ATTACHMENT J-6
PACIFIC NORTHWEST CVN PRIVATE SECTOR MAINTENANCE
PRE-PRICED WORK ITEM LIST
(1) CVN PSM DPIA
| Work Item |
| Work Item Title |
| Labor Hours |
| Material Dollars |
| 042-01-001 |
| Workplace Requirements; accomplish |
| 4,481 |
| $1,189 |
| 042-11-001 |
| Scheduling, Progressing, Material Status and Associated Reports; provide |
| 3,974 |
| $0 |
| 077-01-001 |
| Hazardous Waste Produced on Naval Vessels; control |
| 11,393 |
| $0 |
| 123-12-001 |
| JP-5 Tank Test; accomplish |
| 1,386 |
| $3,934 |
| 123-16-001 |
| Overflow Box Scupper; repair |
| 854 |
| $47,002 |
| 123-16-003 |
| Overflow Box; replace |
| 1,860 |
| $62,233 |
| 123-17-001 |
| Brake Water Tank No.2 Vent Structure; repair |
| 771 |
| $24,172 |
| 123-19-001 |
| Sewage Ejection/Holding Tank; inspect and repair |
| 1,396 |
| $16,740 |
| 123-19-002 |
| Sewage Ejection/Holding Tank; inspect and repair |
| 17,411 |
| $111,299 |
| 123-22-001 |
| Void Manhole Cover; repair |
| 360 |
| $16,333 |
| 130-11-001 |
| Fwd Galley Deck Plate; replace |
| 671 |
| $5,691 |
| 130-11-002 |
| Fantail Structural; repair |
| 697 |
| $218,158 |
| 130-11-003 |
| ACE 3 Plating; repair |
| 414 |
| $881 |
| 130-11-004 |
| Flight Deck Plate; repair |
| 48 |
| $14,975 |
| 130-11-005 |
| Aircraft Elevator No. 4 Approach Plating; repair |
| 329 |
| $103,115 |
| 130-11-006 |
| Bulkhead Structure Support; repair |
| 130 |
| $40,569 |
| 130-11-007 |
| Faring Sponson Port; repair |
| 97 |
| $30,338 |
| 167-11-001 |
| Catapult Officer Emergency Control Station Hatch; repair |
| 454 |
| $31,804 |
| 167-11-002 |
| Quick Acting Watertight Scuttle; replace |
| 33 |
| $15,083 |
| 167-11-004 |
| Aircraft Electric Servicing Station (AESS) Hatch; repair/test |
| 30 |
| $9,256 |
| 167-11-005 |
| AESS No. 13 Watertight Ballistic Hatch; repair |
| 373 |
| $9,257 |
| 167-11-006 |
| Manhole Cover Stud; replace 4-74-3-Q |
| 9 |
| $2,844 |
| 436-51-001 |
| Troubleshoot and Repair Radar TLI; accomplish |
| 31 |
| $1,896 |
| 512-11-001 |
| Ventilation Repair; accomplish |
| 705 |
| $36,845 |
| 512-11-002 |
| Integrated Catapult Control Station (ICCS) Ventilation Flex Hose: replace |
| 130 |
| $12,367 |
| 512-11-007 |
| Preheater and Valve, replace |
| 599 |
| $15,917 |
| 512-11-011 |
| Exhaust Fan Motor Overhaul; accomplish |
| 388 |
| $2,351 |
| 512-11-013 |
| Ventilation Ducting; replace |
| 279 |
| $1,618 |
| 514-23-002 |
| Air Conditioning Plant No. 3 Seawater Circulating Pump; repair |
| 31 |
| $9,572 |
| 521-11-001 |
| Firemain Piping; repair |
| 322 |
| $5,313 |
| 521-11-002 |
| Saltwater Flushing Piping; repair |
| 3,833 |
| $71,686 |
| 521-11-003 |
| Firemain Piping, replace |
| 349 |
| $13,628 |
| 521-11-005 |
| Firemain Valve and Strainer; replace |
| 318 |
| $2,197 |
| 521-21-001 |
| Motor Driven Fire Pump Number 2 Discharge and Suction Piping; replace (ship to shop) |
| 218 |
| $9,096 |
| 521-80-001 |
| SCD CVN68 9928 Fireman Piping and Deluge Shower; accomplish |
| 310 |
| $3,083 |
| 524-11-001 |
| Sea Water Supply Piping; Install |
| 355 |
| $6,339 |
| 526-11-001 |
| Deck Drain Piping; repair |
| 233 |
| $923 |
| 526-11-002 |
| Deck Drain Piping; repair |
| 403 |
| $3,447 |
| 526-11-003 |
| Weather Deck Drain Piping; repair |
| 334 |
| $5,027 |
| 526-11-004 |
| Deck Drain; mechanically clean |
| 271 |
| $923 |
| 526-11-006 |
| Wing Void Drain Piping; repair |
| 112 |
| $586 |
| 526-80-001 |
| SCD CVN68-12122 Weather Deck Drain Modification; accomplish |
| 1,876 |
| $11,125 |
| 528-11-002 |
| Waste Water Drain Piping; repair |
| 156 |
| $611 |
| 528-11-006 |
| CHT vent piping; replace |
| 531 |
| $14,674 |
| 529-11-002 |
| Eductor Suction Piping; repair |
| 23 |
| $7,253 |
| 533-11-001 |
| Potable Water Piping; replace |
| 23 |
| $7,049 |
| 542-11-001 |
| JP5 Manifold; repair |
| 930 |
| $6,448 |
| 542-80-001 |
| SCD CVN76-4573D, Fueling Station No. 6A Installation; accomplish |
| 1,034 |
| $316,835 |
| 551-21-001 |
| Service Air Piping; repair |
| 554 |
| $3,488 |
| 555-80-001 |
| SCD CVN68 -10478, AFFF |
| 6,040 |
| $66,130 |
| 561-80-001 |
| SCD CVN68-6363D, Steering Gear Hydraulic Filter Modification, accomplish |
| 2,438 |
| $38,105 |
| 571-31-001 |
| Number 9 Sliding Padeye Motor and Carriage Assembly; repair |
| 380 |
| $8,313 |
| 581-11-001 |
| Anchor and Chain Assembly; inspect and preserve |
| 6,764 |
| $73,966 |
| 583-11-001 |
| Starboard RIB Davit Weight Test; accomplish |
| 100 |
| $531 |
| 583-80-001 |
| ShipAlt CVN68-8775.1D, Install 50-Man Liferaft, (Stbd); |
| 1,305 |
| $408,568 |
| 586-10-001 |
| Hydraulic Fluid; drain, store and refill |
| 328 |
| $10,607 |
| 586-90-001 |
| SCD CVN76-8425K, Sheave Damper Track Foundation Modify; accomplish |
| 443 |
| $4,576 |
| 587-23-001 |
| Catapult No. 3 Wing Void Drain Piping; replace |
| 149 |
| $5,595 |
| 587-31-001 |
| Cooling Panel Catapult No.4; repair |
| 636 |
| $199,083 |
| 587-41-001 |
| JBD No. One Saltwater Supply Control Valve; repair |
| 286 |
| $2,625 |
| 587-43-001 |
| Jet Blast Deflector (JBD) Enclosure No. 3; repair |
| 589 |
| $184,491 |
| 588-14-001 |
| Aircraft Elevator Number 4 Guide Roller Track; inspect |
| 27 |
| $8,478 |
| 588-31-002 |
| Deck Edge Door Number 2 Lower Track Weld; repair |
| 51 |
| $15,922 |
| 588-80-001 |
| SCD CVN74-4502D, Aircraft Elevator HP Accumulator Gate Valve Modification; accomplish |
| 1,052 |
| $299,277 |
| 589-21-001 |
| Bi-Rail Bridge Crane and Hoist; weight test |
| 307 |
| $1,587 |
| 593-11-001 |
| CHT Discharge Piping; replace |
| 254 |
| $4,527 |
| 593-11-004 |
| CHT Drain Piping; replace |
| 861 |
| $7,123 |
| 593-11-005 |
| Remote Operating Gear; repair |
| 40 |
| $5,105 |
| 593-11-009 |
| Plumbing Drain Piping; replace |
| 1,633 |
| $18,351 |
| 593-11-013 |
| Plumbing Waste Drain Piping; replace |
| 236 |
| $2,178 |
| 612-21-001 |
| Landing Signal Officer Platform Safety Net and Padding; |
| 2,057 |
| $22,362 |
| 612-80-001 |
| SCD CVN74-6486.1D, Weapons Trunk Safety Net Improvement; accomplish |
| 10,333 |
| $107,849 |
| 621-11-001 |
| Metal Joiner Bulkhead; repair |
| 80 |
| $25,114 |
| 623-21-001 |
| Stern Dock; repair |
| 228 |
| $5,150 |
| 623-80-001 |
| SCD CVN68-9883.00, Climber Safety Rail on Mast and Vertical |
| 361 |
| $924 |
| 625-11-002 |
| Flag Bridge Window; replace |
| 392 |
| $11,508 |
| 631-13-002 |
| Vent Inlet 01-74-1-Q; preserve |
| 639 |
| $14,949 |
| 631-13-003 |
| Vent Inlet 01-204-4-Q |
| 104 |
| $14,072 |
| 634-21-001 |
| Flight Deck Nonskid; replace |
| 2,952 |
| $710,886 |
| 638-11-001 |
| Chill Storeroom Deck Covering; repair |
| 72 |
| $6,227 |
| 652-80-001 |
| SCD CVN74-9073D, Surgical Sterilizer Installation; accomplish |
| 224 |
| $149,185 |
| 665-80-001 |
| SCD CVN76-4427D, AIMD EPOP Workbench Grounding Modification; accomplish |
| 695 |
| $217,396 |
| 711-80-001 |
| SCD-CVN68-08324, .50 Caliber Machine Gun Mount; modify |
| 565 |
| $176,754 |
| 763-80-001 |
| SCD CVN68-6154D, Upgrade Ready Room Security Stowage; accomplish |
| 826 |
| $21,105 |
| 782-80-001 |
| SCD CVN68-4522, Weapons Assembly Relocation; accomplish |
| 3,870 |
| $1,211,319 |
| 850-10-001 |
| Integrated Logistics Support (ILS); provide |
| 1,957 |
| $17,738 |
| 857-11-001 |
| Tech Library and Reproduction Support for Production Planning and Execution(NAVSEA & TYCOM); provide |
| 8 |
| $0 |
| 897-10-001 |
| Project Management; provide |
| 41,496 |
| $0 |
| 980-31-001 |
| Trade Supervision and Support; provide |
| 33,288 |
| $0 |
| 986-31-001 |
| Quality Assurance (QA) Support Services (NAVSEA and TYCOM); provide |
| 18,240 |
| $0 |
| 991-11-001 |
| Upper and Lower Stage No.1 Elevator Staging ; provide |
| 30 |
| $4,479 |
| 991-12-001 |
| Island and Mast Staging and Containment; provide |
| 960 |
| $308,625 |
| 992-10-001 |
| Contractor Facilities; provide |
| 3,818 |
| $71,111 |
| 992-31-001 |
| Cleaning and Pumping; accomplish |
| 7,740 |
| $54,531 |
| 993-11-001 |
| Material Support Service, Execution Phase; provide |
| 21,957 |
| $22,374 |