N0002422R5325 Amendment 0007.pdf
PDF 651 KB Posted
- Solicitation number
- N0002422R5325
About this file
This document is a solicitation for the production of the MK 41 Vertical Launching System (VLS) from fiscal year 2022 through 2027. The Navy seeks to award a single contract for the mechanical structure and integration of VLS modules, as well as associated equipment, spare parts, and program support. Offerors must propose solutions for all contract line items, which include firm-fixed-price and cost-plus-fixed-fee items for production, engineering support, and program management. Proposals are due by mid-July 2022, and award is expected at the end of January 2023. The Navy will evaluate proposals based on technical approach, past performance, and total evaluated cost/price. Offerors must demonstrate the ability to meet delivery schedules while adhering to technical data packages and quality standards for this complex weapon system.
View the file
Other files
Show 40 more
Latest 50 of 85 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002421NR43302
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See SF30 Block 14 for summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
U 1 39
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0002422R5325
X 9B. DATED (SEE ITEM 11)
18-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jul-2022
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002422R5325
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
SF30 BLOCK 14
The purpose of this amendment is to:
1. Update section B to add FMS countries to Item titles and Descriptions of Items, 0031, 0031AA, 0031AB, 0032, 0032AA, 0032AB, 0041, 0041AA, 0041AB, 0041AC, 0042, 0042AA, 0042AB, 0042AC, 0043, 0044, 0045, 0046, 0131, 0131AA, 0131AB, 0131AC, 0131AD, 0132, 0132AA, 0132AB, 0132AC, 0132AD, 0133, 0133AA, 0133AB, 0134, 0134AA, 0134AB, 0135, 0135AA, 0135AB, 0136, 0136AA, 0136AB.
2. Update section B to move item 0131AD from the parent CLIN 0130 to parent CLIN 0131.
3. Update Section F item 0136AA delivery date from 01 Oct 2026 to 31 Oct 2026 and to add language for maximum monthly delivery rates.
4. Update Section I clause 52.217-7 VAR I to include item 0098.
5. Update Section J to reflect revised attachments: Attachment 1 – Statement of Work and Attachment J-S6 – CLIN Matrix.
6. Update Section L paragraph 1.4 to extend the deadline for receipt of questions and paragraph 3.4.2.2.1.
7. Update Section M paragraph 2.3.1.3.2 to update the title to “FFP PIO CLIN 0099”.
8. Update Attachment 1 – Statement of work, to remove paragraph 20.2 – Manufacturing Certifications and Traceability.
9. Update Attachment 13 – Government Furnished Information, to add “Additional Models” tab.
10. Update Attachment J-S6 CLIN Matrix to revise CLIN/SLIN descriptions to label FMS cases.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0031
The CLIN description has changed from MK 41 VLS OBRP to MK 41 VLS AT SEA5000 OBRP.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR PARTS.
To:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS AT SEA5000 ONBOARD REPAIR PARTS.
SUBCLIN 0031AA
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR PARTS. See Note D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS AT SEA5000 ONBOARD REPAIR PARTS. See Note D.
SUBCLIN 0031AB
MANUFACTURE, ASSEMBLE, AND TEST MK 41 AT SEA5000 VLS ONBOARD REPAIR PARTS. See Note
CLIN 0032
The CLIN description has changed from MK 41 VLS TRANSP EQUIP to MK 41 VLS AT SEA5000
TRANSP EQUIP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION EQUIPMENT.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS AT SEA5000 TRANSPORTATION EQUIPMENT.
SUBCLIN 0032AA
TRANSP EQUIP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION EQUIPMENT. See Note D.
See Note D.
SUBCLIN 0032AB
TRANSP EQUIP.
CLIN 0041
The CLIN description has changed from MK 41 VLS OBRP to MK 41 VLS CANADA CN CSC OBRP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS CANADA CN CSC ONBOARD REPAIR PARTS.
SUBCLIN 0041AA
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS CANADA CN CSC ONBOARD REPAIR PARTS. See Note D.
SUBCLIN 0041AB
SUBCLIN 0041AC
CLIN 0042
The CLIN description has changed from MK 41 VLS TRANSP EQUIP to MK 41 VLS CANADA CN
CSC TRANSP EQUIP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS CANADA CN CSC TRANSPORTATION
EQUIPMENT.
SUBCLIN 0042AA
CSC TRANSP EQUIP.
EQUIPMENT. See Note D.
SUBCLIN 0042AB
CSC TRANSP EQUIP.
SUBCLIN 0042AC
CSC TRANSP EQUIP.
CLIN 0043
The CLIN description has changed from MK 41 VLS INCO SPARES to MK 41 VLS CANADA CN CSC
INCO SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES. See Note D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS CANADA CN CSC INCO SPARES. See Note D.
CLIN 0044
The CLIN description has changed from MK 41 VLS INCO TOOLS & TEST to MK 41 VLS CANADA
CN CS INCO TOOLS & TEST.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS & TEST EQUIPMENT. See Note D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS CANADA CN CSC INCO TOOLS & TEST
CLIN 0045
The CLIN description has changed from MK 41 VLS LH&A EQUIPMENT to MK 41 VLS CANADA
CN CSC LH&A EQUIPMENT.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS LIFT, HANDLING, & ALIGNMENT EQUIPMENT.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS CANADA CN CSC LIFT, HANDLING, &
ALIGNMENT EQUIPMENT. See Note D.
CLIN 0046
The CLIN description has changed from MK 41 VLS DEPOT SPARES to MK 41 VLS CANADA CN
CSC DEPOT SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES. See Note D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS CANADA CN CSC DEPOT SPARES. See Note D.
CLIN 0131
The CLIN description has changed from MK 41 VLS OBRP to MK 41 VLS
NETHERLANDS/BELGIUM OBRP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM ONBOARD REPAIR
PARTS.
SUBCLIN 0131AA
The CLIN description has changed from MK 41 VLS OBRP to MK 41 VLS NETHERLANDS OBRP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR PARTS. See Notes B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS ONBOARD REPAIR PARTS. See Notes B, and D.
SUBCLIN 0131AB
The CLIN description has changed from MK 41 VLS OBRP to MK 41 VLS NETHERLANDS OBRP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS ONBOARD REPAIR PARTS. See
SUBCLIN 0131AC
The CLIN description has changed from MK 41 VLS OBRP to MK 41 VLS BELGIUM OBRP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS BELGIUM ONBOARD REPAIR PARTS. See Notes B, and D.
SUBCLIN 0131AD
The CLIN description has changed from MK 41 VLS OBRP to MK 41 VLS BELGIUM OBRP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS BELGIUM ONBOARD REPAIR PARTS. See Notes B, and D.
CLIN 0132
The CLIN description has changed from MK 41 VLS TRANSP EQUIP to MK 41 VLS NLS/BEL
TRANSP EQUIP.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM TRANSPORTATION
SUBCLIN 0132AA
The CLIN description has changed from MK 41 VLS TRANSP EQUIP to MK 41 VLS NETHERLANDS
TRANSP EQUIP.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION EQUIPMENT. See Notes B, and
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS TRANSPORTATION
EQUIPMENT. See Notes B, and D.
SUBCLIN 0132AB
The CLIN description has changed from MK 41 VLS TRANSP EQUIP to MK 41 VLS NETHERLANDS
TRANSP EQUIP.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS TRANSPORTATION
EQUIPMENT. See Notes B, and D.
SUBCLIN 0132AC
The CLIN description has changed from MK 41 VLS TRANSP EQUIP to MK 41 VLS BELGIUM
TRANSP EQUIP.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS BELGIUM TRANSPORTATION EQUIPMENT. See
SUBCLIN 0132AD
The CLIN description has changed from MK 41 VLS TRANSP EQUIP to MK 41 VLS BELGIUM
TRANSP EQUIP.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS BELGIUM TRANSPORTATION EQUIPMENT. See
CLIN 0133
The CLIN description has changed from MK 41 VLS INCO SPARES to MK 41 VLS NL/BEL INCO
SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM INCO SPARES
SUBCLIN 0133AA
The CLIN description has changed from MK 41 VLS INCO SPARES to MK 41 VLS NETHERLANDS
INCO SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES. See notes B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS INCO SPARES. See notes B, and D.
SUBCLIN 0133AB
The CLIN description has changed from MK 41 VLS INCO SPARES to MK 41 VLS NL/BEL INCO
SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES. See notes B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM INCO SPARES. See notes B, and D.
CLIN 0134
The CLIN description has changed from MK 41 VLS INCO TOOLS & TEST to MK 41 VLS NL/BEL
INCO TOOLS & TEST.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS & TEST EQUIPMENT.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM INCO TOOLS & TEST
SUBCLIN 0134AA
The CLIN description has changed from MK 41 VLS INCO TOOLS & TEST to MK 41 VLS
NETHERLANDS INCO TOOLS & TEST.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS & TEST EQUIPMENT. See Nots B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS INCO TOOLS & TEST
EQUIPMENT. See Nots B, and D.
SUBCLIN 0134AB
The CLIN description has changed from MK 41 VLS INCO TOOLS & TEST to MK 41 VLS NL/BEL
INCO TOOLS & TEST.
The CLIN extended description has changed from:
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS & TEST EQUIPMENT. See Nots B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM INCO TOOLS & TEST
EQUIPMENT. See Nots B, and D.
CLIN 0135
The CLIN description has changed from MK 41 VLS LH&A EQUIPMENT to MK 41 VLS NL/BEL
LH&A EQUIPMENT.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM LIFT, HANDLING, &
ALIGNMENT EQUIPMENT.
SUBCLIN 0135AA
The CLIN description has changed from MK 41 VLS LH&A EQUIPMENT to MK 41 VLS
NETHERLANDS LH&A EQUIPMENT.
The CLIN extended description has changed from:
See Notes B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS LIFT, HANDLING, &
ALIGNMENT EQUIPMENT. See Notes B, and D.
SUBCLIN 0135AB
The CLIN description has changed from MK 41 VLS LH&A EQUIPMENT to MK 41 VLS NL/BEL
LH&A EQUIPMENT.
The CLIN extended description has changed from:
See Notes B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM LIFT, HANDLING, &
ALIGNMENT EQUIPMENT. See Notes B, and D.
CLIN 0136
The CLIN description has changed from MK 41 VLS DEPOT SPARES to MK 41 VLS NL/BEL DEPOT
SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM DEPOT SPARES.
SUBCLIN 0136AA
The CLIN description has changed from MK 41 VLS DEPOT SPARES to MK 41 VLS NETHERLANDS
DEPOT SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES. See Notes B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS DEPOT SPARES. See Notes B, and
SUBCLIN 0136AB
The CLIN description has changed from MK 41 VLS DEPOT SPARES to MK 41 VLS NL/BEL DEPOT
SPARES.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES. See Notes B, and D.
MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS NETHERLANDS/BELGIUM DEPOT SPARES. See
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for SUBCLIN 0136AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
01-OCT-2026 1 N/A
FOB: Destination
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
31-OCT-2026 1 N/A
FOB: Destination
SECTION F
All Items with a FOB point of Origin and a ship to address location of “N/A”, shall be retained at the contractor’s facility for use in production and shipping. The contractor’s DODAC will be inserted at contract award.
All Items with a FOB point of Destination and a ship to address location of “N/A” will be shipped to a freight forwarder within CONUS, to be designated with name, address, and DODAC at either contract award or option exercise
Maximum Monthly Delivery Rates
Items 0007, 0107 , 0207, 0307 and 0407 shall be delivered at a rate not to exceed four kits per month in total for all Items beginning eighteen months after option exercise date.
Items 0021, 0121 , 0221, 0321 and 0421 shall be delivered at a rate not to exceed one set per month in total for all Items beginning fifteen months after option exercise date.
Items 0022, 0122 , 0222, 0322 and 0422 shall be delivered at a rate not to exceed one set per month in total for all Items beginning fifteen months after option exercise date.
Items 0023, 0123 , 0223, 0323 and 0423 shall be delivered at a rate not to exceed one unit per month in total for all Items beginning twenty-four months after option exercise date.
Items 0024, 0124 , 0224, 0324 and 0424 shall be delivered at a rate not to exceed three units per month in total for all Items beginning twenty-four months after option exercise date.
Items 0025, 0125 , 0225, 0325 and 0425 shall be delivered at a rate not to exceed two lots per month in total for all Items beginning twelve months after option exercise date.
Items 0026, 0126 , 0226, 0326 and 0426 shall be delivered at a rate not to exceed two lots per month in total for all Items beginning twelve months after option exercise date.
Items 0027, 0127 , 0227, 0327 and 0427 shall be delivered at a rate not to exceed two lots per month in total for all Items beginning twelve months after option exercise date.
Items 0028, 0128 , 0228, 0328 and 0428 shall be delivered at a rate not to exceed twelve units per month in total for all Items beginning fifteen months after option exercise date.
Items 0029, 0129 , 0229, 0329 and 0429 shall be delivered at a rate not to exceed twelve sets per month in total for all Items beginning fifteen months after option exercise date.
SECTION I - CONTRACT CLAUSES
52.217-7 VAR I OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989)
(NAVSEA VARIATION I) (OCT 2018)
The Government may require the delivery of the numbered line item(s)/subline item(s), identified in the Schedule as an option item(s), in the quantity and at the price(s) stated in the Schedule. If more than one option exists, the Government has the right to unilaterally exercise any such option, in whole or in part up to the total quantity specified in the option item, whether or not it has exercised other options. Option(s) shall be exercised, if at all, by written or telegraphic notice(s) signed by the Contracting Officer and sent within the time(s) specified below:
ITEM LATEST OPTION EXERCISE DATE
0010, 0011, 0012, 0013, 0014, 0015, 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029 30 JUN 2023
0101, 0102 (Option Group 1) 30 JUN 2024
0105 30 JUN 2024
0107, 0113, 0121, 0122, 0123, 0124, 0125, 0126, 0127, 0128, 0129, 0130, 0131, 0132, 0133, 0134, 0135, 0136, 0137 30 JUN 2024
0201, 0202 (Option Group 2) 30 JUN 2025
0205 30 JUN 2025
0207, 0213, 0221, 0222, 0223, 0224, 0225, 0226, 0227, 0228, 0229 30 JUN 2025
0301, 0302 (Option Group 3) 30 JUN 2026
0305 30 JUN 2026
0307, 0313, 0321, 0322, 0323, 0324, 0325, 0326, 0327, 0328, 0329 30 JUN 2026
0401, 0402 (Option Group 4) 30 JUN 2027
0405 30 JUN 2027
0407, 0413, 0421, 0422, 0423, 0424, 0425, 0426, 0427, 0428, 0429 30 JUN 2027
0098 (Offsets) 29 AUG 2024
0099 (PIO) 30 JUN 2027
Notwithstanding the preceding clause language, Option Items in each of the above designated Option Groups shall be exercised together.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J
The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
Exhibits A-B, rev 4 23 MAY 2022, Contract Data Requirements List, DD Form 1423, 43 pages
List of Solicitation Attachments:
J-S1 Terms of Use Agreement J-S2 Question Submittal Form J-S3* CLIN Pricing, rev 2 23 MAY 2022 J-S4 CDRL Price Group J-S5 Press Release Information Form J-S6 CLIN Matrix, rev 3 08 JULY 2022, (for informational purposes)
*J-S3 is for informational purposes only and section B pricing prevails.
List of Attachments:
1. Statement of Work Vertical Launching System, rev 3 08 July 2022, 31 pages, and Appendices A - B
Appendixes:
A. Parts List, rev 1 23 MAY 2022, Excel file B. Module, Deck & Hatch, Ancillary Cable Sets, Excel file
2. VLS Technical Data Package (TDP) and associated drawings (DVD), updated 23 MAY
3. SLS98-1 VLS Test Assessment Plan, 12 pages
4. Configuration Management Plan for the MK 41 Vertical Launch System, Vol. 1
Equipment (Hardware) Configuration Management, 109 pages
5. Production Readiness Review Plan, rev 1 12 APRIL 2022, 18 pages
6. Instruction for Contractor Registration Access for VLS Interface Control Documents and Corporate Data Management System Registration, 1 page
7. [Reserved]
8. MK 41 VLS MODs 0/2/7/15 Technical Manual, SW394--AF--MMO--010/VLS Revision
4, and associated Maintenance Requirement Cards (DVD)
9. MK 41 Vertical Launching System Packaging and Transportation Plan, 56 pages
10. Government Furnished Property, rev 3 23 MAY 2022
11. Make or Buy Program (Offeror to propose), TBD pages
12. Small Business Subcontracting Plan (Offeror to propose), TBD pages
13. Government Furnished Information rev 2 08 JULY 2022, 19 pages
(Procedures & Models will be provided with TDP) These procedures, models, and drawings are provided for informational purposes only.
Specific adherence to these procedures, models, and drawings is not required. Further, the Contractor’s specific adherence to these procedures, models, and drawings does not relieve the Contractor from delivering the final end product(s) as specified in the contract.
14. MK 41 VLS Indentured Breakdown List, 3288 pages
15. Cost and Software Data Reporting Plan, rev 1 23 MAY 2022, TBD pages
16. MK 41 VLS Resource Distribution Table (RDT), rev 1 23 MAY 2022
17. Option Item Stepladder Price, rev 3 23 MAY 2022, Excel file (Offeror to propose)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
1.0 General Information
For proposal purposes, the estimated date of Award is 31 January 2023. The Government reserves the right to award sooner or later if necessary. The start and end dates, where applicable, will be updated accordingly upon Award.
Each Offeror is required to submit a proposal that is sufficiently detailed and complete to fully demonstrate an understanding of, and compliance with, all of the requirements of the solicitation. Proposals shall contain only material directly related to this acquisition. Offerors shall submit all information required by this solicitation.
Offerors’ proposals shall be based on the requirements contained in this solicitation (including those documents, exhibits, and other attachments to the solicitation identified in Section J). Offerors shall submit a proposal encompassing all of the line items listed in Section B of this solicitation. FAILURE TO FOLLOW THE
INSTRUCTIONS OR CONFORM TO ALL REQUIREMENTS OUTLINED IN THIS SOLICITATION
MAY RESULT IN REJECTION OF THE OFFEROR’S PROPOSAL AND REMOVAL FROM FURTHER
CONSIDERATION FOR AWARD.
Proposals submitted in response to the solicitation must contain a complete description of all pertinent aspects of the effort proposed by the Offeror. Previously submitted data or prior experience presumed to be known to the Government (e.g., previous projects performed for the Government) will not be considered as part of the proposal unless it is explicitly described in the proposal.
General statements such as, “the Offeror understands,” “the Offeror can or will comply with the requirements,” “standard procedures will be used,” “well-known techniques will be used,” or statements which merely paraphrase the solicitation in whole or in part do not constitute compliance with the requirements for proposal content. Data previously submitted, or presumed to be known (e.g., data or services previously submitted or performed for the Government) cannot be considered as part of the proposal unless explicitly incorporated into the proposal.
Discussions of each topic in the proposal shall exhibit continuity and logical progression.
1.1 GOVERNMENT-WIDE POINT OF ENTRY (GPE)
This solicitation will be made available only through the Internet on the SAM website (https://www.sam.gov). From time to time, the Government may post additional information to the SAM website relating to this solicitation (e.g.
responses to questions, solicitation amendments, etc.). It is the responsibility of prospective Offerors to monitor the SAM website for any such information.
1.2 COMMUNICATIONS WITH THE GOVERNMENT
Unless otherwise specified, the Naval Sea Systems Command Procuring Contracting Officer (PCO) and Contract Specialist (CS) are the sole Government points of contact for this acquisition:
Mr. David Chamberlain Procuring Contracting Officer david.s.chamberlain5.civ@us.navy.mil
(202) 781-2598
Mr. Matthew Hubbard Contract Specialist matthew.r.hubbard2.civ@us.navy.mil
(202) 781-4413
1.3 AVAILABILITY OF ATTACHMENTS
Requests for access to the controlled solicitation attachments shall be submitted via email as follows:
TO: Mr. David Chamberlain - david.s.chamberlain5.civ@us.navy.mil CC: Mr. Matthew Hubbard - matthew.r.hubbard2.civ@us.navy.mil
SUBJECT LINE: N00024-22-R-5325 Access Request for (insert name of Offeror)
As electronic attachments to the email request, include the following:
1) Signed copy of the Terms of Use Agreement (TOUA) provided as Attachment J-S1 to this solicitation and a current copy of company’s approved DD Form 2345, Military Critical Technical Data Agreement, verifying eligibility to receive export-controlled information.
Distribution of the controlled solicitation attachments shall be made available in a secure manner to only those Offerors that meet the requirements detailed above and have submitted a signed TOUA (Attachment J-S1).
The deadline to request access to the controlled solicitation documents shall be the same as the deadline to submit bidder’s questions regarding this solicitation.
1.4 SUBMISSION OF QUESTIONS AND COMMENTS
Offerors shall submit written questions and comments related to this solicitation using the Bidder’s Question Submittal Form (Attachment J-S2) for this solicitation. For ease of Government review and to minimize response time, Offerors shall submit this form in the original file format. Do not convert the form to Portable Document Format (PDF). To ensure the Government understands the context of the question, Offerors shall detail the applicable document name, document date or version, page, paragraph, clause or other specific citation to which the question applies. Information contained in the Government’s responses to bidder’s question shall not supersede any information contained in the solicitation (including amendments). In the event of a discrepancy between a response to a bidder’s question and the content of the solicitation, the latter shall take precedence.
Offerors shall not submit comments, questions, or inquiries to any Government representative other than the PCO and CS identified in this section.
The Government intends to distribute bidder’s questions and associated responses via public posting to the SAM website. However, any question or response that contains controlled unclassified information will not be posted publicly, but rather will be sent directly to those Offerors who have executed the TOUA and meet the security requirements detailed herein.
In the event that a prospective Offeror wishes to submit a comment or question that the prospective Offeror believes addresses a subject that is specific or proprietary to the Offeror, then the Offeror shall mark the question accordingly on the submission form and provide justification to support its claim. If the Government concurs with this identification, the Government will respond only to that potential Offeror. If the Government does not concur with this identification, it will inform the submitting Offeror and will not provide any further response. The Offeror may resubmit the question without the proprietary marking if the Q&A deadline has not passed.
Offerors shall submit in accordance with this section any questions or suggestions related to the terms and conditions of this solicitation prior to the deadline for questions.
Therefore, any offer that includes “redlines,” condition(s) of offer, or any other deviation from the requirements of the solicitation may be rejected by the Government and will not be further evaluated for award. As such, Offerors shall submit in accordance with this section any questions or suggestions related to the terms and conditions of this solicitation prior to the deadline for questions.
The deadline for receipt of questions is 119 days after the date the original solicitation was issued (15 July 2022) (see Block 5 of the Standard Form 33). Any questions received after this date may not be answered prior to receipt of proposals.
1.4.1 QUESTIONS
Written questions related to this solicitation shall be submitted electronically as follows:
TO: Mr. David Chamberlain – david.s.chamberlain5.civ@us.navy.mil CC: Mr. Matthew Hubbard – matthew.r.hubbard2.civ@us.navy.mil SUBJECT LINE: N00024-22-R-5325 Question from (insert name of Offeror)
Based upon paragraph 1.5 below, offerors shall not submit any classified questions or proposals in response to this solicitation.
1.5 SOLICITATION SECURITY CLASSIFICATION
This solicitation is unclassified.
1.6 AWARD WITHOUT DISCUSSIONS
Pursuant to the provision under this section entitled FAR 52.215-1, “Instructions to Offerors – Competitive Acquisition”, the Government intends to award a single contract on the basis of a proposal submission without conducting discussions with Offerors, but reserves the right to conduct discussions per FAR 15.306 “Exchanges with Offerors After Receipt of Proposals” if determined by the Contracting Officer to be necessary. Each Offeror shall submit only one proposal for this requirement. No alternate proposals will be accepted, and the submission of multiple proposals for one requirement will result in rejection of the proposal and will not be further evaluated for award. Therefore, each Offeror’s proposal submission shall contain the Offeror’s best terms from a price and technical standpoint. However, the Government may contact any, all, or a limited number of Offerors with questions concerning their proposals as permitted under FAR Part 15. Upon the conclusion of discussions, if they occur, the Government will request Final Proposal Revisions (FPRs) from all Offerors still within the competitive range.
1.7 PROTECTING CONTROLLED UNCLASSIFIED INFORMATION
Pursuant to DFARS 252.204-7008(c)(1), prospective Offerors are advised proper safeguarding of Controlled Unclassified Information (CUI) is considered a special standard of responsibility for this solicitation. See FAR subpart 9.1. Failure to properly safeguard and mark Controlled Unclassified Information in a prospective Offeror’s proposal in accordance with applicable regulation and policy (to include Executive Order 13556, the Defense Acquisition Regulations Supplement and DoD Instruction 5200.48) may preclude the Contracting Officer from being able to provide the required affirmative determination of responsibility. If the Contracting Officer is unable to affirmatively determine the prospective Offeror to be responsible, the prospective Offeror will be ineligible for award.
2.0 GENERAL PROPOSAL INSTRUCTIONS
The completion and submission to the Government of an offer shall indicate the Offeror’s unconditional acceptance of the terms and conditions in the solicitation.
The Government encourages Offerors to contact the PCO and Contract Specialist via the Bidder’s Question Process as outlined in Section L.1.4 above.
Offerors shall take care to submit a legible, neat, orderly, concise and comprehensive proposal. Elaborate brochures or artwork, expensive paper or bindings, or expensive visual or presentation aids beyond those sufficient to present a complete and comprehensive proposal are unnecessary. Clarity is essential. The use of brochures shall be minimized and if used will count against page limits.
2.1 PROPOSAL STRUCTURE, FORMAT, AND PAGE COUNTS
Offerors shall structure proposal submittals such that the required content is organized as follows:
VOLUME
TITLE
PAGE
LIMIT
PAPER
DUPLICATES
ELECTRONIC
COPIES
I Executive
Summary 10 4 1
II Technical Approach and Capability
105 4 1
III Past Performance
See Note 1 4 1
IV Price Proposal None 1 1
Note 1: The total page limit for this volume will vary depending on the number of subcontractors for which the Offeror must provide past performance information. The past performance narrative for the Offeror shall not exceed five (5) pages in length. The past performance narrative for applicable subcontractors shall not exceed two (2) pages in length. Therefore, the page limit for this volume shall be (5 + 2x), where x represents the number of applicable subcontractors.
Each Offeror shall submit paper hard copies and separate electronic copies on CD-ROM or DVD media in the quantities specified above. All copies must contain the same information and format. See paragraph 3.0 and subparagraphs under this section for instructions regarding proposal content that must be submitted solely on electronic media and omitted from the paper versions, including the original and any copies, of the volume.
Offerors are advised that the quality of information is significantly more important than quantity. In this respect, Offerors will strictly observe the page count limitations for each volume. Pages in excess of the applicable page limit will not be read or evaluated and will be removed by the PCO from the back of the respective volume prior to evaluation. It is not necessary to supply the maximum number of pages allowed for each volume; fewer pages may be submitted. Offerors shall organize proposal content sections using index pages or tabbed index divider pages with clear cross-referencing to the table of contents. Only pages which count against page count limitations shall be numbered (e.g., 1, 2, 3), with the exception of the Price Volume. For the Price Volume only, pages must be numbered consecutively within each section, but page numbering may restart at the beginning of each section.
Section L.2.3 identifies specific items that will be exempt from the page count limitations set forth above. In addition, the following proposal content will be exempt from the page count limitations:
Cover letter Table of contents Title pages Index pages Tabs Glossary Cross Reference Matrix List of Tables and Figures
The Government may consider any failure on the part of an Offeror to comply with these instructions to be an indication of how the Contractor will comply with contract requirements during contract performance. Therefore, the Government encourages Offerors to contact the PCO and Contract Specialist via the Bidder’s Question Process outlined in Section L.1.4
Volumes I, II, III and IV shall each contain a cover letter containing:
Offeror name, address, and point of contact Offeror point of contact phone number and electronic mail address Offeror CAGE code and DUNS number Title of proposal, proposal number, and RFP number – Mechanical and Integration (N00024-22-R-5325) Volume number and title (e.g. “Volume II – Technical Proposal (Part 1 of X)”)
The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.
Each factor and volume shall be written to the greatest extent possible on a stand-alone basis so that its content may be evaluated with a minimum of cross-referencing to other factors and volumes of the proposal. Cross-referencing within a given factor is permitted where its use would conserve space without impairing clarity. In the event an Offeror decides to cross reference information, it is the responsibility of the Offeror to include the information in full and provide clear references to that information in other portions of the factor where the Offeror would like the evaluators to consider any duplicated information. Offerors are reminded of their burden to present its capability in a manner that is clear for evaluators.
EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)
Section L – Proposal Instructions
Government SOW Section M – Evaluation Factor
Offeror’s Proposal Reference
CLIN
Reference
Volume II Technical Approach and Capability
Example:
Attachment 1, SOW, Page 102, First Article Test
Note: This column shall address applicable paragraphs within the SOW.
Factor 1 Provide reference to Offeror’s Proposal Volume II – Technical. Example: Refer to appropriate page number in Offeror’s written proposal.
XXXX
2.2 LABELING AND PACKING
Offerors shall pack and submit all proposal binders in cardboard (or equivalent) boxes that may be lifted and handled manually. Offerors should observe a reasonable maximum weight for each box and avoid overloading any single box. Boxes must be sequentially numbered with the box numbers marked on all sides of each box, and written on all sides of the outside wrapper, if necessary. If submitting more than one box, include in one of the boxes a master packing list summarizing the contents (i.e., volume number, copy number, and volume name) of each box, by box number. Submit all copies of electronic media in a single box. These packing instructions also apply to all subcontractor submissions.
Offerors shall submit all volumes in three-ring binders with index tabs or tabbed index divider pages separating each section. Each proposal section shall start on a new page. Each volume shall contain a table of contents that lists the sections, subsections, and page numbers. Each volume shall also include a glossary explaining all abbreviations and acronyms used. Offerors are responsible for the condition of delivered proposals.
The first page of each proposal volume shall display the information required by FAR 52.215-1(c)(2) and shall also contain the volume number, volume title, security classification level of the volume and serial/copy number. If an Offeror wishes to restrict the disclosure or use of its proposals, the Offeror shall use the legend permitted by FAR 52.215-1(e) and prominently indicate the specific pages and paragraphs that contain proprietary information. Each page of an Offeror’s proposals shall be labeled with the Offeror’s name, solicitation number, date corresponding to the date of the proposal, and CUI designation.
All information relating to contract pricing data shall be included only in the section of the proposal designated as the Price Proposal Volume IV. UNDER NO CIRCUMSTANCES SHALL OFFERORS INCLUDE CONTRACT COST AND PRICING DATA IN VOLUMES I THROUGH III. In the event that cost and pricing data are included in Volumes I through III, that pricing data will be excluded from the evaluation.
Unless otherwise stated in this solicitation, Offerors shall ensure that electronic versions of proposals do not contain any information not included in the paper versions. In the event of a discrepancy between the paper version and electronic version of a proposal, the electronic version will govern. Electronic proposal submissions and supporting information shall be submitted on CD-ROM or DVD media in a format that can be accessed using a standard PC-compatible CD-ROM/DVD drive. The Government will not accept submissions on any other electronic media, such as flash memory cards or USB flash drives. All files submitted to the Government shall be compatible with Microsoft Office 2016. All viewgraphs shall be submitted in Microsoft PowerPoint format. All spreadsheets shall be submitted in Microsoft Excel format with all mathematical equations used for calculations visible and traceable. All text and proposal narrative shall be submitted in Microsoft Word format. All schedules shall be submitted in Microsoft Project format. No fields or documents may be password protected. Offerors shall not embed sound or video files into the electronic files. All Microsoft Excel files shall be completely readable and editable such that the Government may readily ascertain the validity of the pricing or other data contained therein. All data and tables shall be submitted in a printable format.
Each CD-ROM/DVD shall be labeled with the solicitation number, proposal volume number and title, the Offeror’s name, date of submittal, security classification level, serial/copy number, any restrictive marking permitted by the FAR (See FAR Part 15), and “Source Selection Information – See FAR 2.101 and 3.104.” The Offeror shall also submit a hardcopy directory listing with each CD-ROM/DVD submitted. Separate files shall be used to enable rapid retrieval of all contents, including exhibits, appendices, and attachments, if any. Prior to submittal, the Offeror shall screen all CD-ROMs/DVDs to ensure that the media does not contain computer viruses or other malware. Each volume shall be organized into directories within the CD-ROM/DVD that duplicate the volumes and partitions used in the paper version of the proposal.
All CD-ROMs/DVDs shall be marked “CUI.”
2.3 PAGE SIZE AND FORMAT
The narrative material in each proposal shall be single-spaced, typed, or printed in 12-point Times New Roman font.
Paper, excluding foldouts, shall be 8 1/2 × 11 inches (standard letter size) with a minimum margin of 1 inch around the page. Text within tables, diagrams, pictorial charts, or graphic material may use no smaller than 8-point font.
These font requirements do not apply to outside documents such as Company Small Business Plan, Forward Pricing Rate Proposals and letters submitted previously to DCMA. Those documents may be submitted in their original format provided they are readable.
Every section, figure, and table shall be numbered; paragraphs within sections do not need to be numbered.
Proposal material shall be presented on double-sided pages only and in a single column on each page in accordance with FAR 52.204-4. Each double-sided page counts as 2 pages.
Foldout sheets may be used for charts and graphs where necessary to depict organization, layout, or implementation schedules. Foldouts shall be uncomplicated to preserve clarity. Extensive written text or tabular data, beyond that reasonably required for clarity, shall not be included in the material presented on the foldout sheet. Foldout pages shall fold entirely within the volume and shall not exceed 11 × 17 inches. Each non-blank side of a foldout page will count as two (2) pages for page count purposes. Foldouts for the proposal are limited to a total of 25 foldout sheets for the entire proposal, excluding Volume IV - Price Proposal. There is no limit as to how many of the pages of the price proposal are foldout pages, and foldout pages in the price proposal do not count against the 25 foldout sheet limit.
2.4 PROPOSAL SUBMISSION
Proposals in response to this solicitation shall be submitted to the Government no later than the time specified in Block 9 of the SF 33 and shall remain valid for 270 days after the due date for receipt of proposals.
“Local time” shall refer to the time zone for Washington, DC.
Telegraphic offers, facsimile offers, or offers submitted by electronic commerce will not be considered. Any proposals received through these means will be deleted or destroyed. Furthermore, the Government will not consider telegraphic, facsimile, or electronic commerce modifications of offers, or withdrawals of offers.
The preferred method of response is by overnight delivery service, such as FedEx, UPS, or DHL. Do not use the United States Postal Service.
All copies of the proposal shall be submitted to the Contract Specialist at the address below.
Commander Naval Sea Systems Command Attn: Mr. Matthew Hubbard, SEA 02531H 1333 Isaac Hull Ave SE Mail Stop 2040 Washington Navy Yard, DC 20376-2040
N00024-22-R-5325
PROPOSAL
DO NOT OPEN IN MAIL ROOM
For instructions on delivering hand-carried proposals, see the provision in this section entitled L-204-H002
SPECIAL PROPOSAL RECEIPT REQUIREMENTS FOR WASHINGTON NAVY YARD.
3.0 PROPOSAL CONTENT REQUIREMENTS
Offerors shall provide the information requested in the following paragraphs in the volumes indicated. If additional information is provided in other volumes or sections, Offerors shall provide clear references to the location in the proposal where the information may be found.
An Offeror’s proposal shall be sufficiently detailed to enable Government evaluation members to make a thorough evaluation against specific factors established in Section M, and to arrive at a sound determination as to whether or not the prospective Offeror will be able to perform in accordance with the stated requirements. Discussions of each topic in the proposal shall exhibit continuity and logical progression. Data shall be organized to enable Government personnel to thoroughly evaluate the proposal. A concise, legible, neat, orderly and comprehensive proposal is required. The Government does not assume the duty to search for data to cure problems it finds in proposals.
Failure to conform to all requirements of this solicitation may form the basis for rejection of the proposal without further consideration for award.
3.1 VOLUME I: EXECUTIVE SUMMARY
Do not include cost or price information in this volume. Executive Summary Volume shall summarize the Offeror’s planned approach to satisfy the Government’s requirements. Key elements of the proposal shall be highlighted for both technical and management perspective. The Executive Summary shall include a response in accordance with paragraph (c) of L-209-H009. The Government will not formally evaluate the Executive Summary with the exception of the OCI information provided.
3.2 VOLUME II: FACTOR 1: TECHNICAL APPROACH AND CAPABILITY
Do not include cost or price information in this volume. The information contained in this volume shall enable Government personnel to make a thorough evaluation and arrive at a sound determination of whether or not the proposal meets the requirements of the solicitation. To this end, the Technical Proposal Volume shall be specific, detailed, and complete enough to demonstrate clearly and fully that the Offeror understands the solicitation and has a thorough understanding of the solicitation requirements for accomplishing the efforts under this solicitation and the technologies involved. The proposal shall also demonstrate that the Offeror has sufficient experience and capability to successfully perform its proposed technical approach. The level of technical detail provided must be sufficient to show how the Offeror proposes to fulfill the Government’s requirements and fully explain the methodology and procedures to be followed. The narrative must also identify and evaluate any risks associated with the Offeror’s proposed approach and propose mitigation steps to minimize the Government’s risk in accepting the Offeror’s proposed technical approach and capability.
The Offeror must clearly state any and all assumptions made to develop the proposed technical approach and capability.
The Technical Approach and Production Capabilities Volume shall address the following elements:
Element 1: Production in Accordance with the TDP Element 2: First Article Qualification Testing and Factory Acceptance Testing Element 3: Facility and Tooling Element 4: Quality Assurance Approach Element 5: Program Management
An extended description of desired proposal content is included below:
Element 1: Production in Accordance with the TDP
The Offeror shall provide a manufacturing plan that includes an Integrated Master Plan (IMP), Integrated Master Schedule (IMS), and Work Breakdown Structure (WBS). The IMP, IMS, and WBS may be submitted as an Appendix A to volume II, which shall not count towards the overall page count of volume II. The manufacturing plan shall demonstrate the Offeror’s technical approach and capability to perform the requirements IAW the delivery schedule. Additionally, the manufacturing plan shall demonstrate its understanding of the Technical Data Packages (TDP) and identification of risks during performance and its approach to managing those risks in performance. This manufacturing plan shall demonstrate the Offeror’s approach to delivering the requirements of Section B and describe its approach to accomplishing the module mechanical structure and integration.
The Offeror shall describe its approach for accomplishing module mechanical structure production, GFP integration and module level integration and test. The approach shall outline the overall manufacturing plan, integration and test approach and contingency plans that ensure successfully completion of line item deliverables.
The Offeror shall demonstrate its experience as a prime contractor or subcontractor producing a MK 41 VLS or a program of similar size and complexity. The Offeror shall address the required technologies, equipment, and/or specialized skills proposed to build and integrate the MK 41 VLS system configuration in accordance with the TDP.
This should include—at a minimum—discussion of the following items:
Integration of GFP
Deck and Hatch Assembly Plenum Assembly Final Assembly and Test
Element 2: First Article Qualification Testing and Factory Acceptance Testing
The Offeror shall describe its approach for conducting First Article Qualification Testing (FAQT) and Factory Acceptance Testing (FAT) to ensure that production units comply with the configuration and functional requirements specified by the TDP.
The Offeror shall describe how first article qualification testing and factory acceptance testing will be implemented in its facility, identify any testing requirements that cannot be performed in its present facility, and provide a plan for any such requirements. The Offeror shall address facilities, fixtures, software, and test equipment required to successfully conduct first article qualification testing and factory acceptance testing.
Element 3: Facility and Tooling
The Offeror shall describe the proposed production assets, test assets, and capital assets in sufficient detail as to demonstrate adequate infrastructure, capability, and capacity for the production and test of the proposed systems at the production rates that result in on-time delivery as required by Section F. The Offeror shall specifically discuss availability of assets during the contract period of performance. The Offeror shall also describe its approach and plan for passing Production Readiness Reviews.
The Offeror shall describe availability of necessary assets including fixtures, software, physical plant facilities, required production and test equipment, special test ranges or facilities and skilled production, test and engineering support personnel.
The offeror must propose one of the following two options for module laydown:
(1) Module laydown procedure in accordance with MK 41 Vertical Launching System (VLS) Packaging and Transportation Plan, Attachment 9, Section 3.2.1 and NAVSEA Drawing 5599305: the Offeror's proposal must demonstrate its capability to perform this procedure.
Or
(2) Alternative module laydown procedure: the Offeror must describe the alternative method to laydown a module, the hardware required for laydown, a sketch of the laydown process, and analyses demonstrating all lifting hardware has a Factor of Safety of 5.0 on Yield.
Note: There is no requirement for the module laydown procedure, whether in accordance with 5599305 or an alternative laydown procedure, to be performed indoors. The Offeror shall specify whether the laydown procedure will be performed indoors or outdoors. If outdoors, the contractor shall specify how the module would be transported to the laydown site, and the contractor's plan to protect the modules in the event of sudden inclement weather conditions.
Note: The Government reserves the right to conduct…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .