3.04_Amendment(9)_26RK022.pdf
PDF 648 KB Posted
- Solicitation number
- N0010426RK022
About this file
This is Amendment 0009 to solicitation N0010426RK022, issued by NAVSUP Weapon Systems Support Mech on October 21, 2026. The amendment extends the solicitation closing date from October 29, 2026 to November 23, 2026 and responds to two contractor inquiries regarding Quality Assurance Representative (QAR) calendar days and estimated acceptance timelines. The amendment clarifies that QAR dates are 60 calendar days for Production Lot Test (PLT) Lot 1 and 240 calendar days for PLT Lot 2, and confirms that 90 days is the correct estimated acceptance period (broken down as 60 days for Estimated Time to Select for Destructive Testing, 15 days for Initial Shipping Estimate to Activity, and 15 days for Procurement Contracting Officer review). Page 15, paragraph 7 has been updated to reflect this 90-day notification requirement.
Section E of the contract has been modified to provide detailed requirements for Production Lot Test Samples, including that test samples must be presented to the Government Quality Assurance Representative with required documentation within specified timeframes, samples are subject to destructive testing and will not be returned, and the Contracting Officer shall notify the contractor of approval, conditional approval, or disapproval within 90 calendar days. The amendment establishes inspection and acceptance procedures using ASQC-Z1.4 General Inspection Level 2, requires quality conformance and functional testing with 100 percent completion in accordance with Drawing 6894520 REV E Table IV, designates Naval Undersea Warfare Center Division Newport as the testing activity at 1176 Howell Street, Newport, Rhode Island 02841, and specifies a retest cost of approximately $18,000 to $20,000 for Item 0001. Test Plan submissions are due within 60 calendar days of contract award, with Government approval/disapproval within 30 calendar days. All quality assurance inspection shall comply with ASQ-9000 Series and ISO 9001 standards, with minimum inspection per MIL-STD-105 (MIL-STD-1916) at inspection Level II, 100 percent inspection for critical characteristics with 1.0 Acceptance Quality Level for major characteristics and 2.5 Acceptance Quality Level for other characteristics.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this amendment is to extend the solicitation closing date to 11/23/2026 and to respond to the following questions:
Q1: Page 15, paragraph 2 - The number of QAR calendar days is missing. Does the contractor fill this in?
A1: The QAR dates are as follows: 60 calendar days (PLT Lot 1), 240 calendar days (PLT Lot 2). This has been added to Section E.
Q2: Page 16, paragraph C - The estimated acceptance states 90 days (ETSD: 60, ISEA: 15, PCO: 15) but page 15, paragraph 7 states that the notification shall be made to the contractor within 60 days. Which is correct?
A2: 90 days is correct. Page 15, paragraph 7 has been updated.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 29 Oct 2026 23 Nov 2026
N0010426RK0220009
Section E - Inspection and Acceptance
Miscellaneous text in this section has been modified to:
SECTION E
(PRODUCTION LOT TEST SAMPLES GOV'T TESTING) (March 2014)
1. Test samples are required from each production lot. A production lot shall consist of: Net deliverable quantity, plus additional units for Lot Acceptance Test, in accordance with Section B. The performance, tests, and/or other characteristics, which the sample units must meet, shall be in accordance with the requirements of Section C of this contract.
2. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The presentation of the lot shall be made to the QAR calendar days after date of contract to select the production test samples. If FAT is required 60 (PLT Lot 1); 240 (PLT Lot 2) then presentation of lot samples shall be made IAW timetable in Section F. The samples shall be selected, at random, from each production lot, by the QAR within 48 hours for resident QARs, and 7 calendar days for non-resident QARs after presentation of the lot.
NOTE 1: Sample units removed for testing from different lots shall not be commingled.
3. After the selection of the production lot samples and all required data, the samples shall be furnished and shipped by the Contractor to the testing activity set forth in Section F within 15 calendar days of selection at no additional charge to the Government. The production lot test samples shall not be considered received until all data necessary to evaluate the samples is received. (This data includes, but is not limited to, radiographic requirements specified in Section E - Inspection and Acceptance, and WAWF-RR.)
4. The following activity will conduct production lot testing: NAVAL UNDERSEA WARFARE CENTER DIVISION KEYPORT POC: Maia Costa.
5. -Disposition of Production Lot Test Samples
Units submitted for Production Lot Testing are subject to destructive testing. These units cannot be used to meet fleet support requirements. Samples tested will not be returned to the Contractor. However, in the event there is a failure, or samples are rejected for some other reason, the Contractor may request the return of units not destroyed during testing and/or residual material for disposition/examination. The written request to return rejected units/material shall be received by the Contracting Officer, with a concurrent copy to the testing activity, within fifteen (15) calendar days after notification of rejection. Any units/material returned will be at the Contractor's expense.
6. All other contractual requirements, such as acceptance, shipment, and payment will not be accomplished until the production lot test samples have been tested, approved, and released for service use. The Contractor shall not make shipment of the production lot until receipt of written notification of approval by the Contracting Officer.
7. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the Contractor within ninety (90) calendar days after receipt of the production lot test samples and all necessary data are received by the Government Testing Activity. Upon receipt of written notice accepting a production lot, shipment shall be made as soon as possible and no later than fifteen (15) calendar days after receipt of such notice.
a) Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b) A notice of conditional approval shall state any further action required of the Contractor. In the event the test sample fails the to meet requirements of the specification or drawing, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, ) with all associated costs and expenses to be borne solely by the Contractor.A003
c) A notice of disapproval shall cite reasons for such. If any production lot test sample(s) is disapproved by the Government and at the Contractor's sole cost and expense, the Contractor may be required, at the option of the Government, to submit an additional production lot test sample(s) for test.
After each notification by the Contracting Officer to submit an additional production lot test sample(s), the Contractor shall - at no additional cost to the Government - make any necessary changes, modifications, or repairs to the production lot or the Government QAR may be required to select another test sample for testing. Such additional test sample(s) shall be furnished to the Government under the terms and conditions and within the time specified in the notification. The Government shall take action on this test sample(s) within sixty (60) calendar days after receipt. The cost of each additional approval, and all costs and expenses related to such test(s) shall be borne solely by the Contractor. Retest Cost for Item 0001 is:
approximately $18,000.00 to $20,000.00. ( Test costs are based on actual rates in effect at the time of issuance of the solicitation. In the NOTE:
event of a test failure, actual cost at the time of retest will be assessed.) The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional tests.
Production Lot: Periodic Production Inspection
Production lot test required IAW 48 CFR 46.000-46.105 and the following:
a. Quality Conformance: YES
b. Destructive Testing: YES
c. Estimated Acceptance: 90 DAYS (ETSD: 60 ISEA:15 PCO:15)
d. Sample size: Two (2) test samples per lot DRAWING 6894520 REV E
1. PLT samples are to be sent to NUWC Newport 1176 Howell St Newport, RI 02841.
e. Sample Disposition: CONTRACTOR TO PERFORM FAILURE ANALYSIS IF DISCREPANT, Test samples sent to NUWC DIV NPT.
f. Sample Plan: ASQC-Z1.4 General Inspection Level 2
g. Inspection Required: COMPAT: XX ENVIR: ___FUNCT: XX EXAM: XX
h. DCMA: Normal QA Action
i. Required in Drawings: YES DRAWING 6894510 REV H and 6894520 REV E
j. Test/Inspection Report Required: YES Approved: NUWC DIV NWPT C8554
k. Test/Inspection Procedure Required: YES Approved: NUWC DIV NWPT C8554
Periodic Quality Conformance tests will be 100 percent completed IAW 6894520 REV E Table IV.
Periodic Quality Conformance Sample testing may be waived by the procuring activity on specific lots based upon a vendor's demonstration of consistently outstanding quality.
SECTION E
INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES
1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, ). The test plan shall be submitted within calendar days after contract award date. The Acceptance Test Plan A001 60 shall identify that test fixtures are available for use at the Contractor's Facility.
2. Notification of test plan approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the Contractor within calendar days after receipt of the plan/procedure.30
3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
4. A notice of conditional approval shall state any further action required of the Contractor.
5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government shall take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.
6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default. However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.
7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:
Approved by__________________________ Date of approval___________________
Contract number and contractor under which plan/procedure was approved__________________.
Test Plan number, revision date and NSN for which the item was previously approved_____________.
8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.
SECTION E
INSPECTION AND ACCEPTANCE
Production Quality Assurance of all items to be furnished hereunder shall be made by the cognizant Government Inspector at the contractor's or sub-contractor's plant. Quality Assurance Inspection System to be in accordance with ASQ-9000 Series and ISO 9001.
Contractor shall maintain a documented inspection system that equally compares to required quality program per attachment. Contractor shall verify all samples meet the requirements/notes in all drawings and specifications.
NOTE:
Acceptance or rejection shall be accomplished by the cognizant GQAR based upon his own inspection(s) and the results of the First Articles or Periodic Production and/or Acceptance Samples from the testing activity to the GQAR via Procurement Contracting Officer (PCO).
QUALITY ASSURANCE REQUIREMENTS
An inspection lot shall consist of items manufactured under essentially the same conditions and at essentially the same time. Prior to submittal of each inspection lot to the Government Representative, the contractor shall provide inspection/or test records that assure the units presented have passed all inspections and tests required by the applicable drawings, specifications and quality assurance documentation. Unless specified otherwise, as a minimum this inspection and testing shall be in accordance with MIL-STD-105 (MIL-STD-1916), latest revision at issue date of solicitation, inspection Level II, with 100% inspection for critical characteristics, 1.0 AQL (Acceptance Quality Level), for major characteristics and 2.5 AQL for all other characteristics. All defects of the same class will be considered collectively when determined compliance with applicable AQL.
| IDCode: J |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0009 |
| EffDate: 21 Oct 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00104 |
| AdmCode: |
| IssuedBy: NAVSUP WEAPON SYSTEMS SUPPORT MECH |
P O BOX 2020, 5450 CARLISLE PIKE
MECHANICSBURG, PA 17050-0788
UNITED STATES
Mckenzy Harris, Email: mckenzy.s.harris.civ@us.navy.mil Telephone: 7176051368 AdminBy:
SCD: B PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0010426RK022 |
| SolDate: 12 Jan 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Lesley Coomes |
| ContDate: |
| CODate: 21 Oct 2026 |