Attachment_11_-Cost_and_Price_Evaluation_Worksheet.xls
XLS spreadsheet 144 KB Posted
- Solicitation number
- N00024-17-R-5216
About this file
Attachment 11 - Cost/Price Spreadsheet
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-11 (Summary Matrix)
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 | |||||||
| CLIN | Description | 2a (CLIN Summary by FY) | 2b (CLIN Breakout) | 2c (Breakout by CY) | 2d (Eng Svcs Breakout) | 2e (WBS Breakout) | 2f (Rate Summary) |
| CLIN summary | Summary data including all CLINS, excluding CLIN 0004 | X | |||||
| 0001 | Navy ECDIS SW 1.0 Production Build | X | X | X | X | ||
| 0002 | Engineering Services | X | X | X | X | X | |
| 0003 | Travel and ODC | X | X | X | X | ||
| 0004 | Data | ||||||
| 1001 | Navy ECDIS Software 1.1 (Maintenance Build) Engineering Services | X | X | X | X | X | |
| 1002 | Travel and ODC | X | X | X | X | ||
| 1003 | Government Purpose Data Rights/ Licenses | X | X | X | X | ||
| 2001 | Navy ECDIS Software 1.2 (Maintenance Build) Engineering Services | X | X | X | X | X | |
| 2002 | Travel and ODC | X | X | X | X | ||
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 |
&CDRAFT
2a (CLIN Summary by FY)
| N00024-17-R-5216 Navy ECDIS SW SECTION L - COST TABLE ATTACHMENT J-11 2a | ||||||||||
| FY Cost Summary Detail for Priced CLINs | ||||||||||
| CLIN | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 | TOTAL Proposed CLIN Amount |
| CLIN 0001 | ||||||||||
| CLIN 0002 | ||||||||||
| CLIN 0003 | ||||||||||
| CLIN 0004 | ||||||||||
| CLIN 1001 | ||||||||||
| CLIN 1002 | ||||||||||
| CLIN 1003 | ||||||||||
| CLIN 2001 | ||||||||||
| CLIN 2002 | ||||||||||
| TOTAL | ||||||||||
| * CLIN 0004 Data Rights is Not Seperately Priced. Does not need to be broken out by FY. | ||||||||||
| Round cost values to whole dollars. | ||||||||||
| The cells on this form do not need to be linked to any other form. | ||||||||||
| Cost should be through FCCM |
2b (CLIN Breakout)
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2b | |||||||||
| Cost Summary Table By CLIN/SLIN | |||||||||
| Major Cost Element | CLIN 0001 | CLIN 0002 | CLIN 0003 | CLIN 1001 | CLIN 1002 | CLIN 1003 | CLIN 2001 | CLIN 2002 | Total |
| Material Overhead ($) | |||||||||
| Major SubContracts ($) | |||||||||
| Other SubContracts ($) | |||||||||
| Interorganizational Transfer ($) | |||||||||
| Total Material ($) | |||||||||
| Direct Program Management Labor (Hours) | |||||||||
| Direct Program Management Labor ($) | |||||||||
| Program Management Overhead ($) | |||||||||
| Total Program Management ($) | |||||||||
| Direct Engineering Labor (Hours) | |||||||||
| Direct Engineering Labor ($) | |||||||||
| Engineering Overhead ($) | |||||||||
| Total Engineering ($) | |||||||||
| Subtotal Labor ($) | |||||||||
| Subtotal Material, Labor, and ODC ($) | |||||||||
| G&A Expense ($) | |||||||||
| Subtotal Estimated Costs less FCCM ($) | |||||||||
| Facilities Capital Cost of Money (FCCM) ($) | |||||||||
| Total Target Cost ($) | |||||||||
| Target Fee/Profit ($) | |||||||||
| Target Fee/Profit (%) | |||||||||
| CLIN Type | CPIF | CPFF | COST | CPFF | COST | FFP | CPFF | COST | N/A |
| TOTAL ($) | |||||||||
| Round cost values to whole dollars. | |||||||||
| Link each cell in this form with the appropriate cells in the Worsheet 2f for each of the CLIN. Do not just paste values where value can be linked to another form. | |||||||||
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2b |
2c (Breakout by CY)
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2c | ||||||||||||||||||||||||||||
| Cost Summary Detail by Calendar Year For CLINs 0001, 0002, 0003, 1001, 1002, 1003, 2001, 2002 (Offeror shall provide a separate sheet for each CLIN) | ||||||||||||||||||||||||||||
| Major Cost Element | CY18 | CY19 | CY20 | CY21 | CY22 | CY23 | CY24 | CY25 | CY26 | Total $ | ||||||||||||||||||
| Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | Hours/Cost | Rate | SubTotal $ | ||
| Material Non-Recurring | ||||||||||||||||||||||||||||
| Major Subs | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Other Subs | ||||||||||||||||||||||||||||
| Interorganizational Transfer | ||||||||||||||||||||||||||||
| Total Material Non-Recurring | ||||||||||||||||||||||||||||
| Material Recurring | ||||||||||||||||||||||||||||
| Major Subs | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Other Subs | ||||||||||||||||||||||||||||
| Interorganizational Transfer | ||||||||||||||||||||||||||||
| Total Material Recurring | ||||||||||||||||||||||||||||
| Labor Non-Recurring | ||||||||||||||||||||||||||||
| Program Management | ||||||||||||||||||||||||||||
| Category/Personnel | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Program Management Indirect Rates | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Engineering | ||||||||||||||||||||||||||||
| Category/Personnel | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Engineering Indirect Rates | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Total Labor Non-Recurring | ||||||||||||||||||||||||||||
| Labor Recurring | ||||||||||||||||||||||||||||
| Program Management | ||||||||||||||||||||||||||||
| Category/Personnel | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Program Management Indirect Rates | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Engineering | ||||||||||||||||||||||||||||
| Category/Personnel | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Engineering Indirect Rates | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| Total Labor Recurring | ||||||||||||||||||||||||||||
| SUBTOTAL COSTS ($) | ||||||||||||||||||||||||||||
| G&A Expense ($) | ||||||||||||||||||||||||||||
| Type | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| SUBTOTAL COSTS ($) | ||||||||||||||||||||||||||||
| Facilities Capital Cost of Money (FCCM) ($) | ||||||||||||||||||||||||||||
| Type | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| * | ||||||||||||||||||||||||||||
| TOTAL ESTIMATED COSTS ($) | ||||||||||||||||||||||||||||
| Fee/Profit ($) | ||||||||||||||||||||||||||||
| Fee/Profit (%) | ||||||||||||||||||||||||||||
| TOTAL ($) | ||||||||||||||||||||||||||||
| Offeror to fill out this template in accrodance with the CLIN breakout in the J-11 Summary Matrix. | ||||||||||||||||||||||||||||
| Round cost values to whole dollars. | ||||||||||||||||||||||||||||
| Link values on this form with values/equations on Worksheet 2f. Do not just paste values where value can be linked to another form. | ||||||||||||||||||||||||||||
| Sub totals must calculate within this form and not be linked to other forms | ||||||||||||||||||||||||||||
| Link each cell containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Interorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs with the unburdened values in Form L-I or L-J. Link each cell containing rates to appropriate cells in Form L-L. | ||||||||||||||||||||||||||||
| Calculations with rates computed on this form shall link to rates from Form L-L and material and labor costs from Form L-J. | ||||||||||||||||||||||||||||
| Cost basis for application of Material Overhead, Indirect Labor Rates, G&A and FCCM must link to value(s) contained in Form L-H, not Form L-J. | ||||||||||||||||||||||||||||
| For CLIN/SLINs which do not have a required Form L-I or L-J, contractor shall enter costs directly onto this form. | ||||||||||||||||||||||||||||
| Categories provided are for example only, link categories to actual categories listed on Form L-L. | ||||||||||||||||||||||||||||
| All values shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.) | ||||||||||||||||||||||||||||
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2c |
2d (Eng Svcs Breakout)
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2d | |||||||||||||||||||||||||||
| Cost Summary Detail for CLINs 0002, 1001, and 2001 (Offeror shall provide a separate sheet for each CLIN) | |||||||||||||||||||||||||||
| Major Cost Element | CY18 | CY19 | CY20 | CY21 | CY22 | CY23 | CY24 | CY25 | TOTAL | ||||||||||||||||||
| Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | Total $ | |
| Labor | |||||||||||||||||||||||||||
| Program Management | |||||||||||||||||||||||||||
| Category/Personnel | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| Program Management Indirect Rates | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| Engineering | |||||||||||||||||||||||||||
| Category/Personnel | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| Engineering Indirect Rates | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| Manufacturing | |||||||||||||||||||||||||||
| Category/Personnel | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| Manufacturing Indirect Rates | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| * | |||||||||||||||||||||||||||
| Total Labor | |||||||||||||||||||||||||||
| SUBTOTAL COSTS ($) | |||||||||||||||||||||||||||
| G&A Expense ($) | |||||||||||||||||||||||||||
| SUBTOTAL COSTS ($) | |||||||||||||||||||||||||||
| Facilities Capital Cost of Money (FCCM) ($) | |||||||||||||||||||||||||||
| TOTAL ESTIMATED COSTS ($) | |||||||||||||||||||||||||||
| Fee ($) | |||||||||||||||||||||||||||
| Fee (%) | |||||||||||||||||||||||||||
| TOTAL ESTIMATED COSTS ($) Plus Fixed Fee | |||||||||||||||||||||||||||
| ** Shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.) | |||||||||||||||||||||||||||
| Major Cost Element | CY15 | CY16 | CY17 | CY18 | CY19 | CY20 | CY21 | ||||||||||||||||||||
| Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | |||||||
| Total Labor (Hours) | |||||||||||||||||||||||||||
| TOTAL Estimated COSTS ($) Plus Fixed Fee | |||||||||||||||||||||||||||
| Composite Rate through Fee | |||||||||||||||||||||||||||
| Labor Category | CLIN 0010 | CLIN 1010 | CLIN 2010 | CLIN 3010 | CLIN 4010 | Total Hours | |||||||||||||||||||||
| Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | Hours | Rate | SubTotal $ | |||||||||||||
| Sample Program Manager | |||||||||||||||||||||||||||
| Senior Engineer | |||||||||||||||||||||||||||
| Engineer | |||||||||||||||||||||||||||
| Site Support / Technician | |||||||||||||||||||||||||||
| Senior Logistician | |||||||||||||||||||||||||||
| Logistician | |||||||||||||||||||||||||||
| Admin | |||||||||||||||||||||||||||
| TOTAL CLIN COST | |||||||||||||||||||||||||||
| Prepare one of these forms for each CLIN as specified on J-11 (Summary Matrix) | |||||||||||||||||||||||||||
| See Instructions for Engineering Services Composite Labor Rate BOE to the right of the table. | |||||||||||||||||||||||||||
| Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points. | |||||||||||||||||||||||||||
| Link values on this form with values/equations on other forms. Do not just paste values where value can be linked to another form. | |||||||||||||||||||||||||||
| Categories provided are for example only, link categories to actual categories listed on Worksheet 2f. | |||||||||||||||||||||||||||
| Rate cells should be linked to the rates Form L-L. Total values shall be computed in this form. | |||||||||||||||||||||||||||
| Provide equations for Total Cost computation. |
2e (WBS )
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2e | |||||||||||||||||||||||||||||||||||||||||||||||||
| Cost Summary Table by Contract WBS for CLINs 0001, 0002, 0003, 1001, 1002, 1003, 2001, 2002 | |||||||||||||||||||||||||||||||||||||||||||||||||
| Line Item * | Description | Major Sub Ktr Costs | Other Sub Ktr Costs | Interorganizational Transfer Costs | Cost of Material | Labor Category Costs | Other Direct Costs | Total Costs | Major Sub Ktr 1 Costs | Major Sub Ktr 2 Costs | Major Sub Ktr N Costs | Major Sub Ktr Costs Total | Other Sub Ktr 1 Costs | Other Sub Ktr 2 Costs | Other Sub Ktr N Costs | Other Sub Ktr Costs Total | Interorganizational Transfer 1 Costs | Interorganizational Transfer 2 Costs | Interorganizational Transfer N Costs | Interorganizational Transfer Costs Total | Labor Category 1 Costs | ||||||||||||||||||||||||||||
| Line Item | NRE | RE | NRE | RE | NRE | RE | NRE | RE | NRE | RE | NRE | RE | NRE | RE | Rate | NRE | RE | Rate | NRE | RE | Rate | NRE | RE | NRE | RE | Rate | NRE | RE | Rate | NRE | RE | Rate | NRE | RE | NRE | RE | Rate | NRE | RE | Rate | NRE | RE | Rate | NRE | RE | NRE | RE | Rate | |
| 1.0 | Navy ECDIS SW - Production Build 1.0 | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | * Sample WBS Structure | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.3.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.3.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.3.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.4 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.5 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.6 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.7 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.7.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.7.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.8 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.9 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.10 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.11 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.12 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.13 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.13.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.13.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.13.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.14 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.14.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.14.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.14.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.15 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.1.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.1.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.3.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.3.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.3.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.4 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.4.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.4.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.1.4.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.4 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4.5 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.5 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.5.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.5.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.5.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.6 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.6.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.6.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.6.3 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.6.4 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.6.5 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.7 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.7.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.7.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.8 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.8.1 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.8.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.9 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.10 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.11 | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | |||||||||||||||||||||||||||||||||||||||||||||||||
| Totals | |||||||||||||||||||||||||||||||||||||||||||||||||
| Prepare one of these forms for each CLIN as specified on J-11 (Summary Matrix). | |||||||||||||||||||||||||||||||||||||||||||||||||
| Round cost values to whole dollars. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Rate cells should be linked to the rates Worksheet 2f. Total values shall be computed in the form. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Cells containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Interorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs in this form are industry inputs. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Link each cell containing rates to appropriate cells in Worksheet 2f. Displayed rate shall be through G&A. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Provide equations for Total Cost computation. Costs shall be through G&A. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Add additional columns for additional labor, material and sub-contractor costs as required. | |||||||||||||||||||||||||||||||||||||||||||||||||
| The formulas in this form shall compute the appropriate parent/child cost roll up relationships. | |||||||||||||||||||||||||||||||||||||||||||||||||
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2e |
2f (Rate Summary)
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2f | ||||||||
| Cost Category | ||||||||
| Rates Category | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
| Material Overhead | ||||||||
| Category 1 | ||||||||
| Category 2 | ||||||||
| Category n | ||||||||
| Direct Labor Rate | ||||||||
| Category 1 | ||||||||
| Category 2 | ||||||||
| Category n | ||||||||
| Indirect Rate | ||||||||
| Category 1 | ||||||||
| Category 2 | ||||||||
| Category n | ||||||||
| General & Adminstrative Rate | ||||||||
| Category 1 | ||||||||
| Category 2 | ||||||||
| Category n | ||||||||
| Facility Capital Cost of Money Rate | ||||||||
| Category 1 | ||||||||
| Category 2 | ||||||||
| Category n | ||||||||
| Other Rate | ||||||||
| Category 1 | ||||||||
| Category 2 | ||||||||
| Category n | ||||||||
| * | ||||||||
| * | ||||||||
| * | ||||||||
| Category N | ||||||||
| Prepare one of these forms as needed for each CLIN as specified in the J-11 (Summary Matrix) | ||||||||
| These rates will be used in rates cells in Worksheets 2a, 2b, 2c, 2d, 2e. | ||||||||
| Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points. | ||||||||
| Rate categories shall include all rates used in this proposal. | ||||||||
| Categories listed are for example only, provide actual categories included in the proposal. | ||||||||
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2f |
2g (BOM)
| N00024-17-R-5216 Navy ECDIS SW SECTION L COST TABLE ATTACHMENT J-11 2g | |||||||||
| Bill of Material (BOM) | |||||||||
| Item # | CLIN | WBS | Part Number | Part Description | Supplier | Qty | Unit Price | Extended Price | Total |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .