SOLICITATION

View the file

Other files

File Type Posted
15RWM61_Amendment_0006.pdf PDF
15RWM61_0005.pdf PDF
15RWM61_Amendment_0004.pdf PDF
15RWM61_Amendment_0003.pdf PDF
15RWM61_0002.pdf PDF
N00164-15-R-WM61_Amendment_1.pdf PDF
15RWM61_att_01.zip ZIP file
15RWM61_att_02.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 78 - 94

95 - 121 X H 122 - 130

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A3 1 130

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00164 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 14

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

15 - 33

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

35 - 37 38 - 40

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 41 - 50 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 51 - 55 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

56 - 76

PART II - CONTRACT CLAUSES

NAVAL SURFACE WARFARE CENTER CRANE DIV

R. FULTZ 812-854-8958

BLDG 121

300 HIGHWAY 361

CRANE IN 47522-5000

812-854-8958

812-854-3805FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

27 Feb 2015

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N00164-15-R-WM61

Section B - Supplies or Services and Prices

ITEM

NO SUPPLIES/SERVICES QTY U/I UNIT PRICE AMOUNT

0001 Services - LOT 1

Unrestricted - Installation and De-installation of Surface Electronic Warfare (SEW) Systems pursuant to the Statement of Work (SOW), paragraph 3.0, included in Section C herein.

Lot

FSC/PSC: 5865

CPFF Estimated Cost Fixed Fee Total Estimated Cost Plus Fixed Fee

ITEM

NO SUPPLIES/SERVICES QTY U/I UNIT PRICE AMOUNT

0002 Services - LOT 2

Small Business Set-Aside - Installation and De-installation of Surface Electronic Warfare (SEW) Systems pursuant to the Statement of Work (SOW), paragraph 3.0, included in Section C herein.

Lot

CPFF Estimated Cost Fixed Fee Total Estimated Cost Plus Fixed Fee

ITEM NO SUPPLIES/SERVICES QTY U/I UNIT PRICE AMOUNT

0003 Support Costs - LOT 1

Unrestricted - Other Direct Costs in support of CLIN 0001, including travel, incidental materials and subcontracting. No Fee shall be paid on costs under CLIN 0003.

1 Lot

FOB: Destination

FFP

0004 Support Costs - LOT 2

Small Business Set-Aside - Other Direct Costs in support of CLIN 0002, including travel, incidental materials and subcontracting. No Fee shall be paid on costs under CLIN 0004.

0005 Supplies - LOT 1

Unrestricted: Materials needed to perform the services in accordance with the Statement of Work, paragraph 3.6. A list of materials will be provided with each order.

0006 Supplies - LOT 2

Small Business Set-Aside: Materials needed to perform the services in accordance with the Statement of Work, paragraph 3.6. A list of materials will be provided with each order.

0007 Services - LOT 1

Unrestricted: Installation and De-installation of Surface Electronic Warfare (SEW) Systems pursuant to the Statement of Work (SOW), paragraph 3.0 included in Section C herein.

0008 Services - LOT 2

Small Business Set-Aside: Installation and De-installation of Surface Electronic Warfare (SEW) Systems pursuant to the Statement of Work (SOW), paragraph 3.0 included in Section C herein.

0009 Data/Technical Data

Technical Data in accordance with DD Form 1423 Contract Data Requirements List contained in Section J herein. The Government shall have unlimited rights to all Data/Tech Data generated under this effort IAW DFARS 252.227-7013, unless an assertion is provided with the offer IAW DFARS 252.227-7017. The price/costs for all Data/Tech Data generated by the contractor directly or indirectly in its performance of this procurement effort. NOTE: CLIN 0009 will be an unpriced CLIN.

LABOR MIX

ESTIMATED LEVEL OF EFFORT:

CLINs 0001 and 0002 are cost reimbursement. CLINs 0007 and 0008 are intended as fixed price equivalents of CLINs 0001 and 0002.

The total number of direct labor hours includes subcontracted labor hours, but does not include holiday, sick leave, vacation and other absence hours. The anticipated labor hours to be expended hereunder is estimated below:

Lot 1 – UNRESTRICTED FULL AND OPEN COMPETITION (CLIN 0001/0007) For purposes of preparing a cost proposal, the offeror should assume that the following number and mix of labor hours will be required, as noted in each year, over the sixty month contract ordering period. The total number of hours of direct labor does not include holiday, sick leave, vacation and other absence hours. The total estimated composition of the 271,913 hours of direct labor is as follows:

Labor Category FY16 Hours

FY17

Hours

FY18

Hours

FY19

Hours

FY20

Hours

TOTAL

Hours

*Program Manager 375 637.5 637.5 540 345 2,535 Senior Engineer 4,500 7,500 7,500 6,375 4,500 30,375 Engineer 7,200 12,000 12,000 10,200 6,600 48,000 Logistician 5,400 9,000 9,000 8,100 4,950 36,450 *QA Specialist 2,700 4,500 4,500 3,825 2,475 18,000 Technical Writer 4,500 7,500 7,500 6,375 4,125 30,000 Clerk/Typist 45 75 75 63.75 41.25 300 Senior Engineering Tech 3,600 6,000 6,000 5,100 3,300 24,000 Engineering Technician 3,600 6,000 6,000 5,100 3,300 24,000 *Planner/Estimator 2,250 3,000 3,000 2,550 1,650 12,450

*Site Foreman 450 750 750 637.5 262.5 2,850 QA Technician 2,700 4,500 4,500 3,825 2,475 18,000 Marine Equip Mechanic 45 75 75 63.75 45 304 Shipfitter/Welder/Burner 75 187.5 187.5 157.5 101.25 709 Pipefitter/Brazier 75 187.5 187.5 157.5 101.25 709 Marine Electrician 75 187.5 187.5 157.5 101.25 709 Electronic Technician 3,150 5,250 5,250 4,463 2,888 21,000 Machinist 30 37.5 37.5 33.75 22.5 161 Maintenance Trades Help

30 37.5 37.5 33.75 22.5 161

Painter/Sandblaster 90 150 150 127.5 82.5 600 Insulator/Lagger 90 150 150 127.5 82.5 600

TOTAL 40,980 67,725 67,725 58,013 37,470 271,913

*Denotes Key Personnel

Accordingly, in the performance of any task order, the contractor will be allowed to adjust the allocation of labor hours in a month amongst the various labor categories as required to accomplish the technical objectives of the delivery order, provided that such adjustment does not cause the ceiling dollar amount for the delivery order to be exceeded.

The contractor shall be reimbursed for costs considered to be alowable, allocable and reasonable as ‘other direct costs’ by the cognizant Defense Contract Audit Agency auditor, consistent with the principles in FAR Part 31.

Amounts to be reimbursed under CLIN 0003 may include applicable G&A or material handling expense, but no fee shall be paid on the costs incurred under CLIN 0003.

Lot 2 – SMALL BUSINESS SET-ASIDE (CLIN 0002/0008) For purposes of preparing a cost proposal, the offeror should assume that the following number and mix of labor hours will be required, as noted in each year, over the sixty month contract ordering period. The total number of hours of direct labor does not include holiday, sick leave, vacation and other absence hours. The total estimated composition of the 90,637 hours of direct labor is as follows:

Labor Category

FY16

Hours FY17 Hours FY18 Hours

FY19

Hours

FY20

Hours

TOTAL

Hours

*Program Manager 125 212.5 212.5 180 115 845

Senior Engineer 1,500 2,500 2,500 2,125 1,500 10,125

Engineer 2,400 4,000 4,000 3,400 2,200 16,000

Logistician 1,800 3,000 3,000 2,700 1,650 12,150

*QA Specialist 900 1,500 1,500 1,275 825 6,000

Technical Writer 1,500 2,500 2,500 2,125 1,375 10,000

Clerk/Typist 15 25 25 21.25 13.75 100

Senior Engineering Tech 1,200 2,000 2,000 1,700 1,100 8,000

Engineering Technician 1,200 2,000 2,000 1,700 1,100 8,000

*Planner/Estimator 750 1,000 1,000 850 550 4,150

*Site Foreman 150 250 250 212.5 87.5 950

QA Technician 900 1,500 1,500 1,275 825 6,000

Marine Equip Mechanic 15 25 25 21.25 15 101

Shipfitter/Welder/Burner 25 62.5 62.5 52.5 33.75 236

Pipefitter/Brazier 25 62.5 62.5 52.5 33.75 236

Marine Electrician 25 62.5 62.5 52.5 33.75 236

Electronic Technician 1,050 1,750 1,750 1,488 963 7,000

Machinist 10 12.5 12.5 11.25 7 53

Maintenance Trades Help 10 12.5 12.5 11.25 7 53

Painter/Sandblaster 30 50 50 42.5 27.5 200

Insulator/Lagger 30 50 50 42.5 27.5 200

TOTAL 13,660 22,575 22,575 19,338 12,489 90,637

*Denotes Key Personnel

Accordingly, in the performance of any task order, the contractor will be allowed to adjust the allocation of labor hours in a month amongst the various labor categories as required to accomplish the technical objectives of the delivery order, provided that such adjustment does not cause the ceiling dollar amount for the delivery order to be exceeded.

The contractor shall be reimbursed for costs considered to be alowable, allocable and reasonable as ‘other direct costs’ by the cognizant Defense Contract Audit Agency auditor, consistent with the principles in FAR Part 32.

Amounts to be reimbursed under CLIN 0004 may include applicable G&A or material handling expense, but no fee shall be paid on the costs incurred under CLIN 0004.

CLAUSES INCORPORATED BY FULL TEXT

CNIN-B-0005 ORDERING -- ADDITIONAL INFORMATION (JAN 2013)

The agency authorized to place delivery orders against this contract is:

Naval Surface Warfare Center, Crane Division (NSWC Crane) – N00164 300 Hwy 361 Crane, IN 47522-5001.

Orders shall be placed against this contract using a DD 1155 or SF 1449 format.

CNIN-B-0008 DATA RIGHTS

(APR 2012)

The Government shall have unlimited data rights to all technical data generated in the performance of this contract, whether required to be delivered or not, in accordance with (IAW) DFARS 252.227-7013; and similarly to all computer software and computer software documentation generated in the performance of this contract, whether required to be delivered or not, IAW DFARS 252.227-7014; unless an assertion is provided and accepted by the Government with the offer IAW DFARS 252.227-7017. Upon creation of an assertion table as directed/applicable, the Offeror will identify the specific CLIN and CDRL to which the assertion applies. No assertion table(s) will be accepted in response to a Request for Proposal (RFP). Assertion(s) may be incorporated into each individual order or resultant contract.

CNIN-NOTICE-0001 SECTION B NOTES (JUL 2014)

1. Section K herein will be incorporated by reference and made a material part of the contract in accordance with

FAR Subpart 15.204-1(b).

2. The System for Award Management (SAM) has replaced Central Contracting Registration (CCR). Offers may obtain information on SAM registration and annual confirmation at the website https://www.sam.gov , or https://www.acquisition.gov and by phone at 1-866-606-8220.

3. Data Item Descriptions (DIDS) referenced in the attached Contract Data Requirements List(s) (CDRLs) are available at the following website: http://www.assistdocs.com

4. The technical data package for this action and subsequent orders may contain information that is export controlled. Only those companies that have completed DD Form 2345 and are certified under the Joint Certification Program (JCP) in an active status are authorized to receive export controlled information.

Additional information is available at http://www.dlis.dla.mil/jcp/.

5. Technical questions concerning this procurement shall be submitted in writing to arrive at NSWC Crane no later than 2:00 PM EST on the 14th calendar day preceding the closing date shown on page 1 addressed as follows:

COMMANDER

CONTRACTING OFFICER/SPECIALIST Rodney Fultz

NSWC CRANE DIVISION, CODE 0222, BLDG 121

300 HWY 361

CRANE IN 47522-5000

or E-mail questions to Rodney.fultz@navy.mil

6. Any amendments to the subject solicitation will be posted to FedBizOpps (http://www.fbo.gov). The complete solicitation package, including all amendments, should be received and reviewed prior to submitting a response. It is the responsibility of the offeror to obtain all amendments and/or other applicable documents prior to submission of the offer. Under these circumstances, offerors are reminded to include acknowledgement of acceptance of these amendments in their offer.

7. The minimum value of services (including cost plus fixed fee) that must be ordered from each awardee will be $10,000.00. If an offeror receives a contract award under both the unrestricted and small business set-aside lots (Lot 1 and Lot 2), the minimum shall be $20,000 (or $10,000 per each contract award).

8. The Government intends to reimburse Other Direct Costs (CLINs 0003 and 0004) on the basis of actual reasonable and allowable costs incurred plus applicable indirect markup rates (i.e. G&A and material handling).

No FEE will be paid for ODCs.

To be added upon award, if applicable:

9. “Contractor XYZ’s” Subcontracting Plan is hereby incorporated and made a material part of this contract IAW FAR 19.705-5(a)(5). The subcontracting plan is an attachment set forth in Section J.

10. The contractor’s warranty provided in response to the solicitation is incorporated by reference and made a material part of the contract.

CNIN-NOTICE-0002 NSWC CRANE GENERAL PROCUREMENT INFORMATION (APR 2014)

1. HANDLING OF INFORMATION BY CONTRACTOR SUPPORT PERSONNEL

Contractors are hereby notified that contractor support personnel within the NSWC Crane Contracting Department may be handling Bid and Proposal or Quote data as well as other correspondence and documentation concerning this action. Non-disclosure statements have been executed by all contractor support personnel participating in the process and are maintained by NSWC Crane.

2. BUSINESS HOURS

NSWC Crane Division allows flexible working hours for its employees. The core time when all employees are scheduled to work is 9:00 am to 3:00 pm (local time).

3. TAX EXEMPTION

Section 39(A) and Section 6 of the Indiana Gross Income Tax Act of 1933, specifically exempts NSWC Crane Division as a government activity from any payment of sales and use taxes.

The assigned Exemption Number is 0018103400015

4. VENDOR SURVEY

NSWC Crane Contracting Department’s mission is to provide responsive, best-value contracting and acquisition support for all customers, accomplished in partnership with industry, academia, and other Government activities, while maintaining the public's trust and fulfilling public policy objectives. In an effort to continually improve our services, the Contracting Office is conducting a survey of our vendors. Your comments will help us determine if we are accomplishing our mission and provide recommendations for ways to improve our processes. Please consider taking the time to complete the survey which can be accessed at the following address:

http://www.navsea.navy.mil/nswc/crane/working/contracting/Lists/Vendor%20Survey/overview.aspx.

5. NSWC CRANE VISITOR INFORMATION: PORTABLE ELECTRONIC DEVICE POLICY

NSWC Crane has implemented full compliance with the NAVSEA Access and Movement Control Instruction 5510.2C, dated 7 August 2012, which restricts the use of portable electronic devices (PEDs) in all NAVSEA spaces. In accordance with NSWC Crane Policy Letter 14-02 dated 20 March 2014, all government civilian, military and contractor personnel assigned to NSWC Crane and all visitors are prohibited from bringing any device or equipment capable of recording, transmitting or exporting photographic images or audible information of any kind into NSWC Crane spaces . This policy prohibits all personal electronic devices other than personal cell phones. For the purpose of this policy, “spaces” include outdoor ranges and test areas.

NSWC Crane areas will be clearly marked. Prohibited devices include: MP3 players, e-readers, digital recording devices, laptop and tablet computers, and/or other electronic devices not provided by the government or specifically authorized. One-way pagers are allowed for fire, safety and security purposes. These devices can be used in non-NSWC Crane areas.

6. RAPIDGate NSA/NSWC CRANE INSTALLATION ACCESS NSA/NSWC Crane is implementing the Navy Commercial Access Control System (NCACS) projects. The NCACS is the standard identity management and perimeter installation access control solution for the access management of vendors, contractors, suppliers and service providers who are not authorized a Common Access Card (CAC). The rationale for implementation of this system is to increase security while reducing impacts to the contractor community by improving efficiencies for base entry.

A new protocol being implemented to fulfill this NCACS requirement is the RAPIDGate system. The system meets Presidential Directive (HSPD-12) requirements by providing background checks of contractor personnel.

A personal badge that affords base access (and/or multiple base access) for one year will be issued to each Contractor employee that meets background check criteria. While Contractors are not required to participate in this program, those Contractors who choose not to participate will be required to obtain daily passes for base access.

For contracts which include the FAR 52.204-9 Personal Identity Verification of Contractor Personnel or will otherwise require frequent access to the Naval Support Activity (NSA)/NSWC Crane site, contractors should consider taking advantage of the benefits available from the RAPIDGate program. A Government Sponsor is required to validate a Contractor’s request for RAPIDGate access, and shall be the Contracting Officer’s Representative (COR). If there is no COR, then the Government Sponsor is the Contracting Officer.

The Government does not guarantee the contractor’s successful enrollment or the successful enrollment of any contractor employees in the RAPIDGate program. Significant delays may result from choosing to access the installation by obtaining a one day pass. The Government will not be held responsible for any access delays associated with using the daily pass process. Please address any questions or concerns regarding RAPIDGate to the COR or the local Base Security Office personnel listed below.

NSA/NSWC Crane RAPIDGate Primary Program Point of Contact is Jon Thomas, and can be reached at Jon.M.Thomas@Navy.mil or at 812-854-5642.

Additional information is available at http://www.rapidgate.com/rapidgate

7. NSWC CRANE RECEIVING FACILITY SCHEDULE

Contractors shall schedule deliveries to ensure arrival at destination only on Monday through Friday (excluding holidays) between the hours of 7:00 A.M. and 2:00 P.M. Eastern Standard Time (EST). The receiving facility is closed on Saturdays and Sundays.

Contractors shall ensure deliveries of EXPLOSIVE MATERIALS arrive at destination only on Monday through Thursday (excluding holidays) between the hours of 7:00 A.M. and 2:00 P.M. EST. The receiving facility for explosives is closed on Fridays, Saturdays and Sundays.

PAYMENT OF FEES(S) (LEVEL OF EFFORT – ALTERNATE I) (NAVSEA) (MAY 2010)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts for level of effort type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable, and shall be paid at the hourly rate(s) specified above per man-hour performed and invoiced.

Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ-B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS LANGUAGE

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

HQ-B-2-0014 PAYMENTS OF FEE(S) (COMPLETION) (NAVSEA) (MAY 1993)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, "fixed fee" in cost-plus-fixed-fee type contracts for completion and phase type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be equal ** percent ( ** %) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, in accordance with the clause of this contract entitled "LIMITATION OF FUNDS" (FAR 52.232-22) or "LIMITATION OF COST" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

NOTE: Percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money.

** - To be determined for each Delivery Order

HQ B-2-0020 TRAVEL COSTS - ALTERNATE I (NAVSEA) (DEC 2005)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its reasonable actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs accepted by the cognizant DCAA.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.

(c) Relocation costs and travel costs incident to relocation are allowable to the extent provided in FAR 31.205-35;

however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incident to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.

(End of Text)

HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST AND FIXED PRICE TYPE)(FEB

1997)

This contract includes the possibility of both cost and firm-fixed price orders.

Item Type

FFP Firm Fixed Price FPLOE Fixed Price Level of Effort CPFF LOE Cost Plus Fixed Fee Level of Effort Cost

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

NOTE: This Statement of Work is applicable to both LOT 1 and LOT 2.

STATEMENT OF WORK (SOW)

FOR

SERVICES TO SUPPORT SURFACE

ELECTRONIC WARFARE (EW) SYSTEMS

1.0 SCOPE

The mission of Naval Surface Warfare Center Crane Division (NSWC Crane) Maritime Electronic Warfare (EW) Systems Division, the In-Service-Engineering-Agent (ISEA) for Advanced EW System Integration, is to transition current EW technology to the U.S. Navy and Coast Guard Fleets, and to provide EW upgrade support to various Coalition Countries by means of Foreign Military Sales (FMS). This requires execution of various Ship Alterations (SHIPALTS), Ordnance Alterations (ORDALTS), and Ship Changes (SCs) which are executed outside Chief of Naval Operations availabilities.

This SOW sets forth the requirements for platform fabrication, as well as system installations/ de-installations for the U.S. Navy, U.S. Coast Guard, and FMS cases. The industrial support will be executed pier side at both CONUS and OCONUS maritime facilities, in public or private shipyards when the Multi-Ship, Multi- Option contract is not available. Task Orders will contain specific work statements and may require resources to support concurrent installations in various world-wide locations. Ship Hulls and Surface EW Systems to be supported under this contract include, but are not limited to the following:

Ship Hulls Surface EW Systems DDG-51 Class AN/SLQ-32(V) all variants to include V6 DDG-1000 Class ES/3601/3701 LHA Class AN/SSX LSD Class AN/SLA-10D LPD Class SEACAP CVN-78/79 Transportable EW Module Various FMS Vessels MK 59 Littoral Combat Ships

USCG WMEC/WMSL

MK-34/MK/36/MK-53 Decoy Launchers

2.0 APPLICABLE DOCUMENTS

The following documents form a basis for this contract. The contractor shall use the current revision when the referenced version has been superseded. Other documents may be specified at the Task Order level. Wherever MILSPECS and MIL Standards are cited, it shall be understood that they are for guidance only.

2.1 Department of Defense Specifications

NAVSEA S9AAO-AA-

SPN-010/GEN-SPEC

General Specifications for Ships of the United States Navy

TS9090-100A Liaison Action Record (LAR) TS9090-310F Alterations to Ships Accomplished by Alteration Installation

Teams

2.2 Department of Defense Standards

DOD-STD-2003-4 (SH) Electric Plant Installation Standard Methods for Surface

Ships and Submarines (Cableways) MIL-STD-22D Notice 3 Welded Joint Design MIL-STD-1310H (Navy) Shipboard Bonding, Grounding, and Other Techniques for

Electromagnetic Compatibility, Electromagnetic Pulse (EMP) Mitigation, and Safety

MIL-STD-1689A (SH) Fabrication, Welding, and Inspection of Ships Structure MIL-STD-2042B Notice 1 Fiber Optic Cable Topology Installation Standard Methods for Naval Ships

2.3 Other Government Documents

EPA 20T-2003 Managing Asbestos in Place EPA 560-OPTS-86-001 A Guide to Respiratory Protection for the Asbestos

Abatement Industry EPA 560/5-85-024 Guidance for Controlling Asbestos-Containing Materials in

Buildings NAVSEA 9210.4A C(Ser 08J/C90 -55740691LD4541600) Changes, Repair and

Maintenance to Nuclear Powered Ships (U) NAVSEA Standard Item

(NSI) 009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

NSI 009-09 Process Control Procedure (PCP); provide and accomplish NSI 009-24 Authorization, Control, Isolation, Blanking, and Tagging

Requirements; accomplish NSI 009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install NSI 009-74 Occupational, Safety and Health Requirements; accomplish NSI 009-78 Passive Countermeasures System (PCMS) Material

Repair/Installation Requirements; accomplish No Document Number Crane Pre/Post-Deployment Checklist for Contractor

Employees Deploying to Theaters of Operation

OPNAVINST 5100.23G

CH-1

Navy Safety and Occupational Health Program Manual

OSHA 1910.1200 Toxic and Hazardous Substances OSHA 1915.14 Hot Work OSHA 1915.15 Maintenance of Safe Conditions OSHA 1915.16 Warning Signs and Labels OSHA 1915.502 Fire Protection in Shipyard Employment

NAVSEA S0400-AD-URM-

010/TUM Revision 07

Tag Out Users Manual

S9074-AQ-GIB-010/248 Requirements for Welding and Brazing Procedure and Performance Qualification

S9074-AR-GIB-010/278 Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure Vessels

SL720-AA-MAN-010 Rev 2 w/Change 3

Fleet Modernization Program (FMP): Management and Operations Manual

T9074-AS-GIB-010/271

Change Notice 1

Requirements for Nondestructive Testing Methods

NAVSEA Standard Items can be found at the following link:

http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx

Other NSIs, SC Documents, SHIPALT/ORDALT Records, Ship's Installation Drawings, and Sketches will be specified at the Task Order Level.

2.4 Industry Documents

ANSI Z49.1:2012 Safety in Welding, Cutting, and Allied Processes

AWS

A3.0M/A3.0:2010

Standard Welding Terms and Definitions

AWS B4.0:2007 Standard Methods for Mechanical Testing of Welds ISO 9001:2008 Quality management systems - Requirements SSPC-QP 2 Standard for Evaluating Painting Contractors

(Removal of Hazardous Coatings from Industrial/Marine Steel Structures)

2.5 NAVSEA Drawings

REMOVAL/

DE-INSTALLATION

DRAWINGS

REV NOMENCLATURE SHEETS

53711-8476812 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade STRL FDN

DWG & ML

1, 1A, 2, 3, 6, 9, 11

53711-8476813 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade Topside

FDN DWG & ML

1, 1A, 2, 3

53711-8476814 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade ELEC

DWG & ML

1, 1A, 2, 3, 3A, 4, 5, 6, 7, 13, 14, 15, 17, 24, 25, 53711-8476816 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade Pipe DWG

& ML

1, 1A, 2, 3, 6, 7, 8, 9, 10, 53711-8476817 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade HVAC

DWG & ML

1, 2, 3, 5, 7

FABRICATION

DRAWINGS

53711-8476812 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade STRL FDN

DWG & ML

1, 1A, 6, 8, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22

53711-8476813 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade Topside

FDN DWG & ML

1, 1A, 2, 4, 5, 6, 8, 9, 10, 10A, 11, 12, 13, 15, 17, 18, 19, 20, 21, 22, 23

53711-8476814 A SHIPALT DDG-51-80316

BLK 2 Upgrade ELEC

DWG & ML

1, 1A, 2, 22A, 27, 28, 29

53711-8476816 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade Pipe DWG

& ML

1, 1A, 2, 4, 5, 12, 13, 15, 16, 17

53711-8476817 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade HVAC

DWG & ML

1, 2, 3, 6, 10, 12, 13, 14

INSTALLATION

DRAWINGS

53711-8476812 A SHIPALT DDG-51-80316

BLK 2 Upgrade STRL FDN

DWG & ML

1, 1A, 4, 5, 7, 8, 10, 11, 14, 15, 16

53711-8476813 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade Topside

FDN DWG & ML

1, 1A, 4, 5, 7, 10, 10A, 12, 13, 14, 16

53711-8476814 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade ELEC

DWG & ML

1, 1A, 2, 6, 8, 9, 10, 11, 12, 18, 19, 20, 21, 22, 23, 27, 28, 29, 30, 31, 32, 33, 34, 35

53711-8476815 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade Wire Connection List

1 through 100

53711-8476816 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade Pipe DWG

& ML

1, 1A, 2, 4, 5, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22

53711-8476817 A SHIPALT DDG-51-80316

AN/SLQ-32 (V)6 / SEWIP

BLK 2 Upgrade HVAC

DWG & ML

1, 2, 3, 4, 6, 8, 9, 10, 11, 12, 15, 16

3.0 REQUIREMENTS

The contractor shall provide all required labor, materials, tools, and resources related to performing installations, including SHIPALTS/ORDALTS/SCs and industrial services such as platform prefabrication/fabrication, system/equipment, shipboard installations, material support, and Quality Assurance (QA) inspection and completion documentation. Services are required to support various levels of U.S. Navy/Coast Guard and FMS ship systems integration both CONUS and OCONUS. All non-nuclear work on nuclear powered ships shall be in strict compliance with NAVSEA 9210.4A.

The contractor shall provide all necessary resources including material, to affect multiple ship systems installation requirements occurring concurrently and their interfaces for all types of ships including, but not limited to, aircraft carriers, surface ships, and cutters in locations worldwide. Material requirements and specifications, along with

Government Furnished Information (GFI)/Government Furnished Equipment (GFE), will be provided per individual Task Order.

3.1 Technical Services

3.1.1 The contractor shall provide services for installing Surface EW Systems and procure the material required for fabricating, assembling and installing the systems for each applicable ship class as defined by the design guidance package including approved drawings.

3.1.2 The contractor shall develop In-Process Control Procedures (IPCPs) utilizing NAVSEA Standard

Items and Designs, and shall detail their process for installing the SC/alterations. (CDRL A009)

3.1.3 The contractor shall provide services including kitting/shipping of material, participating in meetings, visiting government field and industry sites, reviewing installation correspondence, providing background to these reviews, and participating in inventory reviews of hardware.

3.1.4 The contractor shall provide services including, but not limited to, gas free engineering, machining, lagging and tooling services common to marine and ship modernization facilities.

3.1.5 The contractor shall provide the necessary administrative and logistics support at the installation site to the contractor and Government personnel which may include the need to purchase materials, or coordinate special installation requirements as specified in the individual Task Orders.

3.1.6 The contractor shall establish and maintain program management support as specified by each Task

Order. Program management support shall include, but not be limited to, oversight of each Task Order, status reporting, and coordination of subcontract reporting. The contractor shall provide a Contractor’s Progress, Status and Management Report for each Task Order in accordance with Contract Data Requirements List (CDRL) A001.

3.2 SHIPALT/ORDALT/SC Pre-Installation Requirements

3.2.1 The contractor shall provide necessary facilities, equipment, tools, security badges, and trade personnel to accomplish the installation of new systems and technologies.

3.2.2 The Government will conduct ship checks on designated ships prior to scheduled installations to identify situational interferences between approved drawings and specific physical and environmental conditions. The design ship check will be used to identify as-built/existing conditions. The program ISEA representative or SME will notify the contractor of all changes that will be required to systems and structures to interface, integrate and accommodate the planned installations/alterations. The changes typically include, but are not limited to, AC/DC power requirements, cooling water, heating, ventilation and air conditioning, temporary holes cut that are required for removal/installation of equipment, structural and space arrangement requirements.

3.2.3 The contractor shall assign a Contractor's Team Leader (Site Foreman or designee) to attend a "team leader meeting" with NSWC Crane PM/ISEA/SME representative to review the SHIPALT/ORDALT/SC installation requirements/plans, drawings, and schedule, to reaffirm all requirements prior to an installation. The contractor shall prepare a draft Plan of Action and Milestones (POA&M) in accordance with CDRL A002 that lays out the installation schedule prior to the team leader meeting. The contractor shall be prepared to discuss all aspects of the installation including material status, shipping schedule, installation requirements, QA, and safety concerns. The Team Leader shall coordinate the schedule information with NSWC Crane, ship's force, and other activities as necessary to ensure proper support is available and interference or delays are minimized.

Contractor shall ensure the correct installation documents are used prior to commencing a task.

3.3 SHIPALT/ORDALT/SC Installation Requirements

3.3.1 During the SHIPALT/ORDALT/SC phase onboard ship, NSWC Crane PM, SME, or On-Site

Install Coordinator (OSIC) representative will communicate their requirements to the Team Leader.

The contractor shall ensure that the following minimum requirements are met:

(a) The Team Leader shall appoint someone to act in his/her absence if they are required to leave the ship while work is in progress and identify this individual to the NSWC Crane Representative.

(b) The Team Leader shall brief the NSWC Crane OSIC upon completion of each workday on installation progress, including:

i. Status of planned production schedule

ii. Number of personnel onboard

iii. Material needed or proposed substitution

iv. Any proposed design changes or interferences in the installation

v. Labor hours used on previous day

vi. Status of local shipyard support

The Team Leader shall also brief the NSWC Crane OSIC as problems arise.

(c) The contractor shall comply with applicable shipboard industrial safety regulations in conducting Task Order efforts. This includes a mandatory review of the System/Equipment Work Authorization Form (WAF) and tag out procedures, and all shipboard electrical training.

(d) The contractor shall conform to existing shipboard routines regarding cleanliness, personnel conduct, and ship's security and integrity.

(e) The contractor shall adhere to all environmental laws and regulations including federal, state, local, Naval, International, ship and industrial facility. Handling reports and disposal invoices shall be required through local procedures when handling hazardous materials (HAZMAT) and/or waste. The Government will not be responsible for the contractor’s misuse of HAZMAT/waste or for contractor accident cleanup costs.

(f) The contractor shall ensure that all shipboard work follows the processes established in

Appendices C and D of TS9090-310F, including mandatory use of QA workbooks. These workbooks shall adhere to prescribed outline and include all necessary IPCPs, personnel qualifications, personnel certifications, and POA&M. These workbooks are required for all shipboard industrial work.

(g) The contractor shall provide verification of certification for welders, pipe fitters, and all trades requiring certification. Personnel shall carry on their person a copy of the certification at all times during the SHIPALT/ORDALT/SC. No welder shall be permitted to work, in connection with SHIPALT/ORDALT/SC to vessels, unless they are at the time, qualified to the standards established by the U.S. Coast Guard American Bureau of Shipping or Department of the Navy for the type of welding being performed. No welder shall be permitted to work on production or pre-fabrication applications of welding other than those for which they have qualified and been approved.

(h) The contractor shall request Government direction regarding the use of cadmium plated fasteners with regard to any shipboard application.

(i) The contractor shall ensure that all applicable personnel are briefed on their responsibilities at least two (2) working days prior to starting task for each separately placed Task Order on this contract.

(j) The contractor shall notify the government OSIC and/or NSWC Crane Program Manager

(PM), ISEA or SME of any deviation to the drawing package requiring red-lined drawings The contractor shall also notify the Government as discrepancies or issues with the drawings are discovered. Upon contractor review of the Technical Data Package, any corrections that are necessary to the SIDs shall be submitted per the guidance in TS9090-100A and in accordance with CDRL A003.

(k) The Team Leader and contractor personnel shall maintain all sections of a QA workbook during industrial production. QA Workbook shall be available to OSIC for review at any time during installation/deinstallation.

3.3.2 The contractor shall rehabilitate affected spaces to original or equivalent condition which includes, but is not limited to, the following:

(a) Cleaning, preparing, priming and painting the new and disturbed surfaces to match the surrounding areas.

(b) Replacing all deck coverings and insulation damaged incidental to the installation. If more than 40 percent of the deck surface area is damaged, replacement covering of the complete space will be specified. Replace all damaged deck covering with matching styles, colors, and grades in accordance with current requirements.

(c) Repairing all damaged lagging and installing new lagging where appropriate.

(d) Preparing and attaching applicable labels/tags to power panels, piping, data cables and power cables.

(e) Performing a thorough daily cleaning of affected spaces.

3.4 Installation/Deinstallation Ground Rules

3.4.1 Contractor employees shall not visit or contact ships without prior NSWC Crane written approval.

3.4.2 All communication with the Department of Defense (DOD), Naval Activities, and ships shall be via

NSWC Crane PM, ISEA or SME.

3.4.3 All work will be inspected by the OSIC or SME in accordance with the criteria provided under separately placed Task Orders and with the provisions of this contract.

3.4.4 Coordination of each SHIPALT/ORDALT/SC is the responsibility of the assigned NSWC Crane

Alteration Installation Team (AIT) PM/ISEA/SME and OSIC. The NSWC Crane OSIC Representative may halt work and convene an off-ship meeting whenever he/she determines that this is required to resolve problems. This responsibility applies to all aspects of a

SHIPALT/ORDALT/SC.

3.4.5 The contractor shall provide an Alteration Completion Report per the guidance of paragraph

3.24.2.1 in TS9090-310F at the conclusion of each Task Order in accordance with CDRL A004.

3.4.6 The contractor shall provide services including packing and shipping of installation/de-installation of material per direction of NSWC Crane Alteration Installation Team (AIT) PM/ISEA/SME and

OSIC.

3.5 Engineering

The contractor shall perform engineering analysis, research and design by furnishing support for engineering and technical investigations and analyses relating to concepts and designs, focusing on installation engineering, compatibility and operability, and interfaces. The contractor shall also prepare procedures for integration of new installation/SHIPALT/ORDALT/SC projects, including identifying and defining interfaces and relationships between these programs and other DOD systems and subsystems. Specifically, the contractor shall:

(a) Collect data elements for technical and schedule impact

(b) Conduct interface design studies to include recommendations to resolve component or system interface problems

(c) Perform onboard checks, validations, and verifications in compliance with operational standards in the development of recommendations for improvements or technical change. Recommendations shall be submitted in accordance with CDRL A005.

(d) Review/develop test specifications and monitor testing of Electronic Systems. Test specifications shall be submitted in accordance with CDRL A005.

(e) Develop drawings, field sketches, test procedures and/or results installation procedures, maintenance procedures, etc., as required to accomplish necessary work, and to provide revised or updated documentation reflecting the ship's changed configuration. Updated documentation shall be submitted in accordance with CDRL A005.

(f) Inspect all prefabricated parts and conduct certifying tests where applicable. Test results shall be submitted in accordance with CDRL A005.

3.6 Material Support

The term ‘material’ shall include supplies, materials, equipment, hardware and automatic data processing equipment (ADPE), ADPE services, supplies and software. Any material provided by the contractor is subject to the requirements of the Walsh-Healy Public Contracts Act. When competition cannot be achieved, the contractor is fully responsible for justifying fair and reasonable prices.

3.6.1 The contractor is only authorized to purchase and provide materials required by the services to be performed under the individual Task Orders. The procurement of material or equipment of any kind, other than that required to perform the required services, is not authorized nor will any costs incurred be considered allowable. The contractor shall provide receipt inspection of all material procured and a Material Inventory Report in accordance with CDRL A006.

In addition, the purchase of general purpose business items/expenses required for the conduct of the contractor’s normal business operations is not authorized and will not be allowed as a direct cost.

General purpose business items include, but are not limited to, the cost for items such as telephone charges, cellular telephones, fax machines, reproduction machines, word processing equipment, personal computers, office equipment and consumable supplies.

3.6.2 It is anticipated that the contractor will be required to procure material to support installations.

These items include, but are not limited to, metal plate, angle, bar, channel, pipe, tee, elbow, coupling, welding electrode, welding studs, welding rods, cable hangers, electrical cable, circuit breakers, electrical lugs, connectors/backshells, paint, lagging paste, rubber channel, hydraulic fluid, various oils, electrical/mechanical switches, gaskets, stuffing tubes, packing assembly, paint roller, paint brushes, fire cloth, masking tape, and gloves.

3.6.3 If the final material product and associated components are not available in quantity or in the

Government stock system, the contactor may be tasked to procure hardware and special tools incidental to the services (ODCs – CLIN 0002).

3.6.4 Materials that are not authorized for procurement include items containing asbestos, item substitutions, and any material that does not conform to local environmental regulations.

3.6.5 Cadmium plated fasteners shall only be procured as directed at the Task Order level (under supplies

CLIN 0003).

3.6.6 The contractor shall provide transportation of material between the Government storage facility and the contractor’s storage facility.

3.7 Quality Assurance

3.7.1 The contractor shall have a current approved NAVSEA 04XQ QA Plan/Quality Management System to support the AIT efforts tasked under this contract. The QMS shall be maintained throughout the life of the contract. The contractor shall provide a QA Plan for each installation in accordance with CDRL A007 and provide QA and inspection to support the proper installation for technologies being introduced into existing platforms. The contractor shall remain 100 percent responsible for adherence to QA Plan requirements. The contractor shall maintain this system at no cost to the Government and shall submit all updates to the NSWC Crane PM immediately for his/her concurrence prior to start of installation.