighting fixtures (to include ballasts/starters, but not light bulbs) to the facility as it exists at the time of contract start.

g. The Government will recharge the fire extinguishers. However, the contractor is responsible for performing the monthly fire extinguisher inspection.

h. The Government shall provide computers and other IT equipment, as well as other common office machines.

6.0 Travel

Travel in and around the Hampton Roads, VA area (Chesapeake VA, Hampton, VA, Newport News, VA, Norfolk

VA, Portsmouth VA, Suffolk VA, Virginia Beach, VA, Williamsburg, VA, Yorktown, VA) will be routinely required.

Long distance travel may be required to any area where US Navy small watercraft could undergo testing or require assistance. Travel may be to locations such as Jacksonville FL, Patuxent River MD, Key West FL, San Diego CA, Palm Beach FL, Bath ME, Seneca Lake NY, Stennis MS, Panama City FL, Washington DC, Morehead City NC, Hatteras NC, Camp Lejeune NC, Charleston SC, Kings Bay GA, St. Augustine FL, Tampa FL, Wallops Island VA, Cape May NJ, and Newport RI. This list is not all inclusive.

Prior to the contractor incurring any travel outside the Hampton Roads, VA area, the contractor must first obtain approval in writing from the PCO or the COR. Failure to obtain pre-approval may result in non-allowable travel expenses.

7.0 Security Reqirement and Base Access

The Department of Defense Contract Security Classification, DD Form 254 (Section J, Attachment 1), itemizes the security classification requirements for this contract.

Contractor employees will generally be required to access one or more secure military installations in the performance of the services described in this SOW.

All contractor personnel that require access to Department of Navy (DON) information systems and work on-site must:

(1) In accordance with the SECNAV M-5510.30, Chapters 5 and 6, at a minimum, meet the security requirements…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .