Solicitation Amendment No. 0008 Summary
This is Amendment No. 0008 to Request for Proposals (RFP) N0016426RGW20, issued by NSWC Crane Warfare Center on November 16, 2026, for the design, development, and production of Trident II Advanced Inertially guided Missile (AIM) flatcars. The amendment posts responses to questions 38-40, revises Section L paragraph 3.3.1 of the solicitation regarding proposal requirements, and removes the pricing matrix for CLIN 0006 (shipping) since shipping costs are excluded from unit prices for both First Article and Production units and will be billed separately at "Cost No Fee" with FOB Destination terms. The contract is a small business 100% set-aside (NAICS 336510) with anticipated award no later than March 5, 2027. Contract value is to be determined at award, with a minimum quantity of one unit and minimum contract value of $20,000, and a maximum of six units. The solicitation structure includes CLIN 0001 (Drawings at 390 days after delivery order), CLIN 0002 (First Article Units and Testing at 286 days ADO), CLIN 0003 (Production Units at 492 days ADO), and CLIN 0006 (shipping as a separate cost reimbursable line item). Questions clarified critical design parameters including 286,000-pound gross rail load capacity, 116,000-pound lightweight requirement, AAR-M1001 Section C compliance, and that only load configurations 4.1 through 4.4 apply to transportation, with configurations 4.5-4.7 reserved for facility storage and operational use.
Offerors must submit four volumes electronically to Steven Junkins (steven.l.junkins2.civ@us.navy.mil) by the deadline: Volume I (Technical Approach—31 pages maximum including 1-page executive summary, 20 pages for technical approach, 10 pages for management approach), Volume II (Past Performance—up to five references at 3 pages each), Volume III (pricing matrices and completed solicitation fill-ins with detailed Bill of Materials), and Volume IV (cover letter, warranty terms, and representations/certifications). Proposals must use 12-point Times New Roman font, 1-inch margins, 8.5×11-inch format, and be in Microsoft Office 2010 or newer or searchable PDF. The solicitation requires demonstrations of material certification, inspection and testing capabilities, compliance with Contract Data Requirements Lists, handling and shipping controls, and schedule tracking and risk management. Past performance references must be submitted directly by references via DoD SAFE, not through offerors, with questionnaires sent directly to the Contract Specialist. The proposal is valid for 365 days from the submission deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
Miscellaneous text in this section has been modified to:
Questions and Answers
1. Will past performance on non- federal government contracts related to rail car design, testing and manufacture be acceptable and desired (state, local government and commercial)?
Answer: Yes.
2. How does the Government intend to evaluate delivery pricing under the Solicitation's Item 0006 and SOW Section 3.4.5?
Answer: The cost of the shipping should be considered for all 3 Strategic Weapons Facility locations. The exact location will be determined by available location prior to the delivery order. The Government will evaluate comparatively with respect to shipping location.
3. When the railcar is delivered, is it the Governments expectation the car will be a fully commissioned car and able to be towed or the car will not be fully commissioned, and transportation must occur using a method other than towing?
Answer: Fully commissioned and approved for use on rail with AAR.
4. Were any risk reduction contracts awarded prior to this effort? If so, can you provide the contract number and what data rights the Government owns?
Answer: No risk reduction contracts have been awarded prior to this effort.
5. For each order, will there be a Not-to-Exceed amount given for Shipping since shipping costs may vary? Who bears the risk or the rail carrier damage?
Answers: Shipping should be planned out by the vendor. Assumption of risk is in accordance with "Freight on Board" (FOB) terms.
6. Is there an incumbent for this requirement?
Answer: No.
7. What are the number of rail cars to be manufactured for development and production?
Answer: See Section B.
N0016426RGW200008
8. What is the minimum quantity for this IDIQ?
Answer: See Section B
9. What are the number of flat railcars for this contract?
Answer: See Section B.
10. After contract award, how long will it take the Technical Point of Contract to provide GFI.
Answer: 30 days.
11. What should be included in the Bill of Material (BOM)?
Answer: The BOM should be based on the final design of the railcar.
12. Is the end of railcar hydraulic cushioning required?
Answer: Yes. Defined in the Systems Requirement Document (SRD).
13. Please confirm that the design of the NSWC AIM Flatcar should be to AAR-M1001 Section C, part II, and not to any standards pertaining to tank cars.
Answer: Yes. Defined in the Systems Requirement Document (SRD).
14. Are there drawings for WS20972?
Answer: See the new GFI issued with current Solicitation Amendment.
15. What is the G-loading in conjunction with the requirement of the lightweight car of 116,000 pounds?
Answer: Please review Section 3.39 Figure 11 in SRD and the interface drawing Trident II AIM Flatcar /SSE Interface Dwg. 5681514.
16. On page 19 Section 3.12 of the SRD, correct?
Answer: Yes. Please review Section 3.39 Figure 11 in SRD and the interface drawing Trident II AIM Flatcar /SSE Interface Dwg. 5681514.
17. Will WS20972 be provided?
Answer: See the new GFI issued with current Solicitation Amendment.
18. Will the AIM Railcar Bulkhead, AIM Shipping Fixture, and Loading Tube as shown in the 'D5 AIM FLATCAR CARGO' figure of drawing 5681514 be provided as GFP for testing? Additionally, will all the hardware to attach the cargo structures to the flatcar be provided for testing?
Answer: Please review the GFP.
19. Is the government providing mechanical and fabrication drawings for the shipping fixture, bulkhead, and loading tube?
Current drawings provided do not have enough details to create CAD for analysis.
Answer: Please review the GFP.
20. What are the timelines for CLIN 0001 and CLIN 0002?
Answer: This can be negotiated.
21. What are the design criteria for the G forces/ strike-down load listed? Are they yield or ultimate?
Answer: This is listed in Trident II AIM Flatcar/SSE Interface Dwg. 5681514 in Figure 11 in the SRD.
Answer: Strike download did change but is listed in the updated SRD. Strike down load updated to 355 kips.
22. Is the 116,000 pounds lightweight critical given the Vertical G force requirement or is the overall capacity the critical element?
Answer: This is listed in Trident II AIM Flatcar/SSE Interface Dwg. 5681514 in Figure 11 in the SRD.
23. What is the maximum allowable length of the railcar?
Answer: Defined in the Systems Requirement Document (SRD).
24. Should max width of rail car fit within plate C? 10'-0" Recommended for max width with deck length of 68'.
Answer: Defined in Systems Requirement Document (SRD).
25. What is the preferred length of the rail car deck?
Answer: Defined in the Systems Requirement Document
26. What is to be done if the wheels, axles, bearings, side frames, truck bolsters, or span bolsters don't meet the G-loading criteria?
Answer: The system fails and redesign will be required.
27. What is the anticipated date of contract award?
Answer: The anticipated award date will be No Later Than 5 Mar 2027.
28. The empty weight of the car, resulting from the Gross Load Weight/Gross Rail Load requirement stated in Section 3.3.1, is not achievable.
Answer: The GRL is 286,000 lbs. The main focus is configuration 4.4. This will be the transportation load weight with the AIM that will be transported from site to site. Configuration 4.4 is listed at 186,800 lbs., therefore leaving 99,200 lbs. for the weight of JUST the flatcar to meet the 286,000 lb. GRL.
29. The Navy has requested a 68-foot car, the empty weight of the flatcar would be heavier than 80,000 lbs., thus resulting in an excess weight.
Answer: Configuration 4.1 thru 4.4 is the only transportation requirements so the max configuration load is 186,800 lbs. This leaves 99,200 lbs for the weight of JUST the flatcar. Regardless of this, if the design that the vendor creates is over that limit they will need to work with the railroad to put waivers in place so that the flatcar can still travel over the rail limiting the 286,000 lb gross load weight. Additionally, there are some specialized, higher-capacity cars that can handle a Gross Load Weight of 315,000 lbs, though their use might be restricted to specific routes capable of supporting such heavy loads.
30. In Drawing 5681514 on page 60 of 97 of the file "Drawings and SRD.pdf", Note 17 says that "Truck Axle Loads shall not exceed 60,000 lb. per axle in any load condition." To meet the axle load requirement, more than 4 axles are necessary.
Answer: The design DOESN'T have to be a 4-axle flatcar.
Answer: Question and answer above are no longer applicable because it is an obsolete facility requirement.
31.A 6-axle railcar cannot be designed due to the elimination of 3-axle truck bolsters by the rail industry. If the design changes to an 8-axle car, which uses commonly available components, the design of the railcar must be altered resulting in a change in the length specification, a change to the deck height and increase in weight of the railcar which will all exceed the current specifications.
Answer: This is defined in the SRD. This needs to meet the HxWxL requirements.
32.WS20972 and MIL-SPC-810. The specification refers to the securement of the load, but doesn't specifically say the equipment used to transport the load must be designed to these criteria. Please confirm the loadings specified in WS20972 document and MIL-SPC-810 apply to the securement of the load and not the vehicle itself.
Answer: Yes the loadings specified that WS20972 and MIL-SPC-810 apply to the securement of the load.
33. The SRD-500778 includes Configuration 5 requiring support of 249,500 lbs of cargo load, with Configurations 6 and 7 requiring 224,800 lbs. and 230,100 lbs. respectively. If the intended railcar design basis is a 286,000 lb. gross rail load platform, Configuration 5 would leave only 36,500 lbs. available for the car tare weight, which does not appear feasible for a compliant flatcar design. Also requesting Clarification regarding whether the new AIM Flatcar is intended to be limited to a 286,000 lb. gross rail load design, or Configurations 5, 6, and 7 load cases are to be interpreted differently than standard railcar cargo load/gross rail assumption.
Answer: If the design calls out for a higher GRL than 286,000 lbs. waivers can be discussed and that discussion can start. For more details, see previous comments about the load configurations. Configuration 4.4 is the main concern for the transportation load. 4.5 - 4.7 are used for storage and operational use at the facility.
34. At this time, the 286,000 lb. capacity requirement does not appear to be explicitly stated in the SOW text itself, 34.
Answer: Please see note 18 on Drawing 5681514. "ONLY LOAD CONFIGURATIONS 4.1 THRU 4.4 ARE USED FOR
TRANSPORTATION. OTHER LOADS ARE USED FOR STORAGE AND OPERATIONAL USE AT THE
FACILITY". Configuration 4.5 - 4.7 is just facility and storage requirements that will NOT leave the facility. They need to focus on configuration 4.4 as that is the main transportation weight for the cargo as it is in transit. In Configuration 4.4 the load is 216,800 lbs. With the max GRL at 186,000 lbs. this allows 99,200 lbs. for the weight of the flatcar itself.
35. Does the Government anticipate a heavier-duty design basis beyond a standard 286,000 lb. freight car platform?
Answer: The GRL is not listed in the SOW because it is a requirement and it is in the Systems Requirement Document
(SRD-500778).
36. In SRD -500778 Rev Chg 01 Signed, section 3.3.2 states the maximum gross weight of the care is to be no more than 286,000 pounds. Does this mean that the maximum allowable axle loading (with 2 axle trucks) is to be 71,500 pounds?
Answer: The max axle (with 2 axle trucks) loading is 71,500 pounds.
37. In SRD -500778 Rev Chg 01 Signed, section 3.3.7, it states the maximum weight of Configuration 5 is 219,500 pounds. Does this include the weight of the railcar?
Answer: No. Configuration 5 does NOT include the weight of the railcar. This isn't an issue because only load configurations 4.1 to 4.4 are used for transportation. Other loads are used for storage and operational use at the facility. Please see Note 18, on the Trident II AIM Flatcar/SSE Interface Drawing 5681514.
38. Section F lists CLIN 0001 Drawings at 390 days ADO, CLIN 0002 First Article Units and Testing at 286 days ADO, and CLIN 0003 Production Units at 492 days ADO, and further states that each subsequent delivery order is issued only upon successful delivery and acceptance of the preceding CLIN. Are the "days After Date of Order (ADO)" period for each CLIN to begin on the date of that CLIN's own delivery order or on a common date such as contract award or the initial delivery order.
Answer: Each ADO doesn't start until the respective DO is issued for the subject CLIN.
39. Does the 286-day CLIN 0002 delivery period include the 30-day First Article test report submission and the 30-day Government approval period under FAR 52.209-3, or do those periods extend beyond the 286-day requirement?
Answer: CLIN 0002 includes the testing and final delivery of the First Article.
40. Section L 3.3.1 states that prices shall include all shipping and that shipping should be FOB Destination. Section B establishes CLIN 0006 as a separate Cost No Fee line item for shipping with each flat railcar delivery. Will shipping cost be reimbursed at actual allowable cost through CLIN 0006? Will shipping costs be folded into CLIN 0002 and CLIN 0003?
Answer(s): Yes, shipping cost will be at "Cost No Fee" and will be FOB Destination. The shipping costs will not be included in the price for the First Article (CLIN 0002) nor for the Production Units (CLIN 0003). The Pricing Matrix for CLIN 0006 has been removed.
End of Q&A
CLIN 0003 PRICING MATRIX
Qt y
Year
Year 2 Year 3 Year 4 Year 5
1 N/A xxxxxxxxxxxxxxxxxxxxx xxxx xxxxxxxxxxxxxxxxxxxxx xxxx xxxxxxxxxxxxxxxxxxxxx xxxx xxxxxxxxxxxxxxxxxxxxx xxxx
2 N/A
3 N/A
4 N/A
5 N/A
*Matrices to be completed by Offeror
Year 1 Time Period: Date of Award to 12 Months After Award **
Year 2 Time Period: 12 Months After Award to 24 Months After Award **
Year 3 Time Period: 24 Months After Award to 36 Months After Award **
Year 4 Time Period: 36 Months After Award to 48 Months After Award **
Year 5 Time Period: 48 Months After Award to 60 Months After Award **
** Actual dates will be included in the award document.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM QUANTITY - 1
MINIMUM AMOUNT - $20,000
MAXIMUM QUANTITY - 6
MAXIMUM AMOUNT - * TBD AT CONTRACT AWARD
NOTE: CLIN 0006 - SHIPPING IS NOT INCLUDED WITH MAXIMUM QUANTITY. SHIPPING WILL BE AN AT
"COST NO FEE" LINE ITEM WITH EACH FLAT RAILCAR DELIVERY.
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
PROPOSAL REQUIREMENTS
1.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS
Offeror shall comply with the detailed instructions for the format and content of the proposal. Proposals shall be clear and unambiguous. Proposals that do not comply with the detailed instructions for the format and content of the proposal may render the Offeror ineligible for award. The Government reserves the right to reject any proposal that does not comply with these proposal submission instructions.
Delivery and Submission Method
Electronic Delivery of Proposals. Electronic submission to Mr. Steven Junkins (steven.l.junkins2.civ@us.navy.
mil) are required. Timelines of proposals will be determined in accordance with FAR 52.215-1(c)(3)(ii)(A) as applicable. Do not send files containing personally identifiable information (PII), .zip files, or other large electronic files via email. Utilization of DoD SAFE at (https://safe.apps.mil/) is an acceptable transmission tool.
DoD SAFE supports file sizes up to 2GB. If using DoD SAFE, an Offeror shall send a drop-off request email to Mr. Junkins email provided herein. Offerors shall submit their proposal prior to the RFP deadline and comply with the detailed instructions for format and content of proposals.
Any proposal sent by electronic submissions must be completely received in the POC's email inbox prior to the time the solicitation closes in order to be timely; therefore, please take into consideration the time the electronic transmission process may take for the POC to actually receive your email when submitting NSWC Crane will NOT accept facsimile proposals or proposals submitted via Navy Electronic Business Opportunities (NECO).
2.0 PROPOSAL FORMAT
In order to maximize efficiency and minimize the time for proposal evaluation, all Offerors shall submit their proposals in accordance with the format and content specified below. The requirements below apply equally to subcontractors. Proposals that do not meet the requirements below may be deemed unresponsive and may not be eligible for award. The electronic proposal shall be prepared so that if printed, the proposal meets the following format requirements:
- 8.5 x 11-inch paper
- Single-spaced typed lines
- 1-inch margins
- Font text shall be 12-point Times New Roman, except for:
- Graphs, graphics, or charts used to supplement the proposal text shall use Times New Roman that is no smaller than 9-point font size
- Microsoft Office Excel spreadsheets shall use Times New Roman that Is no small that 9-point font size.
The Excel spreadsheets shall be formatted for printing in landscape orientation such that all row and column heading appear on each printed page. All spreadsheets shall include calculations in the cells showing all formulas . Do not enter hard data when formulas were used to calculate the entered value.
- No hyperlinks
- Proposals shall be in English and in U.S. dollars
- Proposals shall be Microsoft Office (word, Excel, PowerPoint) 2010 and newer versions or Adobe Acrobat (PDF) compatible. PDF files shall be searchable when reviewed electronically
2.1 Cover Page and Table of Contents
Offeror shall include a cover page and table of contents for each proposal volume. The cover page shall identify the solicitation number, proposal volume and title, and the Offeror's name. The cover page and table of contents will not count against page limitations.
2.2 Glossary of Abbreviations and Acronyms
Offer shall include a glossary of abbreviations and acronyms for each proposal volume that provides corresponding definitions. Glossaries will not count against page limitations
2.3 Page Numbering System
Offeror shall use a standard page numbering system to facilitate proposal references. All pages shall be numbered consecutively for each section within a volume. Charts, graphs, and other inserted materials shall be included in the page numbering system.
2.4 Restriction on Disclosure and Use of Data
Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall mark the title page with the following legend:
"This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this Offeror as a result of, or in connection with, the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets".
Offerors shall also mark each sheet of data it wishes to restrict with the following legend:
"Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal".
2.5 File Naming Convention
All proposal files shall include the Offeror's company name, volume #, document name, and other useful identifying information. For example:
Company_Volume_I _Technical Approach
Company_Volume_II _Relevant Past Performance
Company_Volume_III _Cost Proposal Narrative
Company_Volume_IV_Cover Letter
3.0 PROPOSAL ORGANIZATION AND CONTENT
Offeror shall organize its proposal and include all proposal content exactly as described herein. Offeror shall organize its proposal into separate volumes and adhere to page limitations as delineated in the Proposal Organization Table below. Page limitations will be treated as maximums. If exceeded, excess pages may not be read or considered in proposal evaluation. When both sides of a sheet display printed material, it shall be counted as two pages.
Proposal Organization Table
Volume Proposal Content Page Limitation
VOLUME I - Technical (Factor 1) Executive Summary 1 Page
Subfactor A:
Technical Approach
20 Pages
Subfactor B:
Management Approach
10 Pages
VOLUME II - Past Performance (Factor 2) Past Performance References
3 pages per reference
VOLUME III - Total Evaluated Price (TEP) (Factor 3) and Completed and SIGNED Solicitation
Pricing Matrices Fill-In
Solicitation Fill-In Information
No page limit
VOLUME IV - Contract Documentation
Cover Letter
Standard Warranty and Conditions
No page limit
3.1 VOLUME I - TECHNICAL (FACTOR 1)
The Technical volume of the proposal shall be submitted as Volume I and shall be no more than 30 pages; plus, an executive summary of no more than one (1) page for a total maximum of 31 pages. The technical proposal shall not contain any pricing information. The order of presentation in the Offeror's submitted written proposal shall correspond to the order of the Factors discussed below. The content requirements described below address major topics of concern to the Government. Failure to respond to any of these topics may be considered a deficiency and may render the Offeror ineligible for award. All proposal information provided must be relevant and clearly explain how the proposed item will meet the requirements of the solicitation. The proposal shall enable the Government evaluation personnel to facilitate a thorough evaluation and arrive at a sound factual-based determination as to whether the proposal will meet the Government's requirements. Each technical proposal shall be specific, detailed, and complete. The technical proposal should clearly and fully demonstrate the degree of the prospective contractor's knowledge and understanding of the requirements. The technical proposal shall be used as a method to determine if the proposed solutions to technical problems are valid and practical. Statements which merely paraphrase the Statement of Work (SOW) or attest that "standard procedures will be employed" are inadequate to enable the Government to evaluate and do not allow the Government to determine if the proposal complies with the requirements of the SOW. Unsupported promises to comply with contractual requirements will not be sufficient.
Failure to thoroughly describe how the proposed item meets a requirement (i.e. test data, test methods, design/drawings, etc.) will result in a negative evaluation in- regards to the subject requirement. Proposals must contain supporting rationale for any statements related to proposed performance. No assumptions will be made by evaluators regarding areas that are not addressed in the Offeror's written proposal. The Offeror's proposal shall be written in such detail to allow the Government to evaluate the proposal on an item/Contract Line Item Number (CLIN) by item/CLIN basis for all CLINs.
3.1.1 Subfactor A - Technical Approach
The submission of an offer constitutes unconditional acceptance to perform all of the tasks described in the SOW to provide the required supplies. Offeror shall provide a written technical proposal to the factors and subfactors described below in such detail as to allow the Government to evaluate the proposal. The proposal shall demonstrate the offeror's capabilities to manufacture or source, kit, and inspect per the applicable drawings and specifications in the SOW. Information to be reviewed by the Government includes material selection and control, testing capabilities including of the same or similar items, and inspection. Information to be reviewed by the Government shall include the information required within the five (5) standards below.
Standard 1: Offeror shall address their material certification procedures.
Standard 2: Offeror shall address their inspection and testing capabilities. Discussion shall address description of facilities, equipment, and personnel qualifications/experience.
Standard 3: Offeror shall address how they plan to comply with Contract Data Requirements Lists (CDRLs).
Standard 4: Offeror shall address their handling and shipping capabilities. Offeror shall describe their approach to controlling and protecting items from damage during transportation between facilities.
Standard 5: Offeror shall address their approach to tracking schedules. Offeror shall describe any management tools used to aid in progress tracking. Offeror shall describe how schedule progress will be communicated to the Government. Offeror shall describe their approach to identification, tracking and resolution of manufacturing problems.
3.1.2 Subfactor B - Management Approach
Offeror shall describe overall management approach including details about processes, tools, and other unique characteristics that demonstrate the ability to successfully manage this requirement. The proposal shall describe how they will track schedules, identify risks, problems, mitigation strategies, overall resolution, and customer /supplier communication.
3.2 VOLUME II - PAST PERFORMANCE (FACTOR 2)
Offeror shall provide all past performance information in accordance with Attachment 1 - Past Performance Matrix. Offeror shall provide three (3) past performance references, if available, which shall reflect recent experience performed within the last five years of the solicitation release date and that demonstrates experience relevant to the solicitation's SOW. In addition to these three past performance references, Offeror shall submit one additional past performance reference for each subcontractor proposed to perform more than 10% of the total effort, if applicable and available. Offeror shall describe how the past performance references are relevant, including details about how it is similar in scope and complexity to this solicitation's SOW.
The Offeror shall provide a maximum of five (5) past performance references. The Offeror shall contact past performance references directly and request that they complete and submit the Past Performance Questionnaire (PPQ), Attachment 2 to steven.l.junkins2.civ@us.navy.mil via DoD Safe in accordance with the timeline set in Block 9 of SF33, Page 1 of the Solicitation. All complete questionnaires shall be sent directly from the POC to the Contract Specialist, Steven Junkins. Under no circumstances shall the questionnaires be returned to the offerors. Any information provided by the offeror's references is subject to verification/validation by the Government during the evaluation process. Each Offeror shall submit present and past performance information for itself on projects of similar size, scope, and technical complexity.
The Offerors may choose to submit present and past performance information for major proposed subcontractors, team members, and/or joint venture partners that have experience in projects of similar size, scope, and technical complexity with their proposal. The total number of past performance references for each Offeror shall not exceed five (including any references submitted by subcontractors, team members and/or joint ventures). This volume shall provide a list of current and relevant contracts on which the offeror has performed in the format requested in the Proposal Requirements portion of this document.
This information, as well as other information the Government may obtain elsewhere via Government databases (CPARs, etc.) and other Government agencies (DCMA, DCAA, etc.), will be used to evaluate the Offeror's past performance. The Government reserves the right to solicit feedback beyond what is identified in the questionnaire. NO CLASSIFIED PAST PERFORMANCE SUPPLEMENTS WILL BE ACCEPTED. Offerors are notified that the Government will use the data provided in this volume that is determined to be current and relevant to the effort at hand and data obtained from other sources in the development of performance risk assessments.
3.3 VOLUME III - TOTAL EVALUATED PRICE (TEP) (FACTOR 3)
3.3.1 Section B: Pricing
The Offeror shall submit pricing for each priced CLIN. For CLINs 0001 and 0002, which are single, one-time prices, the Offeror shall provide pricing in Section B. CLIN 0003 has quantity breaks and can be ordered across multiple years, pricing shall be provided in the pricing matrix at the top of Section B. Should there be any discrepancies with any other pricing information submitted the prices included within the pricing matrix and CLIN Table in Section B will take precedence. As such, the resulting contract award will be made to the successful Offeror using their proposed pricing with the pricing matrix in Section B. Offerors shall submit completed signed solicitation packages including amendments if applicable, with all representations and certifications executed, and with prices in Section B. The prices for shipping will not be included in either the First Article units(CLIN 002) or the Production units (CLIN 0003). The Pricing Matrix for CLIN 0006 has been removed. Shipping should be FOB Destination
3.3.2 Solicitation Fill-ins
Offeror shall complete all solicitation fill-ins using the latest amended solicitation version and provide a copy within Volume III.
3.3.3 Bill Of Materials (BOM)
Offer shall submit a detailed, priced BOM for each proposed solution associated with the CLINs in Section B within Volume III. The BOM shall break down the total proposed CLINs price into individual components, parts, quantities and their associated costs.
3.4 VOLUME IV - CONTRACT DOCUMENTATION
3.4.1. Cover Letter.
Offeror's and subcontractors shall provide a cover letter with the following information:
Solicitation number.
Company name, CAGE code, DUNS number, address, e-mail address, and telephone number.
A statement confirming agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.
A statement that the proposal is valid through 365 calendar days from the date specified for receipt of proposals.
Names, titles, telephone numbers, and e-mail addresses of people authorized to negotiate on the Offeror's behalf with the Government in connection with this solicitation.
DCAA and DCMA office POC, including branch location, contact name, telephone number and e-mail address.
Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office. The Offeror's signature on their proposal indicates the company will meet all requirements of the SOW, without exception and identify all enclosures being transmitted as part of the Offeror's proposal.
If an Offeror believes no organizational conflict(s) of interest exists, an affirmative statement that no such conflict exists shall be included in the cover letter.
3.4.2 Standard Warranty Terms and Conditions
Offerors shall provide a copy of any Standard Warranty being proposed and shall be provided as Volume
IV.
3.4.3 Small Business
The North American Industry Classification (NAICS) code applicable to this solicitation is 336510. The Size standard for NAICS 336510 can be found at www.sba.gov. The size standard certified by the Offeror in its System for Award Management (SAM) Representations and Certifications is valid for the base ordering period and duration of any resultant contract issued against this solicitation. Offerors are advised that this solicitation is 100% set aside for small business. Immediately after the specified closing date and time, the Government will verify each Offeror's size status in SAM.gov to ensure that Offerors are certified as a small business. Any Offeror that is not certified appropriately will be ineligible for award and, therefore, will not be evaluated.
In the event multiple similarly situated small businesses join to meet the requirement to perform more than 50% of the effort, Offerors are advised that there may be an inherent technical risk associated with no clear prime contractor in charge of ensuring successful performance. Offerors should consider this risk in determining how many partners are needed to comply with the greater than 50% requirement.
| IDCode: J |
| Page: 1 |
| Pages: 16 |
| AmendNo: 0008 |
| EffDate: 16 Nov 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00164 |
| AdmCode: |
| IssuedBy: NSWC CRANE |
WARFARE CENTER, 300 HIGHWAY 361
CRANE, IN 47522-5001
UNITED STATES
Steven Junkins, Email: steven.l.junkins2.civ@us.navy.mil Telephone: 812-381-7148 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0016426RGW20 |
| SolDate: 21 Jan 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This modification is to post new questions and answers for questions 38 to 40. In addition Section L paragraph 3.3.1 of the Solicitation has been revised. Lastly, the pricing Matrix for shipping (CLIN 0006) has been removed as the shipping cost is not included in the unit price for the First Article or for the Production units. |
| ContNameTitle: |
| CoNameTitle: Leslie A. Graber-Heshelman |
| ContDate: |
| CODate: 16 Nov 2026 |