This is a Solicitation/Contract Form (Standard Form 33) for a Naval Sea Systems Command (NAVSEA) contract to design, fabricate, test, and deliver Second-Generation D5 AIM Flatcars for the Department of the Navy. The contract number is N0016426RGW20, issued as a negotiated Request for Proposal (RFP). The anticipated award date is no later than March 5, 2027. The solicitation is a Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) contract with minimum quantities of one unit and a minimum contract value of $20,000, and maximum quantities of six units with the maximum amount to be determined at contract award. Offerors must acknowledge receipt of this solicitation and submit sealed offers by the specified deadline. Late submissions, modifications, and withdrawals are subject to FAR provisions 52.214-7 or 52.215-1. The contract includes a Defense Priorities and Allocations System (DPAS) rating designation.
The contract comprises six Contract Line Items (CLINs): CLIN 0001 for design drawings with delivery 390 days after order; CLIN 0002 for First Article fabrication and testing with delivery 286 days after order; CLIN 0003 for production unit fabrication and testing with delivery 492 days after order; CLIN 0004 for technical data at no additional cost; CLIN 0005 for contract ceiling; and CLIN 0006 for shipping on a Cost No Fee basis to one of three Strategic Weapons Facility locations (SWFPAC Bangor WA, SWFLANT Kings Bay GA, or Eastern Range Cape Canaveral FL). The flatcar must comply with Association of American Railroads (AAR) standards, meet a 286,000-pound gross rail load requirement, weigh no more than 99,200 pounds when empty to accommodate cargo configurations, and incorporate hydraulic cushioning at car ends. The design must follow the Systems Requirement Document (SRD-500778), interface drawing 5681514, and standards including AAR-M1001 Section C and MIL-SPC-810. Delivery orders for subsequent CLINs are contingent upon successful delivery and acceptance of preceding CLINs. The contract is administered by Naval Sea Systems Command at Crane, Indiana, with the Procuring Contracting Officer Leslie Graber-Heshelman and Technical Point of Contact Patrick Bowling. Contractors must comply with extensive technical specifications, provide Government Furnished Information (GFI) within 30 days of award, and submit detailed inspection and test records. The file includes 37 questions and answers addressing design criteria, load configurations, weight specifications, and manufacturing requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0016426RGW20_007 SF 30.pdf | ||
| Attachment 09_Summary of Changes of Requirements for Flat Railcar.docx | DOCX document | |
| N0016426RGW20_005_SF30.pdf | ||
| N0016426RGW20_003.pdf | ||
| Solicitation Amendment N0016426RGW200002.pdf | ||
| GFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Section A - Solicitation/Contract Form
N0016426RGW20 - Flat Railcar
Surveillance Criticality Designator (SCD) - A
N0016426RGW200007
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Questions and Answers
1. Will past performance on non- federal government contracts related to rail car design, testing and manufacture be acceptable and desired (state, local government and commercial)?
Answer: Yes.
2. How does the Government intend to evaluate delivery pricing under the Solicitation's Item 0006 and SOW Section 3.4.5?
Answer: The cost of the shipping should be considered for all 3 Strategic Weapons Facility locations. The exact location will be determined by available location prior to the delivery order. The Government will evaluate comparatively with respect to shipping location.
3. When the railcar is delivered, is it the Governments expectation the car will be a fully commissioned car and able to be towed or the car will not be fully commissioned, and transportation must occur using a method other than towing?
Answer: Fully commissioned and approved for use on rail with AAR.
4. Were any risk reduction contracts awarded prior to this effort? If so, can you provide the contract number and what data rights the Government owns?
Answer: No risk reduction contracts have been awarded prior to this effort.
5. For each order, will there be a Not-to-Exceed amount given for Shipping since shipping costs may vary? Who bears the risk or the rail carrier damage?
Answers: Shipping should be planned out by the vendor. Assumption of risk is in accordance with "Freight on Board" (FOB) terms.
6. Is there an incumbent for this requirement?
Answer: No.
7. What are the number of rail cars to be manufactured for development and production?
Answer: See Section B.
