_Exhibit_A-B_CDRLs rev 2 04.20.2022.pdf
PDF 5 MB Posted
- Solicitation number
- N0002422R5325
About this file
This data package includes contract data requirements lists (CDRLs), addendums, and distribution profiles for the FY 22-27 MK 41 Vertical Launching System (VLS) production solicitation issued by the Department of the Navy Naval Sea Systems Command. The CDRLs specify technical data, reports, schedules, meeting minutes, cost data, and engineering change proposals to be delivered by the contractor throughout contract performance. Products include the MK 41 VLS and module assembly. Key delivery dates are tied to contract milestones and events. Data distribution involves the Navy PEO IWS, NSWC DD, and DCARC.
View the file
Other files
Show 40 more
Latest 50 of 85 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRL DATA PACKAGE FOR
Competition
N00024-22-R-
N00024-22-R- 11 January 2022
TABLE OF CONTENTS MATRIX
N00024-22- -
EXHIBIT A
TABLE OF CONTENTS MATRIX
EXHIBITS A-B
CDRL NO.
A001 A002 A003 A004 A005 A006 A007 A008 A009 A010 A011 A012 A013 A014 A015 A016 A017 A018 A019 A020
EXHIBIT B
CDRL NO. TITLE – (SUBTITLE)
B001 Cost and Hour Report (Flex File) B002 Contractor Business Data Report B003 Quantity Data Report
N00024-22- - 11 January 2022
DI-SESS-81000F
DI-NDTI-80809B
DI-MISC-80711A
DI-MGMT-81791
DI-SESS-80639E
DI-SESS-80643E
DI-SESS-81903
DI-MISC-80508B
DI-MGMT-80368A
DI-SESS-80640E
DI-ADMN-81505
DI-ADMN-81373
DI-MGMT-80227
DI-MGMT-80227
DI-QCIC-81722
DI-ILSS-80908
DI-MGMT-81650
Reserved
DI-SESS-81253E
DI-MISC-80508B
DID NO.
DI-FNCL-82162
DI-FNCL-81765C
DI-MGMT-82164
DID NO.
Technical Report Study/Services Configuration Status Accounting Information Reserved Integrated Master Schedule (IMS) Special Production Tooling List/Design Concept Quality Program Plan (QPP) Contractor Progress, Status & Management Contractor Progress, Status & Management Presentation Material Report, Record of Meeting/Minutes Request for Variance (RFV) Status Report Technical Report-Study Services As Built Configuration List (ABCL) Specification Change Notification (SCN) Engineering Change Proposal (ECP) Key Events Schedule Scientific and Technical Reports Test/Inspection Report Product Drawings/Models and Associated Lists
TITLE – (SUBTITLE)
CDRL DD FORM 1423-1
N00024-22- -
CONTRACT DATA REQUIREMENTS LIST FORM APPROVED
(1 DATA ITEM) OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A SESS
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 Product Drawings/Models and Associated Lists 18.ESTIMATE
TOTAL PRICE
6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000F PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ SEE BLK 16
b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
SEE BLK 16 ASREQ SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DID as guide only.
BLOCK 10, 12, 13: Submit no later than fifteen (15) days after notification of engineering drawings, NOR, SCN, or revision approval. Revisions, as a result of Technical Office review comments, shall be submitted not later than 15 DARC.
BLOCK 14/15: Final editable copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD H31. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD H31 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD H31 1 1 0
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-
. CONTRACT / PR NO.E
SOW Multiple Sections
5. CONTRACT REFERENCE
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A NDTI
D. SYSTEM / ITEM F. CONTRACTOR
MK 41 VLS AND MODULE ASSEMBLY
TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 TEST/INSPECTION REPORTS FAI REPORTS 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-NDTI-80809B (SEE BLK 16) PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A 30 DARC SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DID as guide only.
BLOCK 12,13: The report shall be delivered to the requiring office not later than five (5) days following completion of each First Article Test or Inspection. The final report shall be delivered to the requiring office no later than 45 days following completion of each First Article Test or Inspection. DI- NDTI-80809B shall be used as a guide for MRB supporting documentation. At a minimum the item part number, explanation of discrepancy, cause of discrepancy, disposition (use as is, repair, rework, scrap), and corrective action statements shall be provided to NSWC/DD no later than two (2) days after report is completed.
BLOCK 14/15: Final copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD H31. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD G21 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD H31 1 1 0
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-
. CONTRACT / PR NO.E
SOW Multiple Sections
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A SESS
MK41 VLS AND MODULE ASSEMBLY
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 SCIENTIFIC AND TECHNICAL REPORTS WAVER LETTER – MAJOR/MINOR 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-SESS-80711A PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL SEE BLK 16 30 DARC SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 8: Requiring Office approval is in accordance with the Configuration Management Program Plan, TL130-AD-PLN-010-VLS. PEO IWS 3L has approval authority if Major, NSWC/DD H31 if Minor. The Requiring Office will be notified when the draft is available on CDMS. The Requiring Office will respond within 30 days of notification. The Contractor shall respond within 30 DARC. Approval is based on technical content and format.
