Bidders_QA4.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
USS COLE (DDG 67) Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-17-R-4438
Issued by

View the file

Other files

File Type Posted
Bidders_QA5_20180111.xlsx XLSX spreadsheet
N00024-17-R-4438_Amendment_0008.pdf PDF
N00024-17-R-4438_conformed.pdf PDF
N00024-17-R-4438_conformed.pdf PDF
N00024-17-R-4438_Amendment_0007.pdf PDF
N00024-17-R-4438_conformed.pdf PDF
N00024-17-R-4438_Amendment_0006.pdf PDF
N00024-17-R-4438_Amendment_0005_conformed.pdf PDF
N00024-17-R-4438_Amendment_0005.pdf PDF
N00024-17-R-4438_Amend_0004_conformed.pdf PDF
N00024-17-R-4438_Amend_0004_mod.pdf PDF
Bidders_Q&A3_20171114.xlsx XLSX spreadsheet
N00024-17-R-4438_Amend_0003_mod.docx DOCX document
N00024-17-R-4438_Amend_0003_conformed.docx DOCX document
N00024-17-R-4438_Amendment_0002_mod.pdf PDF
Bidders_Q&A1_20171017.xlsx XLSX spreadsheet
N00024-17-R-4438_Amendment_0002_conformed.pdf PDF
J-5_Quality_Assurance_Surveillance_Plan,_Amendment_0001.docx DOCX document
N00024-17-R-4438_0001_conformed.pdf PDF
N00024-17-R-4438_0001_mod.pdf PDF
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
Exhibit_B.pdf PDF
J-5_QASP_USS_COLE_(DDG_67)_FY18_EDSRA_FINAL.pdf PDF
RFP_N00024-17-R-4438.pdf PDF
S-3_PPI_Form.xlsx XLSX spreadsheet
Exhibit_C.pdf PDF
S-2_Past_Performance_Questionnaire.docx DOCX document
exhibita.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
J-5_Enclosure_(1)_cont..xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pre-Proposal Information (PPI) Questions and Answers #4

DATE: 15 DEC 2017SOLICITATION NO: N00024-17-R-4438
TITLE: USS COLE (DDG-67)NAVSEA POC: Justin Lessel, justin.d.lessel@navy.mil; Sheila Utz, sheila.utz1@navy.mil
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.POC PHONE: (202) 781-4064
SSP NO: SSP TPPC-DDG67-MARMCN18-CN01

FORWARD ALL REQUESTS TO: Justin Lessel, justin.d.lessel@navy.mil; Sheila Utz, sheila.utz1@navy.mil

ITEM NO: 512-11-002 CONTRACTOR QUESTION 43: Para 1.3.1 identifies a fan coil unit, RS02-169-1. The "02" in the fan coil assembly represents the 02 level. There are no spaces listed in 1.2 on the 02 Level. Furthermore, there are 2 more fan coil units listed in 1.3.2, but the numbers are not provided nor does it specify a location. This item needs clarification. GOVERNMENT RESPONSE:

WI revised via ERRATA 4

1.2.6 will be added = Passage Way (01-174-4-L)

1.3.1 will be edited to read RS 2-105-2 vice RS 2-169-1 Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Fan Coil Assembly
PARA. NO: 1.3
PAGE NO: 1

ITEM NO: 622-12-001 CONTRACTOR QUESTION 44: Para 3.1 states remove and install a total of 32 square feet of deck panel. Then subpara 3.1.1 list several screws, ferrules and 17 each 48" x 100" deck panels or 567 square feet. Further, the GFM in 5.1 is only listing 1 panel equaling 32 square feet. This item is ambiguous and the contractors are unsure what the government is looking for. This item needs clarification. GOVERNMENT RESPONSE:

WI revised via ERRATA 4

3.1 revised to read 640 SQ.FT vice 32 SQ.FT.

3.1.1 revised to read 20 EA vice 17 EA.

5.1 revised to read 20 EA vice 1 EA.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Nomex Deck Panel
PARA. NO: 3.1, 3.1.1
PAGE NO: 1, 2

ITEM NO: 123-41-001 CONTRACTOR QUESTION 45: The work required in para 3.7.7 in (AC Machinery and Pump Room 5-300-01-E), also appears in WI 631-11-004 and seems redundant. Please clarify if this is correct and in which work item the work should be performed. GOVERNMENT RESPONSE:

WI revised via ERRATA 4

3.7.7 is deleted from 123-41-001.

WI 631-11-004 will remain as is.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Shaft Alley Structural Repair and Preservation; accomplish
PARA. NO: 3.7.7
PAGE NO: 4 of 6

ITEM NO: 251-32-002 CONTRACTOR QUESTION 46: Please clarify what locations or SQFT is to be designated by the supervisor in para 3.12. GOVERNMENT RESPONSE:

WI revised via ERRATA 4

3.12 phrase "as designated by the SUPERVISOR" is deleted.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Forward Gas Turbine Intakes; remediate
PARA. NO: 3.12
PAGE NO: 3 of 4

ITEM NO: 472-11-001 CONTRACTOR QUESTION 47: Please clarify if the intention of para 3.2 is to preserve the entire surface in locations 1.2.1 through 1.2.3 and 1.2.5 or just in way of PCMS replacement. GOVERNMENT RESPONSE:

The intention of para 3.2 is to preserve in its "entirety".

TITLE: (PCMS) Material, 04 Level; replace
PARA. NO: 3.2
PAGE NO: 1 of 2

ITEM NO: 259-10-002 CONTRACTOR QUESTION 48: Please clarify what locations or SQFT is to be designated by the supervisor in para 3.6. Please provide a Table and Line for the correct PNT system to be applied after the repairs are completed. GOVERNMENT RESPONSE:

WI revised via ERRATA 4 This WI is significantly revised.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Number One Gas Turbine Mixing Room, Uptake, Boundary Layer Infra-Red Suppression System (BLISS) Cap; remediate

PARA. NO: 3.6
PAGE NO: 2 of 4

ITEM NO: 259-10-003 CONTRACTOR QUESTION 49: Please clarify what locations or SQFT is to be designated by the supervisor in para 3.6. Please provide a Table and Line for the correct PNT system to be applied after the repairs are completed. GOVERNMENT RESPONSE:

WI revised via ERRATA 4 This WI is significantly revised.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Number 2 Gas Turbine Mixing Room, Uptake, Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair

PARA. NO: 3.6
PAGE NO:

ITEM NO: 150-11-007 CONTRACTOR QUESTION 50: Please specify a Table and Line for the correct Paint system in para 3.15. GOVERNMENT RESPONSE:

WI revised via ERRATA 4

3.15 will now read: "Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, for preservation of exterior surfaces of each location listed in 1.2, including decks, ladders, interior of bulwarks, piping, piping hangers, deck drains, step platform, bulkhead foundations for mounting brackets, and uptake duct deck anchor foundation surfaces.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: 04 Level Structural; repair
PARA. NO: 3.15
PAGE NO: 3 of 5

ITEM NO: 571-80-001 CONTRACTOR QUESTION 51: Please identify the what is to be preserved in para 3.5 and 3.6, as para's 3.5 and 3.6 fail to identify a location or quantity to be preserved. GOVERNMENT RESPONSE:

WI revised via ERRATA 4

1.2.1 Revised to read Kingpost TRK (2-38-0-Q)

3.5 Is deleted.

3.6 Revised to read "Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 7 for the deck and 36 inches up the bulkheads for the locations listed in 1.2.2.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: ShipAlt DDG51-76201D, Forward Retractable Kingpost Removal; accomplish
PARA. NO: 3.5, 3.6
PAGE NO: 2 of 3

ITEM NO: 437-90-002 CONTRACTOR QUESTION 52: Para 3.2.4 states to accomplish 009-12 table 2 columns a, Lines one thru 7. This is for a fit-up…..but then sub para 3.2.4.1 states to accomplish NDT testing IAW Line 9…..Please clarify what the government wants. NDT or fit-up. GOVERNMENT RESPONSE:

Both NDT and Fit-Up are required.

TITLE: SA 77829K Install radar and TDR TLI
PARA. NO: 3.2.4, 3.2.4.1
PAGE NO: 2

ITEM NO: 634-21-002 CONTRACTOR QUESTION 53: There is no requirements referenced under 009-32. Parr 3.5 references 009-84, which has nothing to do with applying nonskid. Para 3.6 specifies SSP-6 Blasting. 009-32 requires WJ-2 or SSP-10. This spec needs review and clarification. GOVERNMENT RESPONSE:

WI revised via ERRATA 4 This WI is significantly revised.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Flight Deck Nonskid
PARA. NO: 3.5, 3.6
PAGE NO:

ITEM NO: 259-10-003 CONTRACTOR QUESTION 54: Please identify the location of the decks, etc. to be preserved in para 3.10. GOVERNMENT RESPONSE:

WI revised via ERRATA 4 This WI is significantly revised.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA ?.

TITLE: Number 2 Gas Turbine Mixing Room, Uptake, Boundary Layer
PARA. NO: 3.10
PAGE NO: 3

ITEM NO: 259-11-003 CONTRACTOR QUESTION 55: Preservation of the forward stack is also covered in 631-21-002. Recommend deleting the preservation in one of the items GOVERNMENT RESPONSE:

WI revised via ERRATA 4

3.5 is revised.

3.6 is revised Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Uptake Engine Room Number One; repair and preserve
PARA. NO: 3.6
PAGE NO: 3 of 4

ITEM NO: 259-12-001 CONTRACTOR QUESTION 56: Preservation of the forward stack is also covered in 631-21-002. Recommend deleting the preservation in one of the items GOVERNMENT RESPONSE:

WI revised via ERRATA 4

3.9 is revised to Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 23, for preservation of the entire interior of locations listed in 1.2.

3.10 is revised to Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 5, 6, 7 OR 8, for the preservation of the entire exterior surfaces of the stack listed in 1.2 and all antenna platforms.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Uptake Engine Room Number 2; repair and preserve
PARA. NO: 3.10
PAGE NO: 4 of 5

ITEM NO: 163-11-001 CONTRACTOR QUESTION 57: Please confirm the 8" Gate Valve in para 3.15.1 will be GFM. GOVERNMENT RESPONSE:

WI revised via ERRATA 4

3.16 Install each 3 inch and larger gate valve listed in Attachment A, repaired in 3.15, using 2.5 through 2.13 for guidance.

5.1 is changed, 5.1.1, Line Item 15 to read 3.15 vice 3.14 to include valve in GFM.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Sea Chests, Wasters and Sea Valves
PARA. NO: 3.15.1, 5.1
PAGE NO: 6, 9

ITEM NO: 631-41-001 CONTRACTOR QUESTION 58: Para 3.2 says to accomplish the requirements of 009-78 for freeboard preservation. Para 2.6 Reference drawing 7623365. That Drawing only shows the mast and doesn't mention how much PCMS tile needs to be replaced. This item is supposed to be completed in conjunction with item110-11-004. Does anyone know how much PCMS tile is involved with these work items? GOVERNMENT RESPONSE:

WI revised via ERRATA 4 SQ.FT is unknown. KTR needs to accomplish a ship check after ERRATA 4 issued.

4.1 is added for specialized coatings.

5.1 Adds PCMS.

Please contact Sheila Utz, sheila.utz1@navy.mil, and Justin Lessel, justin.d.lessel@navy.mil to receive a copy of ERRATA 4.

TITLE: Freeboard Preservation
PARA. NO: 2.6
PAGE NO: 788

ITEM NO: 123-19-001 CONTRACTOR QUESTION 59: The square footage of tanks listed in Para. 1.2.1 - 1.2.8 is not listed in the Specification or the Paint Schedule. Please provide. GOVERNMENT RESPONSE:

The references identified in 2.1 - 2.12 as well as ship checks should be used to determine the square footage of tanks listed in 1.2.1-1.2.8

TITLE: Collection Holding & Waste Drain Tanks
PARA. NO: 1.2
PAGE NO: 1

image1.jpg