This is a DRAFT work item list for the DDG-83 advance package. This list is not final or inclusive of all work items, but it represents the majority of the work package.

View the file

Other files

File Type Posted
N00024-17-R-4432_Amendment_0004_Attachment_J-4_Rev2.xlsx XLSX spreadsheet
USS_HOWARD_(DDG_83)_FY_18_DMP_RFP_Amendment_0004.docx DOCX document
USS_HOWARD_(DDG_83)_04_Q&A.pdf PDF
Bidder's_QA_03_HOWARD.pdf PDF
N00024-17-R-4432_Amendment_0003.pdf PDF
HOWARD_RFP_DDG83__AMENDMENT_0002.pdf PDF
HOWARD_Questions_and_Answers_2.pdf PDF
HOWARD_RFP_DDG83_AMENDMENT_0001.docx DOCX document
HOWARD_Questions_and_Answers_1.pdf PDF
J-4_Pricing_Spreadsheet_DDG_83_Rev1.xlsx XLSX spreadsheet
S-2_Past_Performance_Questionnaire.docx DOCX document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
J-4_Pricing_Spreadsheet_DDG_83.xlsx XLSX spreadsheet
J-7_RTR_Control_Log_and_Form.doc DOC document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
N00024-17-R-4432.docx DOCX document
J-5_QASP_HOWARD_(DDG_83)_FY18_DMP.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
S-3_Pre-Proposal_Information_Form.xlsx XLSX spreadsheet
S-3_Pre-Proposal_Information_Form.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

In Process Work Spec List
042-11-001Accountability of Manhour and Material Reservation; accomplish
042-11-002Conditions Found Report (CFR); provide and manage
042-11-003Work Package Execution Review; accomplish
077-11-001Hazardous Waste Produced on Naval Vessels; control
110-11-001Underwater Hull; inspect and repair
110-11-002Freeboard Structure; inspect and repair
110-20-001Structural Damage; repair
110-21-001Structural Repairs; accomplish
110-21-002Structural Framing; repair
110-21-003Shell Plating; repair
110-21-004Cross Flooding Duct Plating; repair
110-90-001ShipAlt DDG51-70438K, Bow Strengthening Modification; accomplish
113-11-001Machinery Space Bilge Drain Well; repair
115-90-001ShipAlt DDG51-82746K, Stanchion Repair Structural Mods; accomplish
120-11-001Fifth Vertical Stiffener; repair
120-11-002Machinery Room Bulkhead Vertical Stiffener; replace
120-11-003Auxiliary Machinery Room Number One Structural Stiffener; repair
122-22-003Chain Locker Stiffener; repair
123-00-001Tanks and Voids Open, Pump, Clean and Gas Free; accomplish
123-11-001Compensated Fuel Tank Group 2; preserve (touch up)
123-11-002Compensated Fuel Tank Group 5; preserve (touch up)
123-11-003Compensated Fuel Tank Group 2; repair
123-11-004Compensated Fuel Tank Group 3; preserve (touch up)
123-11-005Compensated Fuel Tank Group One; preserve (touch up)
123-11-006Compensated Fuel Tank Group 4; preserve (touch up)
123-11-007Compensated Fuel Tank Group 6; preserve (touch up)
123-11-008Compensated Fuel Tank Group One; repair
123-11-009Compensated Fuel Tank Group 2; preserve
123-11-010Compensated Fuel Tank Group 3; preserve
123-11-011Compensated Fuel Tank Group 3; repair
123-11-012Fuel Oil Service and Gravity Head Tank; repair
123-11-013Fuel Service Tank and Gravity Head Tank; preserve
123-11-014Compensated Fuel Tank Group 4; preserve
123-11-015Compensated Fuel Tank Group 4; repair
123-11-016Compensated Fuel Tank Group 5; repair
123-11-017Compensated Fuel Tank Group 5; preserve
123-11-018Compensated Fuel Tank Group 6; repair
123-11-019Compensated Fuel Tank Group One; preserve
123-12-001JP-5 Tank; preserve
123-12-002Hydraulic Oil Tank Sump; repair
123-12-003JP-5 Tank Vent Screen; repair
123-14-001Potable Water Tank; repair
123-14-002Potable Water Tank; preserve
123-15-001Lube Oil Tank; repair
123-15-002MRG Lube Oil Tank; repair
123-17-002Contaminated Oil Tank; preserve
123-17-003Contaminated Oil Tank; repair
123-19-001Waste Water Drain Collecting Tank; preserve
123-19-002Waste Water Tank; repair
123-19-003Pipe Bracket; replace
123-19-004Plumbing Waste Drain Tank; preserve
123-21-001Accessible Void; repair
123-21-002Accessible Void; preserve
123-21-003Accessible Void; preserve
123-21-004Accessible Void; repair
123-22-001Chain Locker and Chain Locker Sump; repair
123-22-002Chain Locker and Chain Locker Sump; preserve
130-11-001Aircraft Securing Fitting; replace
130-80-001ShipAlt DDG83-83007, Increase Deck plate Thickness (PARTIAL); accomplish
150-11-001Port and Starboard SLQ-32 Antenna Platform; repair and preserve
150-11-003Bulkhead; repair
150-11-007Uptake Engine Room Number One; repair
150-11-008Structural Repair Deckhouse 03 Level; accomplish
150-11-009Director Foundation, Flatness Inspection and Machining; accomplish
163-11-001Waster Sleeve; replace
163-11-003Sea Chest; inspect and repair
165-11-002Sonar Dome Rubber Window (SDRW) Radiographic Evaluation; perform
165-11-003Lower Sonar Dome Access Scuttle; repair
165-11-004Upper Sonar Dome Access Scuttle; repair
165-11-005Sonar Dome Rubber Window (SDRW); inspect and repair
165-80-001ShipAlt DDG51-76227D, Sonar Dome Relief Valve Flange Modification; accomplish
167-11-001Bolted Equipment Removal Plate (BERP); repair
167-11-002Air Vent Hose Connection (AVHC) CRES Cover Ring Fastener; replace
167-11-003Door, Quick-Acting, Watertight; replace
167-11-004Hatch, Ramped, Low Profile, Quick Acting, Spring Balanced; replace
167-11-005Hatch, Steel, Flush, Individual Dog, With Scuttle; replace
167-11-0065 Inch/54 Ammo Strikedown Hatch; preserve
167-11-007Hatch, Steel, Flush, Individual Dog, With Scuttle; replace
167-11-008Cargo Door; replace
167-80-001ShipAlt DDG83-77228D, CRES Individual Dog Watertight Doors; install
167-80-002DDG-83 AER 66074D, Sonar Dome Scuttle Modification; accomplish
168-11-001Quick Acting Watertight Scuttle (QAWTS); replace
169-11-0015"/54 Ammo Strikedown Hatch Blast Shield; replace
171-11-001Support Spar; replace
187-80-001ShipAlt DDG51-86172D, M240 Mount Foundation Modification; accomplish
234-80-001DDG-51 Class AER 66051D, Main Gas Turbine (MGT) and Gas Turbine Generator (GTG) Louver Foreign Object Damage (FOD) Screen Removal; accomplish
241-11-002Number One Main Reduction Gear Casing Rust Cleaning; accomplish
243-11-001Starboard Stern Tube Shaft Seal; overhaul
243-11-002Starboard Propulsion Shafting; inspect and repair
243-12-001Port Stern Tube Shaft Seal; overhaul
243-12-002Port Propulsion Shafting; inspect and repair
243-80-001ShipAlt DDG83-73395D, Bulkhead Shaft Seal Upgrade; accomplish
245-11-001Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly (Stbd); repair
245-11-002Controllable Pitch Propeller (CPP) System, Propeller Blade (Stbd); inspect and assess
245-11-003Controllable Pitch Propeller (CPP) System, Starboard Propeller Hub; replace
245-11-004STBD Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; replace
245-11-005No. One Controllable Pitch Propeller (CPP) Standby Hydraulic Pump; overhaul
245-12-001Controllable Pitch Propeller (CPP) System, Port Propeller Hub; repair
245-12-002Controllable Pitch Propeller (CPP) System Propeller Blade (Port); inspect and assess
245-12-003Controllable Pitch Propeller (CPP) Hydraulic Oil Sump Tank Heater; inspect and clean
245-12-004Port Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box; repair
245-12-005Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly (Port); repair
245-12-007Controllable Pitch Propeller (CPP) Hydraulic System; clean, inspect and flush
245-80-001ShipAlt DDG51-66047D, HOPM Bleed Valve and Snubber Install; accomplish
251-31-001Intake, No. One SSGTG; repair
251-31-002Air Intake and Exhaust Louver; repair and preserve
251-32-001Main Engine Room Number One Gas Turbine Intake; remediate
251-32-004Main Engine Room Number 2 and Number 3 SSGTG Gas Turbine Intake; remediate
256-32-001Seawater Cooling Pump No.2; overhaul
256-33-001Seawater Cooling Pump No. 3; overhaul
256-60-001Air Conditioning Plant Condenser Seawater Valves; replace
256-61-001Seawater Service Butterfly Valve; replace
256-62-002Sea Water Service Valve; replace
256-80-001ShipAlt DDG51-64250D, No. One and No. 3 Ship's Service Generator (SSGTG) Emergency Seawater Piping; accomplish
259-10-001Number One Gas Turbine Mixing Room, Uptake, Boundary Layer Infra-Red Suppression System (BLISS) Cap; remediate
259-11-001Gas Turbine (GTRB) Exhaust Duct Collector; repair
259-11-002Gas Turbine Exhaust Duct; repair
259-11-003SSGTG NO. 2 Exhaust Trunk; preserve
259-80-001ShipAlt DDG51-76087D, Bolted Bliss Cap Alteration; accomplish
261-11-001Fuel Oil Service Pump; overhaul
262-11-001Main Reduction Gear (MRG) Lube Oil Cooler; chemically clean and inspect
262-21-001Lube Oil Settling Tank Heater; inspect and clean
262-41-001Lube Oil Service Pump (LOSP); repair
262-90-002ShipAlt DDG51-76253K, Install Lube Oil Coalescing Filter; accomplish
264-31-001Lube Oil Purifier Heater; clean
264-90-001ShipAlt DDG51-85973K, Lube Oil Purifier Heat Exchanger Modifications; accomplish
321-11-001Multiple Cable Transit (MCT); repair
324-80-001AR 76101D, Replace Dossert Lug Connectors; accomplish
332-80-001ShipAlt DDG83-64198D, Replace 2 Lamp Light Fixture with 3 Lamp Light Fixture; accomplish
407-80-001DDG51-AER 66110D, Bonding and Grounding, Corrosion Modifications; accomplish
411-90-001ShipAlt DDG51-78511K, AWS:ACB12/TI12 CIC Display Upgrade for DDGS; accomplish
436-11-001Flood Alarm System; repair
437-90-001ShipAlt DDG51-77829K, Installation of Radar and TDR TLI's for DFM, JP-5 and Potable Water Tanks; accomplish
438-90-001ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Central Control Station (CCS) Watchstander; accomplish
438-90-002ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish
438-90-201ShipAlt DDG51-80612K, Backfit ICAS Installation; accomplish
441-11-001CW 1253/WSC-6-(V), Radome Gasket seal; Replace
443-11-001AN/SAT-2 Infrared Transmitter; replace
456-90-001ShipAlt DDG51-78513K, ACB12/TI12 KAS WDRC Upgrades; accomplish
456-90-002ShipAlt DDG51-78512K, AWS:ACB12/TI12 MMSP Upgrade for DDGS; accomplish
456-90-003ShipAlt DDG51-77615K, ACB12/TI12 OA Computing Plant Upgrade for DDG; accomplish
456-90-004ShipAlt DDG83 - 78513K, Aegis Weapon System AWS: ACB12/TI12 KAS WDRC UPGRADE; accomplish
456-90-005Cooling Skid, Demineralized Water System Chelate Flush; accomplish
462-11-001Hydrophone, Sonar DT-513B/BQA-8; replace
468-90-001ShipAlt DDG-83 83634K, AN/SQQ-89A(V)15 ASW System Hardware Tech Refresh; accomplish
468-90-002ShipAlt DDG-83 83634K, AN/SQQ-89A(V)15 ASW System Hardware Tech Refresh; accomplish (OPTION ITEM)
472-90-001ShipAlt DDG51-80156K, AN/SLQ-32(V)6 SEWIP Block 2 Upgrade; accomplish
472-90-002OrdAlt 80831, Guided Missile Director AS-3444/SPG-62, Passive Countermeasure System (PCMS) Installation; accomplish (OPTION ITEM)
472-90-003ShipAlt DDG51-84262K/85322K, AN/SLQ-59 Block III TEWM Infrastructure/Embarkable Equipment Installation; accomplish
505-11-001Silicon Aluminum Bronze (SAB) Union Fitting; inspect and replace
512-90-001ShipAlt DDG51-77419K, Textile Duct Installation; accomplish
512-90-002ShipAlt DDG51-71655K, Ventilation System Zone 4 Intake Modifications; accomplish
512-90-003ShipAlt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish
514-11-001Chilled Water Valve; replace
514-11-002Air Conditioning Plant Compressor No.3; overhaul
514-11-003Chilled Water Valve; replace
514-20-001Air Conditioning (AC) Plant Condenser; mechanically clean
514-21-001No.4 Chill Water Pump and Motor; repair
514-22-001No.2 Chill Water Pump; repair
520-11-001Sea Valve; replace
520-11-003Seawater Service Butterfly Valve; replace
521-11-001Electric Motor Operated Firemain Valve; replace
521-11-002Firemain Check Valve; repair
521-11-003Firemain Piping; repair
521-11-004Firemain Piping; replace
521-11-005Electric Motor Operated Firemain Valve Class B overhaul; accomplish
521-11-006Firemain Valve; replace
521-21-001Fire Pump; overhaul
522-80-001ShipAlt DDG51-82474D, Relocation of CIWS, Torpedo and DLS Magazine Gauge; accomplish
526-80-001DDG 51 Class Alteration Equivalent To A Repair (AER) 66089 REV A Deck Drain Repair Ring; accomplish
526-80-002ShipAlt DDG51-77691D, Weather Deck Drain and Trough Modification; accomplish
528-80-001ShipAlt DDG8-64242D, Mast Drainage Modification; accomplish
533-10-001Valve Extension Stem; fabricate
541-12-001Fuel Oil Valve; replace
541-12-002Fuel Transfer System MORPAC Valve; repair
541-21-001Number One and 2 Fuel Oil Purifier; overhaul
541-80-001DDG 51 Class Alteration Equivalent to a Repair (AER) 64191, Fueling At Sea (FAS) Transducer Gage Cutout Root Valve Modification; accomplish
541-90-001ShipAlt DDG51-70403K, Digital Fuel Control System Installation; accomplish
542-21-001JP-5 Service Pump; repair
542-21-002JP-5 Transfer Pump; repair
551-11-002Bleed Air Flex Hose; replace
551-53-001Low Pressure Air Compressor (LPAC) Number One Class B overhaul; accomplish
551-61-001Masker Air Cooler; clean and inspect
551-62-001Prairie Air Cooler; clean and inspect
551-64-001Anti-Icing Air System Hanger Assembly; replace
551-64-002Anti-Icing Piping Support Liner; install
551-65-001Bleed Air Regulating Valve; replace
561-11-002Hydraulic Power Unit Number 1A Class B overhaul; accomplish
561-11-003Hydraulic Power Unit Oil Cooler Chemically Clean; accomplish
562-11-001Rudder Bearing Seal and Rudderstock Seal; repair
581-11-001Ground Tackle; inspect and preserve
581-11-002Anchor Chain Deck Bolster and Hawse/Chain Pipe; repair
581-80-001ShipAlt DDG83-64185D, Anchor Chain Chafing Plate Modification; accomplish
583-90-001ShipAlt DDG51-83894K, Navy Standard Slewing Arm Davit (SLAD) Installation; accomplish
588-21-001Recovery Assist, Securing and Traversing (RAST) System Track and Plate; clean and preserve
588-90-001ShipAlt DDG-51 73212K, Helo Hanger Door Control System Upgrade; accomplish
593-11-003Vacuum, Collection, Holding and Transfer (VCHT) System Piping; replace
593-12-002Waste Water Drain Collecting Pump; overhaul (OPTION ITEM)
593-21-001Oily Waste Transfer Pump Number One Class B overhaul; accomplish
593-90-001ShipAlt DDG51-73622K, VCHT H2S Detector Installation; accomplish
624-11-001Balanced Joiner Door; remove, store and install
631-11-001Machinery Space Bilge; preserve
631-11-002Engine Room Number 2 Bilge; preserve (touch-up)
631-11-003Auxiliary Machinery Room No. One Bilge; preserve
631-11-004Interior Compartment; preserve (touch up)
631-11-005Ship Service Gas Turbine Generator No. 3 Exhaust Trunk; preserve
631-11-007Vacuum Collection Holding Tank Room Bilge Well; preserve
631-11-008A-Size Forward Vertical Launch System (VLS) Sump; repair and preserve
631-11-009Main Engine Room Number One Bilge; repair and preserve (touch-up)
631-11-011Auxiliary Machinery Room Number 2; preserve (touch-up)
631-11-012Generator Room Number 3 Bilge; repair and preserve
631-11-013FWD and AFT Vertical Launching System Bilge Sump; preserve
631-11-014Fan Room; repair and preserve
631-12-004Fairlead; preserve
631-13-001Fan Room; preserve
631-13-002Power Conversion Room Deck; preserve
631-13-003Sonar Cooling Skid; preserve
631-13-006Breezeway Passage; preserve
631-21-002Mast Preservation; accomplish
631-21-003INMARSAT Platform Deck; preserve
631-31-001Underwater Hull; preserve
631-41-001Freeboard; preserve
633-21-001Impressed Current Cathodic Protection (ICCP) System Reference Electrode Assembly; replace
634-11-001Peel and Stick Nonskid; replace
634-11-0025 Inch/54 Cal Projectile Magazine Nonskid; replace
634-11-003Nonskid; replace
634-21-001Flight Deck Nonskid; replace
636-11-001Sonar Dome Hull Damping; preserve and replace (OPTION ITEM)
643-11-001Berthing Habitability Project Installation; accomplish
643-11-006Machine Services; provide
651-11-001Crew/CPO Galley Serving Line Roller Curtain; install
651-11-002Wardroom Dishwashing Machine; replace
651-11-003Wardroom Galley Griddle and Oven; replace
651-90-002ShipAlt DDG51-71605K, DDGM Advanced Galley Modifications; accomplish
655-80-001ShipAlt DDG51-00429D, Self Service Laundry Facility Install; accomplish
711-90-001ShipAlt DDG83 - 79686K, Close In Weapons System (CIWS) 1B Next Gen Combat System; install
721-31-001Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch; preserve
721-31-002Vertical Launch System (VLS) Flush; accomplish
721-31-004MK 41 Vertical Launching System (VLS), Cell Hatch; remove and replace
721-90-001ShipAlt DDG51- 85964K, Vertical Launching System (VLS) BLV Modification; accomplish
813-11-001AEGIS Light-Off (ALO) Schedule; provide
844-31-001Integrated ALO and Combat Systems Testing; accomplish
854-11-001Crew Transportation Service; provide (OPTION ITEM)
980-11-001LOA Inspection Discrepancy Correction Assistance; provide
980-31-001Regional Maintenance Center (RMC) Office Space; provide
980-90-001PHD Representatives Office Facility; provide
980-90-002ShipAlt's DDG51-70403K, 71604K, 71726K, 77829K, 71615K, 73091K and 77427K Alteration Installation Team (AIT) Support Services; provide
980-90-003OrdAlt 74588K, MK 99 FCS/KAS Topside Alteration Installation Team (AIT) Support Service; provide
980-90-004Antenna Photographs; provide
980-90-005MachAlt's 82560, 82566, 82582, 83082 and 84127, Helo Hanger Door Upgrade, Alteration Installation Team (AIT) Support Service; provide
980-90-007ShipAlt DDG83 - 86539, PEOC41 C2P TECH Refresh (OTH), Alteration Installation Team (AIT) Support Services; provide
980-90-008ShipAlt DDG83-87402K 8SSEE INC F AS4293A UPG, Alteration Installation Team (AIT) Support Services; provide
980-90-010ShipAlt DDG83 - 81961, 85114, Alteration Installation Team (AIT) Support Services; provide (OPTION ITEM)
980-90-013OrdAlts 83746K and 85224K, MK41 VLS HSD Relocation and MK41 VLS BL BMD 5.1 HW, and Ordalt 79353K Uptake/Exhaust Plenum ST2, Alteration Installation Team (AIT) Support Service; provide
980-90-014C-DR Box Management AIT Office Space; provide
980-90-015ShipAlt DDG83-81322K PEOC41 ADNS AN/USQ-144K (V)2, Alteration Installation Team (AIT) Support Services; provide
980-90-016OrdAlts 70289, 70920, 70921, 77862, 80194 and SWD 83489, Alteration Installation Team (AIT) Support Service; provide
980-90-017ShipAlts 76869K, 76974K, 80274K, 81728K, 84226K, 87103K, 77615K, 78511K, 78512K, 78513K, 85964K, 76829K, 82635K and 89591K Alteration Installation Team (AIT) Support Service; provide
980-90-018ShipAlt DDG51-83634K/89226, AN/SQQ-89 A(V)15, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
980-90-019OrdAlt DDG51-74603, Sidewall Capacitor Monitor, 78778, AWS:MMSP Transmitter MODS for, 79024, BMD-Spy Coherent Combiner FO, Alteration Installation Team (AIT) Support Service; provide
980-90-201ShipAlt DDG51-00288K, Convert Bosin Storeroom No. 2 to Hazardous Materials Minimization Center; accomplish
980-90-202ShipAlt DDG51-81251K, Battle Force Tactical Trainer (BFTT) AEGIS Hardware (HW) Build 4.2 Upgrade, Al
980-90-203OrdAlt 20351 and 20353 Electric Control Valve on Cooler and Demineralizer (C/D) and Sonar Coolers, Alteration Installation Team (AIT) Support; provide
980-90-204ShipAlt DDG51-88635K, Phalanx, Close in Weapons System (CIWS) Next Generation and Phalanx, Close in Weapons System (CIWS) Upgrades, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
982-31-001Dock Trial, Fast Cruise, and Sea Trial; accomplish
992-11-001Temporary Air Conditioning; provide
992-11-002Temporary Flammable Liquid Storage and Hazardous Material Storage Unit For Ship's Force Use; provide
992-11-003Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor Plant, Barge; accomplish (Option Item)
992-11-004Demineralized Water; provide
992-11-005Transport Control Protocol/Internet Protocol Based T-1 Type Computer Network (T-1 Line) Support Service; provide
992-11-006Temporary Service; provide
992-11-007Integrated Shipboard Network System (ISNS) Support Service; provide
992-11-008Support Service for Ship's Force Security; provide (OPTION ITEM)
992-11-009Oil Spillage and Floating Sandblasting Debris Boom; install
992-11-010Ship's Force Parking; provide
992-11-011Temporary Stowage Area for Ships Force; provide
992-11-012Fuel Assistance and Towboat Service for Fuel Barge; provide (OPTION ITEM)
992-31-001Cleaning and Pumping; accomplish
992-90-001Government Sponsored Representative (SEA21 PMR) Office Space; provide
993-11-001Warehouse Storage Space for Government Use; provide
993-21-001Rigging, Crane, Forklift and Transportation Service; provide
993-31-001Temporary Deck Covering; install
993-31-002AN/SPY-1D Antenna Protective Cover; install
993-31-003Pressurized Waveguide and Transmission Line Dry Air Lay-Up; accomplish
993-31-004Temporary Main Reduction Gear (MRG) Dehumidifier System; provide
997-11-001Drydocking and Undocking; accomplish