N0002421R2205 Amendment 7 Sec C Att 8 updates.pdf

PDF 662 KB Posted

Attached to
US Navy 8M and 11 M Rigid Inflatable Boat (RIB) and U. S. C. G. Special Purpose Craft Law Enforcement II RFP
Solicitation number
N0002421R2205
Issued by

About this file

This solicitation is for the procurement of an estimated one hundred ten rigid inflatable boats over five years under an indefinite delivery/indefinite quantity, firm fixed price contract. The boats will be built to commercial standards using government specifications and include eight-meter and eleven-meter variants for the U.S. Navy as well as an eleven-meter variant for the U.S. Coast Guard. The procurement is set aside for small businesses and will result in a single award made to the lowest price technically acceptable offer. The Naval Sea Systems Command is the contracting agency.

View the file

Other files

File Type Posted
Att_11_QA_ 2021 0514.xlsx XLSX spreadsheet
Att_11_QA_ 2021_0513.xlsx XLSX spreadsheet
Att_8 - CLIN Pricing Sheet REV 2 _12 May 2021.xlsx XLSX spreadsheet
N0002421R2205 Amendment 6- Due Date May 17th 1 PM EST.pdf PDF
Att_11_QA_ 2021 0505.xlsx XLSX spreadsheet
N0002421R2205 Amendment 5 Extend Due Date.pdf PDF
Att_11_QA_ 2021 0429.xlsx XLSX spreadsheet
N0002421R2205 Amendment 4 Update Specification.pdf PDF
Att_11_QA_ 2021 0427.xlsx XLSX spreadsheet
Att_11_QA_ 2021 0420.xlsx XLSX spreadsheet
Att_11_QA_ 2021 0419.xlsx XLSX spreadsheet
N0002421R2205 Amendment 3 Update Quantities and Attachment 8 4.16.pdf PDF
Att_11_QA 2021 04 15.xlsx XLSX spreadsheet
Att_8 - CLIN Pricing Sheet REV 1.xlsx XLSX spreadsheet
N0002421R2205 Amendment 3 Update Quantities and Attachment 8.pdf PDF
N0002421R2205 Amendment 2 Update L3.1.1 Section E.docx DOCX document
N0002421R2205 Amendment 1-Update Preproposal Conference Date to April 14.docx DOCX document
Att_11_QA.xlsx XLSX spreadsheet
Att_5_-_Techncial_Data_Rights.pdf PDF
N00024-21-R-2205 RFP.pdf PDF
Att_8 - CLIN Pricing Sheet.xlsx XLSX spreadsheet
Att_3 - Boat Initial Spare Parts List.xlsx XLSX spreadsheet
Att_4_Boat Production and Delivery Schedule.xlsx XLSX spreadsheet
Att_2 Specification Response Matrix.xlsx XLSX spreadsheet
Att_7_Warranty Rev A.docx DOCX document
Att_10_Non-Disclosure Statement for Covered Attachments.docx DOCX document
Att_6_ UID.pdf PDF
Att_9_Past Performance Information.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002421NR68038

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: 1) Update quantities in Section B; 2) Revise CLIN Pricing Sheet Attachment 8; 3) Correct CLIN Descriptions in Section C; 4) Update clauses 52.212-5 (Dev), G-232-H002, C-211-H007 and 5) Update CLIN Product Codes. (Note all changes in Sectin C, J and Attachment 8 are highlighted in red)

1. CONTRACT ID CODE PAGE OF PAGES

1 44

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0002421R2205

X 9B. DATED (SEE ITEM 11)

01-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-May-2021

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002421R2205

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 1001

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

The NAICS code 336612 has been added.

The MDAP/MAIS Code 000 has been added.

CLIN 1002

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1003

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1004

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1005

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1006

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1007

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1008

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1009

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1010

The WSC Equipment code 000 has been added.

CLIN 1011

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1012

The pricing detail quantity has increased by 1.00 from 1.00 to 2.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1013

The pricing detail quantity has increased by 1.00 from 9.00 to 10.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1014

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1015

The WSC Equipment code 000 has been added.

CLIN 1016

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1017

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1018

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1019

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1020

CLIN 1021

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 1022AA

SUBCLIN 1022AB

SUBCLIN 1022AC

SUBCLIN 1022AD

SUBCLIN 1022AE

CLIN 1023

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1024

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1025

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1026

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1027

The PROG code A30 has been added.

CLIN 1028

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1029

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1030

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1031

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1032

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 1033

CLIN 2001

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2002

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2003

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2004

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2005

CLIN 2006

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2007

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2008

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2009

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2010

CLIN 2011

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2012

The pricing detail quantity has increased by 2.00 from 5.00 to 7.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2013

The pricing detail quantity has increased by 2.00 from 5.00 to 7.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2014

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2015

CLIN 2016

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2017

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2018

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2019

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2020

CLIN 2021

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2022

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2023

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 2024

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3001

CLIN 3002

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3003

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3004

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3005

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3006

The PROG code A30 has been added.

CLIN 3007

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3008

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3009

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3010

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3011

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3012

The pricing detail quantity has increased by 2.00 from 6.00 to 8.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3013

The pricing detail quantity has increased by 1.00 from 4.00 to 5.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3014

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3015

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3016

The PROG code A30 has been added.

CLIN 3017

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3018

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3019

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3020

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3021

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3022

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3023

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 3024

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4001

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4002

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4003

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4004

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4005

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4006

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4007

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4008

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4009

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4010

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4011

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4012

The pricing detail quantity has increased by 2.00 from 2.00 to 4.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4013

The pricing detail quantity has increased by 2.00 from 8.00 to 10.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4014

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4015

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4016

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4017

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4018

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4019

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4020

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4021

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4022

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4023

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 4024

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5001

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5002

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5003

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5004

The WSC Equipment code 000 has been added.

CLIN 5005

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5006

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5007

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5008

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5009

CLIN 5010

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5011

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5012

The pricing detail quantity has increased by 2.00 from 2.00 to 4.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5013

The pricing detail quantity has increased by 2.00 from 8.00 to 10.00.

The PSC code 1940 has been added.

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5014

The WSC Equipment code 000 has been added.

CLIN 5015

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5016

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5017

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5018

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5019

CLIN 5020

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5021

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

CLIN 5022

The PROG code A30 has been added.

The WSC Equipment code 000 has been added.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PART 1 – GENERAL STATEMENT OF WORK

PART 2 – CONTRACT LINE ITEM NUMBER DESCRIPTIONS

PART 3 – STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION

PART 4 – STANDARD CLAUSES

C-1 PART 1 – GENERAL STATEMENT OF WORK

This Statement of Work (SOW) defines the effort required for the, design, construction, testing, configuration control, documentation, and program management for the acquisition of the 8m variant,11m variant of the Naval Special Warfare (NSW) Surface Support Craft (SSC) and the United States Coast Guard (USCG) 11m variant (Special Purpose Craft Law Enforcement).

Unless otherwise specified, any requirement that references “craft,” “ship,” “ships,” “boat,” “boats,” “vessel,” or “vessels” shall be applicable to the boats procured under this Contract.

Award of this contract does not guarantee all of these efforts will be conducted. The Contractor will only conduct efforts upon award of specific delivery order invoking the CLIN’s in Section B in accordance with the detailed description in Section C, Parts 2 and 3 and the contract.

Only the Procuring Contracting Officer (PCO) has the authority for the U.S. Navy to authorize or change work and sign contract documents. No other personnel are authorized by their formal communications or by their course of conduct to commit the U.S. Navy to price changes, schedule changes, or to perform different or additional work.

The Contractor shall only execute tasking or requests for support under this contract when such direction comes from, or is agreed to by, the PCO.

The award of the contract means the Contractor’s proposal was determined to be the best value to the Government, using the Lowest Price Technically Acceptable approach, it does not indicate the Government has approved or certified the design provided with the proposal. The Contractor shall remain fully responsible for delivering boat(s) that meet the requirements of this Contract in accordance with Section C and Attachment 1.

C-1.1 BACKGROUND

The 8m variant and 11m variant NSW SSC boats operate from inshore littorals to blue water, over the horizon locations, in and up to moderate sea states (NSW) in widely diverse climatic conditions (tropical to arctic). They provide over-watch and coverage for diverse NSW waterborne operations, such as: transit for at sea personnel, water parachute jump, diving, surface swimmer support, medical evacuation and command, control, communications, computers, and intelligence duties. The SSCs also provide support for all NSW garrison locations and allow NSW to certify units for deployment in support of Navy and COMNAVSPECWARCOM requirements.

The USCG will use the 11m SSC variant to conduct counter-smuggling, search and rescue (SAR), recreational boating safety (RBS), and ports and waterways coastal security (PWCS) missions and will operate in higher sea states than the USN variants.

All boat variants are desired to provide comparable to enhanced performance of current capabilities while focusing on commonality to maintain reduction in Total Ownership Costs (TOC).

The NSW SSC requires two configuration variants of the 8m and 11m, Open Center Console (Open) and Enclosed Cabin (Cabin), to support mission needs.

The USCG requires the 11m Open Center Console (Open) variant to support mission needs.

C-1.2 QUANTITIES

The resulting contract will be a 5-year Indefinite Delivery, Indefinite Quantity (IDIQ) contract for an estimated one hundred and ten (110) total craft. The initial award is for an estimated fourteen (14) boats based on availablity of funds.

C-1.3 DESIGN, MANAGEMENT AND PRODUCTION

The Contractor will be responsible for managing all activities (design, engineering, logistics, testing and production) under this contract for successful execution. After award the Government will conduct a Design Maturity Review with the Contractor prior to the start of Initial Production.

C-2 PART 2 – CONTRACT LINE ITEM NUMBER DESCRIPTIONS

C-2.1 CLIN 1001 – AND IF EXERCISED, CLINs 2001, 3001, 4001 AND 5001 – 11m OPEN NSW SSC

VARIANT

The Contractor shall construct the boat in accordance with Section C-3 and the Specification (Attachment 1). All boat-specific efforts shall be included in the pricing for the CLIN including:

C-2.1.1 Boat – The Contractor shall provide the boat and trailer in accordance with the Specification (Attachment 1).

C-2.1.2 UID – The Contractor shall provide UIDs for each boat in accordance with Attachment 6.

C-2.1.3 Boat Specific Technical Data Package (TDP) – The contractor shall provide for each boat one (1) hard copy and one (1) electronic copy (CD/DVD) of the Final 11m OPEN NSW SSC Variant TDP developed under CLIN 1022 specific to each boat.

C-2.1.4 Suzuki Engines – The Contractor shall provide two (2) Suzuki engines per boat in accordance with the Specification (Attachment 1). The Contractor shall complete the engine break-in in accordance with the Specification (Attachment 1) as part of the boat CLIN.

C-2.2 CLIN 1002 – AND IF EXERCISED, CLINs 2002, 3002, 4002 AND 5002 - 11m OPEN USCG SPC-LE

VARIANT

The Contractor shall construct the boat in accordance with Section C-3 and the Specification (Attachment 1) for the 11m OPEN USCG Variant. All boat-specific efforts shall be included in the pricing for the CLIN including:

C-2.2.1 Boat – The Contractor shall provide the boat and trailer in accordance with the Specification (Attachment 1).

C-2.2.2 UID – The Contractor shall provide UIDs for each boat in accordance with Attachment 6.

C-2.2.3 Boat Specific Technical Data Package (TDP) – The contractor shall provide for each boat one (1) hard copy and one (1) electronic copy (CD/DVD) of the Final 11m OPEN USCG Variant TDP developed under CLIN 1022 specific to each boat.

C-2.2.4 Mercury Verado Engines– The Contractor shall provide three (3) Mercury Verado engines per boat in accordance with the Specification (Attachment 1). The Contractor shall complete the engine break-in in accordance with the Specification (Attachment 1) as part of the boat CLIN.

C-2.3 CLIN 1003 – AND IF EXERCISED, CLINs 2003, 3003, 4003 AND 5003 – 11m CABIN NSW SSC

The Contractor shall construct the boat in accordance with Section C-3 and the Specification (Attachment 1). All boat-specific efforts shall be included in the pricing for this CLIN including:

C-2.3.1 Boat – The Contractor shall provide the boat and trailer in accordance with the Specification (Attachment 1).

C-2.3.2 UID – The Contractor shall provide UIDs for each boat in accordance with Attachment 6.

C-2.3.3 Boat Specific Technical Data Package (TDP) – The contractor shall provide for each boat one (1) hard copy and one (1) electronic copy (CD/DVD) of the Final 11m CABIN NSW SSC Variant TDP developed under CLIN 1022 specific to each boat.

C-2.3.4 Suzuki Engines – The Contractor shall provide two (2) Suzuki engines per boat in accordance with the Specification (Attachment 1). The Contractor shall complete the engine break-in in accordance with the

C-2.4 CLIN 1004 AND IF EXERCISED, CLINs 2004, 3004, 4004 AND 5004 – 8m OPEN NSW SSC

The Contractor shall construct the boat in accordance with Section C-3 and the Specification (Attachment 1). All boat-specific efforts shall be included in the pricing for this CLIN including:

C-2.4.1 Boat – The Contractor shall provide the boat and trailer in accordance with the Specification (Attachment 1).

C-2.4.2 UID – The Contractor shall provide UIDs for each boat in accordance with Attachment 6.

C-2.4.3 Boat Specific Technical Data Package (TDP) – The contractor shall provide for each boat one (1) hard copy and one (1) electronic copy (CD/DVD) of the Final 8m OPEN NSW SSC Variant TDP developed under CLIN 1022 specific to each boat.

C-2.4.4 Suzuki Engines – The Contractor shall provide two (2) Suzuki engines per boat in accordance with the Specification (Attachment 1). The Contractor shall complete the engine break-in in accordance with the

C-2.5 CLIN 1005 AND IF EXERCISED, CLINs 2005, 3005, 4005 AND 5005 – 8m CABIN NSW SSC

The Contractor shall construct the boat in accordance with Section C-3 below and the Specification (Attachment 1).

All boat-specific efforts shall be included in the pricing for the CLIN including:

C-2.5.1 Boat – The Contractor shall provide the boat and trailer in accordance with the Specification (Attachment 1).

C-2.5.2 UID – The Contractor shall provide UIDs for each boat in accordance with Attachment 6.

C-2.5.3 Boat Specific Technical Data Package (TDP) – The contractor shall provide for each boat one (1) hard copy and one (1) electronic copy (CD/DVD) of the Final 8m CABIN NSW SSC Variant TDP developed under CLIN 1022 specific to each boat.

C-2.5.4 Suzuki Engine Set – The Contractor shall provide two (2) Suzuki engines per boat in accordance with the Specification (Attachment 1). The Contractor shall complete the engine break-in in accordance with the

C-2.6 CLIN 1006 AND IF EXERCISED, CLINs 2006, 3006, 4006 AND 5006 – HOISTING SLINGS for NSW

SSC

The contractor shall provide hoisting slings, trailer hoisting straps, and hardware for designated boats as defined in the Specification (Attachment 1). The sling set shall be delivered with designated boats per the Delivery Order.

C-2.7 CLIN 1007 AND IF EXERCISED, CLINs 2007, 3007, 4007 AND 5007 – 11m SSC BOAT SPARES Contractor shall provide initial spares and repair parts including engine spares for designated boats in accordance with Attachment 3 and paragraph C-3080-1 of this SOW.

C-2.8 CLIN 1008 AND IF EXERCISED, CLINs 2008, 3008, 4008 AND 5008 – 8m SSC BOAT SPARES Contractor shall provide initial spares and repair parts including engine spares for designated boats in accordance with Attachment 3and paragraph C-3080-1 of this SOW.

C-2.9 CLIN 1009 AND IF EXERCISED, CLINs 2009, 3009, 4009 AND 5009 – ENGINE DIAGNOSTIC

LAPTOPS

The Contractor shall provide engine diagnostic laptops in accordance with the Specification (Attachment 1). All laptops shall be delivered to the Naval Surface Warfare Center Carderock, Combatant Craft Department (St. Julien’s Creek) for Cybersecurity initialization as specified in Section F (Deliveries or Performance).

C-2.10 CLIN 1010 AND IF EXERCISED, CLINs 2010, 3010, 4010 AND 5010 –PRE-DELIVERY

INSPECTIONS AND TRIALS (PDIT) (NSW)

The Contractor shall perform boat Pre-Delivery Inspections and Trials (PDIT), in accordance with Section C, Part 3 and the Specification (Attachment 1) Section 094.

C-2.11 CLIN 1011 AND IF EXERCISED, CLINs 2011, 3011, 4011 AND 5011 –PRE-DELIVERY

INSPECTIONS AND TRIALS (PDIT) (USCG)

The Contractor shall perform boat Pre-Delivery Inspections and Trials (PDIT), in accordance with Section C, Part 3 and the Specification (Attachment 1) Section 094

C-2.12 CLIN 1012 AND IF EXERCISED, CLINs 2012, 3012, 4012 AND 5012 - SHIPPING – CHEATHAM

ANNEX, WILLIAMSBURG, VA

The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with Section C, Part 3. Spare parts and items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.

C-2.13 CLIN 1013 AND IF EXERCISED, CLINs 2013 3011, 4013 AND 5013 – SHIPPING – DDDC, SAN

DIEGO, CA

The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with Section C, Part 3. Items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping

C-2.14 CLIN 1014 AND IF EXERCISED, CLINs 2014, 3014, 4014 AND 5014 – SHIPPING – USCG

STATION SAN DIEGO, CA

The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with Section C, Part 3. Items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.

C-2.15 CLIN 1015 AND IF EXERCISED, CLINs 2015, 3015, AND 4015– SHIPPING – USCG STATION

SOUTH PADRE ISLAND, TX

The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with Section C, Part 3. Items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.

C-2.16 CLIN 1016 AND IF EXERCISED CLINS 2016, 3016, 4016 AND 5015 – SHIPPING - USCG

STATION MIAMI, FL

The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with Section C, Part 3. Items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.

C-2.17 CLIN 1017 AND IF EXERCISED, CLINs 2017, 3017, AND 4017 – SHIPPING – USCG MARITIME

LAW ENFORCEMENT ACADEMY, CHARLESTON, SC

The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with Section C, Part 3. Items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.

C-2.18 CLIN 1018 – CREW FAMILIARIZATION (USCG) SAN DIEGO

The Contractor shall provide crew familiarization and training for USCG personnel at San Diego, CA. Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include

Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.19 CLIN 1019 – CREW FAMILIARIZATION (USCG) SOUTH PADRE ISLAND, TX

The Contractor shall provide crew familiarization and training for USCG personnel at South Padre Island, Texas.

Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be Three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.20 CLIN 1020 AND IF EXERCISED, CLIN 2018, 3018, 4016 AND 5015 – CREW FAMILIARIZATION (USCG) Miami, FL The Contractor shall provide crew familiarization and training for USCG personnel at Miami, Florida Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.21 CLIN 1021 AND IF EXERCISED, CLIN 4018 – CREW FAMILIARIZATION (USCG) MARITIME

LAW ENFORCEMENT ACADEMY, CHARLESTON, SC

The Contractor shall provide crew familiarization and training for USCG personnel at the Maritime Law Enforcement Academy at Charleston, South Carolina Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.22 CLIN 1022– TECHNICAL DATA PACKAGE NON-RECURRING ENGINEERING

The Contractor shall develop the initial Technical Data Package (TDP) for each variant in accordance with Section 085 of the Specification (Attachment 1). Boat-specific TDP effort and contents shall be priced in the Boat CLIN and shall be provided with each boat.

C-2.23 CLIN 1023– ENGINEERING CHANGES FROM TESTING (USCG)

This CLIN is reserved for any engineering changes that are required as a result of Government testing of the initial four USCG production 11m SSCs.

C-2.24 CLIN 1024 – ENGINEERING & INDUSTRIAL SERVICES

If exercised, the Contractor shall provide engineering services as authorized by the Contracting Officer that is required to support the program in any of the following areas: Design Engineering & Production, Test Support, and GFP Integration & Support. Requirements under this CLIN might include, but are not limited to, the correction of problems with Government Furnished Property (GFP), changes to the configuration baseline, Government requirements identified during pre-delivery inspection, issue resolution support during Government testing, and the development of engineering products. Examples of work that might be accomplished under this CLIN include equipment installation, rigging support, component replacement, minor design upgrades and subject matter expert technical assistance. The requirements associated with this CLIN are over and above those specified in other contract CLINs. Orders for this effort will be placed in accordance with the general requirements in Section H of this Contract entitled “ENGINEERING & INDUSTRIAL SERVICES.” The Contractor shall complete the table for fully loaded engineering and production rates in Attachment 8.

The work to be performed shall consist of production and engineering related labor as ordered by the Government for Engineering & Industrial Services within scope of this Contract without causing delay or disruption to the work performed under this Contract, or any other Government contract, or any other work in process for the Government.

(a) As used herein, the term “Engineering & Industrial Services” means work under this Contract, ordered by the Contracting Officer. Engineering & Industrial Services do not include performance of work for the correction of Contractor responsible defects.

(b) All modifications will be on a Firm-Fixed-Price (FFP) basis and will be issued as SUBCLINs to this line item. For each proposed modification, the Contractor agrees that it will submit such cost or pricing data as the Contracting Officer may require. Proposed labor and materials costs shall use the rates set forth in Section B of this contract. Travel time necessary for performance of such services shall be included in computing the labor hours of service. Proposed travel costs, if any, shall comply with FAR 31.205-46. Promptly after receipt of proposal, the Contractor and the Contracting Officer shall negotiate the price and schedule for the proposed order. Upon execution and receipt of the modification, the Contractor shall promptly commence the work specified in the order.

(c) Undefinitized Changes. Whenever the Contracting Officer determines that urgent demands or requirements prevent the issuance of a priced order, he/she may issue an unpriced change. Such order may be unilateral or bilateral and shall establish a limitation on Government liability, a maximum ceiling amount, and a schedule for definitization, The Contractor shall begin performing the undefinitized order upon receipt, except as provided in paragraph (3) below. The clause entitled "Contract Definitization" (DFARS 252.2l7-7027) shall be included in any undefinitized order.

(d) Rejection of Unilateral Changes. The Contractor may reject any unilateral changes if the Contractor determines that it cannot feasibly perform the work, or if the Contractor does not concur with the maximum ceiling amount. However, each unilateral change shall be deemed to have been accepted by the Contractor unless within fifteen days of issuance of modification, the Contractor notifies the Contracting Officer in writing of its rejection of the change.

C-2.25 CLIN 1025 – PROVISIONED ITEMS ORDERS (PIO) SPARES

If exercised, the Contractor shall provide spare and repair parts, special tools, test equipment, materials and related support not envisioned at the time of award, in accordance with the requirements herein and the clause entitled

“PROVISIONED ITEM ORDER – ALTERNATE II”.

C-2.26 CLIN 1026 – HULL FLOTATION TEST

If exercised, the Contractor shall conduct flotation test(s) in accordance with the Specification (Attachment 1).

C-2.27 CLIN 1027 AND IF EXERCISED CLINs 2019, 3019, 4019, and 5017 – 11m SSC CREW

FAMILIARIZATION SAN DIEGO

The Contractor shall provide 11m SSC crew familiarization and training for NSW personnel at San Diego, CA.

Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.28 CLIN 1028 AND IF EXERCISED CLINs 2020, 3020, 4020, and 5018 – 11m SSC CREW

FAMILIARIZATION NOFOLK

The Contractor shall provide 11m SSC crew familiarization and training for NSW personnel at Joint Expeditionary Base, Norfolk, VA. Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.29 CLIN 1029 AND IF EXERCISED CLINs 2021, 3021, 4021, and 5019– 11m SSC CREW

FAMILIARIZATION HAWAII

The Contractor shall provide 11m SSC crew familiarization and training for NSW personnel at Pearl City, Hawaii.

Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.30 CLIN 1030 AND IF EXERCISED CLINs 2022, 3022, 4022, and 5020 – 8m SSC CREW

FAMILIARIZATION SAN DIEGO

The Contractor shall provide 8m SSC crew familiarization and training for NSW personnel at San Diego, CA.

Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials.

C-2.31 CLIN 1031 AND IF EXERCISED CLINs 2023, 3023, 4023, and 5021 – 8m SSC CREW

FAMILIARIZATION NORFOLK

The Contractor shall provide 8m SSC crew familiarization and training for NSW personnel at Joint Expeditionary Base, Norfolk, VA. Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials

C-2.32 CLIN 1032 AND IF EXERCISED CLINs 2024, 3024, 4024, and 5022– 8m SSC CREW

FAMILIARIZATION HAWAII

The Contractor shall provide 8m SSC crew familiarization and training for NSW personnel at Pearl City, Hawaii.

Crew familiarization shall include craft operations, main equipment operations and maintenance. This shall include Contractor and/or OEM training and component change out for engines, electrical, and HM&E systems. At a minimum training shall be three (3) full days at End User‘s location for up to five (5) students per boat. The Contractor shall provide all training materials

C-2.33 CLIN 1033

This CLIN is reserved for any Request for Varianace and/or Engineering Changes for the Navy variants.

C-3 PART 3 – STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION

C-3.042-1 CONFERENCES AND REVIEWS

The Contractor shall conduct a Post Award Conference (PAC) and Progress Reviews. The Contractor shall prepare meeting minutes for these reviews.

C-3.042-1.1 Post Award Conference: The Contractor shall conduct a PAC with the Government within thirty

(30) days after contract award and subsequent delivery order awards, as needed. The conference will be held at the Contractor’s facility or by phone at the Government’s discretion. The purpose of the conference is to (1) review the contract and technical documents, (2) review the technical and schedule requirements, and (3) clarify the roles and working relationships between the Contractor and the Government.

C-3.042-1.2 Design Maturity Review: The Contractor shall schedule and host Government personnel for a Design Maturity Review (DMR) prior to construction of the first boat of each variant. The first three (3) variants shall be combined into a single DMR. The other two (2) boat variant DMRs will follow when exercised for a maximum of three (3) DMRs. DMRs for variants may be combined into a single DMR upon agreement of the Government and Contractor. The purpose of the DMR is to demonstrate that the design is sufficiently mature to start construction and that the status of material ordering and delivery will support the proposed build schedule. Any potential risk areas shall be identified and mitigation plans discussed. The Government should be satisfied that all requirements in the Specification (Attachment 1) have been incorporated into the design. The PCO will notify the Contractor within seven (7) days of the DMR whether the start of construction is authorized. The following shall be provided for the DMR:

1. Updated Design and Delivery Schedule,

2. Material and purchased parts status, including but not limited to:

-hull and deck materials, -major equipment, -long lead time items.

3. DRAFT Technical Design Analyses for final Government Approval:

a. Allocated Baseline Weight Estimate (ABWE),

b. Boat Stability Analysis,

c. Flotation Analysis,

d. Quick Draining Analysis

4. Preliminary construction drawings to support reviews of Technical Design Analysis and demonstrate the approach to meet the Specification, including but not limited to:

a. Outboard Arrangement Drawing,

b. Inboard Arrangement Drawing.

5. Construction facilities: The Contractor shall provide evidence of the facilities readiness, especially to produce variants in parallel.

6. Production Manning: The Contractor shall provide evidence that manning resources are available to support planned production,

7. Requests For Variance (RFV): There shall be no open RFVs. Contract Problem Identification Reports (CPIRs) shall have a documented resolution.

8. Risk Assessment: an assessment of risk and the risk management approach to eliminate or mitigate those risks.

C-3.042-1.3 Progress Reviews: Progress Reviews shall be held at the Contractor’s discretion or by Government request, as needed to support the production schedule. Reviews will be held at the Contractor’s facility or by phone and shall not interfere with continued progress or production of boats. Reviews shall not be used as approval to proceed in design or production, unless otherwise specified, and should be used only for informing the Government of process on production, builder questions, and impending risk to program.

C-3.042-2 CONFIGURATION MANAGEMENT

The baseline configuration is set on the acceptance of the first article of each variant.

Unless otherwise specified in the contract, all subsequent boats, for each variant, on this contract shall be identical in configuration to the initial hull of each variant.

(a) Per the Specification (Attachment 1) unless otherwise specified in the applicable delivery order, all subsequent boat variants on this contract shall be identical in configuration to the initial hull variant of each boat configuration. The Contractor shall submit a Request For Variance (RFV) for any configuration change over the life of the contract.

(b) Where feasible, the Contractor shall avoid the use of custom parts and use standard industry interfaces with components to allow for low cost upgrade or transition from obsolete commercial products.

(c) Overall boat design, positioning of equipment and system integration shall not change throughout the life-cycle of the contract unless mutually agreed upon by the Government.

C-3.042-3 WARRANTY

The Contractor will correct defects for the boat, trailer, and all installed equipment, for minimum of one (1) year, starting from the date the boat enters service with the Navy's and USCG’s end-user in accordance with the warranty provided in Attachment 7, Commercial Warranty Terms. Notification of official in-service date will be provided to the builder by the U.S. Navy Boat Inventory Manager. Note to Builders: Boats procured for the Navy may sit in stock (outdoors in uncovered storage) for up to twelve (12) months prior to issue to the Navy end-user.

C-3.042-4 PROGRAM MANAGEMENT

Roles and Responsibilities

C-3.042-4.1 The Contractor shall establish a project management structure that ensures overall quality of the boat components, consistent with their chosen engineering and manufacturing approach.

C-3.042-4.2 The Contractor shall designate a Project Manager (PM) to serve as the principal representative of the Contractor throughout the duration of contract performance. The PM shall be responsible for the performance of the contract and on-time delivery of technically compliant boats and associated equipment. At all times, the PM shall have the responsibility for ensuring program integrity and overall contract performance.

The contractor shall ensure that administration, logistics, financial and other task requirements pertinent to contract performance are successfully implemented.

C-3.042-5 INVOICES

The Contractor shall provide affidavits or invoices from the suppliers of all essential materials used in the construction of the boat. The affidavits or invoices shall be used together with records identifying the lot or serial numbers of the boat in which such materials were used.

C-3.042-6 ENGINEERING CHANGE PROPOSALS / REQUESTS FOR VARIANCE

(a) Upon discovery, the Contractor shall notify the Government of any issues with obsolete components. The Contractor shall notify the Government as soon as possible of an obsolete component impacting system performance or production schedule. Routine one-for-one component replacements can be addressed by submission of a RFV, Form DD1694. Where more complex design changes are required, the Contractor shall submit an Engineering Change Proposal (ECP).

(b) Engineering Change Proposal’s shall be prepared when the Government directs a change in accordance with form DD1693 format and the requirements of the contract. An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue.

(c) Documentation shall be developed in sufficient detail to enable US Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved.

C-3.080-1 SPARES

Boat and PIO Spares:

C-3.080-1.1 Boat (initial) Spares: The Contractor shall provide initial spares for designated boats as outlined in the Spare Parts List (Attachment 3). The spares provided shall match the propulsion /OEM configuration installed on the boat. Spares shall be managed as part of the configuration management process and the Contractor shall inform the Government of any necessary part number updates that will be required throughout the execution of this contract.

C-3.080-1.2 Spares Delivery: Unless otherwise specified, all spares shall be packaged and shipped securely with designated boats. Packaging shall allow for spare components to not be damaged during shipping. Each package of spares shall be labeled with a Master Packing List (MPL), listing the contents of each package and cross-referenced to the Spare Parts List (Attachment 3).

C-3.080-1.3 Updates: The Contractor shall recommend updates to the contract spares list throughout the life cycle of this contract. It is anticipated that parts will become obsolete or newer parts will become available that should be provided as part of spares offered.

C-3.080-1.4 PIO Spares: If ordered, the Contractor shall provide PIO spares in accordance with C-217-H003

PROVISIONED ITEMS ORDERS—ALTERNATE II.

C-3.080-2 PACKAGING

Packaging/Shrink wrap shall be used to protect the boat during delivery. Boat systems shall be protected from freezing temperatures. Batteries shall be disconnected with terminals taped. The bilge plug shall be removed and secured to the steering wheel. Packaging/shrink wrap materials shall be installed in a manner that enables removal and reinstallation to the maximum extent practicable to enable inspection at the delivery location without damage to the packaging materials.

C-3.080-3 DELIVERY

The Contractor shall deliver the boats to East (CAX) or West Coast (DDDC) stock point locations, or end-user locations, as defined in Section F of the basic contract. The Government will identify a delivery location for each boat as part of each delivery order. This will allow the Contractor to plan for production and shipping based upon the agreed destination. If direct delivery to end user location is ordered, the boat shall be delivered fully assembled and operational.

C-3.080-4 UNIQUE ITEM IDENTIFICATION

The Contractor shall provide Unique Item Identification (UID) and Documentation for every boat in accordance with DFARS Clause 252.211-7003 and the requirements provided in the UID (Attachment 6).

C-3.080-5 ESSENTIAL CYBERSECURITY COMPONENTS (ECSC) DOCUMENTATION

For each boat the Contractor shall document and provide ECSC documentation in accordance with Section 085-9 of the Specification (Attachment 1) and Technical Data Package (TDP).

C.3.085-1 TECHNICAL DATA PACKAGE

C.3.085-1.1 General: The Contractor shall provide a copy of the TDP with each boat in accordance with Section 085 of the Specification (Attachment 1). The costs (e.g. print, arrange, bind, etc.) to provide a copy of the TDP, including updating boat applicability and individual boat certifications, shall be included in the unit prices for each Boat CLIN. Any TDP non-recurring engineering (NRE) shall be proposed under CLIN 1022.

C.3.085-1.2 Format: Drawings shall be provided in hard copy, DWG/DXF format and PDF format as specified in the submittal section below. Boat technical manual and COTS manuals, instructions or cut sheets, certifications, analyses, master data index, and all other data shall be provided in hard copy and PDF format.

Calculations, Bill of Material, and ECSC documentation shall be submitted in their native electronic format.

C.3.085-1.3 Data Security: Most of the data in the TDP is considered Controlled Unclassified Information (CUI) and therefore, the Contractor shall exchange data with the Government via a Government provided Integrated Digital Environment (IDE) utilizing appropriate Public Key Infrastructure/Information Assurance protocols

C.3.085-1.4 Submittal: A complete preliminary TDP shall be submitted electronically to the Technical Point of Contact (TPOC)…

This is the start of the file's text. The full file is on GovTribe.