HOWARD_Questions_and_Answers_1.pdf

PDF 67 KB Posted

Attached to
USS HOWARD (DDG 83) FY18 Depot Modernization Period (DMP)
Solicitation number
N00024-17-R-4432
Issued by

About this file

HOWARD Questions and Answers 1

View the file

Other files

File Type Posted
N00024-17-R-4432_Amendment_0004_Attachment_J-4_Rev2.xlsx XLSX spreadsheet
USS_HOWARD_(DDG_83)_FY_18_DMP_RFP_Amendment_0004.docx DOCX document
USS_HOWARD_(DDG_83)_04_Q&A.pdf PDF
Bidder's_QA_03_HOWARD.pdf PDF
N00024-17-R-4432_Amendment_0003.pdf PDF
HOWARD_RFP_DDG83__AMENDMENT_0002.pdf PDF
HOWARD_Questions_and_Answers_2.pdf PDF
HOWARD_RFP_DDG83_AMENDMENT_0001.docx DOCX document
J-4_Pricing_Spreadsheet_DDG_83_Rev1.xlsx XLSX spreadsheet
S-2_Past_Performance_Questionnaire.docx DOCX document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
J-4_Pricing_Spreadsheet_DDG_83.xlsx XLSX spreadsheet
J-7_RTR_Control_Log_and_Form.doc DOC document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
N00024-17-R-4432.docx DOCX document
J-5_QASP_HOWARD_(DDG_83)_FY18_DMP.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
S-3_Pre-Proposal_Information_Form.xlsx XLSX spreadsheet
DRAFT_Howard_DMP_Avail_Index.pdf.xlsx XLSX spreadsheet
S-3_Pre-Proposal_Information_Form.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO: Various

TITLE:

PARA NO:

PAGE NO:

ITEM NO: 251-31-002

TITLE: Air Intake and Exhaust Louvers; Repair and Preserve

PARA NO: 3 8 through 3 8 4 and 3 9 3

PAGE NO:

ITEM NO: 259-11-002

TITLE: Gas Turbine Exhaust Duct; Repair

PARA NO: 3 1 1

PAGE NO:

ITEM NO: 123-00-001

Tanks and Voids Open, Pump, Clean and Gas Free accomplish

PARA NO: 3 1,3 3

PAGE NO:

ITEM NO: 992-31-001

TITLE: Cleaning and Pumping; Accomplish

PARA NO: 3 1

PAGE NO:

ITEM NO: 992-31-001

TITLE: Cleaning and Pumping; accomplish

PARA NO: 3 2

GOVERNMENT RESPONSE: Para 3 2 2 will be revise to read:

remove and dispose of an additional 30,000 gallons of oily liquids from each bilge listed in 1 2 generated by the Navy, after initial cleaning and certification is obtained Work spec revised in Errata 1

CONTRACTOR QUESTION 6: Paragraph 3 2 directs the contractor to "clean each bilge space listed in 1 2 free o f trash, debris, grease, oily liquids and other liquid contaminants prior to the initial certification using 2 2 for guidance " Paragraph 3 2 2 directs contractor to "remove and dispose of an additional 500 gallons of nonhazardous liquids from each bilge listed in 1 2 generated by the Navy, after initial cleaning and

FORWARD ALL REQUESTS TO: Stephanie Jabaley, stephanie.jabaley@navy.mil; Sheila Utz, sheila.utz1@navy.mil

GOVERNMENT RESPONSE: Concur with 3 1 Work spec is revised in Errata 1

CONTRACTOR QUESTION 3: Paragraph 3 1 1 states, "Submit one legible copy, in hard copy or transferrable media of a report listing results of 3 3 to the Supervisor There is no 3 3 on this specification Should this refer to 3 1? Please clarify

CONTRACTOR QUESTION 4: Paragraphs 3 1 and 3 3 directs the contractor to open, empty, clean, render dry and maintain each tank or space listed in 1 2 including each adjacent tank, space or piping system where the scope of repairs will result in a need for certification during the performance of this job Contractor is unable to accurately price the level of effort required to empty all of the tanks listed without knowing the quantity of liquids to be removed Please provide the quantity of liquids to be removed from each tank to ensure fair and accurate competitive pricing

GOVERNMENT RESPONSE: Price Level of Effort based on low point suction

CONTRACTOR QUESTION 5: Paragraph 3 1 directs the contractor to ventilate, empty, clean, render dry and maintain each space for certification during the performance of this job order Contractor is unable to accurately price the level of effort required to empty all of the spaces without knowing the quantity of liquids to be removed Please provide the quantity of liquids to be removed from each space to ensure fair and accurate competitive pricing

GOVERNMENT RESPONSE: Dispose up to a total 250,000 gallons of oily waste water for the spaces listed in Paragraph 1 2 Work spec revised in Errata 1

CONTRACTOR QUESTION 1: Attachment 1 to this question provides a listing of 18 documents that are required by the specifications that have not been provided and 48 documents where the version provided is a different version than required by the specification Please provide the missing 18 documents and the correct versions for the 48 documents or correct the specifications to match the versions sent Thank you

GOVERNMENT RESPONSE: Missing references are provided in Errata 1

CONTRACTOR QUESTION 2: Instead of sending these louvers to Canada, is it authorized to utilize locally qualified subcontractors for the requirements of these paragraphs? Can the requirements of these paragraphs be accomplished using spray method instead of fluidized bed method?

GOVERNMENT RESPONSE: Answer to the first part of this is No Currently the only Navy authorized vendor is applying the fluidized bed method is located in Canada Answer to the second part of this question is NO The only authorized coating system for all louvers is the fluidized bed method IAW 009-32, Table 2, Line 38

CONTRACTOR POC:

Pre-Proposal Information (PPI) Form

Attachment S-3

CONTRACTOR PHONE:

SSP NO:

DATE OF REQUEST: SOLICITATION NO: N00024-17-R-4432

TITLE: USS HOWARD (DDG-83)

NAVSEA POC: Stephanie Jabaley, stephanie.jabaley@navy.mil; Sheila Utz, sheila.utz1@navy.mil

CONTRACTOR: POC PHONE: (202) 781-2721

PAGE NO:

ITEM NO: 077-11-001

TITLE: Hazardous Waste Produced on Naval Vessels; control

PARA NO: 3 5

PAGE NO:

ITEM NO: 243-11-002, 243-12-002

TITLE: Propulsion Shafting

PARA NO: 3 11 4

PAGE NO:

ITEM NO: 992-11-007

TITLE: Integrated Shipboard Network System

PARA NO: 3 1 6

PAGE NO: 1

ITEM NO: 854-11-001

TITLE: Crew Transpiration Service

PARA NO: 3 1 6

PAGE NO: 1

ITEM NO: 993-90-001

TITLE: Warehouse Storage Space for Government Use

PARA NO: 3 1 1

PAGE NO:

ITEM NO: 992-11-012

TITLE: Fuel Assistance and Tow Boat Service Fuel Barge

PARA NO: 3 2, 3 3

PAGE NO: 1

ITEM NO: 992-11-008

TITLE: Support Service for Ships Force Security

PARA NO: 3 3 3 4

PAGE NO: 1

ITEM NO: 123-11-007

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 165-80-001

TITLE: Missing Reference

PARA NO:

PAGE NO:

CONTRACTOR QUESTION 14: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 123-11-007 Compensated Fuel Tank Group 6; preserve (touch up) Ref 2 4 S9633-VF-STM-010/CH-633, Cathodic Protection

GOVERNMENT RESPONSE: Ref 2 4 is incorrect Correct Tech manual is S9086-VF-STM-010 Cathodic Protection Tech manual forwarded to NAVSEA 02 for distribution Work spec revised in Errata

CONTRACTOR QUESTION 15: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 165-80-001 ShipAlt DDG51-76227D, Sonar Dome Relief Valve Flange Modification; accomplish Ref 2 2 522-8432430 Rev A, REPL of PRESS RV on SNR Dome Pressurization SYS

GOVERNMENT RESPONSE: Ref 2 2 available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 8: Paragraph 3 11 4 states to procure materials, fabricate and install new, up to 12 each flange bolts and nuts per coupling We believe this is intended to state, "for each shaft" not for each coupling Please confirm Is so, please correct the specification

GOVERNMENT RESPONSE: The intent of this work spec is correct

CONTRACTOR QUESTION 7: NAVSEA Standard item 009-03 is a Category 1 Standard item invoked without reference in the specifications Paragraph 4 1 of 009-03 states, “The term “hazardous substance” means a substance, which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritant, or otherwise harmful is likely to cause injury ” The Hazardous Waste work item, 077-11-001 doesn’t specifically state what constitutes a hazardous waste (substance) Therefore, the definition of "hazardous substance from 009-03 is interpreted to be applicable to this work item US Code Title 10 USC 7311, reference 2 4 of 077-11-001 applies specifically to the handling of hazardous waste during the repair and maintenance of Naval vessels and requires the Navy to identify the types and amounts of hazardous waste that will be generated or removed by the contractor Oily water removed from petroleum tanks and bilges is considered to be a harmful substance by the definition provided in NAVSEA Standard Item 009-03 The Government has not identified the types and amounts of oily water to be generated or removed from the various petroleum tanks and bilges on the hazardous waste work item Please modify the specification to include the quantities of oily water to be disposed of that will be generated during this availability

GOVERNMENT RESPONSE: Dispose up to 300,000 gallons of oily waste, 500,000 gallons Compensate water and 100,000 gallons of sewage waste Work spec revised in Errata 1 b ge sted ge e ated by t e avy, a te t a c ea g a d certification is obtained Removal shall be measured Total amount of liquids removed greater or less than the above amount will be subject of an equitable adjustment " Contractor is unable to accurately price the level of effort required to empty all of the spaces as required in paragraph 3 2 without knowing the quantity of liquids to be removed from each space This was provided in paragraph 3 2 2 for all of the spaces after certification The contractor is requesting that the same be done for paragraph 3 2 for the same spaces prior to certification Please provide the quantity of liquids to be remodeled out of each space to ensure fair, accurate and competitive pricing

CONTRACTOR QUESTION 9: Paragraph 3 1 6 states to "Provide technical support on an "on call" basis for the duration of the availability " Contractor requests that a more defined, quantifiable requirement be provided for bidding purposes As an alternative, handle this requirement as a negotiated changed, or add a labor manhour and material pool to the specification

GOVERNMENT RESPONSE: Provide 15 mandays of labor and 5,000 dollar material for on call basis Work spec revised in Errata 1

CONTRACTOR QUESTION 10: Paragraph 3 1 1 states to provide 3 round trips per 24 hour day Paragraph 3 1 2 states that shuttle bus service shall commence at 0530 and end at 1800 Please clarify whether the requirements of these two paragraphs are the same or two different services

GOVERNMENT RESPONSE: One round trip in the morning, one round trip in the afternoon and one round trip in the evening Work spec revised in Errata 1

CONTRACTOR QUESTION 13: Paragraph 3 3 states to provide berthing space and fuel for ships force protection security boat Does this paragraph indicate that whips force will be executing the 009-72 requirements while the ship is at the contractor's facility? What type of fuel does the boat require? How many gallons of fuel will be required? Does this specification apply only while the vessel is at the contractors facility?

GOVERNMENT RESPONSE: Government to cancel work item

CONTRACTOR QUESTION 11: Paragraph 3 1 1 requires 70,000 square feet of usable floor space Please review this requirement as it appears extremely excessive compared to the space required on similar prior availabilities

GOVERNMENT RESPONSE: The PM reviewed this work specification and the 70,000 square feet of usable floor space is necessary

CONTRACTOR QUESTION 12: The fuel depot in San Diego will not allow entry of contractor provided tugs and do not let contractors tow the fuel barges Please review requirement and advise

GOVERNMENT RESPONSE: Government to delete para 3 2, 3 3 and 3 4 via ERRATA Work spec revised in Errata 1

ITEM NO: 245-11-002

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 245-12-002

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 411-90-001

TITLE: Missing References

PARA NO:

PAGE NO:

ITEM NO: 438-90-001

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 438-90-002

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 472-90-001

TITLE: Missing References

PARA NO:

PAGE NO:

ITEM NO: 472-90-003

TITLE: Missing References

PARA NO:

PAGE NO:

ITEM NO: 541-12-002

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 551-61-201

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 593-90-001

TITLE: Missing References

PARA NO:

CONTRACTOR QUESTION 20: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 438-90-002 ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish Ref 2 12 RLAR 71726-DDG63-1168313 , Change ASU Foundations

CONTRACTOR QUESTION 25: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided

GOVERNMENT RESPONSE: Ref 2 16 and Ref 2 13 available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 23: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 541-12-002 Fuel Transfer System MORPAC Valve; repair Ref 2 5 S96435-SZ-TRS-010, Electric Motor Operated Valves

GOVERNMENT RESPONSE: Ref 2 5 reference is incorrect Correct Tech manual is S6435-SZ-TRS-010 Electric Motor Operated Valves Tech manual forwarded to NAVSEA 02 for distribution Work spec revised in Errata 1

CONTRACTOR QUESTION 24: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 551-61-201 Masker Air Emitter Belt; clean and repair Ref 2 3 89256-6603, Masker Emitter Belt Cleaning Procedure (For Dry Docked Ships)

GOVERNMENT RESPONSE: Ref 2 3 available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

GOVERNMENT RESPONSE: Ref 2 20 RLAR available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 21: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 472-90-001 ShipAlt DDG51-80156K, AN/SLQ-32(V)6 SEWIP Block 2 Upgrade; accomplish Ref 2 8 RLAR 84262/DDG111/1166696, Revise Drive Shaft Tolerances Ref 2 9 RLAR 84262/DDG52/1168226, Revise Stowage Box Adhesive CAT No from 49071-001 to 495054-009 Ref 2 10 RLAR 84262/DDG63/1168509,, Revise Mounting Requirements for SLQ-59 C/O Switches

GOVERNMENT RESPONSE: Ref 2 8 RLAR, Ref 2 9 RLAR and Ref 2 10 RLAR available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 22: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 472-90-003 ShipAlt DDG51-84262K/85322K, AN/SLQ-59 Block III TEWM Infrastructure/Embarkable Equipment Installation; accomplish Ref 2 8 RLAR 84262/DDG111/1166696, Revise Drive Shaft Tolerances Ref 2 9 RLAR 84262/DDG52/1168226, Revise Stowage Box Adhesive CAT No from 49071-001 to 495054-009

GOVERNMENT RESPONSE: Refs 2 8, 2 9 and 2 20 RLARs available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 18: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 411-90-001 ShipAlt DDG51-78511K, AWS:ACB12/TI12 CIC Display Upgrade for DDGS; accomplish Ref 2 8 RLAR 78511/DDG83/1167825 CIC FDN A038 Continuity Weld Ref 2 9 RLAR 78511/DDG83/1168036, Change Sourcing of 728, 729 & 730 from HSC to IAF

GOVERNMENT RESPONSE: Ref 2 8 RLAR and 2 9 RLAR to NAVSEA 02 available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

GOVERNMENT RESPONSE: Ref 2 12 available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 16: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 245-11-002 Controllable Pitch Propeller (CPP) System, Propeller Blade (Stbd); inspect and assess Ref 2 12 NSWC Technical Notice,, Serial 932/93 (dated 9 Oct 2013)

CONTRACTOR QUESTION 17: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 245-12-002 Controllable Pitch Propeller (CPP) System, Propeller Blade (Stbd); inspect and assess Ref 2 12 NSWC Technical Notice,, Serial 932/93 (dated 9 Oct 2013)

GOVERNMENT RESPONSE: Ref 2 12 available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

GOVERNMENT RESPONSE: Ref 2 20 RLAR available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 19: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 438-90-001 ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Central Control Station (CCS) Watchstander; accomplish Ref 2 20 RLAR 71604/DDG83/1168480 , Locating Dimension to Table PN

ITEM NO: 651-11-002

TITLE: Missing References

PARA NO:

PAGE NO:

ITEM NO: 721-90-001

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 980-90-010

TITLE: Missing Reference

PARA NO:

PAGE NO:

ITEM NO: 456-90-003

TITLE: ShipAlt DDG51-77615K, ACB12/TI12 OA Computing Plant Upgrade for DDG;

accomplish

PARA NO:

PAGE NO:

ITEM NO: 526-80-001

TITLE: DDG 51 Class Alteration Equivalent To A Repair (AER) 66089 REV A Deck Drain Repair Ring; accomplish

PARA NO:

PAGE NO:

ITEM NO: 243-11-002

TITLE: Starboard Propulsion Shafting; inspect and repair

PARA NO:

PAGE NO:

ITEM NO: 243-12-002

TITLE: Port Propulsion Shafting; inspect and repair

PARA NO:

CONTRACTOR QUESTION 31: Para 3 13 list new zinc anode and studs to be bought by contractor Para 3 43 1 states: new anodes will be provided by the supervisor Para 3 19 states: receive new staves will be provided by the supervisor Para 3 43 list a parts list as if contractor is to buy brand new staves and anodes In both instances parts are written down as if material will be GFM and then later provided by contractor Para 5 1 does not list any material as GFM

QUESTION:

Will the parts be provided as GFM, or is the Contractor to provide?

If the parts are to be GFM, will a revision of the spec include staves and anodes as GFM in section 5 0?

Please review and advise

GOVERNMENT RESPONSE: Para 3 43 is accurate Contractor to procure and install with new staves and anodes The work spec is revised to delete references 3 19 and 3 4 1 in Errata 1

CONTRACTOR QUESTION 32: Para 3 13 list new zinc anode and studs to be bought by contractor Para 3 43 1 states: new anodes will be provided by the supervisor Para 3 19 states: receive new staves will be provided by the supervisor

GOVERNMENT RESPONSE: Para 3 43 is accurate Contractor to procure and install with new staves and anodes The work spec is revised to delete references 3 19 and 3 4 1 in Errata 1

CONTRACTOR QUESTION 29: Work Item # 456-90-003 ShipAlt DDG51- 77615K, ACB12/TI12 OA Computing Plant Upgrade for DDG; accomplish Para 3 2 1 states to “Provide crane and rigging services for the removal of the following equipment identified in 2 l0 using 2 25 for guidance, when directed by the SUPERVISOR ” The references (2 10 & 2 25) called out in this paragraph do not indicate the pieces of equipment referenced as the “following equipment” in paragraphs 3 2 1 1 through 3 2 1 27 It is believed that the references called out in this paragraph are not the correct references to use, and the spec may need to be revised Para 3 2 5 states to “Accomplish the following requirements of 2 17 as follows:”

Reference 2 17 does not provide the correct details referenced in para 3 2 5 1 thought 3 2 5 4 and the spec may need to be revised Please review and advise

GOVERNMENT RESPONSE: Paragraph 3 2 1 should read: "3 2 1 Provide crane and rigging services for the removal of the following equipment identified in 2 17 using 2 16 for guidance, when directed by the SUPERVISOR" Paragraph 3 2 5 should read "3 2 5 Accomplish the following requirements of 2 22 as follows:" These changes are reflected in Errata 1

CONTRACTOR QUESTION 30: Work Item # 526-80-001 DDG 51 Class Alteration Equivalent To A Repair (AER) 66089 REV A Deck Drain Repair Ring; accomplish

QUESTION:

Ref 2 2 AER 66089, DDG 51 Class Alteration Equivalent to a Repair (AER), Deck Drain Repair Ring, identifies ENCL (1) as “Deck Drain Insert Ring Installation Procedures” however, ENCL (1) was not included in Ref 2 2 Please provide ENCL (1) “Deck Drain Insert Ring Installation Procedures” of Ref 2 2 AER 66089, DDG 51 Class Alteration Equivalent to a Repair (AER), Deck Drain Repair Ring

GOVERNMENT RESPONSE: Enclosure available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 27: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 721-90-001 ShipAlt DDG51- 85964K, Vertical Launching System (VLS) BLV Modification; accomplish Ref 2 3 RLAR 85964/DDG83/1166705, VLS LSQQ Cable Guard Ripout and New Install Not Required

GOVERNMENT RESPONSE: Ref 2 3 RLAR available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

CONTRACTOR QUESTION 28: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 980-90-010 ShipAlt DDG83 - 81961, 85114, Alteration Installation Team (AIT) Support Services; provide (OPTION ITEM) Ref 2 4 RLAR 81961/DDG79/1168116, Safe FDN's Bus Needs To Be Above Deck Need 10 Deg Cut-in Vice 90 Deg

GOVERNMENT RESPONSE: 2 4 RLAR available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

593-90-001 ShipAlt DDG51-73622K, VCHT H2S Detector Installation;

accomplish Ref 2 13 RLAR 73622/DDG80/1140604, Revise sourcing of item B0102 from GFM to

IAF

Ref 2 16 RLAR 73622/DDG92/1166422, Material requirement for alarm SWBD Module M0103

CONTRACTOR QUESTION 26: Upon review of the Advanced Work Package CD received on 8/7/2017, Contractor notes several Work Item References were not provided 651-11-002 Wardroom Dishwashing Machine; replace Ref 2 2 S6161-MK-FSE-010 Rev 2, Dishwashing Machine

GOVERNMENT RESPONSE: Ref 2 2 available upon request to Stephanie Jabaley at stephanie jabaley@navy mil

ITEM NO: 438-90-201

TITLE: DDG51-80612K,BACKFIT ICAS

INSTALLATION; ACCOMPLISH

PARA NO:

PAGE NO:

ITEM NO: 123-19-004

TITLE: PLUMBING WASTE DRAIN TANK;

PRESERVE

PARA NO:

PAGE NO:

ITEM NO: 472-90-001

TITLE: ShipAlt DDG51-80156K, AN/SLQ- 32(V) 6 SEWIP Block 2 Upgrade; accomplish, and 472-90-003 ShipAlt DDG51- 84262K/85322K AN/SLQ-59 Block III TEWM Infrastructure/Embarkable Equipment Installation; accomplish

PARA NO:

PAGE NO:

ITEM NO: 110-90-001

TITLE: DDG51-70438K, BOW

STRENGHTENING

MODIFICATION;ACCOMPLISH

PARA NO:

PAGE NO:

ITEM NO: 324-80-001

TITLE: REPLACE DOSSERT LUG

CONNECTORS ACCOMPLISH

PARA NO:

PAGE NO:

CONTRACTOR QUESTION 37: Para 3 1-3 1 9 directs contractor to accomplish an inspection of the existing dosserts in 3 each Switchboards and 10 each Load Centers to determine size and quantity of dosserts requiring replacement because of their existing condition Para 3 1 8 directs to develop a spreadsheet to determine what quantity and size of Crimp Lugs will be required However, there is no Para in the Spec directing to submit a report of the findings of Para’s 3 1-3 1 9 Contractor cannot provide an estimate without these findings and recommends that a report be submitted for an equitable adjustment to procure the Crimp Lugs that will be required to accomplish this work item Will an Errata be issued in a forthcoming amendment to correct this specification?

Please review and advise

GOVERNMENT RESPONSE: Work specification is revised to add $7,000 material cost via Errata 1

CONTRACTOR QUESTION 34: There are at least three switches in the tank for level and start/stop for the pumps Why are they not directed to be removed and blanked along with the anode removal prior to the commercial blast of the tank? Please review and advise

GOVERNMENT RESPONSE: removing and blanking these switches fall under 009-06; Maintaining Protection and cleanliness for non-radioactive operation and 009-23; Interferences remove and install of NAVSEA Standard Item FY18 (Ch-1)

CONTRACTOR QUESTION 35: QUESTION #1: The references in both work items are the same numbers and titles despite being different work items and ShipAlt numbers Are both work items to be estimated as written or will a revision be made to one or both of the work items?

QUESTION #2: Para 3 1 of 472-90-001 states to “accomplish the requirements of 2 2 through 2 15 Work to be completed in accordance with the schedule provided in 2 1 ” Reference 2 1 is “Standard Items” and not a Modernization Turnover Schedule Will a schedule be provided for this work item?

Please advise

GOVERNMENT RESPONSE: QUESTION #1: 427-90-001 references will be updated to reflect correct reference documents QUESTION #2: WI 472-90-001 is corrected via Errata 1 and all Paragraphs, including 3 1, are amended

CONTRACTOR QUESTION 36: Reference 2 2 Rev C has items as being provided as being provided as GFM Reference 2 7 4720-DDG83-FY18 is listed on Spec However sheet on 4720 states no drawings found for DDG 83 S/A70438K Please provide instruction and verify if these items will be provided as GFM or should contractor provide

GOVERNMENT RESPONSE: GOVERNMENT RESPONSE: The 4720 is a live document The government will provide an updated 4720

- please see attached page in current 4720 showing these items as being provided as GFM by the BIW Planning Yard

CONTRACTOR QUESTION 33: Reference 2 2 Rev A shows items B0101,C0101 & CA101 as being provided as GFM

Reference 2 4 4720-DDG83-FY17 is listed on Spec

However sheet 268 on 4720-DDG83-FY17 states no drawings found for

DDG 83 S/A80612K

Please provide instruction and verify if these items will be provided as GFM or should contractor provide

GOVERNMENT RESPONSE: The 4720 is a live document The government will provide an updated 4720 - please see attached page in current 4720 showing these items as being provided as GFM by the BIW Planning Yard

Para 3 43 list a parts list as if contractor is to buy brand new staves and anodes In both instances parts are written down as if material will be GFM and then later provided by contractor Para 5 1 does not list any material as GFM

QUESTION:

Will the parts be provided as GFM, or is the Contractor to provide?

If the parts are to be GFM, will a revision of the spec include staves and anodes as GFM in section 5 0?

Please review and advise

File details come from the government source that posted it. Updated .