Attachment 15 - MK41 VLS SSP CSDR Plan rev1 5.23.2022.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
FY 22-27 MK 41 Vertical Launching System (VLS) Production
Solicitation number
N0002422R5325
Issued by

About this file

This document is a Cost and Software Data Reporting (CSDR) Plan for the FY 22-27 MK 41 Vertical Launching System (VLS) Production contract opportunity with the Department of the Navy Naval Sea Systems Command.

The plan outlines reporting requirements for the prime contractor to provide cost, software, and technical data on the MK41 VLS program from contract award through final delivery and acceptance. Key reporting elements include FlexFile cost and hour reports at the Work Breakdown Structure level, recurring and non-recurring cost definitions, and submission events on an initial, interim, and final basis through final delivery in FY2027. The contractor must also provide a Resource Distribution Table, attend a Post Award Conference to review reporting processes, and maintain a WBS Dictionary to map internal accounts to reporting categories. The scope covers five annual production lots from FY2022 through FY2026 for modules, assemblies, integration, testing, engineering support and program management.

View the file

Other files

File Type Posted
Bidders Q and A 08_16_2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0010.pdf PDF
N0002422R5325 Amendment 0010 Conformed.pdf PDF
Bidders Q and A 08_11_2022.xlsx XLSX spreadsheet
J-S3 CLIN Pricing rev3 08.11.2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0009 Conformed.pdf PDF
Bidders Q and A 08_5_2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0009.pdf PDF
Attachment 1 - Appendix A - Parts List rev2 08.05.2022.pdf PDF
N0002422R5325 Amendment 0008 Conformed.pdf PDF
N0002422R5325 Amendment 0008.pdf PDF
Bidders Q and A 07_26_2022.xlsx XLSX spreadsheet
Attachment 1- SOW rev4 07.08.22.pdf PDF
Bidders Q and A 07_08_2022.xlsx XLSX spreadsheet
J-S6 CLIN Matrix - FY(22-23)-27 Launcher RFP rev3 7.8.2022.pdf PDF
N0002422R5325 Amendment 0007 Conformed.pdf PDF
Attachment 13 - Government Furnished Information rev2 7.8.2022.pdf PDF
N0002422R5325 Amendment 0007.pdf PDF
Attachment 13 - Government Furnished Information rev1 6.6.2022.pdf PDF
N0002422R5325 Amendment 0006.pdf PDF
N0002422R5325 Amendment 0006 Conformed.pdf PDF
Bidders Q and A 06_06_2022.xlsx XLSX spreadsheet
Attachment 17 - Step Ladder Pricing rev3 5.23.2022.xls XLS spreadsheet
J-S6 CLIN Matrix - FY(22-23)-27 Launcher RFP rev2 5.23.2022.pdf PDF
N0002422R5325 Amendment 0005 Conformed.pdf PDF
Attachment 1- SOW rev3 05.23.22.pdf PDF
Bidders Q and A 05_23_2022_MH.xlsx XLSX spreadsheet
J-S3 CLIN Pricing rev2 05.23.2022.xlsx XLSX spreadsheet
Exhibit_A-B_CDRLs rev 4 05_23_2022 - Final.pdf PDF
Attachment 1 - Appendix A - Parts List rev1 5.23.2022.pdf PDF
Attachment 10- GFP rev3 5.23.2022.pdf PDF
Attachment 16 - MK41 VLS SSP RDT rev1 5.23.2022.xls XLS spreadsheet
N0002422R5325 Amendment 0005.pdf PDF
Bidders Q and A 05_05_2022.xlsx XLSX spreadsheet
Bidders Q and A 05_03_2022.xlsx XLSX spreadsheet
J-S6 CLIN Matrix - FY(22-23)-27 Launcher RFP rev1 5.03.2022.pdf PDF
Attachment 17 - Step Ladder Pricing rev2 05.03.2022.xls XLS spreadsheet
N0002422R5325 Amendment 0004.pdf PDF
Exhibit_A-B_CDRLs rev 3 05_03_2022 - Final.pdf PDF
Attachment 10- GFP 03MAY22.pdf PDF
N0002422R5325 Amendment 0004 Conformed.pdf PDF
Bidders Q and A 04.20.2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0003.pdf PDF
_Exhibit_A-B_CDRLs rev 2 04.20.2022.pdf PDF
N0002422R5325 Amendment 0003 Conformed.pdf PDF
Attachment 5 - Production Readiness Review Plan rev1 04.12.2022.pdf PDF
Bidders Q and A 04.12.2022.xlsx XLSX spreadsheet
Attachment 17 - Step Ladder Pricing rev1 04.12.2022.xls XLS spreadsheet
_Exhibit_A-B_CDRLs rev 1 04.12.2022.pdf PDF
Attachment 10- GFP 04.12.21.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
MK41 Vertical Launching System
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
B
C-LRIP
XC-FRP
O&S
1c. PRIME MISSION PRODUCT
MK41 Vertical Launching System
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
XOther
2. COMMODITY TYPE
Missile System
3. PLAN ITERATION TYPE
INITIAL
XREVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20220429
5. LAST APPROVED PLAN DATE (YYYYMMDD)
20220201
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Grahovac, Robert
6b. ADDRESS (Include ZIP Code)
2450 CRYSTAL DR

ARLINGTON, VA 22202-4812

6c. TELEPHONE NUMBER (Include Area Code)
(703) 872-3786
6d. E-MAIL ADDRESS
robert.g.grahovac@navy.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
IWS 3L
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME

iii. LOCATION

iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
XCBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD
9c. APPROPRIATION (check all that apply)
RDT&E
XPROCUREMENT
O&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
NSEA-22-B-C1(R)
10b. APPROVED PLAN REVISION NUMBER
1
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
TECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES

DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01MK41 Vertical Launching System (VLS)X
1.12Missile/Ordnance System Integration, Assembly, Test, and CheckoutXXX
1.22MK 41 VLS Prime Mission ProductX
1.2.13MK 41 VLS Modules & EquipmentX
1.2.1.14Mk 9 Mod 5/7 Systems ModuleXXX
1.2.1.24Plenum Cell CoverXXX
1.2.1.34Canister Adapter AssemblyXXX
1.2.1.44MK 170 Sill AssemblyXXX
1.2.1.54MK 8 Mod 5/7 Standard ModuleXXX
1.32Encasement DeviceXX
1.42Command and/or LaunchXX
1.52Missile/Ordnance System Software Release 1...n (Contractor Shall Specify)XX
1.62Platform Integration, Assembly, Test, and Checkout 1...n (Contractor Shall Specify)XX
1.72Systems EngineeringXX
1.82Program ManagementXX
1.92Module Test and EvaluationXX
1.102TrainingXX
1.112DataXX
1.122Peculiar Support EquipmentXX
1.132Common Support EquipmentXX
1.142Operational/Site Activation by Site 1...n (Contractor Shall Specify)XX
1.152Contractor Logistics Support (CLS)XX
1.162Industrial FacilitiesXX
1.172Initial Spares and Repair PartsXX

Subtotal Cost X X

Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX

Reporting Contractor Profit/Loss or Fee X X

Total PriceXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019
Signer, Service Cost Director:Carlton Lavinder
Signed Date:5/6/2022 9:33:39 AM

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile), Quantity Data ReportContract Award (plus 12 months months)Initial2023090120231101
2Cost and Hour Report (FlexFile), Quantity Data ReportFY23 Annual ReportInterim2024090120241101
3Cost and Hour Report (FlexFile), Quantity Data ReportFY24 Annual ReportInterim2025090120251101
4Cost and Hour Report (FlexFile), Quantity Data ReportFY25 Annual ReportInterim2026090120261101
5Cost and Hour Report (FlexFile), Quantity Data ReportFY26 Annual ReportFinal2027090120271101
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS

INITIAL REPORT

Other than the Resource Distribution Table, submission events associated with this CSDR Plan are classified as either """"Initial"""", """"Interim"""", or """"Final"""" submissions as identified in block 14.d of this CSDR plan.

i. Submission events marked """"Initial"""" shall report the Contractor's total anticipated contract cost and resulting price using the maximum allowable contractor quantities, hours, or options (as applicable). For sealed bid contracts (i.e., contracts awarded under FAR Part 14) the reported FAC/EAC shall equal the value of the Contractor's sealed bid (using the maximum allowable contractor quantities, hours, or options (as applicable)). For negotiated contracts (i.e., contracts award under FAR Part 15) the reported FAC/EAC shall be equal in overall value to the Contractor's best and final offer (and consistent in distribution with any supporting cost and pricing data (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). For all other contracts, the reported FAC/EAC shall be equal in overall value to the Contractor's final proposal and consistent in distribution with any supporting data provided to substantiate the contract's value, reasonableness, and/or realism (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). No ATD costs are anticipated to reported on an """"Initial"""" submission except for any certified precontract costs incurred prior to or on the date of contract award.

ii. Interim"""" report submissions are any report that is not either an """"Initial"""" or """"Final"""" report. Reported ATD, EAC/FAC, and quantities on """"Interim"""" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's """"As Of Date"""" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).

iii. Reported ATD, EAC/FAC, and quantities on """"Final"""" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.

"COVID-19 Remarks:

The Reporting Entity shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.

Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.

If applicable, the Reporting Entity shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.

If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission.

Additional Data Fields #1-#12 (FlexFile): If applicable, the Reporting Entity shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.

FAC vs EAC

The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as """"Forecast at Completion"""" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.

NON-RECURRING/RECURRING DEFINITIONS

Recurring and Non-Recurring Costs required for all levels:

Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management.

Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out.

Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities.

Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.

Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.

Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.

Examples of Systems Test and Evaluation activities include quality control, assurance, acceptance testing of production units including pilot support & system safety support; test equipment in support of operations; and Manufacturing System/Software Integration Laboratory (SIL) sustainment and lab support. Examples of Training activities include repetitive activities that vary with the quantity of training devices being produced. Examples of Spares and Repair Parts activities include spare parts and materials for production, production representative and/or LRIP units including both initial and replenishment spares.

Examples of Support Equipment activities include efforts that pertain to repetitive activities that vary with the quantity of support items being produced. Examples of Tooling activities include efforts that pertain to repetitive activities that vary with the quantity of items being produced and tooling maintenance/sustainment. Examples of Operational/Site Activation activities include efforts that pertain to a series of sites or organizations and those activities repeat for each site.

Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management.

Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.

Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.

Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.

Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts.

Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts.

WBS INDEX AND DICTIONARY

The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.

The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.

For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.

COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES

Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.

1921-3 CONTRACTOR BUSINESS DATA REPORT

a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.

END ITEMS/ORDER LOTS SCOPE IDIQ

Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.

CONTRACTOR COST DATA REPORT UNIT/SUBLOT REPORTING

The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7.

QUANTITY REPORTING

a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.

b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.

FINAL COST REPORT

Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred.

POST AWARD CONFERENCE (PAC)

The Reporting Entity shall attend and participate in a CSDR Readiness Review meeting (also known as the Post award CSDR conference) which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and standard functional categories in the FlexFile (functional data elements in the 1921 series) codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary.

RESOURCE DISTRIBUTION TABLE (RDT)

The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DODI 5000.73 and DoDM 5000.04-M-1.

PERIOD OF PERFORMANCE (POP)

If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance.

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
1FY22 LotC-FRP
2FY23 LotC-FRP
3FY24 LotC-FRP
4FY25 LotC-FRP
5FY26 LotC-FRP
17. END ITEMS
a. IDb. NAME
AMK 41 Standard Module
BMK 41 System Module
CMK 41 Launcher Ancillary
DMK 41 Mech Ancillary
EMK 41 Adapter Assemblies
FMK 41 Common
18. UNIT/SUBLOT REPORTING AND UNIT SEQUENCING REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT/SUBLOT REPORTING
(X if applicable)d. UNIT SEQUENCING

(X if applicable)

DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

File details come from the government source that posted it. Updated .