BLOCK 10, 12, 13: Submit no later than five (5) days after need or detection becomes known and in accordance with the VLS Configuration Management Program Plan TL130-AD-PLN-010-VLS. Contract revisions, as a result of Technical Office review comments, shall be submitted no later than 30 DARC.
BLOCK 14/15: Upload a copy of the draft and final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31 and PEO IWS 3L.
NSWC/DD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
CONTRACT / PR NO.E.
SOW Attachment 1 Sections 13 & 14
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A MGMT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 KEY EVENTS SCHEDULE 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81791 (SEE BLK 16) SOW Attachment 1 Multiple Sections PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
SEE BLK 16 N/A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Data must be included for Prime Contractor and all 1st Tier suppliers
BLOCK 8: Approval authority is NSWC/DD
BLOCK 10, 12, 13: Submit no later than twenty days prior to first event.
BLOCK 14/15: Upload a copy of the draft and final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31 and PEO IWS 3L.
NSWC/DD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
. CONTRACT / PR NO.E
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A CMAN
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 ENGINEERING CHANGE PROPOSAL (ECP) CLASS I OR CLASS II 18.ESTIMATE
TOTAL PRICE
6. REQUIRING OFFICE4.AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639E PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DID as guide only.
BLOCK 8: Requiring office approval is in accordance with the Configuration Management Program Plan. The requiring office shall be notified the draft is available on the Contractor’s specified website.
The requiring office will respond within thirty(30) days of notification. The contractor shall respond within fifteen(15) days after receipt of requiring office comments and ten (10) days after CCB approval.
Requiring office signature is required for approval. Approval is based on technical content and format.
BLOCK 10, 12, 13: Initial Submission of the data item shall be after a need for a change becomes known or in accordance with the Technical Instruction. Subsequent submissions shall be as directed by the requiring office.
BLOCK 14/15: Final copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD H31. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD H31 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD H31
PEO IWS 3L
15. TOTAL 022
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
CONTRACT / PR NO.E.
SOW Attachment 1 Multiple Sections
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A CMAN
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 SPECIFICATION CHANGE NOTICE (SCN) 18.ESTIMATE
TOTAL PRICE
6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80643E PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DID as guide only.
BLOCK 8: Requiring office approval is in accordance with the Configuration Management Program Plan. The requiring office will be notified the draft is available on the Contractor’s specified website.
The requiring office will respond within sixty (60) days of notification. The contractor shall respond within thirty (30) days after receipt of requiring office comments. Requiring office signature is required for approval. Approval is based on technical content and format.
BLOCK 10, 12, 13: Initial Submission of the data item shall be in concert with the associated ECP or in accordance with the Technical Instruction.
BLOCK 14/15: Final copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD G21. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD G21 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
. CONTRACT / PR NO.E
SOW Attachment 1 Multiple Sections
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. B. EXH/ATCH NO.CONTRACT LINE ITEM NO. C. CATEGORY
TDP TM OTHER
0100 A CMAN
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 AS BUILT CONFIGURATION LIST (ABCL) 18.ESTIMATE
TOTAL PRICE
6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81903 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16
b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A ASREQ SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DID as guide only.
BLOCK 5: The requiring office is as specified in the Technical Instruction.
BLOCK 10, 12, 13: Submission of the data item shall be in accordance with the Technical Instruction.
BLOCK 14/15: Final copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD H31. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD H31 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD/H31 0 1 0
15. TOTAL 10 0
G. PREPARED BY H. DATE I APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
CONTRACT / PR NO.E.
SOW Attachment 1 Section 14.5
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A SESS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008 TECHNICAL REPORT-STUDY/SERVICES TEST REPORT 18.ESTIMATE
TOTAL PRICE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B SOW Attachment 1 Section 14 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A ASREQ SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 10, 12, 13: Submit no later than seven (7) days after test in accordance with VLS Configuration Management Program Plan TL130-AD-9LN-010-VLS. Contract revisions, as a result of technical office review comments, shall be submitted no later than 30 DARC.
BLOCK 14/15: Upload a copy of the draft and final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31.
NSWC/DD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
CONTRACT / PR NO.E.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A MGMT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 STATUS REPORT PRODUCTION READINESS REVIEW 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80368A SOW Attachment 1 Section 5 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R ASGEN b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A COPY Reg Repro
16. REMARKS
BLOCK 14/15: Upload a copy of the draft and final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31.
NSWC/DD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
. CONTRACT / PR NO.E
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A SESS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010 REQUEST FOR VARIANCE (RFV) MAJOR/MINOR VARIANCE REPORT 18.ESTIMATE
TOTAL PRICE
6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80640E PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DI-CMAN-80640D as guide only.
BLOCK 8: Requiring office approval is in accordance with the Configuration Management Program Plan. The requiring office shall be notified the draft is available on the Contractor’s specified website.
The requiring office will respond within thirty (30) days of notification. The contractor shall respond within Fifteen (15) days after receipt of requiring office comments. Approval is based on technical content and format.
BLOCK 10, 12, 13: Initial Submission of the data item shall be after a need for a change becomes known or in accordance with the Technical Instruction. Subsequent submissions shall be as directed by the requiring office.
BLOCK 14/15: Final copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD H31. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD H31 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
CONTRACT / PR NO.E.
SOW Attachment 1 Section 14.3
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A MGMT
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011 REPORT, RECORD OF MEETINGS/MINUTES MANAGEMENT MEETING REPORT 18.ESTIMATE
TOTAL PRICE
6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81505 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A SEE BLK 16 SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 10, 12, 13: Submit no later than five (5) days after completion of meeting.
BLOCK 14/15: Upload a copy of the draft and final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31.
NSWC/DD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
E. CONTRACT / PR NO.
N00024-22-R-5325
SOW Attachment 1 Section 18.3
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A X
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 PRESENTATION MATERIAL
18. ESTIMATE
TOTAL PRICE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373 SOW Attachment 1 Multiple Sections PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DID as guide only.
BLOCK 10, 12, 13: Submit no later than fifteen (15) days after notification of engineering drawings, NOR, SCN, or revision approval. Revisions, as a result of Technical Office review comments, shall be submitted not later than 15 DARC.
BLOCK 14/15: Final editable copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD H31. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD H31 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD H31
PEO IWS 3L
15. TOTAL 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
E. CONTRACT / PR NO.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A MGMT
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A013 CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT Quarterly Program Review 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-MGMT-80227 (SEE BLK 16) PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT QRTLY SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Tailor Paragraph 10.3 (H) and (J) as follows
(h) Any cost incurred for the reporting period and total contractual expenditures of reporting date including a list of contract requirements delivered during the reporting period. Include the date delivered and contract due date as part of the list.
Any trips and significant results including a list of formal and informal meetings between the government and contractor that occurred during the reporting period and any scheduled meetings during the next three (3) reporting periods. Include the meeting subject and outcome of the meetings as part of the list.
BLOCK 12/13: The contractor shall submit the initial data item forty-five (45) days after the technical instruction is approved. Subsequent submissions of data item shall be in the first month of each quarter.
BLOCK 14/15: Final editable copy will be provided electronically to PEO IWS 3L and posted on the Contractor’s specified website with a notification sent to PEO IWS 3L.
PEO IWS 3L
NSWCDD H31
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
E. CONTRACT / PR NO.
N00024-22-R-5325
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A MGMT
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014 CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT Weekly Management Meeting 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-MGMT-80227 (SEE BLK 16) PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT WEKLY 90DAC b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A EOQ COPY Reg Repro
16. REMARKS
BLOCK 14/15: Final editable copy will be provided electronically to PEO IWS 3L and posted on the Contractor’s specified website with a notification sent to PEO IWS 3L.
PEO IWS 3L
NSWCDD H31
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
E. CONTRACT / PR NO.
N00024-22-R-5325
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A QC1C
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A015 QUALITY PROGRAM PLAN (QPP) 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-QC1C-81722 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT X1 SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A SEE BLK 16 N/A COPY Reg Repro
16. REMARKS
BLOCK 10, 12, 13: Submit no later than three (3) months after contract award.
BLOCK 11: Contract Award
BLOCK 14/15: Upload a copy of the final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31 and PEO IWS 3L.
NSWC/DD H31
PEO IWS 3L
15. TOTAL
0 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
DATEJ.
E. CONTRACT / PR NO.
N00024-22-R-5325
SOW Attachment 1 Section 20
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A SESS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A016 SPECIAL PRODUCTION TOOLING LIST/DESIGN CONCEPT 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-ILSS-80908 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A SEE BLK 16 SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 10, 12, 13: Submit list one month prior to manufacturing.
BLOCK 11: Contract Award.
BLOCK 14/15: Upload a copy of the final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31.
NSWC/DD H31 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
. CONTRACT / PR NO.E
SOW Attachment 1 Section 19.7
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A MGMT
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A01 INTEGRATE MASTER SCHEDULE (IMS) 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-MGMT-81650 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT QTRLY SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 12, 13: Submit schedule three (3) months after contract award. Subsequent reports are due the first working Monday at the end of each three-month period and shall include schedules for all 1st tier suppliers.
BLOCK 11: Contract Award.
BLOCK 14/15: Upload a copy of the final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31.
NSWC/DD H31
PEO IWS 3L
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
E. CONTRACT / PR NO.
N00024-22-R-5325
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A CMAN
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A019 CONFIGURATION STATUS ACCOUNTING INFORMATION 18.ESTIMATE
TOTAL PRICE
6. REQUIRING OFFICE4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81253E (SEE BLK 16) PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEMIA SEE BLK 16
b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A SEE BLK 16 SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 4: Use DID as guide only.
BLOCK 10, 12, 13: Submission of the data item shall be in accordance with the Technical Instruction.
BLOCK 14/15: Final copy for all non-proprietary data will be posted on NAVSEA CDMS with notification sent to NSWCDD G21. Final editable copy for proprietary data will be available on the Contractor’s specified website with a notification sent to NSWCDD G21 and PEO IWS 3L. Final editable copy for proprietary data will be provided electronically to PEO IWS 3L.
NSWCDD H31
PEO IWS 3L
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
. CONTRACT / PR NO.E
SOW Attachment 1 Section 14.5
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 A MISC
D. SYSTEM / ITEM F. CONTRACTOR
MK41 VLS AND MODULE ASSEMBLY TBD 17. PRICE
GROUP
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A020 TECHNICAL REPORT STUDY/SERVICES MAKE OR BUY PROGRAM 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-MISC-80508B PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEMIA SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
A N/A SEE BLK 16 COPY Reg Repro
16. REMARKS
BLOCK 10,12, 13: Submit no later than seven (7) days after test in accordance with VLS Configuration Management Program Plan TL130-AD-PLN-010 VLS. Contract revisions, as a result of technical office review comments, shall be submitted no later than 30 DARC.
BLOCK 14/15: Upload a copy of the draft and final data in both Adobe PDF and editable format to CDMS with a notification sent to NSWC/DD H31 and NSWC/DD R41.
NSWC/DD H31
PEO IWS 3L
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
E. CONTRACT / PR NO.
N00024-22-R-5325
SOW Attachment 1 Section 18.2
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY
TDP TM OTHER
0100 B FNCL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B001 Cost and Hour Report (Flex File) Contractor Cost Data Report (CCDR) 18.ESTIMATE
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE
DI-FNCL-82162 PEO IWS 3L
7. DD250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13 DATE OF SUBSEQUENT SUB. a. ADDRESSEE REVIEW FINAL
N/A SEE BLK 16 SEE BLK 16 COPY Reg Repro
16. REMARKS
Blocks 10 - 14: Prepare the FlexFile in accordance with DI-FNCL-82162, (or the most recently approved version) and the FMB-6 approved Contract Cost and Software Data Reporting (CSDR) Plan (DD Form 2794). The FMB-6 approved Contract CSDR Plan is included as a contract attachment 21.
Contractors shall be required to submit the FlexFile at frequencies specified in the FMB-6 approved Contract CSDR Plan in the contract. The Contract CSDR Plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed.
It is the responsibility of the Government Program Office to submit a date change request for the event-driven date through the CSDR Submit-Review (CSDR-SR) system for approval by the Defense Cost and Resource Center (DCARC) before the date reflected in the FMB-6 approved Contract CSDR Plan occurs.
The Government requests that all previously reported Tier 2 standard functional categories be reported in the Cost-Hour (FlexFile). The FlexFile shall be delivered in MS Excel (.xlsx) or comma separated values (.csv) in the contractor's format of choosing, so long as it fulfills the requirements of the Contract CSDR Plan and is in accordance with the FlexFile DID or in JavaScript Object Notation (JSON) as described in the FlexFile File Format Specification (FFS) and Data Exchange Instructions (DEI) referenced in the FlexFile DID Section III. All FlexFiles shall be submitted electronically using the CSDR-SR website at https:cade.osd.mil. Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. All DCARC Portal accounts need to be renewed at least annually.
Subcontractor Reporting: Prime contractors are responsible for flowing down existing CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare a separate Subcontract CSDR Plan for submission to the DCARC for FMB-6 approval
DCARC
*SEE BLK 16
15. TOTAL 0 0 0
G. PREPARED BY H. DATE I. APPROVED BY
ROBERT G. GRAHOVAC, PEO IWS 3L1 TOAN NGUYEN, PEO IWS 3L
DD FORM 1423-1, FEB 2001 Previous editions are obsolete
11 January 2022
ATEJ.D
N00024-22-R-5325
. CONTRACT / PR NO.E
SOW Attachment 1 Section 22
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .