Text version
Instructions and Definitions
| Prepare in accordance with Work Breakdown Structure (WBS) defined in the CSDR Plan (Attachment J-01) for all software and firmware development efforts. |
| Provide information at the Computer Software Configuration Item (CSCI) level and, where appropriate, at the Computer Software Component (CSC) level or Computer Software Unit (CSU) level in order to document historical SLOC planned for modification or reuse. Detail at the CSC level and/or CSU level is also requested when more than one contractor or sub-contractor is performing work within that CSCI. |
| CSCI: An aggregation of software that is designated for configuration management (CM) and treated as a single entity in the CM process. |
| CSC: A functional or logically distinct part of a CSCI. A CSC is typically an aggregate of two or more CSUs. |
| CSU: Smallest subdivision of a Computer Software Configuration Item (CSCI) for the purposes of engineering management. CSUs are typically separately compilable pieces of code. |
| ACTIVITY DESCRIPTION |
| Performing Agent: Break out by prime contractor and any sub contractor(s) on additional rows for each CSCI (excluding subcontractor(s), if any, that provide(s) a separate J-24 whose effort is not rolled into this J-24). |
| If a subcontractor submits a separate J-24, the prime J-24 shall include completed rows for the subcontract in the following columns: T through AC, AL, AN and AO. These entries shall match the subcontractor submission, if any. |
| Functional Purpose and Description: Clearly identify/describe each CSCI, including purpose/use of support software components. Reference to the location within the technical package is acceptable. |
| BOE Number: Cite the Basis of Estimate (BOE) for each CSCI |
| DESCRIPTION OF HISTORIC EFFORT |
| If the estimated modified and reused SLOC is greater than the historic effort (i.e. SLOC available for reuse), provide detailed justification for the source of the additional estimated modified/reuse SLOC. |
| If multiple historic efforts are being used for one CSCI, add rows to show all of the historic effort sources. |
| Programming Language: Provide the programming language used for the historic effort. |
| Counting Tool: The USC Unified Code Counting (UCC) Tool (Release 2015.12) shall be used for any supported language. For languages not supported by UCC, the Count Lines of Code (CLOC) Tool (v.1.64) shall be used. The column shall reflect the tool utilized for the respective historic effort. |
| Output for Total DSLOC: Report the total Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2015.12) or CLOC (v.1.64) output for "total lines." |
| Output for Blank DSLOC: Report the blank Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2015.12) or CLOC (v.1.64) output for "blank lines." |
| Output for Comments Whole DSLOC: Report the whole comments Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2015.12) output for "comments whole" or CLOC (v.1.64) output for "comments." |
| Output for Comments Embedded DSLOC: Report the embedded comments Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2015.12) output for "comments embedded." |
| Output for Logical DSLOC: Report the logical Delivered Source Lines of Code (DSLOC) for the cited historical effort as counted by the USC Unified Code Counting (UCC) Tool (Release 2015.12) output for "logical SLOC" or CLOC (v.1.64) equivalent output "code." |
| HISTORIC PERFORMANCE |
| Latest Completed Development Effort: Cite the last completed effort where the historic CSCI was modified. |
| If a historic CSCI is being split into multiple CSCI's, cite the percentage split of the historic CSCI for each CSCI. The total of percentages should equal to 100%. |
| Contract Number: Cite the contract on which the modification of the historic CSCI occurred. |
| Year Completed: Provide the year when this effort was completed. |
| ESLOC Count: Provide Equivalent SLOC (ESLOC) count for effort. |
| DCTI Hours: Design, Code, Test, & Integration (DCTI) hours spent on that CSCI |
| Of the IEEE 12207 Development Process Activities: |
| 1.0 Process Implementation |
| 2.0 System Requirements Analysis |
| 3.0 System Architectural Design |
| 4.0 Software Requirements Analysis |
| 5.0 Software Architectural Design |
| 6.0 Software Detailed Design |
| 7.0 Software Coding and Test |
| 8.0 Software Integration |
| 9.0 Software Qualification Testing |
| 10.0 System Integration |
| 11.0 System Qualification Testing |
| 12.0 Software Installation |
| 13.0 Software Acceptance Testing |
| DCTI hours include: |
| 6.0 Software Detailed Design |
| 7.0 Software Coding and Test |
| 8.0 Software Integration |
| PLANNED EFFORT SIZING |
| Justification for Changes from Historic Source: Provide a description of how the legacy code will be modified for the new development effort, including description of new functionality and removed functionality. |
| Programming Language: Provide the programming language for the development effort. |
| DCTI = Preliminary & Detailed Design, Code, CSCI Testing, and SW Integration Testing |
| From IEEE 12207, DCTI hours include: |
| 6.0 Software Detailed Design |
| 7.0 Software Coding and Test |
| 8.0 Software Integration |
| Provide descriptions of Source Lines of Code (SLOC) allocation categories (New, Modified, Reuse, NDI, Verbatim, Deleted, Other) in the BOE |
| Software Definitions: |
| 1. NEW CODE: This represents new source statements or existing source statements requiring significant modifications, wherein significant is defined as any logical block of related code (class, module, function) where more than 50% of the lines will be newly written or modified. |
| 2. MODIFIED CODE: This represents source statements that exist but required modification, wherein modification is limited to changing 15 – 50% of a single source statement. |
| 3. REUSE CODE: The represents source statements that currently exist and require minimal modification, wherein minimal is defined less than 15% changes to a single source statement. |
| 4. NDI or VERBATIM CODE: This represents intact executable modules (example: COTS, GOTS) and no changes or maintenance is planned. It excludes Machine Generated Code. |
| 5. MACHINE GENERATED CODE: This represents a subset of VERBATIM code which is listed separately. These source statements are automatically generated by software applications which allow tracing of actions. |
| 6. DSLOC: Delivered software lines of code |
| 7. ESLOC: Equivalent software lines of code |
| 8. Reserved: This represents future ECPs for Future Capabilities for the SSDS ICS. It should be left blank. |
| Total Logical DSLOC: Sum of New, Modified and Reused Code |
| Total Physical DSLOC: Total Delivered Software Lines Of Code, excluding comments and blanks. |
| Total Physical DSLOC with Comments & Blank Lines: Total Delivered Software Lines Of Code, including comments and blanks. |
| DSLOC TO ESLOC CONVERSION CALCULATIONS |
| Justification for ESLOC Conversion Factors: Provide the source for the ESLOC conversion factors, including any modifications applied. If ESLOC conversion factors differ from industry rule of thumb of 1.0 (New), 0.5 (Modified), 0.1 (Reused), provide supporting data and calculations. |
| NEW to ESLOC: Inverse of number of new lines of code per ESLOC (1 / (New Lines of Code per ESLOC) |
| Modified to ESLOC: Inverse of number of modified lines of code per ESLOC (1 / (Modified Lines of Code per ESLOC) |
| Reuse to ESLOC: Inverse of number of reused lines of code per ESLOC (1 / (Reused Lines of Code per ESLOC) |
| NDI or Verbatim to ESLOC: Inverse of number of NDI/Verbatim lines of code per ESLOC (1 / (NDI/Verbatim Lines of Code per ESLOC) |
| Machine Generated to ESLOC: Inverse of number of machine generated lines of code per ESLOC (1 / (Machine Generated Lines of Code per ESLOC) |
| Deleted to ESLOC: Inverse of number of deleted lines of code per ESLOC (1 / (Deleted Lines of Code per ESLOC) |
| Other to ESLOC: Inverse of number of other lines of code per ESLOC (1 / (Other Lines of Code per ESLOC) |
| Total ESLOC: Sum of each code type (New/Modified/Reused/NDI/Machine Generated/Deleted/Other) multiplied by their DSLOC to ESLOC Conversion Factor |
| Planned Performance |
| Justification for ESLOC/Hour Metric: Provide source of the ESLOC per hour factor, including any modifications applied. |
| ESLOC/ Hour: Provide the software productivity factor for the CSCI. |
| TOTAL HOURS: Total ESLOC/ (ESLOC/ Hour) |
J-24 SLOC Summary Template
SOFTWARE LINES OF CODE SUMMARY
TOTAL DEVELOPMENT
| Activity Description | Description of Historic Effort | Historic Performance | Planned Effort Sizing (RAW SLOC PROGRAM SIZE (DSLOC)) | DSLOC to ESLOC Conversion Calculations | Planned Performance | ||||||||||||||||||||||||||||
| WBS | CSCI | Performing Agent | Functional Purpose and Description (Reference Technical Section) | BOE Number (Reference Proposal Volume, Section, Book, and Page) | Historic Effort (Program/CSCI) | Programming Language | Counting Tool | ||||||||||||||||||||||||||
| (UCC or CLOC) | Output for Total DSLOC | Output for Blank DSLOC | Output for Comments Whole DSLOC | Output for Comments Embedded DSLOC | Output for Logical DSLOC | Latest Completed Development Effort | Contract Number | Year Completed | ESLOC Count | DCTI Hours | Justification for Changes from Historic Source | Programming Language | New | Modified | Reuse | NDI or Verbatim | Machine Generated | Deleted | Other | Total Logical DSLOC | Total Physical DSLOC | Total Physical DSLOC with Comments & Blank Lines | Justification for ESLOC Conversion Factors | New to ESLOC | Modified to ESLOC | Reuse to ESLOC | NDI or Verbatim to ESLOC | Machine Generated to ESLOC | Deleted to ESLOC | Other to ESLOC | Total | ||
| ESLOC | Justification for ESLOC/Hour Metric | ESLOC/ Hour | TOTAL HOURS | ||||||||||||||||||||||||||||||
| #.# | Past Performance | ||||||||||||||||||||||||||||||||
| #.#.# | Primary Function(s) |
| #.#.#.# | ||||||||||||||||||||||||||||
| Prime | <All New Code> | C++ | - 0 | N/A | N/A | N/A | N/A | N/A | No existing code for X. Adding 1,000,000 for new functionality | C++ | 1,000,000 | - 0 | - 0 | - 0 | - 0 | - 0 | 1,000,000 | Software Cost Estimating Package X, including modifications to those conversion factors. | 1.0 | 0.5 | 0.1 | 1,000,000 | Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc | 1.75 | 571,429 | |||
| Prime | Program X (AN/SXX-YY)/ CSCI Z | C++ | 500,000 | Program X Development | NXXXXX-XX-C-XXXX | XX | 100,000 | 100,000 | Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effort | C++ | 75,000 | 25,000 | 50,000 | 25,000 | 150,000 | Software Cost Estimating Package X, including modifications to those conversion factors. | 1.0 | 0.5 | 0.1 | 0.01 | 92,750 | Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc | 1.25 | 74,200 | ||||
| Subcontractor A | : | - 0 | ||||||||||||||||||||||||||
| Subcontractor B | : | - 0 | ||||||||||||||||||||||||||
| #.#.#.# | - 0 | |||||||||||||||||||||||||||
| Prime | <All New Code> | C++ | - 0 | N/A | N/A | N/A | N/A | N/A | No existing code for X. Adding 1,000,000 for new functionality | C++ | 1,000,000 | - 0 | - 0 | - 0 | - 0 | - 0 | 1,000,000 | Software Cost Estimating Package X, including modifications to those conversion factors. | 1.0 | 0.5 | 0.1 | 1,000,000 | Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc | 0.96 | 1,041,667 | |||
| Prime | Program X (AN/SXX-YY)/ CSCI Z | C++ | 500,000 | Program X Development | NXXXXX-XX-C-XXXX | XX | 100,000 | 100,000 | Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effort | C++ | 75,000 | 25,000 | 50,000 | 150,000 | Software Cost Estimating Package X, including modifications to those conversion factors. | 1.0 | 0.5 | 0.1 | 0.01 | 92,500 | Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc | 1.99 | 46,482 | |||||
| Subcontractor A | : | - 0 | ||||||||||||||||||||||||||
| Subcontractor B | : | - 0 | ||||||||||||||||||||||||||
| - 0 | ||||||||||||||||||||||||||||
| Prime | <All New Code> | C++ | - 0 | N/A | N/A | N/A | N/A | N/A | No existing code for X. Adding 1,000,000 for new functionality | C++ | 1,000,000 | - 0 | - 0 | - 0 | - 0 | - 0 | 1,000,000 | Software Cost Estimating Package X, including modifications to those conversion factors. | 1.0 | 0.5 | 0.1 | 1,000,000 | Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc | 2.05 | 487,805 | |||
| Prime | Program X (AN/SXX-YY)/ CSCI Z | C++ | 500,000 | Program X Development | NXXXXX-XX-C-XXXX | XX | 100,000 | 100,000 | Adding 75,000 SLOC for Y functionality. Reusing 75,000 for similar effort. Removing 25,000 for non-applicable effort | C++ | 75,000 | 25,000 | 50,000 | 150,000 | Software Cost Estimating Package X, including modifications to those conversion factors. | 1.0 | 0.5 | 0.1 | 0.01 | 92,500 | Historic productivity on Program X (AN/SXX-YY)/ CSCI Z during NXXXXX-XX-C-XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, with XX% Adjustment for XXXX, etc | 1.45 | 63,793 | |||||
| Subcontractor A | : | |||||||||||||||||||||||||||
| Subcontractor B | : |
| : |
| : |
Support Software
| -(Components) | |
| : | |
| Totals | |
| 1.0 | SSDS Integrated Combat System |
| 1.1 | SSDS SW Capability Builds |
| 1.1.2 | Capability Build Software Release |
| 1.1.2.1 | Software Product Engineering |
| 1.1.2.2 | Computer Software Configuration Item (CSCI) Subsystem Software |
| 1.1.2.2.1 | Enterprise Air Surveillance Radar (EASR) |
| 1.1.2.2.1.1 | SW Development Testing Validation |
| 1.1.2.2.1.2 | Training Software Development |
| 1.1.2.2.2 | Evolved Sea Sparrow Missile (ESSM) Block 2 |
| 1.1.2.2.2.1 | SW Development Testing Validation |
| 1.1.2.2.2.2 | Training Software Development |
| 1.1.2.2.3 | Surface Electronic Warfare Improvement Program (SEWIP) Block 3 |
| 1.1.2.2.3.1 | SW Development Testing Validation |
| 1.1.2.2.3.2 | Training Software Development |
| 1.1.2.2.4 | Cybersecurity |
| 1.1.2.2.5 | Reserved- Future ECP Capabilities |
| 1.1.2.2.5.1 | SW Development Testing Validation |
| 1.1.2.2.5.2 | Training Software Development |
| 1.2.2 | Software Migration |
| 1.2.2.1 | HTI 12 |
| 1.2.2.2 | HTI 12H |
| 1.2.2.3 | HTI 16 |
| 1.2.2.4 | HTI 16TR |
| 1.2.2.5 | Reserved- HTI-Next |
Software Development
Totals: