This document contains preliminary specifications for maintenance, repair, and modernization efforts for CVN-class aircraft carriers homeported in the Bremerton, Washington area. The specifications cover a range of work items including replacement of watertight doors and nonskid flooring, planning services, and sea trials. Key details include requirements for reservation of manhours and materials, surface preparation standards, material and equipment specifications, inspection requirements, and report deadlines. The Navy intends to solicit this work through request for proposal N00024-18-R-4300 with a anticipated award as a single, cost plus incentive fee and award fee contract over five years to the successful offeror.

Pre-Priced Specs

View the file

Other files

File Type Posted
Bidders'_Questions_Log_PNW_as_of_14_June_2018.pdf PDF
N00024-18-R-4300_Amendment_0008.pdf PDF
ATTACHMENT_J-6_DATED_6-13-18_R1.docx DOCX document
N00024-18-R-4300_Conformed_through_Amendment_0008.pdf PDF
ATTACHMENT_J-6_DATED_6-6-18.docx DOCX document
N00024-18-R-4300_Amendment_0007.pdf PDF
N00024-18-R-4300_Conformed_through_Amendment_0007.pdf PDF
ATTACHMENT_J-6_DATED_6-5-18,_Amd_0007.docx DOCX document
Attachment_S_1_Cost_Exhibits_L001_thru_L008_Amd_0007.xlsx XLSX spreadsheet
Attachment_S_5_Cost_Exhibits_L001_thru_L008_Amd_0007.xlsx XLSX spreadsheet
N00024-18-R-4300_Conformed_through_Amendment_0006.pdf PDF
N00024-18-R-4300_Amendment_0006.pdf PDF
N00024-18-R-4300_Conformed_through_Amendment_0005.pdf PDF
N00024-18-R-4300_Amendment_0005.pdf PDF
N00024-18-R-4300_Amendment_0003.pdf PDF
Attachment_S_5_Cost_Exhibits_L001_thru_L008_updated.xlsx XLSX spreadsheet
Attachment_S_1_Cost_Exhibits_L001_thru_L008_updated.xlsx XLSX spreadsheet
N00024-18-R-4300_Amendment_0004.pdf PDF
PNW_CVN_PSM_CDRL_Package_5-21-18_updated.pdf PDF
DD254_for_N00024-18-R-4300_signed.pdf PDF
Copy_of_Bidders'_Questions_Log_PNW_as_of_22_MAY_2018.pdf PDF
F3_Delivery_Redelivery_Schedule.docx DOCX document
N00024-18-R-4300_0002.pdf PDF
N00024-18-R-4300_0001.pdf PDF
DD254_for_N00024-18-R-4300_signed.pdf PDF
Exhibit_A,_B,_and_C_DRAFT_PNW_CVN_PSM_CDRL_Package_2-2-18.pdf PDF
J_Attachments.zip ZIP file
N00024-18-R-4300_RFP.pdf PDF
S_Attachments.zip ZIP file
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIMINARY SPECIFICATION

SHIP: CVN NOTIONAL (RMC 84) ITEM NO: 042-27-001

COAR: 16 PCN: None

CMP: NONE

PLANNER: VARNEY , ROBERT

SSP: OTHR-RMC84-19-CN01 1 of 3 ITEM NO: 042-27-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Accountability of Manhour and Material Reservation;

accomplish

1.2 Location of Work:

1.2.1 Not Applicable

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 None

3. REQUIREMENTS:

3.1 Accomplish the following, in addition to the specific requirements of the Job Order, for Work Items which identify reservation of manhours or material dollars.

3.2 Identify task/discrepancies and initiate an estimate of manhours and material dollars on Reservation Task Request/Control Form (Attachment A) for each discrepancy or task identified to be accomplished under a reservation item or reservation paragraph, entering the date and estimate of labor and material, and deliver the estimate to the SUPERVISOR.

3.2.1 Reservation taskings shall not be used to accomplish work outside the scope of the specific Work Item identifying a reservation work paragraph.

3.3 The SUPERVISOR shall review the estimate submitted and if in agreement, shall sign the "RMC/NSA Authorization Agreement to Quote" blank, authorizing the work at the manhour and material dollars quoted.

The contractor shall then sign the "Contractor Obligation/Agreement to Quote" blank and enter the estimated start date. The RMC/NSA contracts representative shall initial the form in the blank provided.

3.3.1 If there is a difference of opinion in the estimate provided by the contractor and RMC/NSA, the manhours and material dollars shall be negotiated immediately to resolve the difference. The negotiated manhour and material dollars shall then be entered in the provided "Revised Estimate" blocks with the required signatures as indicated in 3.3.

3.4 The Contractor shall enter the work completion date, sign and date the control form, and submit to the SUPERVISOR within two (2) days after completion of the tasking authorized.

Report: Weekly Manhour and Material Reservation Date: + 0

3.5 Submit one legible copy, in approved transferrable media, of a weekly report listing all Work Items with manhour and material

SHIP: CVN NOTIONAL (RMC 84)

SSP: OTHR-RMC84-19-CN01 2 of 3 ITEM NO: 042-27-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

reservation paragraphs identified to the SUPERVISOR.

3.5.1 The report shall contain the following; Work Item number, reservation control form serial number, reservation paragraph number, total original manhours and material dollars allocated in each paragraph, the manhour and material dollars negotiated for each authorized tasking, and the remaining balances of manhour and material dollars.

Report: Weekly Report - Final Date: + 5

3.6 Submit one legible copy, in approved transferrable media, of a final report no later than five days after completion of the availability to the SUPERVISOR.

3.6.1 The report shall contain the same information specified in 3.5.1.

3.7 The reservation manhours and material dollar requirements listed in the individual Work Items are a part of this contract under the original solicitation and award. Therefore they are subject to the provisions, terms, conditions and clauses of this contract job order.

3.7.1 The manhour reservation shall include both prime contractor and sub contractor efforts.

3.8 The balance of hours remaining in the reservation items after negotiations have concluded, and it is evident that no additional work will be tasked, is subject to a decrease change order.

3.9 Only production manhours expended will be considered towards the contractors obligation to provide the defined reservation manhour effort.

While supervision, quality assurance, and other nonproductive labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractors obligation to provide reserved manhours. The production manhour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual Work Item.

3.10 Material dollars shall be based on actual costs to the Contractor of acquiring the materials provided. Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G and A), or profit into the actual cost of materials expended toward the reservation.

4. NOTES:

4.1 The information received in the consolidated final report of 3.6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all reservation Work Items.

4.2 The reservations listed in the individual Work Items are not to be considered Time and Material or a Level of Effort. Once the scope of work for a task has been listed and a mutually agreeable number of manhours or materials has been agreed to, neither party will be entitled

SSP: OTHR-RMC84-19-CN01 3 of 3 ITEM NO: 042-27-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

to an adjustment based on actual manhours or material dollars required.

4.3 Each task shall not exceed 25 mandays without approval of the Project Manager.

4.4 The SUPERVISOR will serialize each reservation control form.

4.5 A tracking log is provided as Attachment B.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: CVN NOTIONAL (RMC 84) ITEM NO: 167-11-005

COAR: 16 PCN: None

CMP: NONE

PLANNER: VARNEY , ROBERT

SSP: OTHR-RMC84-19-CN01 1 of 2 ITEM NO: 167-11-005

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Quick Acting Watertight Door 01-44-4; replace

1.2 Location of Work:

1.2.1 RAM Launcher Eqpt Room (01-39-4-C)

1.2.2 RAM Launcher Strm & Wkshop (01-44-4-A)

1.3 Identification:

1.3.1 Quantity (One EA), Quick Acting Watertight Door, (01-44-4), Non-ballistic, 26 Inch by 66 Inch, 8 Dogs, Right Hand, Interior, Low Hinge, 10 PSI, Assy. 20-C of 2.3, APL: 312090090

1.3.2 Quantity (One EA), Quick Acting Airtight Door, (01-44-4), Non-ballistic, 26 Inch by 66 Inch, 3 Dogs, Right Hand, Interior, Low Type Hinge, 2 PSI, Outside Hasp, Assy. 445 of 2.3

2. REFERENCES:

2.1 Standard Items

2.2 S9086-UF-STM-010/CH600V1, Structural Closures

2.3 116-6035254 Rev A, USS Nimitz CVN 68 Structural Mods CIWS Sponson Fr 32-46 Port

2.4 S9AA0-AB-GOS-010/GSO, General Specifications for Overhaul of Surface Ships

3. REQUIREMENTS:

3.1 Remove existing equipment listed in 1.3.1 and install new equipment listed in 1.3.2, located in 1.2, in accordance with paragraph 600-2.2.4 of 2.2, using 2.3 and 2.4 for guidance.

3.1.1 Notify the SUPERVISOR, Damage Control Assistant, and Ship's Safety Officer prior to removal in 3.1.

3.1.2 Chip and grind surfaces flush in way of repairs.

3.1.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

3.1.4 Template exact size, configuration, and location from existing shipboard conditions.

(V)(G) "POST INSTALLATION - STRAIGHTNESS TEST"

3.2 Accomplish the requirements of paragraph 600-2.2.2.2.4.1 of 2.2.

Acceptance Criteria: Maximum acceptable variation for knife-edge is plus or minus 1/16 inch and maximum acceptable warpage of the door frame is 1/8 inch.

3.3 Accomplish the requirements of 009-25 of 2.1 for a chalk test of the

SSP: OTHR-RMC84-19-CN01 2 of 2 ITEM NO: 167-11-005

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

structural closure replaced in 3.1.

3.4 Accomplish the requirements of 009-25 of 2.1 for a air hose test of the new bulkhead weld and equipment installed in 3.1. Allowable leakage:

None.

(V)(G) "OPERATIONAL TEST"

3.5 Accomplish an operational test of the equipment installed in 3.1, in accordance with Paragraph 624j of 2.4. Fully open and close through one complete cycle to ensure proper operation. Allowable binding and sticking: None.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

3.7 Accomplish the requirements of paragraphs 602g and 602j of 2.4 for manufacture and installation of closure label plates and markings.

Obtain closure classification information from Ship's Damage Control Book.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: CVN NOTIONAL (RMC 84) ITEM NO: 634-21-001

COAR: 16 PCN: None

CMP: NONE

PLANNER: VARNEY , ROBERT

SSP: OTHR-RMC84-19-CN01 1 of 2 ITEM NO: 634-21-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hangar Bay No. 3 Non-Skid; replace

1.2 Location of Work:

1.2.1 Hangar Bay No. 3 (1-179-0-Q)

1.2.2 Aircraft Elevator No. 3, Well and Approach

1.2.3 Aircraft Elevator No. 4, Well and Approach

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 600-5941755 Rev H, Aircraft Carrier CVAN 68 Aircraft Securing Fittings Arr Mn Dk

2.3 510-6600937 Rev D, Aircraft Carrier CVA(N) 68 Diagram Weather Drains Main Deck

3. REQUIREMENTS:

3.1 Prepare a sketch showing the existing nonskid locations and markings for each location listed in 1.2.

(V)(G) "VISUAL INSPECTION"

3.2 Accomplish a joint inspection with the SUPERVISOR, Ship’s Force, and TYCOM Representative to review and clarify an agreed upon number of aircraft securing fittings in the deck. Inspection shall be performed no less than 3 working days prior to start of contractor equipment load aboard.

3.2.1 Submit a detailed diagram in approved transferrable media showing the agreed upon number, no less than 3 working days prior to the start of preservation processes.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 13, Columns A, B, C and E, for up to 21,000 square feet located in 1.2.1, using 2.2 and 2.3 for guidance.

3.3.1 Prepare surface to the requirements of NACE/SSPC-SP WJ-2/L condition.

3.3.2 Use Interbond 998 when International Nonskid system is

selected.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 5, Columns A, B, C and E, for up to 1,200 square feet located in 1.2.2, using 2.2 and 2.3 for guidance.

3.4.1 Prepare surfaces to Near White Metal Blast NACE 2/SSPC-SP-10

SSP: OTHR-RMC84-19-CN01 2 of 2 ITEM NO: 634-21-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

condition.

3.4.2 Apply Randolph Randogrip Navy G Type V nonskid.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 5, Columns A, B, C and E, for up to 1,200 square feet located in 1.2.3, using 2.2 and 2.3 for guidance.

3.5.1 Prepare surfaces to Near White Metal Blast NACE 2/SSPC-SP-10 condition.

3.5.2 Apply Randolph Randogrip Navy G Type V nonskid.

3.6 Apply new markings using the sketch prepared in 3.1.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Equipment and tanks utilized must comply with Work Specification 992-10-001, paragraph 3.4.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: CVN NOTIONAL (RMC 84) ITEM NO: 634-21-002

COAR: 16 PCN: None

CMP: NONE

PLANNER: VARNEY , ROBERT

SSP: OTHR-RMC84-19-CN01 1 of 2 ITEM NO: 634-21-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Flight Deck Nonskid; replace

1.2 Location of Work:

1.2.1 Flight Deck, Wire Slap Box Area, Frames 165-220

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 Visual Landing Aids General Service Bulletin No. 8, Rev S

2.3 345-4325573 Rev N, Visual Landing Aids (VLA) Flight Deck Lighting Locations

2.4 600-2649460 Rev K, Aircraft Securing Fittings Arrgt Flt Dk Port

2.5 600-2649461 Rev M, Aircraft Securing Fittings Arrgt Flt Dk Stbd

2.6 510-2647498 Rev S, Aircraft Carrier CVA(N)68 Diagram Weather Drains Gallery Deck

2.7 510-2647497 Rev P, Aircraft Carrier CVA(N)68 Diagram Weather Drains Flight Deck

2.8 Systems and Specifications, SSPC Painting Manual, Volume 2

3. REQUIREMENTS:

3.1 Prepare a sketch showing the existing nonskid locations and markings for each location listed in 1.2.

(V)(G) "VISUAL INSPECTION"

3.2 Conduct a joint inspection with the SUPERVISOR, Ship’s Force, and TYCOM Representative to review and clarify the tie in areas of new and old preservation areas including an agreed upon number of aircraft securing fittings and washdown countermeasure spray heads in the deck.

Inspection shall be performed no less than 7 working days prior to start of contractor equipment load aboard.

3.2.1 Submit a detailed diagram in electronic format showing the clarified tie in areas no less than 5 working days prior to the start of preservation processes.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 19, Columns A, B, and E for 22,800 square feet, including impact pad areas, at the location listed in 1.2.1, using 2.2 through 2.8 for guidance.

3.3.1 Prepare surface by waterjetting in accordance with the

SSP: OTHR-RMC84-19-CN01 2 of 2 ITEM NO: 634-21-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

requirements of NACE 5/SSPC-SP-12 condition WJ-2/L of 2.8

3.3.2 Install Interbond 998 primer.

3.4 Re-establish surface profile for up to 2,000 square feet in the locations listed in 1.2, as approved by the SUPERVISOR.

3.5 Apply new VLA markings in accordance with NAWC Marking and Lighting VLA and Aircraft Operating Clearances Drawing provided by NAVAIR and using the sketch prepared in 3.1 for any markings not covered by NAVAIR.

3.5.1 Contact the local CAFSU via the SUPERVISOR for the current NAWC Marking and Lighting VLA Operating Clearances Drawing when required by this work item.

(I)(G) "VISUAL INSPECTION OF VLA MARKINGS"

3.5.2 Accomplish a joint visual inspection with the SUPERVISOR, Ship's Force, and CAFSU, of the VLA markings. Lay out and verify markings prior to application of color toppings.

3.5.2.1 Contact the local CAFSU via the SUPERVISOR for

verification of VLA markings prior to application of color topping.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Equipment and Tanks utilized must comply with paragraph 3.4.1 of Work Specification 992-10-001.

4.2 Ship’s Force will be responsible for removal and reinstallation of impact pads.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: CVN NOTIONAL (RMC 84) ITEM NO: 634-21-003

COAR: 16 PCN: None

CMP: NONE

PLANNER: VARNEY , ROBERT

SSP: OTHR-RMC84-19-CN01 1 of 2 ITEM NO: 634-21-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Flight Deck Landing Area Nonskid; replace

1.2 Location of Work:

1.2.1 Flight Deck, Frame 45 to Frame 115, Starboard Foul Line to Port Deck Edge

1.2.2 Flight Deck, Frame 215 to Frame 262, Starboard Foul Line to Port Deck Edge

1.2.3 Flight Deck, Frame 110 to Frame 220, 6 Inches Outside

Starboard Foul Line to 6 Inches Outside Port Foul Line

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 Visual Landing Aids General Service Bulletin No. 8, Rev S

2.3 345-4325573 Rev N, Aircraft Carrier CVAN68 VLA Flight Deck Lighting Locations

2.4 600-2649460 Rev K, Aircraft Carrier CVAN 68 Acft Securing Fittings Arrg Flt Dk Port

2.5 600-2649461 Rev M, Aircraft Carrier CVAN 68 Aircraft Securing Fittings Arrgt. Flt. Dk. Stbd.

2.6 510-2647498 Rev S, Carrier CVA(N)68 Diagram Weather Drains Gallery Deck

2.7 510-2647497 Rev P, Aircraft Carrier CVA(N)68 Diagram Weather Drains Flight Deck

3. REQUIREMENTS:

3.1 Prepare a sketch showing the existing nonskid locations and markings for each location listed in 1.2.

(V)(G) "VISUAL INSPECTION"

3.2 Conduct a joint inspection with the SUPERVISOR, Ship’s Force, and TYCOM Representative to review and clarify the tie in areas of new and old preservation areas including an agreed upon number of aircraft securing fittings and washdown countermeasure spray heads in the deck.

Inspection shall be performed no less than 3 days prior to start of contractor equipment load aboard.

3.2.1 Submit a detailed diagram in electronic format showing the clarified tie in areas no less than 5 working days prior to the start of preservation processes.

SSP: OTHR-RMC84-19-CN01 2 of 2 ITEM NO: 634-21-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 19, Columns A, B, and E for 40,919 square feet located in 1.2.1 and 1.2.3, using 2.2 through 2.7, and Attachment A, for guidance.

3.3.1 Prepare surface to the requirements of NACE 2/SSPC-SP-10 condition.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 19, Columns A, B, and E, for 45,874 square feet located in 1.2.3, using 2.2 through 2.4, and Attachment A, for guidance.

3.4.1 Prepare surface to the requirements of NACE 2/SSPC-SP-10 condition.

3.5 Use Interbond 998 when International Nonskid system is selected.

3.6 Apply new VLA markings in accordance with NAWC Marking and Lighting VLA and Aircraft Operating Clearances Drawing provided by NAVAIR and using the sketch prepared in 3.1 for any markings not covered by NAVAIR.

3.6.1 Contact the local CAFSU via the SUPERVISOR for the current NAWC Marking and Lighting VLA Operating Clearances Drawing when required by this work item.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Diagram of nonskid replacement area provided as Attachment A.

4.2 Equipment and tanks utilized must comply with paragraph 3.3.1 of Work Specification 992-10-001.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: CVN NOTIONAL (RMC 84) ITEM NO: 813-11-001

COAR: 16 PCN: None

CMP: NONE

PLANNER: VARNEY , ROBERT

SSP: OTHR-RMC84-19-CN01 1 of 2 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Advance Planning for Repairs and Alterations; provide

1.2 Location of Work:

1.2.1 Bremerton Naval Complex (BNC)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 099-60NW, Schedule and Associated Reports for Aircraft Carrier (CVN) Availabilities at Puget Sound Naval Shipyard Over 9 Weeks in Duration;

provide and manage

3. REQUIREMENTS:

3.1 Provide planning and estimating services in support of authorized repairs and alterations.

3.1.1 Provide Rough Order of Magnitude (ROM) estimates (+/- 40%) for all work authorized on Task Memo within 10 business days of receipt of Task Memo from SUPERVISOR.

3.1.2 Participate in planning meetings and conferences, to include Naval Supervisory Authority (NSA) project team and execution planning meetings, as directed by the SUPERVISOR.

3.1.2.1 Provide a Project Manager, authorized to represent the company to make decisions, as the principal point of contact between the SUPERVISOR and the Contractor.

3.1.3 Accomplish work specification and reference review in support of advance planning effort.

3.1.4 Perform joint (Government & Contractor) work scoping ship check of authorized work.

3.1.5 Provide document control and reproduction services for

planning and work specification reference documents.

3.1.6 Develop Material Requirement List (MRL) for each work

specification and provide with detailed cost proposal.

3.1.7 Identify, submit authorization request and procure authorized Long Lead Time Material (LLTM) related to work specification requirements.

3.1.8 Identify trade skill and other manning requirements.

3.1.9 Request authorization and accomplish repair and alteration prefabrication to meet availability completion dates.

Report: PRELIMINARY PRODUCTION SCHEDULE Date: + 0

SSP: OTHR-RMC84-19-CN01 2 of 2 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.1.10 Prepare and submit one legible copy, in hard copy or approved transferrable media, of a preliminary production schedule for the basic work package to the SUPERVISOR beginning at A-5 and monthly thereafter.

3.1.10.1 Develop and prepare preliminary production schedule for all authorized work in accordance with 2.1.

3.1.11 Prepare and submit detailed cost proposal to the SUPERVISOR, when requested.

3.2 Participate in work integration and coordination meetings to include NSA project team, tank, facilities, CHT, and firemain meetings to coordinate work with other maintenance activities.

3.2.1 Provide a Project Manager, authorized to represent the company to make decisions, as the principal point of contact between the SUPERVISOR and the Contractor.

3.3 Chair and conduct a weekly planning status meeting to discuss status of contractor efforts in accomplishing advance planning requirements.

3.4 Participate in the Non-Shipyard Contractor Work Job Summary Review Process for all authorized work in accordance with Attachment A.

3.5 Accomplish Risk Identification, Analysis, and Management and participate in NSA related meetings for all authorized work.

3.5.1 Identify, Analyze, Develop Response, Monitor & Control

identified risks associated with work specification requirements.

3.5.2 Document risk on NSA forms provided (Risk Grid & Information Sheet) and present at weekly scheduled risk meetings.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: CVN NOTIONAL (RMC 84) ITEM NO: 982-32-001

COAR: 16 PCN: None

SWT FILE NO: 982-010 CMP: NONE

REVISED: 08 Oct 2016 PLANNER: VARNEY , ROBERT

SSP: OTHR-RMC84-19-CN01 1 of 2 ITEM NO: 982-32-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Sea Trial; accomplish

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 None.

3. REQUIREMENTS:

3.1 Schedule and conduct a joint conference (Contractor, Ship's Force, and the SUPERVISOR), and prepare a sea trial test agenda listing tests and final adjustment for equipment and systems installed or repaired by the contractor in accordance with the job order. The agenda shall include as a minimum: sequence of events, tests to be accomplished, and data to be recorded.

Report: Agenda Date: + 0

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of agenda to the SUPERVISOR for review five days prior to scheduled sea trial.

3.2 Remove debris, tools, equipment, and rigging material not required for tests prior to sea trial.

3.3 Provide qualified mechanics and manufacturer's representatives and accomplish a 24-hour sea trial in accordance with the approved test agenda. Make corrections, final adjustments, and record test data.

Report: Rider's List Date: + 0

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing full names, security clearances, home addresses, home telephone numbers (if available), and names of next of kin of personnel scheduled to ride the ship during sea trials to the SUPERVISOR.

3.3.1.1 Submit the list ten days prior to the established sea trial date.

Report: Completed TM's Date: + 0

3.3.2 Submit one legible copy, in hard copy or approved

transferrable media, of completed test memoranda to the SUPERVISOR.

SSP: OTHR-RMC84-19-CN01 2 of 2 ITEM NO: 982-32-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.4 Remove and install temporary services, welding leads, and hoses necessary to accomplish sea trials.

4. NOTES:

4.1 The Commanding Officer of the ship will provide a sea trial evolution agenda and exercise actual control over navigation and operation of the ship, its machinery, and its equipment.

4.2 Operational tests, test memos, or test procedures identified by individual work items in the job order shall be integrated into the sea trial agenda as applicable.

4.3 Sea trials will not be scheduled for accomplishment on weekends or federal holidays.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.