This document is a solicitation requesting proposals for the development, qualification, and delivery of a Shipboard Energy Magazine. Key details include that the solicitation seeks preliminary design, detailed design, manufacture of a first unit, qualification testing, associated engineering services, and options for low rate initial production units that are stepladder priced. The Naval Sea Systems Command is issuing this competitive request for proposals. Proposals are due by August 5, 2020, as amended. Controlled unclassified technical information will be provided to certified offerors. The solicitation includes requirements for power conversion, energy storage, external interfaces, and variants to support naval warships.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question
| Shipboard Energy Magazine N00024-20-R-4112 - Pre-Proposal Information/Question | ||||||
| Question Number: | Date Submitted: | Question Source: (RFP, attachment #, GFI title, etc.) | Page number and paragraph header from source: | Question: | Answer | |
| 001 | 6/8/20 | N0002420R4112 RFP, Section C | Page152, Para. 2.4 Volume 1: Technical (Factors 1 and 3; Page 154: para. 2.4.2.1.5 Energy Storage Media Trade Study | Since an effective comparative trade study typically includes a cost comparative assessment (especially for USG cost sensitive procurements), can the Energy Storage Media Trade Study that is required for Volume I address a relative non-value cost comparison (i.e. proposed baseline of 1.0 vice others as factors of that baseline) of the various evaluated energy storage approaches? | Solicitation N0002420R4112 Section L paragraph 2.4.2.1.5 is revised to append the following statement: "The Energy Storage Media Trade Study shall include relative cost comparisons of potential solutions on a normalized scale and is not required to have absolute costs." | |
| 002 | 6/8/20 | TBD | TBD | TBD | TBD | |
| 003 | 6/8/20 | N0002420R4112 RFP, Section J, Attachment J | Page 47, Section 6.3.2, | Is Dark Ship Start (DSS) capability required or evaluated for technical selection criteria for CLIN 0001? If so, what power and voltage levels does the PCC source converter need to run at to support the DSS? Also, is the small coolant pump a GFE item and on a separate power circuit? How does that circuit integrate with the notional single line diagrams? | The correct reference for this question is Solicitation N0002420R4112 Section J Attachment H, not Attachment J. Attachment H provides operational scenarios, but all power and voltage requirements are explicitly stated in the technical specifications within Solicitation N0002420R4112 Section J Attachments B through G, inclusive of any dark ship starting power and voltage. The small coolant system pump cited in paragraph 6.3.2 of Solicitation N0002420R4112 Section J Attachment H is external to the EM (not Contractor furnished) and the power for this pump is also within the overall constraints of power and voltage specified. | |
| 004 | 6/8/20 | N0002420R4112 RFP, Section C | Page 17, Section 3.3.17.2, [EM_FRD_389] and [EM_FRD_390] Figure 4 | Figure 4 shows an auxillary mission critical feed of 450 VAC of 70 amps max.for ESC trickle charge, fans, controls, et.als. Can you confirm that this voltage source (450 VAC) applies to the baseline and alternate1 and 2 variants of 4160VAC, 450 VAC and 13.8KVAC SSDS respectively? | The correct reference for this question is Solicitation N0002420R4112 Section J Attachment B. The 450V Ship Electrical Distribution System as depicted in Figure 4 of solicitation N0002420R4112 Section J attachment B applies to the baseline and all variants specified for this solicitation. It is noted that the 70 Amps cited in Solicitation N0002420R4112 Section J attachment B paragraph 3.3.2.1.1 is for input to the ESC. | |
| 005 | 6/8/20 | N0002420R4112 RFP, Section M | Page 187, Para. 2.6.2.1 CLIN 0006 Evaluated Price | For the LRIP shipsets of CLIN 0006, in order to provide a realistic unit ceiling price based on econmic material ordering quantities, manufacturing facilities, test facilities and resulting manufacturing costs of those units, a minimum and maximum quantity of Energy Magazine systems that would be placed on order against each shipset and their annual delivery timing is needed. Learning curves and material volume economic order quantities are quantity and time frame dependent. Can the Navy provide the minimum and maximum EM system quantities and annual delivery timing of those units per each ship set listed? | Solicitation N0002420R4112 Section B CLIN 0006 identifies the maximum quantity for the line item under the "QUANTITY" and provides for step ladder pricing in the table entitled STEPLADDER PRICING TABLE (TO BE FILLED IN BY OFFEROR). Solicitation N0002420R4112 Section F - Deliveries or Performance provides the delivery date for the CLIN 0006 unit(s) and includes the note that if additional units are selected from the option set, the delivery of each successive unit shall be no later than one month from the delivery of the prior unit in the option. Solicitation N0002420R4112 Section I clause 52.217-7 VAR I OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989) (NAVSEA VARIATION I) (OCT 2018) states the latest option exercise dates. The minimum quantity is 0 (zero) and the maximum quantity is as stated, 5 (five). The delivery timing can be determined by the combination of the latest option exercise date and the delivery date for the CLIN. | |
| 006 | 6/8/20 | N0002420R4112 RFP, | ||||
| Amendment 0001, Section I | Cover Sheet, Block 14, item b), Page 2 | The Amendment 0001 lists changes in Block 14 against Section I Clause 52.217-17. Summary of changes on page 2, Section I, discusses changes to Clause 52.217-7. Can the Navy confirm that the listing on the Cover Sheet, block14 is a typo and should read 52.217-7? | The correct reference for Solicitation N0002420R4112 Amendment 0001 is 52.217-7. | |||
| 007 | 6/8/20 | Section C, N00024-20-R-4112 | Page 29, Para 1.2.1.2 | Provision 1.2.1.2 states: All functionality of… shall be accomplished by higher frequency transformers contained within the energy magazine. All previous PMS-320 documentation indicated that simple line frequency transformers would suffice to provide Galvanic isolation at the AC power interface. Is a technology that changes and increases frequency to enable higher frequency transformers required at the AC input power interface? What is the definition of “higher frequency”? | Solicitation N0002420R4112 Section C paragraph 1.2.1.2 is revised to delete the following statement: "by higher frequency transformers contained". Galvanic isolation requirements are addressed in Solicitation N0002420R4112 Section J attachment B. | |
| 008 | 6/8/20 | Section F and Section C of N0002420R4112 | Page 83, Pages 45-47, Para 3.1 – 3.3 | Please clarify that CLIN 0003 delivery date is 3 mths AOE, and please advise when the government plans to exercise CLIN 0003 option. The CLIN 0003 Statement of Work tasks are to provide services, materials, facilities and personnel for a number of environmental qualification tests. We do not believe 3 months is sufficient time to perform these tasks. | Solicitation N0002420R4112 Section I clause 52.217-7 VAR I OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989) (NAVSEA VARIATION I) (OCT 2018) states the latest option exercise dates. Solicitation N0002420R4112 Section F - Deliveries or Performance provides the delivery date for the CLIN 0003 and has been changed to reflect 6 month after option exercise. | |
| 009 | 6/8/20 | Section C, N00024-20-R-4112 | Page 38, Para 1.3.1.2 | The document states “In order to properly coordinate with the Navy’s own modeling and simulation capability, the test site shall employ Real Time Digital Simulator (RTDS) software so that all models and simulations developed may be transferred to the Navy for additional testing.” In this context is “RTDS” referring to the specific company RTDS Technologies, or as a general acronym covering the entire class of real-time simulation platforms? | Solicitation N0002420R4112 Section C paragraph 1.3.1.2. has been modified to clarify the requirement. | |
| 010 | 6/12/20 | N0002420R4112 RFP, Section I | Page 99 | FAR 52.219-28 clause is listed in solicitation as MAR 2020 version, the current clause is MAY 2020 and was updated to May version in Federal Acquisition Circular 2020-5 dated March 30, 2020. Is this clause going to be updated to MAY 2020 version? | This clause in addition to other clauses were updated based on the latest software writing updates. | |
| 011 | 6/12/20 | N0002420R4112 RFP, Section I | Page 99 | FAR 52.219-9 clause is listed in solicitation as MAR 2020 (Deviation 2018-O0018) version, the current clause is JUN 2020 and was updated to the June version in Federal Acquisition Circular 2020-5 dated March 30, 2020. Is this clause going to be updated to JUN 2020 version? | This clause in addition to other clauses were updated based on the latest software writing updates. | |
| 012 | 6/12/20 | N0002420R4112 RFP, Section F, Section C | Section F,Page 83; Section C, Page 46 | CLIN 0003 has a stated delivery date of 3 mths AOE. Considering the types and numbers of tests specified for EQT as stated in CLIN0003 Para 3.1, this CLIN duration is unrealistically short. Can this duration be adjusted to 6 months? | See response to Question #008. | |
| 013 | 6/12/20 | N0002420R4112 RFP, Section F, Section C | Section F Page 46 | How many qualification units does the Navy expect to be acquired and built to accomplish performance and environment qualification tests within the allotted time frame ? | Solicitation N0002420R4112 Section B states that CLIN 0001 is for one (1) First Unit and it is assumed that the CLIN 0003 scope will be performed on the CLIN 0001 First Unit. | |
| 014 | 6/12/20 | N0002420R4112 RFP, Section C, Section L | Section C, 0.13 Earned Value Management; Section L, 2.7.2 Management Approach and Metrics | Please confirm that a contractor that has not met requirements of DFARS 252.234-7002 and does not hold approved EVMS, is eligible to submit proposal with the plan per FAR Clause 52.234-2 (b) and 52.234-3(b) and that such proposal will not be decremented during evaluation due to the lack of approved EVMS. | Solicitation N0002420R4112 Section L paragraph 2.7.2 states that an Offeror shall describe the processes it uses to monitor and control costs, including their use and experience with Earned Value Management Systems (EVMS). Solicitation N0002420R4112 Section C paragraph 0.13 states the Contractor shall establish, maintain, and use in the performance of this contract, an Earned Value Management System (EVMS). Establishment of an EVMS may occur post contract award, but must be recognized by the cognizant Administrative Contracting Officer (ACO) as complying with the criteria provided in paragraph 0.13. Therefore, an approved EVMS is not required prior to award and will not be considered unacceptable, but there may be a risk associated with achieving the requirement for a recognized EVMS. | |
| 015 | 6/15/20 | Integrated Operational Concept Description (IOCD) For The Shipboard Energy Magazine (EM), Revision 1.0, 16 April 2020 | Pg. 13: | |||
| 2.0 Referenced Documents | References 6 through ll were not provided with the other references. Can they be provided? | Solicitation N0002420R4112 Section J Attachment H paragraph 2.0 (Referenced Document) list ref No 6 through 11 that were not a required reference in the document and have been removed from the references list, as well as the notation in paragraph 5.2 of the document. | ||||
| 016 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 38, Section 1.3.1.2 | The requirement states "In order to properly coordinate with the Navy’s own modeling and simulation capability, the test site shall employ Real Time Digital Simulator (RTDS) software so that all models and simulations developed may be transferred to the Navy for additional testing." | ||
| Is the intention of this statement to require the proposer to develop the HIL compatible models using ONLY the specific RTDS hardware and software platform? Essentially eliminating other HIL providers (Typhoon, OPAL RT, PLECS) from consideration? In the event a proposer is already invested in a HIL platform (Typhoon for example), would the proposer then need to invest into RTDS HW/SW? | Solicitation N0002420R4112 Section C paragraph 1.3.1.2. has been modified to clarify the requirement. | |||||
| 017 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 27, Section 1.2.1 | Can the Navy identify the "Navy's Power Hardware in the loop (PHIL)/Controller Hardware in the Loop (CHIL) test site?" Without identification of test site location/title, proper budgetting cannot be performed. | Solicitation N0002420R4112 Section C paragraph 1.3.1.2. has been modified to clarify the requirement. | |
| 018 | 6/15/20 | Solicitation: N0002420R4112 | Pg.28 , Section 3.3.4.1 | Can NAVSEA Design Practices and Criteria Manual, T9070-AL-DPC-020/077-2 be supplied as it was not found in documents supplied? | Yes, will be provided via separate correspondence from the NAVSEA Contract Specialist. | |
| 019 | 6/15/20 | Solicitation: N0002420R4112 | Pg.28, Section 3.3.4.1 | Does 3.3.4.1 take precedence over 3.3.4.2? | All sections of the SOW must be read together. The question does not include sufficient technical detail or explanation to clarify the Offeror's concern. The Government does not see the identified sections as conflicting. | |
| 020 | 6/15/20 | Solicitation: N0002420R4112 | Pg.31, Section 3.3.7.1 | Does 3.3.7.1 take precedence over 3.3.15.13.8? | All sections of the SOW must be read together. The question does not include sufficient technical detail or explanation to clarify the Offeror's concern. The Government does not see the identified sections as conflicting. The reference to 3.3.15.13.8 appears to be incorrect and is likely 3.3.15.3.8. | |
| 021 | 6/15/20 | Solicitation: N0002420R4112 | Pg.31, Section 3.3.7.1.7 | Does 3.3.7.1.7 apply to propylene glycol too? | The specification noted in the referenced paragraph of Solicitation N0002420R4112 Section J Attachment B, 802-5959353 Rev BJ Mil-Std-777D (schedule for piping modified for DDG 51 class), does not provide requirements or a statement on equivalency between Ethylene glycol - water (EGW) and Propylene glycol - water (PGW), which therefore would prohibit use of PGW. | |
| 022 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 31, Section 3.3.7.2 | Is SAE 100R14, JIC an acceptable alternate? | Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.7.2 specifies SAE AS620 or SAE AS1227 shall be used when connecting piping sections of adjacent cabinet sections to support hatchability requirements. Additionally, 3.3.15.18 and its sub-requirements defines hose assemblies and fittings for use on piping system internal to the Energy Magazine and for connections to the ship's Chilled Water (CW) system. | |
| 023 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 31, Section 3.3.7.3 | Is this applicable to small diameters (e.g., dimeters less than 1/2")? | Yes. No diameter constraint is specified in Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.7.3. | |
| 024 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 32, Sections 3.3.7.8 thru 3.3.7.13 | Do these sections apply to both internal coolant loop(s) and chilled water loop(s)? | Yes. Solicitation N0002420R4112 Section J Attachment B paragraphs 3.3.7.8 through 3.3.7.13 apply to all EM valves and piping. | |
| 025 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 32, Section 3.3.8.6 | Does this section conflit with Figure 5? | No. The Government does not see the identified sections as conflicting. | |
| 026 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 36, Section 3.3.13.2 | Is this section incomplete? | The word "in" at the end of the sentence is deleted. Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.13.2 shall read "The maintenance allowance space shall extend outward from the EM physical extents in the direction indicated." | |
| 027 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 41, Section 3.3.15.3.3 | Will ships chilled water be running during the 2 hrs? | As stated in Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.12.14, repair times shall include the time required for detection, isolation, disassembly, replacement, re-assembly, alignment, verification of repair, and return to operation. The availability or external isolation from the ships' chilled water system is not guaranteed. | |
| 028 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 41, Section 3.3.15.10 | Does this section apply to coolant systems operating at an inlet and outlet pressure of 1 ATM? | Yes. Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.15.10 shall include all coolant systems. | |
| 029 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 42, Section 3.3.15.16 | Must the filter be outside the EM for maintainence access? | No. | |
| 030 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 42, Section 3.3.15.18.3 | Does 3.3.7.1 take precidence? | All sections of the SOW must be read together. The question does not include sufficient technical detail or explanation to clarify the Offeror's concern. The Government does not see the identified sections as conflicting. | |
| 031 | 6/15/20 | Solicitation: N0002420R4112 | Pg. 42, Section 3.3.15.18.6 | What defines a "pressure boundary component"? | Solicitation N0002420R4112 Section J Attachment B has been modified to include paragraph 3.3.15.18.9 that states "A pressure boundary component is any component or part in the Energy Magazine piping system that creates a physical barrier between the fluid within the piping system and the atmosphere, other physically separated cooling system, or non-wetted component including but not limited to piping, valves, pipe fittings, hoses, cold plates, heat exchangers, etc. [Definition]" | |
| 032 | 6/19/20 | RFP, Section L | Page 154, 2.4.2.1.4 | Will the government consider removing the verification cross reference matrix/table from the page count. This matrix/table will take up several pages but does not add additional information about the offer to the technical volume. | Solicitation N0002420R4112 Section L paragraphs 2.2.4 and 2.4.2.1.4 have been modified to clarify the requirement. | |
| 033 | 6/19/20 | RFP, Section L | Page 154, 2.4.2.1.4 | Will the Government be identifying what it considers "performance requirements" for the development of a verification cross reference matrix/table or is it the intention that the offerer will extract what they deem "performance requirements" from the Section J Attachments. | Solicitation N0002420R4112 Section J Attachments B through H include Navy approved Technical Performance Specifications which will be used to evaluate proposed design and eventually verify performance of designed and built hardware. Solicitation N0002420R4112 Section L paragraph 2.4.2.1.4 has been modified to clarify the requirement. | |
| 034 | 6/19/20 | RFP, Section C | Page 14, 0.3.2.1 | An FRD document is referenced as Government Furnished but no specific FRD was included in the data package. While several attachments are tagged with FRD numbers, was it the intent of the Government to provide a separate FRD or have the offerer create their own? Will the Government provide an electronics database of requirements? | No. The Government furnished Energy Magazine Functional Requirements Document (FRD) is a Microsoft Excel depiction of the language fully contained within Solicitation N0002420R4112 Section J Attachments B through H and will be provided as Government Furnished Information post contract award to avoid any ambiguity on the requirements. All FRD references made in the solicitation N0002420R4112 Section J Attachments B through H documents are word for word identical to what is written in the RFP. | |
| 035 | 6/19/20 | RFP, Section L | Page 155, 2.4.2.1.6.1 | "The Government will not consider any technical solutions for which the following subsystems are TRL 5 or lower: Power Electronics at the component level...". To help "normalize" our TRL assessment, does the Government consider >6kV SiC TRL 6 or higher? If not, how does the Government reconcile the stated goal (Section 0.2, pg 12) to incorporate "wide band-gap power electronics devices (such as Silicon-Carbide (SiC), greater than 6KV rating) into the power conversion equipment" against the TRL requirement in 2.4.2.1.6.1? | Solicitation N0002420R4112 Section C paragraph 0.1 contains program goals and not explicit requirements. The assessment of technology maturity is the responsibility of the Contractor to correctly identify and provide an accurate TRL for each major energy magazine subsystem. | |
| 036 | 6/19/20 | RFP, Section C | Page 26, 1.1.4; Page 37, 1.3.1.1 | The Government is requesting a number of battery assets necessary to complete S9310-AQ-SAF-010 and SG270-BV-SAF-010 testing. Can this list of required test assets be reduced depending on the level of qualification previously achieved, under this same qualification criteria? | No. Any presumed exemption from providing these test assets may assume a level of qualification that may not be verifiable as part of the offer. | |
| 037 | 6/19/20 | RFP, Section C | Page 28, 1.2.1 | "If insulating material is being considered to reduce the creepage and clearance distance...material...process...shall be submitted to the Government as a Request for Variance for approval by the Government". All insulating material by definition is to reduce creepage and clearance, even on commercial wire. Can the Government better define where approval for insulating material is required? | Solicitation N0002420R4112 Section C paragraph 1.2.1 requirement is applicable to the Offeror's designed/selected/installed insulation systems between conductive parts at different electrical potentials or between an energized part and ground to comply with the solicitation N0002420R4112 Section J Attachment B paragraph 3.3.1.4 and not pre-insulated components (wire, transformer windings, laminated busbar, etc.) that are procured by the Offeror which meet all applicable requirements contained in solicitation N0002420R4112 Section J Attachment B. Any location in the Energy Magazine system that is not in compliance with the requirements of solicitation N0002420R4112 Section J Attachment B paragraph3.3.1.4 would require Navy approval through the Request for Variance process. | |
| 038 | 6/19/20 | RFP, Section C | Page 35, 1.2.1.6 | Modeling and analysis activity as part of the Preliminary and Detailed Design Reports shall include "...e. EMI radiation and susceptibility". The effort involved to produce a model to predict EMI radiation and susceptibility would seem excessive, and its validity questionable. Was the intention to provide a model that predicted conducted emissions and conducted susceptibility? | Solicitation N0002420R4112 Section C paragraph 1.2.1.6 requires the Offerors to include documentation of EMI analysis activity and identify any tools used in the analysis of Energy Magazine conducted EMI and EMI susceptibility. | |
| 039 | 6/19/20 | RFP, Section C | Page 35, 1.2.1.6 | A switching model with fixed time step of 2.5us and can only contain 30 switches is not going to be a full model and will not faithfully reproduce the switching behavior. Would suggest the Government accept across the board the delivery of only average models, rather than requiring a written request and approval during the contract period and/or remove or adjust the limitations on the switching model. We would recommend a time step of no less than 0.5us and switch count limitations removed to allow the appropriate representation of the system. | The requirements as contained in Solicitation N0002420R4112 Section C paragraph 1.2.1.6 remain unchanged. | |
| 040 | 6/19/20 | RFP, Section C | Page 36, 1.2.1.6.1 | Does the GFI regarding detailed analysis methodology around CM include the testing called out in 1.2.1.6.1? It is unclear what the Government's expectation is for DM and CM characterization and if special test facilities and/or equipment will be required. Can the Government further define the effort involved in characterizing DM and CM? | The methods of analysis required by solicitation N0002420R4112 Section C paragraph 1.2.1.6 can be found in articles entitled "Common-Mode Equivalent circuits for Analysis of Grounding Methods in Naval Power Systems" by Brovont and Pekarek (NEJ No. 126-4, Dec 2014) and "Equivalent Circuits for Common-Mode Analysis of Naval Power System" by Brovont and Pekarek, IEEE 978-1-4799-1857-7/15. | |
| 041 | 6/19/20 | RFP, Section C | Page 36, 1.2.1.6.1 | Should we assume that the detailed switching coupled CM and DM model has the same switching model restrictions stated previously (2.5us and max of 30 switches). It is believed these restrictions will not result in a satisfactory model. We recommend a time step of no less than 0.5us (depending on frequency range of interests) and no switch count limitations to allow for an appropriate representation of the system. | See response for question #039. | |
| 042 | 6/19/20 | RFP, Section C | Page 38, 1.3.1.2 | CHIL must be tested prior to PDR. Contractor shall supply the controller HW and SW for CHIL testing. Release for SW coding is an output of CDR. According to the Government's schedule and development approach, how can controller HW and SW be available for CHIL prior to PDR? Can the Government further define the pedigree of HW and SW required for CHIL to appropriately define the expectation for such items delivered within the first several months of the program? | Solicitation N0002420R4112 Section C paragraph 1.3.1.2 has been modified to clarify the requirement. | |
| 043 | 6/19/20 | RFP, Section C | Page 41, 1.4 | 1.4 states "EM shall be tested to its full power level under load". Does this mean that all aspects must be under full power simultaneously putting out 3.2MW to 3 separate loads? Or can each part of the system be tested to full power but not simultaneously? Considerations could be module full power, groups of modules, cabinets, or by function/load. | Solicitation N0002420R4112 Section J Attachment C paragraph 3.2.5 provides the required operating durations and lineups for the baseline output converter configurations. | |
| 044 | 6/19/20 | Sec J Att B | Page 34, 3.3.12.3 | [EM_FRD-262] appears incomplete, "COTS or NDI hardware, operating systems, and middleware shall be utilized unless..." | Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.12.3 has been modified to remove the word "unless". | |
| 045 | 6/19/20 | Is pre-planning, contracting, and scheduling facilities for EQT considered to be part of CLIN0001 as the 3 month AOE for CLIN0003 does not seem sufficient without the pre-planning period. | Solicitation N0002420R4112 Section F - Deliveries or Performance provides the delivery date for the CLIN 0003 and has been changed to reflect 6 months after option exercise. | |||
| 046 | 6/19/20 | RFP, Section C | Page 47, CLIN 0003, 3.1 | It is unclear if the variants need to be put through EQT vs just the baseline. "shall conduct environmental qualification testing on the Energy Magazine and all associated components and auxiliaries...". If it is all 3 input variants it is unlikely this activity could be completed in the 3 month POP. Not withstanding issues noted in question 14. | Solicitation N0002420R4112 Section C paragraph 3.1 has been modified to clarify the requirement. EQT shall be satisfied by direct testing or by extension for prior testing of same/similar items. | |
| 047 | 6/19/20 | Sec J Att K, DD254 | Section J Attachment K N0002420R4112 DD254 3-26-20.pdf (DD 254, DoD Contract Security Classification Specification) appears to be an empty file. | The Offeror should verify their version of Adobe Acrobat or PDF reader software is working properly. Contact contract specialist if still issue. | ||
| 048 | 6/19/20 | Given the developmental nature of the CLIN0001 it would seem appropriate for the Government to specify CLIN0006 as a ROM at this stage of the program. Will the Government consider changing CLIN0006 to a ROM for this proposal? | No. | |||
| 049 | 6/19/20 | Section J Att B, Att D, E & F | Page 16, Figure 2, Figure A1 in Att D, E, F | In Section J, Attachment B, Figure 2, the first Energy Magazine building block shows an "AC/AC Line Frequency" block. This block in current shipboard systems would imply a 60 Hz transformer. That same block appears in Section J, Attachments D, E, and F in Figure A1. Additionally, Figure A2 clearly identifies an AC/AC isolated converter followed by an AC/DC isolated converter (assuming the dotted line represents isolation). Is it the intention of the Government to specify the use of 60 Hz transformers, or are those not permitted in any baseline or variant systems? If the Government was not trying to specify a line frequency transformer the block should be represented by one block; an AC/DC isolated converter stage. This seems to conflict with the statement on page 29 of the RFP "All necessary functionality of the baseline and variant inputs/outputs shall be accomplished by higher frequency transformers contained within the Energy Magazine specified volume." | The figures contained in these references contain functionality that may be required depending on the application. The Solicitation N0002420R4112 Section C reference to higher frequency transformer has been removed in A002. | |
| 050 | 6/19/20 | Section J Att G | Page 11, 2.2.2 | "The ESC will be required to provide a 2 cu ft (i.e., 2 ft. x 2 ft. x 6 in.) of volume within its IP54 boundary to house assets associated with the distributed EM Control System." This space reservation does not seem necessary since the procurement is calling for an integrated energy magazine which will already include the complete control system. | Solicitation N0002420R4112 Section J Attachment G paragraph 2.2.2 has been modified to remove the requirement. | |
| 051 | 6/19/20 | Section J Att B | Page 49, 3.3.17.85 | How long does the EM need to run without external coolant flow, and how much power does it need to deliver during this time (Dark Ship Start)? | Solicitation N0002420R4112 Section J Attachment H paragraph 6.3.2. describes the intent for cooling to be provided by a small external coolant system pump provided by the Navy. That coolant system pump will provide cooling upon completion of Energy Magazine ramping up voltage to its connected ship service bus. | |
| 052 | 6/19/20 | Section J Att B | Page 38, 3.3.14.14 | "...operating temperature range (i.e., 32°F to 122°F) after having been exposed to the non-operating temperature range (i.e., 40°F to 167°F)." Is it intended for the minimum non-operating ambient temperature to be higher than the minimum operating ambient temperature? Is the 40 degrees intended to be -40? | Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.14.14 has been modified to correct the temperature range. | |
| 053 | 6/19/20 | Section J Att B | Page 56, 3.4.1.2.11.1 | "3.4.1.2.11.1 The EM shall receive a hardwired switchboard high temperature alarm signal when the switchboard internal temperature exceeds approximately 60 degrees C (140 degrees F). [EM_FRD-575]" | ||
| What action, if any, is the EM required to take in response to this switchboard over temperature signal? | The received hardwired signal described in Solicitation N0002420R4112 Section J Attachement B paragraph 3.4.1.2.11 shall to be passed on to the ship's control system for action. | |||||
| 054 | 6/19/20 | Section J Att B | Page 57, 3.4.2.1.1 | "3.4.2.1.1 The EM LVDC (375V, Type I) Galvanically Isolated PCC efficiency, exclusive of the energy storage media, shall be greater than or equal to 92% at full power rating when supporting the load. [EM_FRD-585]" | ||
| This requirement seems to apply to the converter interfacing from the unregulated battery bus to the 375V load, but is written as if it is referencing the entire PCC. | The efficiency noted in Solicitation N0002420R4112 Section J Attachment B paragraph 3.4.2.1.1 is specific the single stage power converter described in paragraph 3.4.2.1. Similar requirements are included in the requirements for each Power Converter class defined in Solicitation N0002420R4112 Section J Attachment B. | |||||
| 055 | 6/19/20 | Section J Att B | Page 60, 3.4.2.2.7 | "The EM shall transition from ONLINE to POWER AVAILABLE, in response to the hardwired discrete Remove Voltage Immediately (RVI) signal from the output load controller that indicates that the output load requires removal of voltage from its input terminals. [EM_FRD-828]" | ||
| This requirement is not consistent with the concept of operations in Attachment H. It seems that only the output asserting the RVI signal should be shut down but the rest of the EM should continue to provide power to all other loads. | Solicitation N0002420R4112 Section J Attachment B paragraph 3.4.2.2.7 defines the Remove Voltage Immediately (RVI) signal for Power Converter defined in Para 3.4.2.2, a similar RVI and RVI response for each output power converter in paragraph 3.4 and as stated in Solicitation N0002420R4112 Section J Attachment H (IOCD), the output converters shall only respond to its associated RVI signal. The Government does not see the identified sections as conflicting. | |||||
| 056 | 6/19/20 | Section J Att B | Page 56, 3.4.1.2.7.1 | "3.4.1.2.7.1 The operator shall not be allowed to close the breakers (by local nor remote operation) upon loss of this permissive. [EM_FRD-568]" | ||
| The shall statement seems to apply to the GFE switchboard rather than to the EM. | Solicitation N0002420R4112 Section J Attachment B paragraph 3.4.1.2.7 requires the Energy Magazine to provide a permissive signal to the switchboard breaker. Paragraph 3.4.1.2.7.1 provides clarification to how the permissive signal is intended to be used shipboard. The para. was provided for information purposes only. | |||||
| 057 | 6/19/20 | Section J Att B | Page 29, 3.3.5.17.1 | "3.3.5.17.1 Cable conductors shall have two inches of slack inside the EM. [EM_FRD-182]" | ||
| Large gauge MIL-C-24643 (3.3.5.21) are too stiff to accommodate any slack within the cabinet | The slack required in Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.5.17.1 originates as a requirement in MIL-STD-2003-1A and is carried into the Attachment B. The requirements as contained in Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.5.17.1 remain unchanged. | |||||
| 058 | 6/19/20 | Section B Note C | Page 7, Note C | "Additional priced SLINs may be added to Section B at time of option exercise to allow the use of multiple funding sources for the shipsets." Does the government intend to use RTD&E funding for procurement of LRIP unit(s) or will funding designated/obligated in OPN and/or SCN be used? | The funding to be used is at the sole discretion of the Government in accordance with appropriation law, and has no bearing on the work done by the Offeror nor their pricing. | |
| 059 | 6/19/20 | Is the 19month POP for CLIN0006 for delivery of the first LRIP unit? | Yes. | |||
| 060 | 6/19/20 | Due to the level of support data needed for proposal, will PMS 320 provide an extension of 60 days to the RFP due date? | Solicitation N0002420R4112 Section L paragraph 2.1.1 has been modified. | |||
| 061 | 6/19/20 | Section J Att C | 3.2.1.1.1 | Are these referenced documents provided during the proposal phase. |
| "Software Interface Design Document for the Data Interface Unit Computer Software Configuration Item" document number 63A170065 and "Software Interface Design Document for the Universal Control Console Computer Software Configuration Item" document number 63A170069 | These documents will be provided as Government Furnished Information post contract award. | ||
| 062 | 6/24/20 | Section J Attachment C | |
| (Acquisition Specification Sheet EM02BDGI-X020405/150/2200-01GI02GI04N) | Section 3.2.6.1 (page 9) | This section specifies a minimum deliverable energy of 150kW-hr prior to recharging. However, section 3.2.5.1.2 defines an application profile that requires more than 150kW-hr (~174kW-hr). |
| Clarification is requested that this larger energy number must be delivered prior to any recharging of the energy storage media. | Solicitation N0002420R4112 Section J Attachment C paragraph 3.2.6.1 defines a minimum stored energy that the Offeror is required to deliver. Solicitation N0002420R4112 Section J Attachment C paragraphs 3.2.5.1.1 and 3.2.5.1.2 define the profiles that the Energy Magazine shall support. The Offer shall propose a design to meet all specified requirements. The Government does not see the identified sections as conflicting. | ||
| 063 | 6/24/20 | Section J Attachment C | |
| (Acquisition Specification Sheet EM02BDGI-X020405/150/2200-01GI02GI04N) | Section 3.2.5.1.1 (page 9) | This section specifies an application profile involving the 375VDC, 650VDC, and 1000VDC outputs. However, the duration of the 1000VDC output is not specified. |
Is it intended that this output be supported continuously (similar to the 375VDC output) or for 4 minutes (similar to the 650VDC output) or for some other period?
If the intent is for this bus to be supported continuously, it could not be supported at full power as an output at the same time as the 375VDC output is being supported since the combined output power would be greater than the 1MW input power and the ESC energy storage is finite.
| If the intent is for this bus to be supported for 4 minutes, the combined energy draw on the battery would be greater than 150kW-hr (~168kW-hr). If this is the case, clarification is requested that this larger energy number must be delivered prior to any recharging of the energy storage media. | Solicitation N0002420R4112, Section J, Attachment C para. 3.2.6.1 defines a minimum stored energy that the bidder is required to deliver. Attachment C para. 3.2.5.1.1 and 3.2.5.1.2 define the profiles that the Energy Magazine shall support. The Offeror shall propose a design to meet all specified requirements. The 375VDC output shall operate continuously at full power and the 1kVDC and 650VDC output shall operate as defined for 4 minutes. | ||
| 064 | 6/24/20 | Section J Attachment C | |
| (Acquisition Specification Sheet EM02BDGI-X020405/150/2200-01GI02GI04N) | Section 3.2.5.1.1 (page 9) | Clarification is also requested that the application profile specified in 3.2.5.1.1 is intended to be full rated load on the 375VDC and 1000VDC outputs in addition to the specified full rated load on the 650VDC output. |
| Simultaneous full load on all three outputs can be achieved, but will drive energy storage sizing to achieve current needs | See response for question #063. | ||
| 065 | 6/24/20 | SOW | |
| (N00024-20-R-4112) | Section C - 1.3.1.2 (page 38) |
Section C - 1.4.1 (page 41) Section L - 2.4.2.2.2 (page 156) These sections collectively indicate that as part of this effort the contractor/offeror is to conduct HIL testing at a capable test site, develop a test plan including HIL, and shall detail HIL testing and qualification-- including proposed facilities and their capabilities.
| Clarification is requested if there are specific test sites intended, or will aspects of contractor scope HIL testing scope be redacted from the RFP? | Solicitation N0002420R4112 Section C paragraph 1.3.1.2 has been modified to clarify the requirement. | ||
| 066 | 6/24/20 | SOW | |
| (N00024-20-R-4112) | Section C - 1.4.1 (page 41) | ||
| Section C - 1.4.4 (page 43) | This section requires that the Test and Evaluation Plan (CDRL A044) identify vendor plans for an ESS program in accordance with MIL-HDBK-2164A. Additional ESS reference is included in Section 1.4.4 regarding an ESS test report. |
The second paragraph of MIL-HDBK-2164A Section 1.1 specifies that "This handbook cannot be cited as a requirement. If it is, the contractor does not have to comply."
| Clarification is requested to identify vendor ESS expectations. | Solicitation N0002420R4112 Section C paragraph 1.4.1 has been modified to clarify the requirement. | ||
| 067 | 6/24/20 | SOW | |
| (N00024-20-R-4112) | Section C - 3.1 (page 45) | This section identifies a requirement to conduct drip testing in accordance with MIL-STD-810H. |
MIL-STD-810H Laboratory Test Methods do not include a drip test. It does include various Degree of Enclosure tests including Rain, Sand and Dust, Immersion, etc. MIL-STD-108 specifies an actual drip test (if visual examination is insufficient) that utilizes the MIL-STD-810 rain chamber but identifies test conditions that differ from Method 506. Additionally, Section J Attachment B Paragraph 3.3.14.10 specifies "The EM enclosures shall meet the Ingress Protection (IP) rating of 54 in accordance with NEMA IEC 60529.E328" which contains separate degree of enclosure test requirements.
| Clarification of vendor Degree of Enclosure test requirements is requested. | MIL-STD-810H does include provisions for a drip test. The scope includes conduct of a drip test in accordance with MIL-STD-810H, and requires the cabinet have an Ingress protection rating of 54 in accordance with the NEMA standard. | ||
| 068 | 6/24/20 | SOW | |
| (N00024-20-R-4112) | Section C - 1.2.1 (page 27) | Regarding the "in-line spare" concept of operation, clarification is requested for the internet of n-1 redundancy. |
Does a single point failure, for any given interface, result in continued operation at less than 100% capacity?
Is there a minimum percentage threshold to meet graceful degradation?
| Would 0% be acceptable given the other interfaces of the EM remain functional? | Solicitation N0002420R4112 Section C paragraph 1.2.1 indicates the contractor shall "consider" an in-line spare, but does not require it. Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.12.22 states that if multiple LRUs are used to generate EM input or output interface, the EM interface shall be capable of continuing operation at reduced power when one or more LRU faults exist as long as a viable power path exists. If an Offeror's proposed design includes n-1 redundancy to meet reliability/availability/MTBF requirements, that n-1 hardware should be utilized to maintain a viable power path. 0% would be acceptable given solicitation N0002420R4112 Section J Attachment B paragraphs 3.3.6.9, 3.4.2.1.3, 3.4.3.1.3, 3.4.4.1.3, 3.4.5.1.1, 3.4.6.1.3, and 3.4.7.1.3 are maintained and all Energy Magazine interface parameters be maintained while meeting the specific interface parameters, including fault requirements. | ||
| 069 | 6/24/20 | Section J Attachment B | |
| (Technical Specification for Energy Magazine) | Section 3.3.14.19 (page 41) | EMI testing in accordance with MIL-STD-461 Rev G now requires RE102 and RS103 antenna placement in a sufficient number of positions such that the entire area of each EUT enclosure and the first 35 cm of cables and leads interfacing with the EUT enclosure are within the 3 dB beam width of the antenna. By comparison, MIL-STD-461F only requires antenna placement in positions to cover the entire width of each EUT enclosure. Thus, Rev G has expanded the testing scope to include all surface areas of vertical surfaces which significantly increases the testing costs of tall cabinets. |
| Clarification is requested of whether MIL-STD-461 Rev F antenna position requirements would be acceptable for RE102 and RS103 testing. | Solicitation N0002420R4112 Section J Attachment B paragraph 2.1 states the active revision of the referenced specifications at the time of contract award shall apply. | ||
| 070 | 6/24/20 | SOW | |
| (N00024-20-R-4112) | Section L - 2.4.2.5 (page 157) | ||
| Provision L-227-H002 (page 181) | Section L - 2.4.2.5 "The Offeror shall provide a draft System Engineering Management Plan (SEMP) that meets the system engineering requirements of Section C, paragraph 0.3.2 and CDRL A001. The Offeror shall submit an initial Software Development Plan (SDP) that addresses the software engineering requirements…” |
Provision L-227-H002 "The initial SDP shall not be subject to the technical proposal page limitation of the solicitation."
Is the draft System Engineering Management Plan (SEMP) subject to the technical proposal page limitation of the solicitation?
| Yes, the draft SEMP is subject to the page limit. | ||||||
| 071 | 6/29/20 | Section J Attachment B Technical Specification for Energy Magazine Rev 1.0 FINAL 3-16-2020 | Page 84; Para 3.4.9.1.23 | We understand that the step load of 2.2MW is driven by the system and utilization equipment. Is there some impedance or ramp rate that can be assumed at the EM interface? | Solicitation N0002420R4112 Attachments B, C, D, E, and F include requirements for 200MW/sec. This slew rate must be met while maintaining power quality requirements at the ships interface as defined in Solicitation N0002420R4112 Attachment B. | |
| 072 | 6/29/20 | Section J Attachment B Technical Specification for Energy Magazine Rev 1.0 FINAL 3-16-2020 | Page 36; Para 3.3.13.1 | Regarding 3.3.13.1 – [EM_FRD-296], Is this requirement only meant to define LRUs for maintenance purposes (it resides in the maintainability section), or is it meant to imply that the entire system could be constructed in such a manner? | Solicitation N0002420R4112 Section J Attachment B paragraph 3.3.13.1 applies to the entire system, including its components and subassemblies. | |
| 073 | 6/29/20 | Section J Attachment B Technical Specification for Energy Magazine Rev 1.0 FINAL 3-16-2020 | Page 7; 1. Scope; [EM_FRD-3] | Regarding [EM-FRD-3], is there any further definition of the frequency and regularity of these pulsating loads? | No. | |
| 074 | 6/29/20 | Section J Attachment C Acq Spec Sheet for EM02BDGI-X020405 Rev 1.0 3-20-20 Final | Page 9; 3.2.5.1.1.1 | We understand that the 4 minute requirement (3.2.5.1.1.1 – EM_SLANT_BUILD-23) to be the maximum power and energy expected from the EM. Will this be a common scenario? Will it be more common for the EM to see some lesser load more often? Are there any ‘mission profiles’ which would be more representative of the expected loads on the system? | All anticipated mission load usage is expected to not exceed the energy needed to meet the requirements defined in Solicitation N0002420R4112. There are no ‘mission profiles’ which would be more representative of the expected loads on the system. | |
| 075 | 6/29/20 | All | NA | Is there an overall weight requirement for each module (LRU) or for the entire assembly? Is there a weight density or floor loading requirement? | Solicitation N0002420R4112 does not provide an overall weight requirement for LRUs or the overall system nor is a weight density or floor loading provided. Solicitation N0002420R4112 Section M paragraph 2.1.2 does identify overall system size and weight as an evaluation criteria. | |
| 076 | 7/2/20 | Solicitation: N0002420R4112 | Section B, page 2/190 and 3/190 | RFP Section B, page 2/190, CLIN 0001, Energy Magazine First Unit (Completion), lists CLIN 0001 as contract type CPIF. Section B, page 3/190, CLIN 0003, EM Qualification Testing, is listed as FFP. First Article Development costs and Qualification Testing costs are typically highly interdependent. The scope, number of test iterations and resultant cost of the successor task, Qualification Testing, can vary significantly with changes to the first article. Offeror proposes that for the same reason CLIN 0001 is cost-reimbursable, so should CLIN 0003 be cost-reimbursable. Request change of CLIN 0003 from FFP to cost-reimbursable. | CLIN 0003 is for Environmental Qualification Testing. The requirements as contained in Solicitation N0002420R4112 remain unchanged. | |
| 077 | 7/2/20 | Solicitation: N0002420R4112 | Section B, page 4/190 | CLIN 0006 requests stepladder pricing for shipset quantities of one through five. To enable accurate pricing of this CLIN, please clarify what constitutes a shipset. | Solicitation N0002420R4112 Section C paragraph 6.1 defines a ship-set as "a single Energy Magazine that has two physically separate cabinets: the Power Conversion Cabinet (PCC) and the Energy Storage Cabinet (ESC) and any ancillary associated items as defined in CLIN 0001." | |
| 078 | 7/2/20 | Solicitation: N0002420R4112 | Pg. 150/190, 2.1.1 | The Energy Magazine RFP comes at a time when many companies have been operating with a remote workforce, or are only now ramping back to full strength. Considering the scope complexity of the Energy Magazine solution (e.g., power conversion, energy storage, external interfaces, multiple variants, etc.), and the large volume of cost/price and technical information (e.g., several “drafts”, “initial” and cross-references) required by the RFP, offeror requires more time to provide an effective response. We therefore request an extension of the proposal submittal due date to 9/11/2020. | Solicitation N0002420R4112 Section L paragraph 2.1.1 has been modified. | |
| 079 | 7/2/20 | Amendment 0001 to Solicitation: N0002420R4112 | Pg. 5-6, para. 2.2.3 | Amendment 0001 to the RFP, para. 2.2.3, Page Physical Limitations, on pages 5-6 of 25 specify that “Foldouts for the entire proposal are limited to a total of twenty (20) pages.” Please clarify, is the limitation 10 foldouts/20 pages, or 20 foldouts/40 pages? | Solicitation N0002420R4112 Section L paragraph 2.2.3 states the proposal is limited to a total of 20 pages being foldouts. Each foldout is counted a 2 pages. The proposal is therefore limited to a maximum of 10 foldouts, which would account for 20 pages toward the overall page limit. | |
| 080 | 7/2/20 | N0002420R4112 RFP, Section C | Paragraph 1.3.1.1 Energy Storage Media (if Battery-Based), page 37 | In consideration of saving program costs, should lithium ion based batteries be selected, and those battery cells/LRU modules have or will have been characterized/accepted by the Navy to portions of S9310/SG270 for facility or shipboard use, will all battery test assets cited in RFP paragraph 1.3.1.1 need to be submitted for qualification testing? Can the Navy provide a list of lithium ion battery system suppliers whose relevant, large-scale, battery systems that were contracted separately by the Navy, are acceptable for Navy test facility/shipboard use IAW NAVSEA S9310 requirements? | See response for question #036. No list exists. |