Exhibit A - Contract Data Requirements List (CDRLs)_11 Oct 2017.pdf
PDF 369 KB Posted
- Solicitation number
- N00039-17-R-0033
About this file
This document is a Contract Data Requirements List (CDRL) outlining sixteen data items required under a contract for Digital Modular Radio (DMR) High Frequency Distribution Amplifier Group (HFDAG) components and services awarded to Thales Defense Security Incorporated by the Department of the Navy Information Warfare Systems Command. Required data items include hazardous materials reports, engineering change proposals, progress reports, test plans and reports, manuals, cost reports and field service reports. Key deliverables include electromagnetic and environmental test reports due 90 days prior to initial component deliveries under CLINs 0001-0003, acceptance test procedures and reports due within 90 days of initial component deliveries, and technical manuals due 30 days prior to initial CLIN 0001-0003 deliveries. The contract was awarded on January 24, 2019 for a total value of $30,931,029 and requires data submissions on schedules ranging from monthly to one-time, with government review periods of 15 to 60 days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENT LIST (CDRL)
FOR THE
DIGITAL MODULAR RADIO (DMR)
HIGH FREQUENCY DISTRIBUTION AMPLIFIER GROUP
(HFDAG) COMPONENTS AND SERVICES
OCTOBER 116,MAY 31, 2017
HFDAG Components CDRL Index
CDRL
Number CDRL Title SOW Reference
A001 HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP) REPORT 3.2
A002 ENGINEERING CHANGE PROPOSAL 3.6
A003 CONTRACTOR’S PROGRESS STATUS MANAGEMENT REPORT 3.7.2, 4.5
A004 REQUEST FOR VARIANCE (RFV) 3.7.4
A005 TECHNICAL MANUALS 3.7.5
A006 COST/MANPOWER REPORTING 3.8
A007 1000W HARDWARE ACCEPTANCE TEST PROCEDURES (HATP) 4.1.1
A008 1000W HARDWARE ACCEPTANCE TEST REPORT 4.1.1
A009 ELECTROMAGNETIC ENVIRONMENTAL EFFECTS (E3) TEST REPORT 4.1.2, 4.2.2, 4.3.2
A010 ENVIRONMENTAL EFFECTS TEST REPORT 4.1.3, 4.2.3, 4.3.3
A011 FPMU HATP 4.2.1
A012 FPMU HARDWARE ACCEPTANCE TEST REPORT 4.2.1
A013 HF TRANSCEIVER DUAL RECEIVER HATP 4.3.1
A014
HF TRANSCEIVER DUAL RECEIVER HARDWARE ACCEPTANCE TEST
REPORT 4.3.1
A015 FIELD SERVICES REPORT 4.3.5
A016 ASSESSMENT AND REPAIR SUMMARY
4.6.1, 4.6.2, 4.6.3, 4.6.4
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control b Pl d t t f t th b i ti S d l t d f t th G t I i C t ti Offi f th C t t/PR N li t d i Bl k E
A. CONTRACT LINE ITEM NO.
0001-00073
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER X
D. SYSTEM/ITEM
HIGH FREQUENCY
DISTRIBUTION AMPLIFIER
GROUP (HFDAG)
COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
THALES DEFENSE SECURITY
INCORPORATED (TDSI)
1. DATA ITEM NO
A001
2. TITLE OF DATA ITEM
HAZARDOUS MATERIALS MANAGEMENT
PROGRAM (HMMP) REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81398C
5. CONTRACT REFERENCES
SOW 3.2
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
9. DIST
STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF 1ST
SUBMISSION
180 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final Reg Repro
BLOCK 4: Document (if applicable) is for guidance only. MS office compatible format acceptable and delivery shall be through electronic mail.
Contractor’s format acceptable.
BLOCK 12: To be delivered 180 DACA for the first delivery order for Contract Line Item Numbers (CLIN) 0001 through 0003.
Government has 60 days from the date of submission to approve or reject.
(N00039)
COR
Contracting Officer Contract Specialist
15. TOTAL ---------
G. PREPARED BY
CHUCK GOODING, PMW/A
170, H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _«PAGE»_ of _«PAGES»_
Pages
18. ESTIMATED
TOTAL PRICE
$0
17. PRICE
GROUP
NSP
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization Send completed form to the Government Issuing Contracting Officer for the Contract/PR No listed in Block E
A. CONTRACT LINE ITEM NO.
0001-00073
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
TDSI
1. DATA ITEM NO.
A002
ENGINEERING CHANGE PROPOSAL (ECP)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639D
5. CONTRACT REFERENCE
SOW 3.6
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
AS REQ
12. DATE OF 1ST
SUBMISSION
AS REQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
AS REQ
Draft Final Reg Repro
BLOCK 4: Document (if applicable) is for guidance only. MS office compatible format acceptable and delivery shall be through electronic mail. Contractor shall utilize DD Form 1692 (through 1691-7 where applicable) when submitting an ECP and refer to MIL-HDBK-61A for guidance in completing the form.
Government has 60 days from the date of submission to approve or reject.
(N00039)
COR
15. TOTAL --------- «TOT
«TO
«TOT
CHUCK GOODING, PMW/A
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _«PAGE»_ of _«PAGES»_
Pages
18. ESTIMATED
TOTAL PRICE
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No listed in Block E
A. CONTRACT LINE ITEM NO.
All exercised CLINs each year
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A003
CONTRACTOR’S PROGRESS STATUS
MANAGEMENT REPORT
DI-MGMT-80227
5. CONTRACT REFERENCE
SOW 3.7.2, 4.5
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
MTHLY
12. DATE OF 1ST
SUBMISSION
30 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
MTHLY
Draft Final Reg Repro
BLOCK 4: Document (if applicable) is for guidance only. MS office compatible format acceptable and delivery shall be through electronic mail. Contractor’s format acceptable.
BLOCK 12 AND 13: For active task/delivery orders, the contractor shall submit 30 days after task/delivery award and monthly thereafter until task or delivery is complete.
Government has 15 days from the date of submission to approve or reject.
(N00039)
COR
CHUCK GOODING, PMW/A
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _«PAGE»_ of _«PAGES»_ Pages
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001-00073
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A004
REQUEST FOR VARIANCE (RFV)
DI-SESS-80640D
5. CONTRACT REFERENCE
SOW 3.7.4
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final Reg Repro
BLOCK 4: Document provides guidance for submission of RFVs. Contractor shall complete DD Form 1694. Unlocked/Editable Adobe PDF format acceptable and delivery shall be through electronic mail.
Government has 60 days from the date of submission to approve or reject
(N00039)
COR
CHUCK GOODING, PMW/A 170
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _«PAGE»_ of _«PAGES»_ Pages
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001 - 00063
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A005
TECHNICAL MANUALS
N/A
5. CONTRACT REFERENCE
SOW 3.7.5
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: Document (if applicable) is for guidance only. MS office compatible format acceptable and delivery shall be through electronic mail. Contractor’s format acceptable.
BLOCKS 12 & 13: To be delivered no later than 30 days prior to the first deliveries of CLINs 0001 through 0003.
Government has 60 days from the date of submission to approve or reject.
(N00039)
COR
TOTAL PRICE
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001 - 00063
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A006
COST/MANPOWER REPORTING
5. CONTRACT REFERENCE
SOW 3.8
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ANNLY
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: Contractor's format is acceptable. This deliverable shall also address cost and manpower information; specifically the Contractor shall report if the cost of products/services provided during the affected period is commensurate with the anticipated burn rate as well as the total number of “direct charge” employees working on the contract. The Contractor shall also indicate the average number of full time equivalents (FTEs) that were performing during the reported period. The Contractor shall also report per CLIN/SLIN/ACRN, the following: this period and cumulative labor hours by labor category; this period and cumulative labor cost by cost element, such as direct labor, G&A, overhead, etc.; this period and cumulative material, other direct costs (ODCs) and travel with associated costs; the percentage of work complete under the CLIN/SLIN;
and the cost estimate to complete the CLIN/SLIN.
Block 10: Contractor shall provide report once, annually, when updating the contractor’s (or subcontractor’s) Standard Cost Model, and upon completion of prior year production lot builds.
Block 12: Fifteen (15) days after completion of annual update of the contractor’s (or subcontractor’s) Standard Cost Model for all firm-fixed price contract line items, and completion of prior year production lot builds
Government has 60 days from the date of submission to approve or reject.
(N00039)
COR
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001, 0002
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A007
1000W HARDWARE ACCEPTANCE TEST PROCEDURES
DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW 4.1.1
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
AS REQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
AS REQ
Draft Final Reg Repro
BLOCK 4: Cited DiD contains format and content preparation instructions. MS office compatible file-format acceptable and delivery shall be through electronic mail.
BLOCK 12 &13: To be submitted within 90 days of first delivery. Updates to these procedures shall be provided as necessary.
Government has 60 days from the date of submission to approve or reject.
(N00039)
COR
TOTAL PRICE
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001, 0002
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A008
1000W HARDWARE ACCEPTANCE TEST REPORT
DI-QCIC-81891
5. CONTRACT REFERENCE
SOW 4.1.1
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
AS REQ
12. DATE OF 1ST SUBMISSION
AS REQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
AS REQ
Draft Final Reg Repro
BLOCK 4: Cited DiD contains format and content preparation instructions. MS Office compatible file-format acceptable and delivery shall be through electronic mail.
BLOCKS 12 & 13: The Contractor shall submit electronically 15 days after completion of test. Report shall also be included in the packaging for each 1000W PA delivered.
Government has 60 days from the date of submission to approve or reject.
(N00039)
COR
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001 - 00063
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A009
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS (E3)
TEST REPORT
DI-EMCS-81542 and MIL-STD-461
5. CONTRACT REFERENCE
SOW 4.1.2, 4.2.2, 4.3.2,
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft Final Reg Repro
BLOCK 4: Document (if applicable) is for guidance only. MS office compatible format acceptable and delivery shall be through electronic mail. Contractor’s format acceptable.
BLOCKS 12 & 13: To be submitted 90 days prior to the the first delivery order for CLINs 0001-0003.
Government has 45 days from the date of submission to approve or reject.
(N00039)
COR
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0001-00063
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A010
ENVIRONMENTAL EFFECTS TEST REPORT
DI-NDTI-80809 and MIL-STD-810G
5. CONTRACT REFERENCE
SOW 4.1.3, 4.2.3, 4.3.3
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft Final Reg Repro
BLOCK 4: Document (if applicable) is for guidance only. MS office compatible format acceptable and delivery shall be through electronic mail. Contractor’s format acceptable.
BLOCKS 12 & 13: To be submitted 90 days prior to the the first delivery order for CLINs 0001-0003.
Government has 45 days from the date of submission to approve or reject.
(N00039)
COR
TOTAL PRICE
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0003, 0004s2
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A011
FPMU HATP
5. CONTRACT REFERENCE
SOW 4.2.1
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: Cited DiD contains format and content preparation instructions. MS Office compatible file-format acceptable and delivery shall be through electronic mail.
BLOCKS 12 & 13: To be submitted within 90 days of first delivery. Updates to these procedures shall be provided as necessary.
Government has 60 days from the date of submission to approve or reject
(N00039)
COR
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0003, 0004 2
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A012
FPMU HARDWARE ACCEPTANCE TEST REPORT
5. CONTRACT REFERENCE
SOW 4.2.1
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: Cited DiD contains format and content preparation instructions. MS Office compatible file-format acceptable and delivery shall be through electronic mail.
BLOCKS 12 & 13: The Contractor shall submit electronically 15 days after completion oftest. . Report shall also be included in the packaging for each FPMU delivered.
Government has 60 days from the date of submission to approve or reject
(N00039)
COR
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 00063
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A013
HF TRANSCEIVER DUAL RECEIVER HATP
5. CONTRACT REFERENCE
SOW 4.3.1
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: Cited DiD contains format and content preparation instructions. MS Office compatible file-format acceptable and delivery shall be through electronic mail.
BLOCKS 12 & 13: To be submitted within 90 days of first HF TRANSCEIVER Dual Receiver delivery. Updates to these procedures shall be provided as necessary.
Government has 60 days from the date of submission to approve or reject
(N00039)
COR
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 00063
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A014
HF TRANSCEIVER DUAL RECEIVER HARDWARE
ACCEPTANCE TEST REPORT
5. CONTRACT REFERENCE
SOW 4.3.1
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: Cited DiD contains format and content preparation instructions. MS Office compatible file-format acceptable and delivery shall be through electronic mail.
BLOCKS 12 & 13: The Contractor shall submit electronically 15 days after completion of test. . Report shall also be included in the packaging for each HF Transceiver Dual Receiver delivered.
Government has 60 days from the date of submission to approve or reject
(N00039)
COR
$0
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
00085-00096
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A015
FIELD SERVICES REPORT
5. CONTRACT REFERENCE
SOW 4.5
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: Document (if applicable) is for guidance only. MS office compatible format acceptable and delivery shall be through electronic mail. Contractor’s format acceptable.
BLOCKS 12 & 13: The Contractor shall submit in accordance with requirements defined by each TO/DO.
Government has 60 days from the date of submission to approve or reject.
COR
17. PRICE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0012, 0013, 0014, 0015
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER _X_ __
D. SYSTEM/ITEM
HFDAG COMPONENTS
E. CONTRACT/PR NO.
N00039-17-R-0033
F. CONTRACTOR
A016
Assessment and Repair Summary
None
5. CONTRACT REFERENCE
SOW 4.6.1, 4.6.2, 4.6.3, 4.6.4
6. REQUIRING OFFICE
SPAWAR, PMW/A 170
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLCK 16
Draft Final Reg Repro
BLOCK 4: MS Office compatible file-format acceptable and delivery shall be through electronic mail. The Contractor shall provide a written assessment for each repair denoting the following:
- Assessment of the failure (or lack thereof)
- The tier of the repair
- Repair performed
- Testing and/or inspection performed to ensure part is returned to full functionality.
BLOCKS 12 & 13: The Contractor shall submit with delivery of each repaired item.
Government has 60 days from the date of submission to approve or reject
(N00039)
COR
$0
18. ESTIMATED
TOTAL PRICE
$0
17. PRICE
| Contract data requirement list (cdrl) |
| for the |
| digital modular radio (DMR) |
| High frequency distribution amplifier group (hfdag) components and services |
| OCTOBER 116,May 31, 2017 |
File details come from the government source that posted it. Updated .