Attachment_11_-Cost_and_Price_Evaluation_Worksheet_Rev._2_8-9-2017.xls

XLS spreadsheet 236 KB Posted

Attached to
U. S Navy Electronic Chart Display and Information System Software
Solicitation number
N00024-17-R-5216
Issued by

About this file

Attachment 11 - Cost and Price Evaluation Worksheet Rev. 2

View the file

Other files

File Type Posted
Q&A_Response_Package_-_Batch_4.pdf PDF
N00024-17-R-5216_Navy_ECDIS_RFP_Amendment_2_-_Conformed_Copy.pdf PDF
N00024-17-R-5216_Navy_ECDIS_RFP_Amendment_2.pdf PDF
N00024-17-R-5216_Navy_ECDIS_RFP_Amendment_1.pdf PDF
N00024-17-R-5216_Navy_ECDIS_RFP_Amendment_1_-_Conformed_Copy.pdf PDF
Attachment_11_-Cost_and_Price_Evaluation_Worksheet_Rev._1_8-2-2017.xls XLS spreadsheet
NAVY_ECDIS_SOFTWARE_(17-R-5216)_SIGNED_CDRLS_DTD_7-27-17.pdf PDF
Q&A_Response_Package_-_Batch_3.pdf PDF
Q&A_Response_Package_-_Batch_2.pdf PDF
Q&A_Response_Package_-_Batch_1.pdf PDF
N00024-17-R-5216_Ex_A_CDRLs_(Searchable_File).pdf PDF
Attachment_12_-_Past_Performance_Questionnaire.docx DOCX document
NAVY_ECDIS_SOFTWARE_(17-R-5216)_SIGNED_CDRLS_DTD_1-31-17.pdf PDF
Attachment_5_-_Terms_of_Use_Letter_-_SRD.docx DOCX document
Attachment_13_-_Contractor_Compliance_Checklist.docx DOCX document
NAVY_(17-R-5216)_ADDRESSEE_LIST_6-15-17.pdf PDF
Attachment_10_-_Offerors_Question_and_Answer_Sheet.xls XLS spreadsheet
Attachment_9_-_Navy_ECDIS_GFI_List_2017-06-12.xlsx XLSX spreadsheet
N00024-17-R-5216_Final_Solicitation.pdf PDF
Attachment_11_-Cost_and_Price_Evaluation_Worksheet.xls XLS spreadsheet
15-NR-46120_DD254_Signed.pdf PDF
Attachment_4_-_Terms_of_Use_Letter_-_COGENT.docx DOCX document
Draft_RFP_QA_-_Batch_2_-_FBO_Posted_6-9-17.pdf PDF
Draft_RFP_Q&A_Response_Packages_-_Batch_1.pdf PDF
Offeror_Question_and_Answer_Sheet.xls XLS spreadsheet
Navy_ECDIS_SW_N00024-17-R-5216_-_Draft_RFP_.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-11 (Summary Matrix)

N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11
CLINDescription2a (CLIN Summary by FY)2b (CLIN Breakout)2c (Breakout by CY)2d (Eng Svcs Breakout)2e (WBS Breakout)2f (Rate Summary)2g (BOM)2h (SLOC Table)
CLIN SummarySummary data including all CLINs, excluding CLIN 0004XXXX
0001Navy ECDIS SW 1.0 Production BuildXXX
0002Engineering ServicesX
0003Travel and ODC
0004Data
1001Navy ECDIS Software 1.1 (Maintenance Build) Engineering ServicesX
1002Travel and ODC
1003Government Purpose Data Rights/ Licenses
2001Navy ECDIS Software 1.2 (Maintenance Build) Engineering ServicesX
2002Travel and ODC
N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11

&CDRAFT

2a (CLIN Summary by FY)

N00024-17-R-5216 Navy ECDIS SW SECTION L - COST TABLE ATTACHMENT J-11 2a
FY Cost Summary Detail for Priced CLINs
CLINFY18FY19FY20FY21FY22FY23FY24FY25FY26TOTAL Proposed CLIN Amount
CLIN 0001
CLIN 0002
CLIN 0003
CLIN 0004
CLIN 1001
CLIN 1002
CLIN 1003
CLIN 2001
CLIN 2002
TOTAL
* CLIN 0004 Data Rights is Not Seperately Priced. Does not need to be broken out by FY.
Round cost values to whole dollars.
The cells on this form do not need to be linked to any other form.
Cost should be through FCCM
N00024-17-R-5216 Navy ECDIS SW SECTION L - COST TABLE ATTACHMENT J-11 2a

2b (CLIN Breakout)

N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2b
Cost Summary Table By CLIN/SLIN
Major Cost ElementCLIN 0001CLIN 0002CLIN 0003CLIN 1001CLIN 1002CLIN 1003CLIN 2001CLIN 2002Total
Material Overhead ($)
Major SubContracts ($)
Other SubContracts ($)
Interorganizational Transfer ($)
Total Material ($)
DirectAdministrative Labor (Hours)
Direct Administrative Labor ($)
Administrative Overhead ($)
Total Administrative ($)
Direct Program Management Labor (Hours)
Direct Program Management Labor ($)
Program Management Overhead ($)
Total Program Management ($)
Direct Engineering Labor (Hours)
Direct Engineering Labor ($)
Engineering Overhead ($)
Total Engineering ($)
Subtotal Labor ($)
Subtotal Material, Labor, and ODC ($)
G&A Expense ($)
Subtotal Estimated Costs less FCCM ($)
Facilities Capital Cost of Money (FCCM) ($)
Total Target Cost ($)
Target Fee/Profit ($)
Target Fee/Profit (%)
CLIN TypeCPIFCPFFCOSTCPFFCOSTFFPCPFFCOSTN/A
TOTAL ($)
Round cost values to whole dollars.
Link each cell in this form with the appropriate cells in the Worsheet 2f for each of the CLIN. Do not just paste values where value can be linked to another form.
Categories provided are for example only, link categories to actual categories listed in Worksheet 2f
N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2b

2c (Breakout by CY)

N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2c
Cost Summary Detail by Calendar Year For CLINs 0001, 0002, 0003, 1001, 1002, 1003, 2001, 2002 (Offeror shall provide a separate sheet for each CLIN)
Major Cost ElementCY18CY19CY20CY21CY22CY23CY24CY25CY26Total $
Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $
Material
Major Subs
*
*
Other Subs
Interorganizational Transfer
Material Overhead
Total Material
Labor
Administrative
Category/Personnel
*
*
*
Administrative Indirect Rates
*
*
*
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Total Labor
SUBTOTAL COSTS ($)
G&A Expense ($)
Type
*
*
SUBTOTAL COSTS ($)
Facilities Capital Cost of Money (FCCM) ($)
Type
*
*
TOTAL ESTIMATED COSTS ($)
Fee/Profit ($)
Fee/Profit (%)
TOTAL ($)
Offeror to fill out this template in accordance with the CLIN breakout in the J-11 Summary Matrix.
Round cost values to whole dollars.
Link values on this form with values/equations on Worksheet 2f. Do not just paste values where value can be linked to another form.
Sub totals must calculate within this form and not be linked to other forms
Link each cell containing the Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Interorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs with the unburdened values in Worksheet 2e or 2g, where applicable. Link each cell containing rates to appropriate cells in Worksheet 2f.
Calculations with rates computed on this form shall link to rates from Worksheet 2f and material and labor costs from Worksheet 2d or 2g.
Cost basis for application of Material Overhead, Indirect Labor Rates, G&A and FCCM must link to value(s) contained in Worksheet 2f.
Categories provided are for example only, link categories to actual categories listed in Worksheet 2f
All values shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)
N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2c

2d (Eng Svcs Breakout)

N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2d
Cost Summary Detail for CLINs 0002, 1001, and 2001 (Offeror shall provide a separate sheet for each CLIN)
Major Cost ElementCY18CY19CY20CY21CY22CY23CY24CY25TOTAL
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateTotal $
Material
Material Overhead
Major Subcontracts
Other Subcontracts
Interorganizational Transfer
Total Material
Labor
Administrative
Category/Personnel
*
*
*
Administrative Indirect Rates
*
*
*
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Total Labor
SUBTOTAL COSTS ($)
G&A Expense ($)
SUBTOTAL COSTS ($)
Facilities Capital Cost of Money (FCCM) ($)
TOTAL ESTIMATED COSTS ($)
Fee ($)
Fee (%)
TOTAL ESTIMATED COSTS ($) Plus Fixed Fee
** Shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)
Major Cost ElementCY18CY19CY20CY21CY22CY23CY24CY25
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
Total Labor (Hours)
TOTAL Estimated COSTS ($) Plus Fixed Fee
Composite Rate through Fee
Labor CategoryCLIN 0002CLIN 1001CLIN 2001Total Hours
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
TOTAL CLIN COST
Prepare one of these forms for each CLIN as specified on J-11 (Summary Matrix)
If composite rates are used, provide the calculations used in deriving the composite rates.
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Link values on this form with values/equations on other forms. Do not just paste values where value can be linked to another form.
If Subcontractor hours/costs are proposed, Offerors shall provide a separate Worksheet 2d for each Subcontractor with costs linked.
Categories provided are for example only, link categories to actual categories listed on Worksheet 2f.
Rate cells should be linked to the rates Worksheet 2f. Total values shall be computed in this form.
Provide equations for Total Cost computation.
N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2d

2e (WBS)

N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2e
Cost Summary Table by Contract WBS for CLIN 0001
CLIN TotalCY18CY19
WBSDescriptionBOE IDCost ElementHoursDirect LaborFringeOverheadSubcontractorSubK OverheadMaterialMaterial OverheadG&AFCCMTotal CostsTarget Fee (Completion)Min FeeMax FeeTotal FeeTotal Price (Cost Plus Target Fee)Cost ElementHoursDirect LaborFringeOverheadSubcontractorSubK OverheadMaterialMaterial OverheadG&AFCCMTotal CostsTarget Fee (Completion)Min FeeMax FeeTotal FeeTotal Price (Cost Plus Target Fee)Cost ElementHoursDirect LaborFringeOverheadSubcontractorSubK OverheadMaterialMaterial OverheadG&AFCCMTotal CostsTarget Fee (Completion)
Line Item
1.0Navy ECDIS SW - Production Build 1.1
* Sample WBS Structure
Totals
Prepare one of these forms for each CLIN as specified on J-11 (Summary Matrix).
Round cost values to whole dollars.
Total values shall be computed in the form.
Cells containing the Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Inter-Organizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs in this form are Industry Inputs.
Link each cell containing rates to appropriate cells in Worksheet 2f.
Total Costs shall be through FCCM. Do not input or paste values where values can be derived through formulas.
Add additional columns for additional labor, material and sub-contractor costs as required.
The formulas in this form shall compute the appropriate parent/child cost roll up relationships.
The Offeror shall define the WBS Structure to include clear descriptions of the lower level WBS element in the appropriate columns.
N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2e

2f (Rate Summary)

N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2f
Cost Category
Rates Category20182019202020212022202320242025
Material Overhead
Category 1
Category 2
Category n
Direct Labor Rate
Category 1
Category 2
Category n
Indirect Rate
Category 1
Category 2
Category n
General & Adminstrative Rate
Category 1
Category 2
Category n
Facility Capital Cost of Money Rate
Category 1
Category 2
Category n
Other Rate
Category 1
Category 2
Category n
*
*
*
Category N
These rates shall be linked to rates cells in Worksheets 2a, 2b, 2c, 2d, 2e for each applicable CLIN identified in J-11 (Summary Matrix).
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to five (5) decimal points.
Rate categories shall include all rates used in this proposal.
Categories listed are for example only, provide actual categories included in the proposal.
If composite rates are used, provide the calculations used in deriving the composite rates.
N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2f

2g (BOM)

N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2g
Bill of Material (BOM) for CLIN 0001
Item #WBSBOE IDPart NumberPart DescriptionSupplierQtyUnit PriceExtended PriceMaterial OHG&AFCCMTotal
Prepare one of these forms for each CLIN as specified on J-11 (Summary Matrix).
Round cost values to whole dollars.
Total values shall be computed in the form.
Link each cell containing rates to appropriate cells in Worksheet 2f.
Add additional columns for applicable rates as needed.
Total Costs shall be through FCCM. Do not input or paste values where values can be derived through formulas.
N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2g

2h (SLOC Table)

SOFTWARE LINES OF CODE SUMMARY
TOTAL DEVELOPMENT
Activity DescriptionDescription of Historic EffortHistoric PerformancePlanned Effort Sizing (RAW SLOC PROGRAM SIZE (DSLOC))DSLOC to ESLOC Conversion CalculationsPlanned Performance
WBSCSCIPerforming AgentFunctional Purpose and Description (Reference Technical Section)BOE Number (Reference Proposal Volume, Section, Book, and Page)Historic Effort (Program/CSCI)Programming LanguageCounting Tool
(UCC or CLOC)Output for Total DSLOCOutput for Blank DSLOCOutput for Comments Whole DSLOCOutput for Comments Embedded DSLOCOutput for Logical DSLOCLatest Completed Development EffortContract NumberYear CompletedESLOC CountDCTI HoursJustification for Changes from Historic SourceProgramming LanguageNewModifiedReuseNDI or VerbatimMachine GeneratedDeletedOtherTotal Logical DSLOCTotal Physical DSLOCTotal Physical DSLOC with Comments & Blank LinesJustification for ESLOC Conversion FactorsNew to ESLOCModified to ESLOCReuse to ESLOCNDI or Verbatim to ESLOCMachine Generated to ESLOCDeleted to ESLOCOther to ESLOCTotal
ESLOCJustification for ESLOC/Hour MetricESLOC/ HourTOTAL HOURS
#.#Historic Performance
#.#.#Primary Function(s)
#.#.#.#
Prime<All New Code>C++- 0N/AN/AN/AN/AN/ANo existing code for X. Adding 1,000,000 for new functionalityC++1,000,000- 0- 0- 0- 0- 0- 01,000,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.11,000,000Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.01,000,000
PrimeProgram X (AN/SXX-YY)/ CSCI ZC++500,000Program X DevelopmentNXXXXX-XX-C-XXXXXX100,000100,000Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effortC++75,00025,00050,00025,000150,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.10.0192,750Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.092,750
Subcontractor A:
Subcontractor B:
#.#.#.#
Prime<All New Code>C++- 0N/AN/AN/AN/AN/ANo existing code for X. Adding 1,000,000 for new functionalityC++1,000,000- 0- 0- 0- 0- 0- 01,000,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.11,000,000Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.01,000,000
PrimeProgram X (AN/SXX-YY)/ CSCI ZC++500,000Program X DevelopmentNXXXXX-XX-C-XXXXXX100,000100,000Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effortC++75,00025,00050,00025,000150,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.10.0192,750Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.092,750
Subcontractor A:
Subcontractor B:
Prime<All New Code>C++- 0N/AN/AN/AN/AN/ANo existing code for X. Adding 1,000,000 for new functionalityC++1,000,000- 0- 0- 0- 0- 0- 01,000,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.11,000,000Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.01,000,000
PrimeProgram X (AN/SXX-YY)/ CSCI ZC++500,000Program X DevelopmentNXXXXX-XX-C-XXXXXX100,000100,000Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effortC++75,00025,00050,00025,000150,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.10.0192,750Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.092,750
Subcontractor A:
Subcontractor B:
:
:
Support Software
-(Components)
:
Totals
#.#Contract Performance
#.#.#Primary Function(s)
#.#.#.#
Prime<All New Code>C++- 0N/AN/AN/AN/AN/ANo existing code for X. Adding 1,000,000 for new functionalityC++1,000,000- 0- 0- 0- 0- 0- 01,000,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.11,000,000Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.01,000,000
PrimeProgram X (AN/SXX-YY)/ CSCI ZC++500,000Program X DevelopmentNXXXXX-XX-C-XXXXXX100,000100,000Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effortC++75,00025,00050,00025,000150,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.10.0192,750Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.092,750
Subcontractor A:
Subcontractor B:
#.#.#.#
Prime<All New Code>C++- 0N/AN/AN/AN/AN/ANo existing code for X. Adding 1,000,000 for new functionalityC++1,000,000- 0- 0- 0- 0- 0- 01,000,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.11,000,000Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.01,000,000
PrimeProgram X (AN/SXX-YY)/ CSCI ZC++500,000Program X DevelopmentNXXXXX-XX-C-XXXXXX100,000100,000Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effortC++75,00025,00050,00025,000150,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.10.0192,750Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.092,750
Subcontractor A:
Subcontractor B:
Prime<All New Code>C++- 0N/AN/AN/AN/AN/ANo existing code for X. Adding 1,000,000 for new functionalityC++1,000,000- 0- 0- 0- 0- 0- 01,000,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.11,000,000Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.01,000,000
PrimeProgram X (AN/SXX-YY)/ CSCI ZC++500,000Program X DevelopmentNXXXXX-XX-C-XXXXXX100,000100,000Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effortC++75,00025,00050,00025,000150,000Software Cost Estimating Package X, including modifications to those conversion factors.1.00.50.10.0192,750Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc1.092,750
Subcontractor A:
Subcontractor B:
:
:
Support Software
-(Components)
:
Totals:

Instructions for 2h

Instructions for Worksheet 2h (SLOC Table)
Prepare in accordance with Contractor proposed Work Breakdown Structure (WBS) (Attachment J-11 Worksheet 2e) for all software development efforts.
Provide information at the Computer Software Configuration Item (CSCI) level and, where appropriate, at the Computer Software Component (CSC) level or Computer Software Unit (CSU) level in order to document historical SLOC planned for modification or reuse. Detail at the CSC level and/or CSU level is also requested when more than one contractor or sub-contractor is performing work within that CSCI.
CSCI: An aggregation of software that is designated for configuration management (CM) and treated as a single entity in the CM process.
CSC: A functional or logically distinct part of a CSCI. A CSC is typically an aggregate of two or more CSUs.
CSU: Smallest subdivision of a Computer Software Configuration Item (CSCI) for the purposes of engineering management. CSUs are typically separately compilable pieces of code.
ACTIVITY DESCRIPTION
Performing Agent: Break out by prime contractor and any sub contractor(s) on additional rows for each CSCI (excluding subcontractor(s), if any, that provide(s) a separate Worksheet 2h whose effort is not rolled into this Worksheet 2h).
If a subcontractor submits a separate Worksheet 2h, the prime Worksheet 2h shall include completed rows for the subcontract in the following columns: T through AC, AL, AN and AO. These entries shall match the subcontractor submission, if any.
Functional Purpose and Description: Clearly identify/describe each CSCI, including purpose/use of support software components. Reference to the location within the technical package is acceptable.
BOE Number: Cite the Basis of Estimate (BOE) for each CSCI
DESCRIPTION OF HISTORIC EFFORT
Historic Effort: Cite the source (Program and CSCI) of the modified and reused software.
If the estimated modified and reused SLOC is greater than the historic effort (i.e. SLOC available for reuse), provide detailed justification for the source of the additional estimated modified/reuse SLOC.
If multiple historic efforts are being used for one CSCI, add rows to show all of the historic effort sources.
Programming Language: Provide the programming language used for the historic effort.
Counting Tool: The USC Unified Code Counting (UCC) Tool (Release 2011.10) shall be used for any supported language. For languages not supported by UCC, the Count Lines of Code (CLOC) Tool (v.1.58) shall be used. The column shall reflect the tool utilized for the respective historic effort.
Output for Total DSLOC: Report the total Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2011.10) or CLOC (v.1.58) output for "total lines."
Output for Blank DSLOC: Report the blank Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2011.10) or CLOC (v.1.58) output for "blank lines."
Output for Comments Whole DSLOC: Report the whole comments Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2011.10) output for "comments whole" or CLOC (v.1.58) output for "comments."
Output for Comments Embedded DSLOC: Report the embedded comments Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2011.10) output for "comments embedded."
Output for Logical DSLOC: Report the logical Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2011.10) output for "logical SLOC" or CLOC (v.1.58) equivalent output "code."
HISTORIC PERFORMANCE (WHERE APPLICABLE)
Latest Completed Development Effort: Cite the last completed effort where the historic CSCI was modified.
If a historic CSCI is being split into multiple CSCI's, cite the percentage split of the historic CSCI for each CSCI. The total of percentages should equal to 100%.
Contract Number: Cite the contract on which the modification of the historic CSCI occurred.
Year Completed: Provide the year when this effort was completed.
ESLOC Count: Provide Equivalent SLOC (ESLOC) count for effort.
DCTI Hours: Design, Code, Test, & Integration (DCTI) hours spent on that CSCI
Of the IEEE 12207 Development Process Activities:
1.0 Process Implementation
2.0 System Requirements Analysis
3.0 System Architectural Design
4.0 Software Requirements Analysis
5.0 Software Architectural Design
6.0 Software Detailed Design
7.0 Software Coding and Test
8.0 Software Integration
9.0 Software Qualification Testing
10.0 System Integration
11.0 System Qualification Testing
12.0 Software Installation
13.0 Software Acceptance Testing
DCTI hours include:
6.0 Software Detailed Design
7.0 Software Coding and Test
8.0 Software Integration
CONTRACT PERFORMANCE
Justification for Changes from Historic Source: Provide a description of how the legacy code will be modified for the new development effort, including description of new functionality and removed functionality.
Programming Language: Provide the programming language for the development effort.
DCTI = Preliminary & Detailed Design, Code, CSCI Testing, and SW Integration Testing
From IEEE 12207, DCTI hours include:
6.0 Software Detailed Design
7.0 Software Coding and Test
8.0 Software Integration
Provide descriptions of Source Lines of Code (SLOC) allocation categories (New, Modified, Reuse, NDI, Verbatim, Deleted, Other) in the BOE
Software Definitions:
1. NEW CODE: This represents new source statements or existing source statements requiring significant modifications, wherein significant is defined as any logical block of related code (class, module, function) where more than 50% of the lines will be newly written or modified.
2. MODIFIED CODE: This represents source statements that exist but required modification, wherein modification is limited to changing 15 – 50% of a single source statement.
3. REUSE CODE: The represents source statements that currently exist and require minimal modification, wherein minimal is defined less than 15% changes to a single source statement.
4. NDI or VERBATIM CODE: This represents intact executable modules (example: COTS, GOTS) and no changes or maintenance is planned. It excludes Machine Generated Code.
5. MACHINE GENERATED CODE: This represents a subset of VERBATIM code which is listed separately. These source statements are automatically generated by software applications which allow tracing of actions.
6. DELETED CODE: This represents source statements that currently exist and are removed from the software component due to no modification or reuse.
7. DSLOC: Delivered software lines of code
8. ESLOC: Equivalent software lines of code
Total Logical DSLOC: Sum of New, Modified and Reused Code
Total Physical DSLOC: Total Delivered Software Lines Of Code, excluding comments and blanks.
Total Physical DSLOC with Comments & Blank Lines: Total Delivered Software Lines Of Code, including comments and blanks.
DSLOC TO ESLOC CONVERSION CALCULATIONS
Justification for ESLOC Conversion Factors: Provide the source for the ESLOC conversion factors, including any modifications applied. If ESLOC conversion factors differ from industry rule of thumb of 1.0 (New), 0.5 (Modified), 0.1 (Reused), provide supporting data and calculations.
NEW to ESLOC: Inverse of number of new lines of code per ESLOC (1 / (New Lines of Code per ESLOC)
Modified to ESLOC: Inverse of number of modified lines of code per ESLOC (1 / (Modified Lines of Code per ESLOC)
Reuse to ESLOC: Inverse of number of reused lines of code per ESLOC (1 / (Reused Lines of Code per ESLOC)
NDI or Verbatim to ESLOC: Inverse of number of NDI/Verbatim lines of code per ESLOC (1 / (NDI/Verbatim Lines of Code per ESLOC)
Machine Generated to ESLOC: Inverse of number of machine generated lines of code per ESLOC (1 / (Machine Generated Lines of Code per ESLOC)
Deleted to ESLOC: Inverse of number of deleted lines of code per ESLOC (1 / (Deleted Lines of Code per ESLOC)
Other to ESLOC: Inverse of number of other lines of code per ESLOC (1 / (Other Lines of Code per ESLOC)
Total ESLOC: Sum of each code type (New/Modified/Reused/NDI/Machine Generated/Deleted/Other) multiplied by their DSLOC to ESLOC Conversion Factor
Planned Performance
Justification for ESLOC/Hour Metric: Provide source of the ESLOC per hour factor, including any modifications applied.
ESLOC/ Hour: Provide the software productivity factor for the CSCI.
TOTAL HOURS: Total ESLOC/ (ESLOC/ Hour)

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .