AMC_SOW_ATT_05_MPFUB_Maintenance_Requirements.pdf

PDF 2 MB Posted

Attached to
Afloat Maintenance for NEPO Systems
Solicitation number
N0002513C0003
Issued by

About this file

MPFUB REQUIREMENTS

View the file

Other files

File Type Posted
13-R-0003-0003.pdf PDF
13-R-0003-0002.pdf PDF
13-R-0003-0001.pdf PDF
ppq_rev_dec_2011.doc DOC document
AMC_SOW_ATT_03_INLS_Maintenance_Requirements.pdf PDF
AMC_CDRLS_PRIOR.pdf PDF
N00025-13-R-0003_1_Aug.pdf PDF
AMC_SOW_ATT_02_ABLTS_Maintenance_Requirements.pdf PDF
AMC_SOW_ATT_07_CIS_Requirements.pdf PDF
AMC_SOW_ATT_04_LCM_Maintenance_Requirements.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MPF Maintenance Procedures

SERIAL# SWBS REFERENCE/MRC PROCEDURE PERIODICITY

UB001 664 GENSPACE-01 General Space Inspection Weekly

UB002 59A1 9UPQ Inspect Automatic Fire Extinguisher Monthly

UB003 59A1 9UQZ Inspect Coolant System Hoses, Test Coolant System mixture Monthly

UB004 59A1 MPFUB-01 Test Operate Main Engine Monthly

UB005 59A1 MPFUB-02 Test Operate Generator Engine Monthly

UB006 59A1 9UPY Clean, Inspect and Service Batteries and Cables Quarterly

UB007 59A1 9UPS Inspect Portable Fire Extinguisher Quarterly

UB008 59A1 9UPU Clean and Inspect Dry Chemical Fire Extinguisher Quarterly

UB009 59A1 9UPV Inspect Steering Components, Lubricate Quarterly

UB010 59A1 9UPW Lubricate Fittings Quarterly

UB011 59A1 9UQC Inspect and Lubricate Bow Door and compartments Quarterly / post-backload

UB012 59A1 9UQD Inspection of Topside Equipment Quarterly / post-backload

UB013 59A1 MPFUB-03 Fresh Water Wash Boat Quarterly / post-backload

UB014 59A1 9UQJ Inspect Alternator Drive Belts Semi-annually

UB015 59A1 9URV Inspect Generator V-Belt Semi-annually

UB016 59A1 9UQG Inspect Electrical System Semi-annually

UB017 59A1 9URN Inspect Exhaust System Annually

UB018 59A1 9URT Test Navigation Lights Annually/ pre-offload

UB019 59A1 9UQX Inspect Generator Exhaust System Annually

UB020 59A1 9URG Inspect hoses, pipes, Fittings, and Supports Annually

UB021 59A1 9YLL Clean and Inspect Air Conditioner Filters Annually

UB022 59A1 9URE Inspect Controls Annually / post-backload

UB023 59A1 9URF Clean, Inspect and Lube Control head Annually / post-backload

UB024 59A1 9UQE Inspect Seats Post-backload

UB025 59A1 9UQH Clean and Inspect Engine Anodes Post-backload

UB026 59A1 9UQN Clean and Inspect Hull and Bottom Post-backload

UB027 59A1 9UQT Lubricate Drive Shaft Assembly Post-backload

UB028 59A1 9URL Inspect Boat Equipage Post-backload

UB029 59A1 9URW Inspect Shore Power Cable and Connectors Post-backload

UB030 59A1 9UPP Clean and Inspect Sea Water Strainer Pre-offload / post backload

UB031 59A1 1UW4 Clean and Inspect Engine Duplex Sea Water Strainer Pre-offload / post backload

UB032 59A1 9UQW Inspect Concealed Snubber Mounts Pre-offload / post backload

UB033 260 MPF-01 Consolidated Spectrographic Lube Oil Analysis As Directed

MPFUB MAINTENANCE PROCEDURES

File details come from the government source that posted it. Updated .