Amendment_0007-_Conformed.docx

DOCX document 227 KB Posted

Attached to
USS MESA VERDE (LPD 19) FY18 Dry-Docking Phased Maintenance Availability (DPMA)
Solicitation number
N00024-17-R-4429
Issued by

About this file

Amendment 0007 - Conformed

View the file

Other files

File Type Posted
J-4_Pricing_LPD_19_(Amendment_8).xlsx XLSX spreadsheet
Amendment_0008-_Conformed.docx DOCX document
Amendment_0008.docx DOCX document
MESA_VERDE_QA__4-1.docx DOCX document
Amendment_0007.docx DOCX document
Amendment_0006.docx DOCX document
Amendment_0006-_Conformed.docx DOCX document
MESA_VERDE_QA__3.docx DOCX document
Amendment_0005_-_Conformed.docx DOCX document
Amendment_0005.docx DOCX document
Amendment_0004_-_Conformed.docx DOCX document
Amendment_0004_-_Modification.docx DOCX document
MESA_VERDE_QA__2.docx DOCX document
Amendment_0003_-_Modification.docx DOCX document
Amendment_0003_-_Conformed.docx DOCX document
MSV_Amendment_0002.docx DOCX document
J-4_Pricing_Spreadsheet_LPD_19_(Amendment_2).xlsx XLSX spreadsheet
MSV_Amendment_0002-_Conformed.docx DOCX document
Amendment_0001-_Modification.docx DOCX document
Amendment_0001-_Conformed.docx DOCX document
CDRL_A.pdf PDF
CDRL_B.pdf PDF
CDRL_C.pdf PDF
J-4_Pricing_Spreadsheet_LPD_19.xlsx XLSX spreadsheet
MESA_VERDE_RFP_-_FINAL.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
S-1_Tech_Cap_Data_Sheet.docx DOCX document
J-5_QASP_LDP_19.DOCX DOCX document
S-4_PP_Reference_List.docx DOCX document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
S-3_Pre-Proposal_Information_Form.xlsx XLSX spreadsheet
MESA_VERDE_Q&A_1-1.docx DOCX document
S-3_Pre-Proposal_Information_Form.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002417R4429

Section SF 30 - BLOCK 14 CONTINUATION PAGE

AMENDMENT 0007

The purpose of Amendment 0007 is to revise Section C paragraph 3.1.4 labor and material burden rate to match Section L and Attachment J-4.

Specific changes are outlined in red below.

AMENDMENT 0006

The purpose of this amendment is to:

-Section J, revise Attachment J-1 Specification Package No. [SSP TPPC-LPD19-MARMCN18-CN01], Attachment J-2 Work Item Plans, Drawings, and Other References, and Attachment J-3 Execution Milestones and Key Event Dates -Section L, add NAVSEA clause HQ L-2-0013 SPECIAL PROPOSAL RECEIPT REQUIREMENTS and update Section 2.0 to revise the proposal POC

AMENDMENT 0005

The purpose of Amendment 0005 is to:

-Section B, revise CLIN 0008 description to match the Attachment J-4 Pricing Workbook. The title of CLIN 0008 remains unchanged.

-Section C, revise paragraph 3.1.4 to match the J-3, Milestone Schedule -Section I, add DFARS 252.245-7001 through 252.245-7004 -Section J, revise Attachment J-1 Specification Package No. [SSP TPPC-LPD19-MARMCN18-CN01] and Attachment J-2 Work Item Plans, Drawings, and Other References

Specified changes are outlined in red below.

AMENDMENT 0004

The purpose of Amendment 0004 is to:

· Section A, extend the proposal deadline to 1 September 2017 at 3PM

· Section L, extend questions deadline to 18 August 2017 and extent proposal due date to 1 September 2017

AMENDMENT 0003

The purpose of Amendment 3 is to:

- Section C, revise par 1.4 JFMM website.

- Section J, revise Attachment J-1 Specification Package No. [SSP TPPC-LPD19-MARMCN18-CN01] and Attachment J-2 Work Item Plans, Drawings, and Other References.

- Section L, revise 3.0 "General Information", MARMC security website.

Section C and Section L changes are highlighted in RED font.

AMENDMENT 0002

The purpose of Amendment 2 is to:

-Section B, revise CLIN structure -Section C, revise par 3.5 "Milestone Definitions" -Section J, revise Attachment J-1 Specification Package No. [SSP TPPC-LPD19-MARMCN18-CN01], Attachment J-2 Work Item Plans, Drawings, and Other References, Attachment J-3 Execution Milestones and Key Event Dates, and Attachment J-4 Pricing Workbook.

-Sections L & M, revise the Interport Differential amount for Pascagoula, MS and Norfolk, VA.

AMENDMENT 0001

The purpose of Amendment 0001 is to:

-Section C, add Paragraph 3.5 "Milestone Definitions" -Section I, revise FAR Clause 52.211-11 Liquidated Damages -Section J, revise Attachment J-3 Execution Milestones and Key Event Dates -Sections L & M, revise the Interport Differential amount for Pascagoula, MS -Section M, delete "management" under Factor 2 - Technical Capabilities

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0001

Base TYCOM

FFP

1
Lot

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MESA VERDE (LPD 19) DURING FY18 DRY-DOCKING PHASED MAINTENANCE AVAILABILITY (DPMA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A and C

FOB: Destination

PURCHASE REQUEST NUMBER: N0002417PR93047

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0002

DATA

FFP

1
Lot

CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED

The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.

Not Separately Priced (NSP).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0003

BASE PMS 407 (OMN)

FFP

1
Lot

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MESA VERDE (LPD 19) DURING FY18 DRY-DOCKING PHASED MAINTENANCE AVAILABILITY (DPMA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A and C

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0004

Base PMS 407 (OPN)

FFP

1
Lot

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MESA VERDE (LPD 19) DURING FY18 DRY-DOCKING PHASED MAINTENANCE AVAILABILITY (DPMA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A and C

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0005

Prorated WIs

FFP

1
Lot

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MESA VERDE (LPD 19) DURING FY18 DRY-DOCKING PHASED MAINTENANCE AVAILABILITY (DPMA) (Prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A and C

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0006

ShipAlt17 85358K,EC88631,EC85342,EC92415

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A, B, & C.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0007

ShipAlt LPD17-81798K SPAWAR

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A, B, and C.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0008

ShipAlt LPD-17 75874K PEOC4I SPAWAR

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0009

ShipAlt LPD19-SA 85307K ISMT USMC

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0010

TYCOM WI's

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1 (SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A, B, & C.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0011

Crew Living Space Habitability Project

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0012

Messing and Berthing, Steam- Homeport

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

See Notes A,B, and C.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0013

Messing and Berthing, Electric- Homeport

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0014

Messing and Berthing, Steam-Out of Port

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0015

Messing and Berthing,Electr- Out of Port

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0016

Messing and Berthing Tow- Out of Port

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0017

Ship's Force Parking

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0018

Ship's Force Office Space and Classroom

FFP

1
Lot
OPTION
The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Phased Maintenance Availability (DPMA) onboard USS MESA VERDE (LPD 19) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LPD19-MARMCN18-CN01 drawings, test procedures, and other detailed data as included in Attachments J-1( SSP TPPC-LPD19-MARMCN18-CN01) and J-2.

NET AMT

NOTE A: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully loaded ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of man hours included in its price proposal for contract modifications shall include only direct production man hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

1. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 1 above shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production man hour functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production man hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Material handling & Warehousing Safety/Environmental

1. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

1. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.

1. Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

1. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a Request for Contract Change (RCC) issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, Government authorized vendors, or any other work at the sole discretion of the Administrative Contracting Officer. RCC’s that are for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate.

1. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth and new work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated.

Fully burdened Ship Repair Labor Rate
TBD
Material Burden Rate
TBD

NOTE B: Option item to which the option clause FAR 52.217-7 applies and which is to be supplied only if and to the extent said option is exercised.

NOTE C: GROWTH RESERVATION

The growth reservation manhours and material dollar requirements listed in the individual Work Items are a part of this contract under the original solicitation and award. The manhour reservation shall include both prime contractor and subcontractor efforts. The balance of hours and material remaining in the reservation items after negotiations have concluded, and when it is evident that no additional work will be tasked, is subject to a decrease change order. Only actual production manhours expended will be considered towards the contractor’s obligation to provide the defined reservation manhour effort. While supervision, quality assurance, and other nonproduction labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor’s obligation to provide reserved manhours. The manhour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual Work Item. Material dollars shall be based on actual costs to the Contractor of acquiring the materials provided. Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the actual cost of materials expended toward the reservation. The information received in the consolidated final report required by Section C Paragraph 6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all reservation Work Items. The reservations listed in the individual Work Items are not to be considered Time and Material or a Level of Effort. Once the scope of work for a task has been listed and a mutually agreeable number of manhours or materials has been agreed to, neither party will be entitled to an adjustment based on actual manhours or material dollars required. Each task shall receive approval by, the Navy Project Manager and the Administrative Contracting Officer (ACO).

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)

This entire contract is fixed price.

Section C - Descriptions and Specifications

SCOPE OF WORK

1. GENERAL REQUIREMENTS

0. The Contractor under the direction of the Regional Maintenance Center (RMC) and as an independent Contractor and not as an agent of the Government, shall furnish the material, support (electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repair and alteration of the USS MESA VERDE (LPD 19) FY18 Dry-Docking Phased Maintenance Availability (DPMA) in accordance with the requirements stated in this Section, the Work Item Specifications and Work Item Plans, Drawings, and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract. Category I NAVSEA FY17 Standard Items through CHG 2 identified under Attachment J-1 are applicable to all items without further reference. Category II NAVSEA FY17 Standard Items through CHG 2 are applicable when invoked and/or referenced in individual work items specified in Attachment J-1.

NAVSEA Standard items may be found at:

http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI.aspx

0. The Contractor shall accomplish planning and scheduling to ensure a rational, integrated and timely plan for receipt, storage and installation of Government Furnished Material as identified in work item specifications, and for accomplishment of production work.

0. The Contractor shall provide an integrated milestone plan for the availability. These milestones will include a schedule of key events necessary to meet the contract delivery dates. A critical path analysis and a milestone schedule shall be used to measure schedule accomplishment of the functions and elements required to successfully complete the repair and alteration of USS MESA VERDE (LPD 19) FY18 DPMA within the availability dates herein.

0. INTEGRATED PRODUCTION SCHEDULE DEVELOPMENT, UPDATE, AND REVIEWS –

In support of NAVSEA Standard Item requirements and to confirm the contractor has all available input for development of the Integrated Production Schedule, including the development of the Integrated Work Package, Production Schedule, Integration of O, I and D level Work, Integration of AIT and SHIPALT requirements and any other contractor assigned or Third Party work scheduled for accomplishment concurrent with the CNO availability, the contractor shall, with the Regional Maintenance Center (RMC), conduct the Work Package Execution Review (WPER). The WPER will take place at the RMC located at the vessel’s homeport. The RMC will schedule the WPER per the Joint Fleet Maintenance Manual (JFMM) Milestones either as a separate event or concurrent with an Integrated Project Team Development (IPTD) event no later than A-30 for CNO availabilities. This review shall be accomplished following the JFFM, Volume II, Integrated Fleet Maintenance requirements including the Critical Time Period, First 100 Hour Plan. Final 100 Hour plan and identify any schedule or scope impact. See Appendix E of the JFMM II-I-2E-1. The JFMM can be found at https://www.submepp.csd.disa.mil/JFMM/index.htm.

The Contractor shall formally present its Integrated Production Schedule to the Navy Supervisory Authority (NSA) at the WPER, Start of the Availability, 25% complete conference, 50% complete conference, 75% complete conference, production completion meetings, and for pre Sea Trials requirements. The Integrated Production Schedule shall include Alteration Installation Teams (AIT), Government-Contracted Third Party Maintenance Providers, Ship's Force, Commercial Industrial Services (CIS), and Fleet Maintenance Activity (FMA) work to the maximum extent this information is available. At each meeting, the contractor shall present and explain, at minimum, the following information:

3. The Contractor's latest, Government approved, Integrated Production Schedule created in full compliance with Standard Item 009-60.

3. The Contractor's current progress in preparing for and/or executing the Availability in accordance with their Integrated Production Schedule. The Contractor shall provide an explanation and mitigation plan for any preparation or execution delays in comparison to their Integrated Production Schedule.

1. The Contractor's plan shall describe opportunities for schedule acceleration (at no cost to the Government unless directly related to a Government caused delay) and potential risks and mitigations to remaining schedule attainment.

0. Wherever the term “Job Order” is used in this solicitation/award, it also means “Contract.”

0. The Contractor shall report and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the work specifications. As found conditions, needed repairs and corrective action reports will be submitted to the Government in the form of a Condition Found Report (CFR). The Contractor's conditions found reporting shall be in accordance with that set forth in Standard Item 009-01.

0. The Navy may send a site inspection team to perform an inspection of the contractor's facility prior to arrival of the vessel

0. GOVERNMENT FURNISHED MATERIAL: Government Furnished Material (GFM) cited in the solicitation will be shipped to the contractor’s facility. The successful offeror is to coordinate delivery of Government Furnished Material with the Project Manager. Government property permanently removed from a vessel that requires a Property Administrator's disposition instructions shall be properly prepared for shipment and be delivered as directed by the Property Administrator. GFM will be listed in paragraph 5 of the Work Item(s).

0. QUALITY ASSURANCE

8. QUALITY ASSURANCE PROGRAM - The Contractor shall provide and maintain a quality assurance program acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. The Contractor's quality assurance program shall be in accordance with that set forth in Standard Item 009-04. In addition to its rights under Clause 252.217-7005, Inspection and Manner of Doing Work (Jul 2009), the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality assurance program and, as such, the Contractor shall not be entitled to progress payments for said work and material.

8. Quality Assurance Surveillance Plan (QASP) - The Contractor shall meet the performance/acceptable quality level requirements for each deliverable/assessment area in the QASP, Attachment J-5. There will be monetary deductions based on unfavorable contractor performance as stated in the QASP. There is no maximum dollar limit to the deductions which can be assessed against the Contractor for failing to meet the performance/acceptable quality level requirements.

0. IDENTIFICATION OF CONDITION FOUND - In accordance with the requirements of NAVSEA Standard Item 009-01, the contractor shall identify needed repairs and recommend corrective action during contract performance for work/deficiencies discovered which are not covered by the existing work package. For conditions to impact the critical path(s) /controlling item(s), the contractor shall notify the government via electronic media within 24-hours of discovery. This initial notification need not include all content required for a Condition Found Report (CFR), but must include a description of the condition/deficiency and an estimated timeframe for the offeror's professional recommendation for resolution, which shall not exceed five (5) working days as specified below. Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR (intended to represent the "Work Request" described in DFARS 252.217-7028, Over and Above Work (Dec 1991)) per CDRL A002.

1.10.1 CONDITION FOUND NOTIFICATION TO GOVERNMENT

CFRs shall be submitted through the Navy Maintenance Database Re-platform (NMDR) within five (5) working days of discovery of the condition. At a minimum, the CFR will include the following:

(1) Identify contract, ship, and hull number

(2) Serialized by CFR number

(3) Identification of the applicable Work Item number

(4) Date requirement was discovered

(5) Description of the work requirement

(6) Specific location of the work

(7) Recommendation for corrective action

(8) Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability). Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.

(9) Identification of related changes, if any, to the internal milestones and production and contract completion dates.

1.10.2 GOVERNMENT REVIEW AND RESPONSE TO CFR

The Maintenance Team will review the CFR. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to five (5) working day requirement). As appropriate, the Government and contractor will need to meet, conduct ship checks and/or discuss the recommendation for corrective action further to determine the full scope of work required prior to final approval of the CFR. The contractor's accuracy reflected in the CFRs submitted may be evaluated in CPARS and utilized for past performance ratings on future requirements. Additionally, deductions may be assessed in accordance with Attachment J-5, QASP.

1.11 REQUEST FOR CONTRACT CHANGE (RCC)

In the event a growth requirement or new work is validated and fully scoped, the Government may generate a Request for Contract Change (RCC) and the ACO may request a firm fixed price proposal from the contractor.

The contractor shall provide all Change Order Price Analysis (COPA) proposals to the ACO in response to RCCs within seven (7) calendar days. A contractor’s COPA shall remain valid for a minimum of 14 calendar days, unless otherwise specified on an individual RCC by the ACO; if another timeline is specified by the Government on an individual RCC, the contractor’s COPA shall remain valid for that amount of time. A COPA addressing a change to the FFP contract shall include at a minimum:

a.Labor hours to be performed by the Prime Contractor__________
b.Subcontractor Quote (If applicable)*$__________
c.Material Quote (If applicable)**$__________
d.Mark-up (If applicable)$__________

*Subcontractor quotes shall include labor hours, labor rate, material (part number, description, unit cost, quantity, total cost, and vendor quotes for each line item), and tiered subcontractor quotes (if applicable)

** Material quote shall include the part number, description, unit cost, quantities, total cost, and vendor quotes for each line item

Note 1: Labor hours for both prime and subcontract shall be provided broken down by trade and labor mix.

Note 2: The required documentation must accompany the COPA for the COPA to be considered submitted to the ACO. See Attachment J-5, QASP, for deductions associated with late or invalid COPA submittals.

If circumstances arise where the contractor is unable to submit a COPA within seven (7) calendar days, the contractor shall notify the ACO in writing of the specific circumstances and provide a revised date in which a COPA proposal will be submitted. Additional time needed to complete a COPA may be granted solely at the discretion of the ACO. The new timeframe granted, solely at the discretion of the ACO which may differ from the contractor’s request, shall be met by the contractor. Deductions may be assessed in accordance with Attachment J-5, QASP.

0. NAVY MAINTENANCE DATABASE (NMD): The Contractor shall use NMD for the submission of Condition Found Reports throughout the administration of this contract. NMD is located at https://mfom.sscno.nmci.navy.mil/MFOM/DodStatement.aspx.

0. ORGANIZATION CHART AND EMPLOYEE ROSTER:

1. ORGANIZATION CHART - Within 30 days of contract award, submit a chart detailing each management, technical, engineering and production position from the highest company level to the lowest supervisory level. Include descriptions of each position describing the duties, responsibilities, authority and names of the individuals filling the positions. The organizational chart must represent the facility that will perform the work.

1. EMPLOYEE ROSTER: After receipt of award and prior to starting work aboard the vessel, the contractor must submit a list of employees who will work aboard ship to the Commanding Officer of the ship via the NSA Security Office. The list should be on company letterhead, include each employee's name and security clearance when required, and bear the signature of a company official.

0. AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER – No order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer's. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.

1. LOCATION: Government facilities are not available for this requirement. All work shall be completed at the contractor’s facilities.

2.1 DRYDOCK CERTIFICATION - The dry-docking of all vessels shall be accomplished in dry docks certified in accordance with MIL-STD-1625D(SH) dated 27 August 2009.

3. SCHEDULE: USS MESA VERDE must be delivered, mission-ready, no later than 03 May 2019.

3.1: MILESTONES: In addition to the contract completion date of 03 May 2019, the Government has established execution dates for the milestones identified in Attachment J-3.

3.1.1 - Reserved

3.1.2 - If any milestone event is not accomplished by the date provided, and the failure to accomplish any such milestone event does not arise from a cause beyond the control and without fault or negligence of the Contractor, such failure may be deemed to constitute a failure to perform this contract in accordance with its terms within the meaning of subparagraph (a)(1)(ii) of the clause of this contract entitled "DEFAULT” (DFARS 252.217-7009).

3.1.3 - Reserved

3.1.4- The Contractor shall schedule the performance of all items in the USS MESA VERDE (LPD 19) FY18 DPMA work package, including work items included as both Base and Option items, so as to permit a contract scope increase up to 150,448 “hours” and $2,410,188 in “material” to be performed as "Additional Requirements" (including growth and new work). “Material,” as defined for the application of this paragraph, is defined as physical deliverable materials, exclusive of prime and subcontractor labor. “Hours,” as defined for the application of this paragraph is to include both prime and subcontract labor hours. The contractor agrees that these Additional Requirements, if ordered, shall be performed concurrently with the aforementioned work items, during the contract period of performance, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.

The "Additional Requirements," if required, shall be ordered during the contract period of performance, as may be modified, on the following schedule:

0. No more than 75% of the hours or material following the 25% schedule point the availability (as measured in days between the “Start Availability” and “Avail Complete” milestones in Attachment J-3).

0. No more than 50% of the hours or material following the 50% schedule point the availability (as measured in days between the “Start Availability” and “Avail Complete” milestones in Attachment J-3).

0. No more than 25% of the hours or material following the 75% schedule point the availability (as measured in days between the “Start Availability” and “Avail Complete” milestones in Attachment J-3).

3.2. DELAYS / DISRUPTIONS: The contractor shall coordinate the work effort with the NSA Project Manager on a daily basis to prevent changing situations from causing delays and disruptions. Disruption due to minor delays in obtaining access to spaces and operation of equipment are to be expected. A minor delay is defined as eight (8) hours or less. These disruptions are considered normal rather than unusual occurrences during the performance of tasks ordered under this contract. If, during contract performance, delays greater than those indicated above are encountered, the Contractor shall immediately verbally notify the Project Manager and Contracting Officer, followed by a written statement within 24 hours after occurrence of delay, stating time of impact, reason for delay, duration of impact, number of people affected, action taken to properly schedule the work, action taken to minimize impact, and the names of the Government person(s) contacted.

3.3 - SCHEDULE AND ASSOCIATED REPORTS: The proposed scheduling of work, resources, key events and milestones submitted by the Contractor in accordance with Standard Item 009-60 during the course of contract performance shall not be materially different from the Schedule and Associated Reports provided in the Contractor’s technical proposal.

3.4 MILESTONES FOR CERTAIN REPORTS (Quality Assurance Plan (QASP) Attachment J-5 Deliverable 2): The contractor shall complete the necessary work associated with the following reports and submit to the Government the required reports in the necessary format and containing the required information as specified in the Work Item no later than A+61.

Work Item
Description
Report Paragraph Number
Report Type

Reports Due On or Before the First 20% of the Docking Duration, as specified by the docking date in Attachment J-3

110-11-001
Underwater Hull and Appendages; inspect
3.4.2
Visual
3.5.3
NDT
163-11-002
Sea Chest; inspect and repair
3.3.2
Visual
3.4.2
NDT
243-11-002
Stern Tube Shaft Seal; overhaul
3.2.2.1
Visual with OEM assist
3.2.4.4
Visual & Measurement
243-11-005
Starboard Propulsion Shafting; inspect and repair
3.3.2.1
Visual
243-12-003
Port Propulsion Shafting; inspect and repair
3.3.2.1
Visual
244-11-001
Outboard Propulsion Shafting (Starboard), Bearing Clearance Measurement; perform
3.1.1
Measurement
3.2.3
Visual &

Measurement

3.3.3.3
Visual &

Measurement

244-12-003
Outboard Propulsion Shafting (Port), Bearing Clearance Measurement; accomplish
3.2.3
Visual &

Measurement

3.3.3.3
Visual &

Measurement

245-11-001
Controllable Pitch Propeller (CPP) Blade; repair and assess
3.3.4
Torque
245-11-004
Controllable Pitch Propeller (CPP) Starboard Valve Rod

Assembly; repair

3.2.2.4
Visual &

Measurement

245-12-003
Controllable Pitch Propeller (CPP) Port Valve Rod Assembly;

repair

3.2.2.4
Visual &

Measurement

520-10-001
Sea Valve; repair and replace
3.1.1
Pre-Op Test
529-11-004
Main and Secondary Drainage Valves; repair
3.1.1
Pre-Op Test
529-11-005
Main and Secondary Drainage Valves; replace
3.4.1
Visual
562-11-001
Rudderstock Seal Assembly (PORT and STBD); repair
3.2.1.1
Visual
562-11-003
Rudder Stock Bearing; replace
3.5.1.1
Visual
3.8.1.2
Visual
3.10.1.1
Visual &

Measurement

631-31-001
Underwater Hull; preserve
3.4.5.2
Visual
633-21-001
Impressed Current Cathodic Protection System Reference

Electrode Assembly; replace

3.2.1
Pre-Op Test, Visual

Reports Due On or Before the First 20% of the Avail Duration, as specified in Attachment J-3

138-11-001
Flight Deck Catwalk; preserve
3.2.1
Visual
241-11-001
Main Reduction Gear (MRG) Turning Gear; overhaul
3.6.4
Visual &

Measurement

259-11-001
Propulsion Gas Turbine Exhaust Duct No. One; repair
3.4.2
Visual & NDT
259-11-004
Gas Turbine Air Intake Perforated Sheathing; preserve
3.3.1
Visual
261-11-001
Quick Closing Valve Remote Pull Cable; replace
3.2.1
Inspection
262-11-001
Main Lube Oil Cooler Clean and Inspect
3.4.3
Repair Recommendations
262-41-001
Lube Oil Service Pump; overhaul
3.3.3.1
Inspection
262-42-001
Lube Oil Service Pump; overhaul
3.3.3.1
Inspection
304-11-001
Multiple Cable Penetrator (MCP); repair
3.1.1
Inspection
311-21-001
Ship Service Diesel Generator (SSDG) No.One, "D" Level 8,000

Hour Maintenance; accomplish

3.4.8
Inspection of 3.4.1, 3.4.3, & 3.4.4
311-23-002
Title: Ship Service Diesel Generator (SSDG) No.3, "D" Level

8,000 Hour Maintenance; accomplish

3.4.8
Inspection of 3.4.1, 3.4.3, & 3.4.4
311-23-003
Number 3 Ship Service Diesel Generator Intake Air Cooler;

repair

3.3.1.1
Visual
311-26-001
Cylinder Head Cap Plug, No.6 Ship Service Diesel Generator

Engine(SSDGE); replace

3.6.3.1
Visual & Measurements
311-26-003
Ship Service Diesel Generator (SSDG) No.6, "D" Level 8,000

Hour Maintenance; accomplish

3.4.8
Inspection of 3.4.1, 3.4.3, & 3.4.4
521-11-001
Firemain Valve; repair
3.1.1
Pre-Op
524-21-001
Auxiliary Machinery Seawater Pump; repair
3.3.3.2
Visual & Measurements
529-11-001
Ballast Valves; repair
3.1.1
Pre-Op
529-61-001
Deballast Air Compressor (DBAC) NO. 2, Class B Overhaul;

accomplish

3.3.2.1
Inspection
529-61-002
Deballast Air Compressor (DBAC) No. One, Class B Overhaul;

accomplish

3.3.2.1
Inspection
529-61-004
Deballast Air Compressor (DBAC) No. 3, Class B Overhaul;

accomplish

3.3.2.1
Inspection
529-61-005
Deballast Air Compressor (DBAC) No. 5, Class B Overhaul;

accomplish

3.3.2.1
Inspection
529-61-006
Deballast Air Compressor (DBAC) No. 4, Class B Overhaul;

accomplish

3.3.2.1
Inspection
533-11-001
Potable Water Pump No. 4; overhaul
3.4.1.1
Visual
541-12-003
Hellan Strainer; replace
3.1.2
Pre-Op & Visual
553-10-001
Nitrogen Generator/Compressor No. One and No. 2; overhaul and

system clean

3.3.4.2
Inspection
581-11-002
Anchor and Anchor Chain; inspect and preserve
3.4.11
Inspection
584-21-001
Stern Gate Upper and Lower Hydraulic Cylinder Assembly;

repair

3.3.1
Visual
588-11-001
Thrust Roller, Deck Edge Aircraft Elevator; repair
3.2.2
Inspection
588-11-003
Port Aircraft Elevator Lockbar; repair
3.1.2
Inspection
623-11-002
Starboard (Stbd) Accommodation Ladder; repair
3.1.1
Visual

This listing is not all-inclusive of reports to be provided by the Contractor.

3.5 Milestone Definitions. The following milestones shall be considered achieved (certified) if all work associated with each of the key events as identified in the Planning Event Readiness List (PERL) are completed in their entirety (no Contractor caused exceptions allowed), accepted, and certified by the SUPERVISOR. The PERL can be found in Attachment J-3, Execution Milestones and Key Event Dates.

(a) Undocking. Prior to undocking, the Work Items listed under “Undock” in the PERL must be complete in their entirety (no contractor caused exceptions allowed), accepted, and certified by the SUPERVISOR:

(b) Crew Move Aboard. This milestone is considered achieved if all contracted work that impacts habitability spaces and habitability support systems is completed in its entirety (no contractor caused exceptions allowed), certified, and accepted by the SUPERVISOR. Completion of habitability spaces shall be evidenced by closeout of spaces per NAVSEA Standard item 009-81. Key areas of concern are: safety of the crew, sanitation and serviceability of food preparation, serving, and eating areas; livability of berthing and sanitary spaces; cleanliness.

1. The Work Items listed under “Crew Move Aboard” in the PERL must be completed in their entirety (no contractor exceptions allowed), certified, and accepted by the SUPERVISOR for Crew Move Aboard:.

While some specific Ship’s Force requirements (e.g. availability of LAN, fitness facilities, etc…) may impact the date upon which Ship’s Force chooses to return to the ship, this milestone will be considered complete when the above requirements are met.

The actual date for Ship’s Force return will be coordinated by Ship’s Force, NSA’s Project Manager, and KTR.

4. SAFETY:

4.1 SAFETY INSPECTOR / FIRE MARSHALL: In addition to the safety standards provided in the specifications, the contractor is responsible for providing an experienced Safety Inspector/Fire Marshall who will accomplish daily inspections of the Contractor's entire work area on the ship, together with the Contracting Office’s Safety Representative. This Inspector or Fire Marshall shall not be one of the Contractor's supervisors or superintendents normally assigned to the ship and shall be identified in the contractor’s approved Safety Plan.

4.2 PERSONAL PROTECTIVE EQUIPMENT: Whenever work is performed aboard U.S. Naval Ships or vessels at piers or dry docks of a Naval Shipyard or Naval Station, Contractor employees (including management personnel) shall have and use at all times the following personal protective equipment:

(a) Protective hard hats that meet the following specifications:

(1) Protective helmets purchased after July 5, 1994 shall comply with ANSI Z89.1-1986, "American National Standard for Personnel Protection-Protective Headwear for Industrial Workers-Requirements," or shall be demonstrated to be equally effective.

(2) Protective helmets purchased before July 5, 1994 shall comply with ANSI Standard "American National Standard Safety requirements for Industrial Head Protection," Z89.1-1969, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CFR 1910.135 Head Protection]

(b) Approved type Plano or prescription glasses meeting the following specifications:

(1) Protective eye and face devices purchased after July 5, 1994 shall comply with ANSI standard Z87.1-1989, "American National Standard Practice for Occupational and Educational Eye and Face Protection", or shall be demonstrated by the employer to be equally effective.

(2) Protective eye and face devices purchased before July 5, 1994 shall comply with ANSI "USA standard for Occupational and Educational Eye and Face Protection", Z87.1-1968, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CRF 1910.133 Protective eye and face devices.]

(c) Safety toe shoes, with built-in protective toe box that meet the following specifications:

(1) Protective footwear purchased after July 5, 1994 shall comply with ANSI Standard Z41-1991, "American National Standard for Personal Protection-Protective Footwear", or shall be demonstrated by the employer to be equally effective.

(2) Protective footwear purchased before July 5, 1994 shall comply with the ANSI standard "USA Standard for Men's Safety Toe Footwear", Z41.1 1967, or shall be demonstrated by the employer to be equally effective [Ref. 29 CFR 1910.136 Protective eye and face devices.]

4.3 BLACK OXIDE COATED THREADED FASTENERS (BOCTFs): Due to safety concerns, use of BOCTFs is not authorized when installing or replacing threaded fasteners in the accomplishment of any work required by any Work Item in this contract.

4.4 Force Protection Condition - The Navy is currently in force protection condition Bravo. Any costs associated with delays, disruptions, or security precautions associated with this force protection condition level shall be included in your proposal. Contractors will not receive additional compensation for delays, disruptions, or security precautions associated with this force protection condition level.

4.5 FIRE DRILL: The Contractor shall coordinate the execution of a full scale fire drill with the NSA within the first 30 days after the ship's arrival at the contractor's facility.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .