FY 22-27 MK 41 Vertical Launching System (VLS) Production
Solicitation number
N0002422R5325
Issued by

About this file

This solicitation requests proposals for the production of MK 41 Vertical Launching Systems (VLS) from fiscal year 2022 through 2027. The Navy seeks to procure MK 41 MOD 36, MK 41 MOD 47, and MK 41 MOD 37 VLS units, as well as associated modules, components, equipment, and services. Offerors should propose pricing for low-rate initial production in the base year, with additional quantities and options to be awarded in subsequent fiscal years. Proposals are due by September 1, 2022. The award will be a fixed-price contract with cost-plus-fixed-fee and cost-plus-incentive-fee elements for technical support and establishment of production processes. The period of performance spans five years of production and sustainment for the MK 41 VLS across the U.S. Navy and allied fleets.

View the file

Other files

File Type Posted
Bidders Q and A 08_16_2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0010.pdf PDF
N0002422R5325 Amendment 0010 Conformed.pdf PDF
Bidders Q and A 08_11_2022.xlsx XLSX spreadsheet
J-S3 CLIN Pricing rev3 08.11.2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0009 Conformed.pdf PDF
Bidders Q and A 08_5_2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0009.pdf PDF
Attachment 1 - Appendix A - Parts List rev2 08.05.2022.pdf PDF
N0002422R5325 Amendment 0008 Conformed.pdf PDF
N0002422R5325 Amendment 0008.pdf PDF
Bidders Q and A 07_26_2022.xlsx XLSX spreadsheet
Attachment 1- SOW rev4 07.08.22.pdf PDF
Bidders Q and A 07_08_2022.xlsx XLSX spreadsheet
J-S6 CLIN Matrix - FY(22-23)-27 Launcher RFP rev3 7.8.2022.pdf PDF
N0002422R5325 Amendment 0007 Conformed.pdf PDF
Attachment 13 - Government Furnished Information rev2 7.8.2022.pdf PDF
N0002422R5325 Amendment 0007.pdf PDF
Attachment 13 - Government Furnished Information rev1 6.6.2022.pdf PDF
N0002422R5325 Amendment 0006.pdf PDF
N0002422R5325 Amendment 0006 Conformed.pdf PDF
Bidders Q and A 06_06_2022.xlsx XLSX spreadsheet
Attachment 17 - Step Ladder Pricing rev3 5.23.2022.xls XLS spreadsheet
J-S6 CLIN Matrix - FY(22-23)-27 Launcher RFP rev2 5.23.2022.pdf PDF
Attachment 1- SOW rev3 05.23.22.pdf PDF
Bidders Q and A 05_23_2022_MH.xlsx XLSX spreadsheet
J-S3 CLIN Pricing rev2 05.23.2022.xlsx XLSX spreadsheet
Exhibit_A-B_CDRLs rev 4 05_23_2022 - Final.pdf PDF
Attachment 15 - MK41 VLS SSP CSDR Plan rev1 5.23.2022.xlsx XLSX spreadsheet
Attachment 1 - Appendix A - Parts List rev1 5.23.2022.pdf PDF
Attachment 10- GFP rev3 5.23.2022.pdf PDF
Attachment 16 - MK41 VLS SSP RDT rev1 5.23.2022.xls XLS spreadsheet
N0002422R5325 Amendment 0005.pdf PDF
Bidders Q and A 05_05_2022.xlsx XLSX spreadsheet
Bidders Q and A 05_03_2022.xlsx XLSX spreadsheet
J-S6 CLIN Matrix - FY(22-23)-27 Launcher RFP rev1 5.03.2022.pdf PDF
Attachment 17 - Step Ladder Pricing rev2 05.03.2022.xls XLS spreadsheet
N0002422R5325 Amendment 0004.pdf PDF
Exhibit_A-B_CDRLs rev 3 05_03_2022 - Final.pdf PDF
Attachment 10- GFP 03MAY22.pdf PDF
N0002422R5325 Amendment 0004 Conformed.pdf PDF
Bidders Q and A 04.20.2022.xlsx XLSX spreadsheet
N0002422R5325 Amendment 0003.pdf PDF
_Exhibit_A-B_CDRLs rev 2 04.20.2022.pdf PDF
N0002422R5325 Amendment 0003 Conformed.pdf PDF
Attachment 5 - Production Readiness Review Plan rev1 04.12.2022.pdf PDF
Bidders Q and A 04.12.2022.xlsx XLSX spreadsheet
Attachment 17 - Step Ladder Pricing rev1 04.12.2022.xls XLS spreadsheet
_Exhibit_A-B_CDRLs rev 1 04.12.2022.pdf PDF
Attachment 10- GFP 04.12.21.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 05:00 PM local t ime 01 Sep 2022

X

A X B X C X D

EX

X

G F 230 - 235

236 - 258 X H 259 matthew.r.hubbard@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DX-A3 1 266

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

MATTHEW R HUBBARD (202)781-4413

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 125

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

126 - 147 148 - 151

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

152 - 158

159 - 178 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 179 - 190 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 191 - 194 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

195 - 227

PART II - CO NTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

228 - 229

6. REQUISITION/PURCHASE NO.

N0002421NR43302

5. DATE ISSUED

18 Mar 2022

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002422R5325

Section SF 30 - BLOCK 14 CONTINUATION PAGE

SF30 BLOCK 14

The purpose of this amendment is to:

1. Revise the USN FFG VLS procurement profile and delivery schedule, remove FFG option exercise groups, and create FFG stepladder SLINs in option years one and three for the funding of one or two FFG VLS in those years

2. Remove the Not Separately Priced note from USN DDG SLIN series xxxxAD, Mechanical Ancillary Components

3. Revise the delivery schedules for Australia and Canada VLS SLINs

4. Remove the single Belgium 2-module VLS from the Netherlands requirement, add a requirement for two 1-module Belgium VLS, and revise the Netherlands and Belgium delivery schedules

5. Add a CLIN for offset costs

6. Clarify module laydown and provide offerors with the option to propose an alternative laydown procedure

7. Further smaller changes as detailed below

Accordingly the following changes have been incorporated:

1. Update section A to change proposal due date to 01 September 2022.

2. Update section B to remove CLIN/SLINs 0104, 0104AA, 0104AB, 0104AC, 0130AC, 0204, 0204AA, 0204AB, 0204AC, 0304, 0304AA, 0304AB, 0304AC, 0306, 0306AA, 0306AB, 0306AC, 0404, 0404AA, 0404AB, and 0404AC; Update CLINs/SLINs 0001AD, 0002AD, 0003AD, 0004AD, 0101AD, 0102AD, 0105AA, 0105AB, 0105AC, 0130, 0130AA, 0130AB, 0132AA, 0132AB, 0201AD, 0202AD, 0301AD, 0302AD, 0305AA, 0305AB, 0305AC, 0401AD, and 0402AD; Create new CLINs/SLINs 0098, 0131AD, 0137, 0137AA, and 0137AB.

3. Update Section C Item descriptions.

4. Update Section D Item descriptions.

5. Update Section E Item lists.

6. Update Section F.

7. Update section I clause 52.217-7 VAR I.

8. Update Section J to reflect revised attachments.

9. Update Section L to extend deadline for offerors to submit questions and paragraph 3.4.2.2.

10. Update Section M paragraph 2.3.1.3.

11. Update Exhibit A-B CDRLs A010 Block 5 and Block 16-Block 4 Remarks.

12. Update Attachment 1 – SOW

- Additional language to Paragraph 13.0.

- Update to quantity in first sentence of paragraph 19.8.

13. Update Attachment 1 – Appendix A – Parts Lists.

-Items 0005AA, 0006AA, 0105AA, 0205AA, 0305AA, 0405AA - MK 41 MOD 37 Vertical Launching System.

-Items 0005AB, 0006AB, 0105AB, 0205AB, 0305AB, 0405AB - VLS Mech Ancillary.

-Items 0005AC, 0006AC, 0105AC, 0205AC, 0305AC, 0405AC - VLS Sill Assembly Adapters.

-Items 0031AA & AB, 0041AA, AB, & AC, and 0131AA, AB, AC, & AD – MK 41 VLS OBRP.

-Items 0130AA & AB - MK 41 MOD 48 VLS Netherlands.

-Items 0132AA, AB, AC, & AD - MK 41 VLS Transportation Equipment.

-Items 0137AA & AB - MK 41 MOD 50 VLS Belgium.

14. Update Attachment 2 – TDP.

15. Update Attachment 10 – GFP.

16. Update Attachment 15 – CSDR Plan.

17. Update Attachment 16 – RDT.

18. Update Attachment 17 – Step Ladder Pricing.

- Tab FY24 Step Ladder Prices; CLINs 0105AA, 0105AB, and 0105AC.

- Tab FY26 Step Ladder Prices; CLINs 0305AA, 0305AB, and 0305AC.

- Tabs "FY24 Step Ladder Prices", "FY25 Step Ladder Prices", "FY26 Step Ladder Prices", and "FY27 Step Ladder Prices"; Items 0128, 1029, 0228, 0229, 0328, 0329, 0428, and 0429; Step Ladder Quantity and Upper Quantity Updated.

19. Update Attachment J-S3 – CLIN Pricing.

- Tab Base Year; CLINs 0001AC, 0002AC, 0003AC, and 0004AC are now listed as NSP.

- Tab FY24 Options; CLINs 0101AC, 0102AC, 0131AD, 0132AD, 0137AA, and 0137AB are updated.

CLINs 0104AA, 0104AB, and 0104AC are removed.

- Tab FY25 Options; CLINs 0201AC and 0202AC marked as NSP. CLINs 0204AA, 0204AB, 0204AB are removed.

- Tab FY26 Options; CLINs 0301AC and 0302AC are updated. CLINs 0304AA, 0304AB, 0304AC, 0306AA, 0306AB, and 0306AC are removed.

- Tab FY27 Options; CLINs 0401ac and 0402AC are marked NSP. CLINs 0404AA, 0404AB, and 0404AC are removed.

20. Update Attachment J-S6 – CLIN Matrix.

- CLINs 0005AA, 0005AB, 0005AC, 0006AA, 0006AB, 0006AC, 0030AA, 0030AB, 0031AA, 0031AB, 0032AA, 0032AB, 0040AA, 0040AB, 0040AC, 0041AA, 0041AB, 0041AC, 0042AA, 0042AB, 0042AC, 0043, 0044, 0045, 0046, 0130AA, 0130AB, 0131AA, 0131AB, 0131AC, 0132AA, 0132AB, 0132AC, 0133AA, 0133AB, 0134AA, 0134AB, 0135AA, 0135AB, 0136AA, 0136AB, 0205AA, 0205AB, and 0205AC have their delivery dates updated.

- CLINs 0105AA, 0105AB, 0105AC, 0305AA, 0305AB, and 0305AC Quantity, Stepladder, section B notes, and delivery dates have been updated.

- CLINs 0132AA and 0132AB have their quantity and delivery dates updated.

- CLINs 0098, 0131AD, 0132AD, 0137, 0137AA, and 0137AB have been added.

- CLINs 0106, 0106AA, 0106AB, 0106AC, 0130AC, 0204, 0204AA, 0204AB, 0204AC, 0304, 0304AA, 0304AB, 0304AC, 0306, 0306AA, 0306AB, 0306AC, 0404, 0404AA, 0404AB, and 0404AC have been removed.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

MK 41 MOD 36 VLS

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS.

PURCHASE REQUEST NUMBER: N0002421NR43302

NET AMT

0001AA

10 Each

MK 8 MOD 5 STANDARD MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 5 STANDARD

MODULE. See Note A.

FOB: Destination

0001AB

2 Each

MK 9 MOD 5 SYSTEM MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 5 SYSTEM

MODULE. See Note A.

0001AC

1 Set

MK 41 MOD 36 VLS LAUNCHER ANCILLARY

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A and F.

0001AD

VLS MECH ANCILLARY

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Note A.

0001AE

1 Lot

VLS SILL ADAPTER ASSEMBLIES

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Note A.

MK 41 MOD 36 VLS

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS.

0002AA

MK 8 MOD 5 STANDARD MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 5 STANDARD

MODULE. See Note A.

0002AB

MK 9 MOD 5 SYSTEM MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 5 SYSTEM

MODULE. See Note A.

0002AC

1 Each

MK 41 MOD 36 VLS LAUNCHER ANCILLARY

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 36 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A and F.

0002AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Note A.

0002AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Note A.

MK 41 MOD 47 VLS

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS.

0003AA

MK 8 MOD 7 STANDARD MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Note A.

0003AB

MK 9 MOD 7 SYSTEM MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Note A.

0003AC

MK 41 MOD 47 VLS LAUNCHER ANCILLARY

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A and F.

0003AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Note A.

0003AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Note A.

MK 41 MOD 47 VLS

0004AA

MK 8 MOD 7 STANDARD MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Note A.

0004AB

MK 9 MOD 7 SYSTEM MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Note A.

0004AC

MK 41 MOD 47 VLS LAUNCHER ANCILLARY

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A and F.

0004AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Note A.

0004AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Note A.

MK 41 MOD 37 VLS

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 37 VLS.

0005AA

MK 41 MOD 37 VLS LAUNCHER

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 37 VLS

LAUNCHER. See Note A.

0005AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Note A.

0005AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Note A.

MK 41 MOD 37 VLS

0006AA

MK 41 MOD 37 VLS LAUNCHER

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 37 VLS

LAUNCHER. See Note A.

0006AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Note A.

0006AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Note A.

4 Kit

DDG AMOD B/L VII KIT

FFP

MANUFACTURE, ASSEMBLE, AND TEST DDG AEGIS MODERNIZATION

BASELINE VII KIT.

OPTION LAUNCHER FIT CHECK TOOLS

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK41 LAUNCHER FIT CHECK

TOOLS. See Note B.

FOB: Origin (Shipping Point)

OPTION PRODUCTION READINESS REVIEW

FFP

CONDUCT PRODUCTION READINESS REVIEW. See Note B.

OPTION PHYSICAL CONFIGURATION AUDIT

FFP

CONDUCT PHYSICAL CONFIGURATION AUDIT OF MODULE AND

MAJOR COMPONENTS. See Note B.

5,000 Hours

OPTION GFP Technical Support

CPFF

GFP TECHNICAL SUPPORT. See Note B.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

2,500 Hours

OPTION ESTABLISH PRODUCTION PROCESSES/PROGRAMS

CPFF

ESTABLISH PRODUCTION PROCESSES/PROGRAMS. See Note B.

OPTION FIRST ARTICLE TESTS (FAT)

PERFORM FIRST ARTICLE TESTS

0015AA

OPTION MK 41 VLS DECK & HATCH FAT

FFP

PERFORM FIRST ARTICLE TEST FOR MK 41 VLS DECK AND HATCH

ASSEMBLY. See Note B.

0015AB

OPTION MK 41 VLS SYSTEM MODULE FAT

FFP

PERFORM FIRST ARTICLE TEST FOR MK 41 VLS MK 9 MOD 7 SYSTEM

MODULE. See Note B.

OPTION PRODUCTION SUPPORT MATERIAL

FFP

MANUFACTURE, ASSEMBLE, AND TEST PRODUCTION SUPPORT

MATERIAL. See Note B.

OPTION INSTALLATION ATTRITION SPARES

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INSTALLATION

ATTRITION SPARES.. See Note B.

OPTION MK 9 MOD 7 SYSTEM MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Note B.

3 Each

OPTION MK 8 MOD 7 STANDARD MODULE

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes B and C.

4 Lot

OPTION PLENUM CELL COVER

FFP

MANUFACTURE, ASSEMBLE, AND TEST PLENUM CELL COVER.. See Notes B and C.

OPTION CANISTER ADAPTER ASSEMBLY

FFP

MANUFACTURE, ASSEMBLE, AND TEST CANISTER ADAPTER

ASSEMBLY. See Notes B and C.

OPTION MK 170 SILL ASSEMBLY

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 170 SILL ASSEMBLY. See Notes B and C.

32 Each

OPTION MODULE SHIPPING TRAILER

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING TRAILER.

See Notes B and C.

32 Set

OPTION MODULE SHIPPING FIXTURES

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING FIXTURES.

See Notes B and C.

MK 41 MOD 40 VLS AT SEA5000

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 40 VLS AT SEA5000

CLASS.

0030AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 40 VLS AT SEA5000

CLASS. FMS CASE = AT-P-LFZ.

0030AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 40 VLS AT SEA5000

CLASS. FMS CASE = AT-P-LFZ.

MK 41 VLS OBRP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS.

0031AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Note D.

0031AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Note D.

MK 41 VLS TRANSP EQUIP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT.

0032AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Note D.

0032AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Note D.

MK 41 MOD 49 VLS CANADA CN CSC

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 49 VLS CN CSC

CLASS

0040AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 49 VLS CN CSC

CLASS. FMS CASE = CN-P-LLG.

0040AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 49 VLS CN CSC

CLASS. FMS CASE = CN-P-LLG.

0040AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 49 VLS CN CSC

CLASS. FMS CASE = CN-P-LLG.

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

0041AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Note D.

0041AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Note D.

0041AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Note D.

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

0042AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Note D.

0042AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Note D.

0042AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Note D.

MK 41 VLS INCO SPARES

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES. See Note D.

MK 41 VLS INCO TOOLS & TEST

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS &

TEST EQUIPMENT. See Note D.

MK 41 VLS LH&A EQUIPMENT

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS LIFT, HANDLING, &

ALIGNMENT EQUIPMENT. See Note D.

MK 41 VLS DEPOT SPARES

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES. See Note D.

OPTION Offsets

This CLIN will cover offsets costs (no profit or fee will be provided) and is not anticipated to be used for any direct offset cost. This CLIN will be subject to the requirements of DFARS 225.7303-2(3) and contingent on FMS funding availability. Offerors shall propose $0 dollars for this CLIN for proposal purposes only.

OPTION PROVISIONED ITEM ORDERS

PROVISIONED ITEM ORDERS

The combined value of all orders placed under this item shall not exceed $12,500,000.00. See Notes B, and E.

DATA ITEMS

FFP

DATA ITEMS. Not Separately Priced (NSP)

OPTION MK 41 MOD 47 VLS

0101AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B and G.

0101AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B and G.

0101AC

OPTION MK 41 MOD 47 VLS LAUNCHER ANCILLARY

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F, and G.

0101AD

OPTION VLS MECH ANCILLARY

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G

0101AE

OPTION VLS SILL ADAPTER ASSEMBLIES

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

0102AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B and G.

0102AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B and G.

0102AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F, and G.

0102AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G.

0102AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

OPTION [Reserved]

[Reserved]

0104AA

Each

FFP

[Reserved]

0104AB

Set

FFP

[Reserved]

0104AC

Lot

FFP

[Reserved]

OPTION MK 41 MOD 37 VLS

0105AA

OPTION MK 41 MOD 37 VLS LAUNCHER

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 37 VLS

LAUNCHER. See Notes A, B and C.

0105AB

2 Set

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B and C.

0105AC

2 Lot

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and C.

3 Kit

OPTION DDG AMOD B/L VII KIT

FFP

MANUFACTURE, ASSEMBLE, AND TEST DDG AEGIS MODERNIZATION

BASELINE VII KIT. See Note B.

OPTION GFP TECHNICAL SUPPORT

CPFF

FFP

MANUFACTURE, ASSEMBLE, AND TEST PRODUCTION SUPPORT

MATERIAL. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INSTALLATION

ATTRITION SPARES.. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes B and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST PLENUM CELL COVER.. See Notes B and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST CANISTER ADAPTER

ASSEMBLY. See Notes B and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 170 SILL ASSEMBLY. See Notes B and C.

24 Each

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING TRAILER.

See Notes B and C.

24 Set

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING FIXTURES.

See Notes B and C.

OPTION MK 41 MOD 48 VLS NETHERLANDS

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 48 VLS

NETHERLANDS FRIGATE REPLACEMENT.

0130AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 48 VLS

NETHERLANDS FRIGATE REPLACEMENT. See Notes B, and D.

0130AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 48 VLS

NETHERLANDS FRIGATE REPLACEMENT. See Notes B, and D.

0130AC

FFP

[Reserved]

0131AD

OPTION MK 41 VLS OBRP

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Notes B, and D.

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

0131AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Notes B, and D.

0131AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Notes B, and D.

0131AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS ONBOARD REPAIR

PARTS. See Notes B, and D.

OPTION MK 41 VLS TRANSP EQUIP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

0132AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Notes B, and D.

0132AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Notes B, and D.

0132AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Notes B, and D.

0132AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS TRANSPORTATION

EQUIPMENT. See Notes B, and D.

OPTION MK 41 VLS INCO SPARES

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES

0133AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES. See notes B, and D.

0133AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO SPARES. See notes B, and D.

OPTION MK 41 VLS INCO TOOLS & TEST

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS &

TEST EQUIPMENT.

0134AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS &

TEST EQUIPMENT. See Nots B, and D.

0134AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INCO TOOLS &

TEST EQUIPMENT. See Nots B, and D.

OPTION MK 41 VLS LH&A EQUIPMENT

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS LIFT, HANDLING, &

ALIGNMENT EQUIPMENT.

0135AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS LIFT, HANDLING, &

ALIGNMENT EQUIPMENT. See Notes B, and D.

0135AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS LIFT, HANDLING, &

ALIGNMENT EQUIPMENT. See Notes B, and D.

OPTION MK 41 VLS DEPOT SPARES

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES.

0136AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES. See Notes B, and D.

0136AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS DEPOT SPARES. See Notes B, and D.

MK 41 MOD 50 VLS BELGIUM

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 50 VLS BELGIUM

FRIGATE REPLACEMENT.

0137AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 50 VLS BELGIUM

FRIGATE REPLACEMENT. See Notes B and D.

0137AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 50 VLS BELGIUM

FRIGATE REPLACEMENT. See Notes B and D.

0201AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B and G.

0201AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B and G.

0201AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F and G.

0201AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G.

0201AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

0202AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B and G.

0202AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B and G.

0202AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F and G.

0202AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G.

0202AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

0204AA

FFP

[Reserved]

0204AB

FFP

[Reserved]

0204AC

FFP

[Reserved]

0205AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 37 VLS

LAUNCHER. See Notes A, B and G.

0205AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B and G.

0205AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

4 Kit

FFP

MANUFACTURE, ASSEMBLE, AND TEST DDG AEGIS MODERNIZATION

BASELINE VII KIT. See Note B.

CPFF

FFP

MANUFACTURE, ASSEMBLE, AND TEST PRODUCTION SUPPORT

MATERIAL. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INSTALLATION

ATTRITION SPARES.. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST PLENUM CELL COVER.. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST CANISTER ADAPTER

ASSEMBLY. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 170 SILL ASSEMBLY. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING TRAILER.

See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING FIXTURES.

See Notes B, and C.

0301AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B and G.

0301AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B and G.

0301AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F, and G.

0301AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G.

0301AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

0302AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B, and G.

0302AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B, and G.

0302AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F, and G.

0302AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G.

0302AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

0304AA

FFP

[Reserved]

0304AB

FFP

[Reserved]

0304AC

FFP

[Reserved]

0305AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 37 VLS

LAUNCHER. See Notes A, B and C.

0305AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B and C.

0305AC

2 Lot

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and C.

0306AA

FFP

[Reserved]

0306AB

FFP

[Reserved]

0306AC

FFP

[Reserved]

2 Kit

FFP

MANUFACTURE, ASSEMBLE, AND TEST DDG AEGIS MODERNIZATION

BASELINE VII KIT. See Note B.

CPFF

FFP

MANUFACTURE, ASSEMBLE, AND TEST PRODUCTION SUPPORT

MATERIAL. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INSTALLATION

ATTRITION SPARES.. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST PLENUM CELL COVER.. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST CANISTER ADAPTER

ASSEMBLY. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 170 SILL ASSEMBLY. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING TRAILER.

See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING FIXTURES.

See Notes B, and C.

0401AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B and G.

0401AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B and G.

0401AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F, and G.

0401AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G.

0401AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

0402AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE. See Notes A, B and G.

0402AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Notes A, B and G.

0402AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 47 VLS LAUNCHER

ANCILLARY COMPONENTS. See Notes A, B, F, and G.

0402AD

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B, and G.

0402AE

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

0404AA

FFP

[Reserved]

0404AB

FFP

[Reserved]

0404AC

FFP

[Reserved]

0405AA

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 MOD 37 VLS

LAUNCHER. See Notes A, B and G.

0405AB

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS MECHANICAL

ANCILLARY COMPONENTS. See Notes A, B and G.

0405AC

FFP

MANUFACTURE, ASSEMBLE, AND TEST VLS SILL ADAPTER

ASSEMBLIES. See Notes A, B and G.

1 Kit

FFP

MANUFACTURE, ASSEMBLE, AND TEST DDG AEGIS MODERNIZATION

BASELINE VII KIT. See Note B.

CPFF

FFP

MANUFACTURE, ASSEMBLE, AND TEST PRODUCTION SUPPORT

MATERIAL. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 41 VLS INSTALLATION

ATTRITION SPARES.. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 9 MOD 7 SYSTEM

MODULE. See Note B.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 8 MOD 7 STANDARD

MODULE See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST PLENUM CELL COVER.. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST CANISTER ADAPTER

ASSEMBLY. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MK 170 SILL ASSEMBLY. See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING TRAILER.

See Notes B, and C.

FFP

MANUFACTURE, ASSEMBLE, AND TEST MODULE SHIPPING FIXTURES.

See Notes B, and C.

CLAUSES INCORPORATED BY FULL TEXT

B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)

(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.

(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:

(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.

(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.

(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.

(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.

(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor.

Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid.

If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).

(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.

(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.

(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.

(End of text)

B-216-H006 FEE TABLE (NAVSEA) (MAR 2019)

Labor CLIN Labor Hours Cost Per Hour*

Fee Rate Per Hour*

Loaded Hourly Rate*

0013 5,000

0014 2,500

0113 5,000

0213 5,000

0313 5,000

0413 5,000

*The offeror shall divide the proposed fee for each CLIN by the quantity of labor hours indicated to complete the table. Fee is calculated based on cost less FCCOM; if FCCOM is proposed, necessary columns may be added.

In the event of any inconsistency between the above table and the CLIN pricing, the CLIN pricing shall take precedence.

B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.

(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;

however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.

B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.

(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

CLAUSES INCORPORATED BY FULL TEXT

B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)

The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

Section B Notes:

NOTE A – Hull numbers and funding to be designated

NOTE B – Option Item to which Section I FAR clause 52.217-7 VAR I OPTION FOR INCREASED QUANTITY

– SEPARATELY PRICED LINE ITEM (MAR 1989) (NAVSEA VARIATION I) (OCT 2018) or 52.217-9 VAR I OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) (NAVSEA VARIATION I) (OCT 2018) is applicable and which is to be supplied only if and to the extent said Option is exercised.

NOTE C – Stepladder pricing is utilized under this contract to provide the contractor an opportunity to propose different pricing for separate and distinct quantity ranges within each CLIN. Pricing utilized at basic contract award and option exercise shall be based solely on the pricing proposed by the contractor in Attachment 17, Option Item Stepladder Price. Notwithstanding the availability of the option to propose different pricing for different quantities, the contractor may propose the same price for multiple quantities. At time of award or option exercise, stepladder CLINs may be unilaterally broken out by the Government into sub-contract line items (SLINs) to accommodate funding or delivery requirements. If this occurs, the unit price for a given stepladder range will be maintained.

The Government reserves the right to unilaterally adjust the quantity and unit price of each stepladder Option CLIN in accordance with this Note (Note C), if and to the extent said Option CLINs are exercised.

For all CLINs with stepladder pricing, the Government may unilaterally exercise a given line item more than once prior to the latest option exercise date identified in clause FAR 52.217-7 VAR I or 52.217-9 VAR I (see Section I).

Option CLINs with stepladder pricing may be exercised until the total quantity purchased equals the maximum quantity listed for that option CLIN in Section B.

If any line item is exercised more than once within a 90-day period from the date the Option was initially exercised, the unit price of the CLIN shall be adjusted downward to reflect the appropriate stepladder unit price for the entire quantity purchased within that 90-day period and funds will be realigned, as necessary.