8. What is the minimum quantity for this IDIQ?
Answer: See Section B
9. What are the number of flat railcars for this contract?
Answer: See Section B.
10. After contract award, how long will it take the Technical Point of Contract to provide GFI.
Answer: 30 days.
11. What should be included in the Bill of Material (BOM)?
Answer: The BOM should be based on the final design of the railcar.
12. Is the end of railcar hydraulic cushioning required?
Answer: Yes. Defined in the Systems Requirement Document (SRD).
13. Please confirm that the design of the NSWC AIM Flatcar should be to AAR-M1001 Section C, part II, and not to any standards pertaining to tank cars.
Answer: Yes. Defined in the Systems Requirement Document (SRD).
14. Are there drawings for WS20972?
Answer: See the new GFI issued with current Solicitation Amendment.
15. What is the G-loading in conjunction with the requirement of the lightweight car of 116,000 pounds?
Answer: Please review Section 3.39 Figure 11 in SRD and the interface drawing Trident II AIM Flatcar /SSE Interface Dwg. 5681514.
16. On page 19 Section 3.12 of the SRD, correct?
Answer: Yes. Please review Section 3.39 Figure 11 in SRD and the interface drawing Trident II AIM Flatcar /SSE Interface Dwg. 5681514.
17. Will WS20972 be provided?
Answer: See the new GFI issued with current Solicitation Amendment.
18. Will the AIM Railcar Bulkhead, AIM Shipping Fixture, and Loading Tube as shown in the 'D5 AIM FLATCAR CARGO' figure of drawing 5681514 be provided as GFP for testing? Additionally, will all the hardware to attach the cargo structures to the flatcar be provided for testing?
Answer: Please review the GFP.
19. Is the government providing mechanical and fabrication drawings for the shipping fixture, bulkhead, and loading tube?
Current drawings provided do not have enough details to create CAD for analysis.
Answer: Please review the GFP.
20. What are the timelines for CLIN 0001 and CLIN 0002?
Answer: This can be negotiated.
21. What are the design criteria for the G forces/ strike-down load listed? Are they yield or ultimate?
Answer: This is listed in Trident II AIM Flatcar/SSE Interface Dwg. 5681514 in Figure 11 in the SRD.
Answer: Strike download did change but is listed in the updated SRD. Strike down load updated to 355 kips.
22. Is the 116,000 pounds lightweight critical given the Vertical G force requirement or is the overall capacity the critical element?
Answer: This is listed in Trident II AIM Flatcar/SSE Interface Dwg. 5681514 in Figure 11 in the SRD.
23. What is the maximum allowable length of the railcar?
Answer: Defined in the Systems Requirement Document (SRD).
24. Should max width of rail car fit within plate C? 10'-0" Recommended for max width with deck length of 68'.
Answer: Defined in Systems Requirement Document (SRD).
25. What is the preferred length of the rail car deck?
Answer: Defined in the Systems Requirement Document
26. What is to be done if the wheels, axles, bearings, side frames, truck bolsters, or span bolsters don't meet the G-loading criteria?
Answer: The system fails and redesign will be required.
27. What is the anticipated date of contract award?
Answer: The anticipated award date will be No Later Than 5 Mar 2027.
28. The empty weight of the car, resulting from the Gross Load Weight/Gross Rail Load requirement stated in Section 3.3.1, is not achievable.
Answer: The GRL is 286,000 lbs. The main focus is configuration 4.4. This will be the transportation load weight with the AIM that will be transported from site to site. Configuration 4.4 is listed at 186,800 lbs., therefore leaving 99,200 lbs. for the weight of JUST the flatcar to meet the 286,000 lb. GRL.
29. The Navy has requested a 68-foot car, the empty weight of the flatcar would be heavier than 80,000 lbs., thus resulting in an excess weight.
Answer: Configuration 4.1 thru 4.4 is the only transportation requirements so the max configuration load is 186,800 lbs. This leaves 99,200 lbs for the weight of JUST the flatcar. Regardless of this, if the design that the vendor creates is over that limit they will need to work with the railroad to put waivers in place so that the flatcar can still travel over the rail limiting the 286,000 lb gross load weight. Additionally, there are some specialized, higher-capacity cars that can handle a Gross Load Weight of 315,000 lbs, though their use might be restricted to specific routes capable of supporting such heavy loads.
30. In Drawing 5681514 on page 60 of 97 of the file "Drawings and SRD.pdf", Note 17 says that "Truck Axle Loads shall not exceed 60,000 lb. per axle in any load condition." To meet the axle load requirement, more than 4 axles are necessary.
Answer: The design DOESN'T have to be a 4-axle flatcar.
Answer: Question and answer above are no longer applicable because it is an obsolete facility requirement.
31.A 6-axle railcar cannot be designed due to the elimination of 3-axle truck bolsters by the rail industry. If the design changes to an 8-axle car, which uses commonly available components, the design of the railcar must be altered resulting in a change in the length specification, a change to the deck height and increase in weight of the railcar which will all exceed the current specifications.
Answer: This is defined in the SRD. This needs to meet the HxWxL requirements.
32.WS20972 and MIL-SPC-810. The specification refers to the securement of the load, but doesn't specifically say the equipment used to transport the load must be designed to these criteria. Please confirm the loadings specified in WS20972 document and MIL-SPC-810 apply to the securement of the load and not the vehicle itself.
Answer: Yes the loadings specified that WS20972 and MIL-SPC-810 apply to the securement of the load.
33. The SRD-500778 includes Configuration 5 requiring support of 249,500 lbs of cargo load, with Configurations 6 and 7 requiring 224,800 lbs. and 230,100 lbs. respectively. If the intended railcar design basis is a 286,000 lb. gross rail load platform, Configuration 5 would leave only
36,500 lbs. available for the car tare weight, which does not appear feasible for a compliant flatcar design. Also requesting Clarification regarding whether the new AIM Flatcar is intended to be limited to a 286,000 lb. gross rail load design, or Configurations 5, 6, and 7 load cases are to be interpreted differently than standard railcar cargo load/gross rail assumption.
Answer: If the design calls out for a higher GRL than 286,000 lbs. waivers can be discussed and that discussion can start. For more details, see previous comments about the load configurations. Configuration 4.4 is the main concern for the transportation load. 4.5 - 4.7 are used for storage and operational use at the facility.
34. At this time, the 286,000 lb. capacity requirement does not appear to be explicitly stated in the SOW text itself, 34.
Answer: Please see note 18 on Drawing 5681514. "ONLY LOAD CONFIGURATIONS 4.1 THRU 4.4 ARE USED FOR
TRANSPORTATION. OTHER LOADS ARE USED FOR STORAGE AND OPERATIONAL USE AT THE
FACILITY". Configuration 4.5 - 4.7 is just facility and storage requirements that will NOT leave the facility. They need to focus on configuration 4.4 as that is the main transportation weight for the cargo as it is in transit. In Configuration 4.4 the load is 216,800 lbs. With the max GRL at 186,000 lbs. this allows 99,200 lbs. for the weight of the flatcar itself.
35. Does the Government anticipate a heavier-duty design basis beyond a standard 286,000 lb. freight car platform?
Answer: The GRL is not listed in the SOW because it is a requirement and it is in the Systems Requirement Document
(SRD-500778).
36. In SRD -500778 Rev Chg 01 Signed, section 3.3.2 states the maximum gross weight of the care is to be no more than 286,000 pounds. Does this mean that the maximum allowable axle loading (with 2 axle trucks) is to be 71,500 pounds?
Answer: The max axle (with 2 axle trucks) loading is 71,500 pounds.
37. In SRD -500778 Rev Chg 01 Signed, section 3.3.7, it states the maximum weight of Configuration 5 is 219,500 pounds. Does this include the weight of the railcar?
Answer: No. Configuration 5 does NOT include the weight of the railcar. This isn't an issue because only load configurations 4.1 to 4.4 are used for transportation. Other loads are used for storage and operational use at the facility. Please see Note 18, on the Trident II AIM Flatcar/SSE Interface Drawing 5681514.
End of Q&A
CLIN 0003 PRICING MATRIX
Qty Year 1 Year 2 Year 3 Year 4 Year 5
1 N/A xxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxx
2 N/A
3 N/A
4 N/A
5 N/A
CLIN 0006 PRICING MATRIX
Destination Year 1 Year 2 Year 3 Year 4 Year 5
Strategic Weapons Facility Pacific (SWFPAC) N/A
Strategic Weapons Facility Atlantic (SWFLANT) N/A
Eastern Range
(ER) N/A
*Matrices to be completed by Offeror
Year 1 Time Period: Date of Award to 12 Months After Award **
Year 2 Time Period: 12 Months After Award to 24 Months After Award **
Year 3 Time Period: 24 Months After Award to 36 Months After Award **
Year 4 Time Period: 36 Months After Award to 48 Months After Award **
Year 5 Time Period: 48 Months After Award to 60 Months After Award **
** Actual dates will be included in the award document.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM QUANTITY - 1
MINIMUM AMOUNT - $20,000
MAXIMUM QUANTITY - 6
MAXIMUM AMOUNT - * TBD AT CONTRACT AWARD
NOTE: CLIN 0006 - SHIPPING IS NOT INCLUDED WITH MAXIMUM QUANTITY. SHIPPING WILL BE AN AT
"COST NO FEE" LINE ITEM WITH EACH FLAT RAILCAR DELIVERY.
Item Supplies/Service Quantity Unit Unit Price Amount
Drawings
The Design Phase includes the design of the Second-Generation D5 AIM Flatcar in accordance with the Statement of Work (SOW) and Technical Data Package as delineated in Section 3.2. The Design Phase will end in successful completion of the Critical Design Review.
Pricing Arrangement: Firm Fixed Price
1 Each
First Article Units and Testing
Fabrication of the First Article Second- Generation D5 AIM Flatcar in accordance with the Statement of Work (SOW) and Technical Data Package as delineated in Section 3.3.
First Article Testing includes tests such as Association of American Railroads Testing, facility checks, and final delivery of the First Article Second-Generation D5 AIM Flatcar in accordance with the Statement of Work (SOW) and Technical Data Package as delineated in Section 3.4.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Pricing Arrangement: Firm Fixed Price
1 Each
Production Units
Fabrication, production unit acceptance testing, and delivery of Second-Generation D5 AIM Flatcars in accordance with the Statement of Work (SOW) and Technical Data Package as delineated in Section
3.5. NOTE: This is an Undefined CLIN, therefore the quantity is notional and the Government may order less or more of the quantity value stated.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Pricing Arrangement: Firm Fixed Price
4 Each
Technical Data Technical Data Requirements for CLINs 0001 through 0003 in accordance with Contract data Requirements List (CDRLs). CDRLs A001 - A022, applicable Data Item Descriptions (DIDs), and the Statement of Work. The costs for all data/tech data generated by the contractor directly or indirectly in its performance of this procurement effort is included in the price paid by the Government under CLINs 0001 - 0003.
Pricing Arrangement: Firm Fixed Price
1 Lot
Contract Ceiling This CLIN is only to populate the contract ceiling amount. No Delivery Orders will be placed against this CLIN.
Pricing Arrangement: Firm Fixed Price
1 Each
SHIPPING
This CLIN encompasses the costs of shipping the First Article Unit (CLIN 0002) and the Production Units (CLIN 0003) to one of the three following locations: Strategic Weapons Facility Atlantic (SWFLANT) Kings Bay, GA; Strategic Weapons Facility Pacific )SWFPAC) Bangor, WA; or Eastern Range (ER) Cape Canaveral, FL. NOTE: This is an Undefined CLIN, therefore the quantity is notional and the Government may order less or more of the quantity value stated.
Shipping Destination will be determined at the Delivery Order level.
Pricing Arrangement: Cost No Fee
5 Each
Section C - Description/Specifications/Statement of Work
Requirements Flat Railcar
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(Endof Text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
(End of Text)
C-209-H003 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
(Offeror to fill in contract number(s), as applicable. See Section M)
(End of Text)
C-209-H001 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (APR 2024) (Apr 2024)
(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.
(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A dated 25 June 2013.
(End of Text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018) (Oct 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
(End of Text)
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
(End of Text)
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018) (Dec 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
(End of Text)
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018) (Oct 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal * dated * in response to NAVSEA Solicitation No. N0016426RGW20 .
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
* To be filled in by offeror
(End of Text)
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019) (Mar 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and
(iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen. No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair.
Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination.
The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M- 5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL-DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).
(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989- 064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.
(End of Text)
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A , attached hereto.
(End of Text)
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC
(NAVSEA) (OCT 2018)
(Oct 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above;
and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal
(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
(End of Text)
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018) (Oct 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
(End of Text)
C-242-H002 POST AWARD MEETING (NAVSEA) (OCT 2018) (Oct 2018)
(a) A post-award meeting with the successful offeror will be conducted within days after award of the contract. The meeting 30 will be held at the address below:
Location/Address: at the contractor's site
(b) The contractor will be given working days notice prior to the date of the meeting by the Contracting Officer.15
(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the contract award.
(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out. Specific topics shall be mutually agreed to prior to the meeting.
(End of Text)
C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE
I (NAVSEA) (MAY 2019)
(May 2019)
(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.
(b) . GFI is defined as that information essential for the installation, test, operation, Government Furnished Information (GFI) and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:
(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or
(ii) add items of data or information to the attachment identified in Section J; or
(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.
(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:
(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or
(2) By submitting a request to the
N0016426RGW200007
https://assist.dla.mil/online/start/
Department of Defense Single Stock Point (DoDSSP)
Building 4, Section D
700 Robbins Avenue
Philadelphia, Pennsylvania 19111-5094
Telephone (215) 697-6396
Facsimile (215) 697-9398
Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.
(End of Text)
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
(End of Text)
Section D - Packaging and Marking
Additional Regulation or Supplemental Clauses Incorporated by Full Text
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022) (Feb 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
(End of Text)
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018) (Oct 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
(End of Text)
Section E - Inspection and Acceptance
INSPECTION ACCEPTANCE NOTE
Due to system constraints, the base contract Inspection and Acceptance terms will be incorporated at award. Inspection and Acceptance will be as follows:
CLIN 0001: Inspection and Acceptance at Destination by Government
CLIN 0002: Inspection at Origin and Acceptance at Destination by Government
CLIN 0003: Inspection and Acceptance at Origin by Government
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-4 Inspection of Services-Fixed-Price. Aug 1996 52.246-16 Responsibility for Supplies. Apr 1984
Additional Regulation or Supplemental Clauses Incorporated by Full Text
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018) (Oct 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
(End of Text)
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019) (Jan 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
(End of Text)
Section F - Deliveries or Performance
DELIVERY INSTRUCTIONS
SPECIAL NOTE: Delivery orders for subsequent CLINs are contingent upon the successful delivery and approval of preceding CLINs. Specifically for CLIN 0001, 0002 and 0003.
A delivery order for CLIN 0002 may be issued only upon the successful delivery and acceptance of CLIN 0001.
A delivery order for CLIN 0003 may be issued only upon the successful delivery and acceptance of CLIN 0002.
CLIN 0001 Drawings
On or Before 390 Days After Date of Order (ADO)
CLIN 0002 First Article Units and Testing On or Before 286 Days After Date of Order (ADO)
CLIN 0003 Production Units
On or Before 492 Days After Date of Order (ADO)
Delivery NOTE: The Government requires the full quantity of units purchased under CLIN 0003 to be delivered on or prior to 492 days after receipt of order.
Early delivery of all CLINs will be acceptable at no extra cost to the Government.
Overall Contract Delivery Period
Government Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.242-15 Stop-Work Order. Aug 1989 52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991 52.247-55 F.o.b. Point for Delivery of Government-Furnished Property. Jun 2003
Additional Regulation or Supplemental Clauses Incorporated by Full Text
F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018) (Oct 2018)
All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
(End of Text)
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.204-7002 Payment for Contract Line or Subline Items Not Separately Priced. Apr 2020 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .