N00024-17-R-4428_Conformed_Amend_6.pdf

PDF 907 KB Posted

Attached to
USS Oscar Austin FY18 DMP
Solicitation number
N00024-17-R-4428
Issued by

About this file

Conformed Solicitation Amendment 6

View the file

Other files

File Type Posted
OSA_Q&A6.pdf PDF
N00024-17-R-4428_Mod_Amend_6.pdf PDF
N00024-17-R-4428_Modification_Amend_5.pdf PDF
N00024-17-R-4428_Conformed_Amend_5.pdf PDF
OSA_Q&A5.pdf PDF
N00024-17-R-4428_Conformed_Amend_4.pdf PDF
N00024-17-R-4428_Modification_Amend_4.pdf PDF
OSA_Q&A4.pdf PDF
J-4_Pricing_Workbook_v3.xlsx XLSX spreadsheet
J-4_Pricing_Workbook_v2.xlsx XLSX spreadsheet
OSA_Q&A3.pdf PDF
N00024-17-R-4428_Conformed_Amend_3.pdf PDF
N00024-17-R-4428_Modification_Amend_3.pdf PDF
N00024-17-R-4428_Conformed_Amend_2.pdf PDF
OSA_Q&A2.pdf PDF
N00024-17-R-4428_Modification_Amend_2.pdf PDF
J-4_Pricing_Workbook_v1.xlsx XLSX spreadsheet
N00024-17-R-4428_Conformed_Amendment_1.docx DOCX document
N00024-17-R-4428_Modification_Amendment_1.docx DOCX document
OSA_Q&A1_v3.docx DOCX document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
S-3_Pre-Proposal_Information_Form.xlsx XLSX spreadsheet
J-5_QASP_OSA_(DDG_79)_FY18_DMP.docx DOCX document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
N00024-17-R-4428.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local t ime 10 Oct 2017

X

A X B X C X D

EX

X

G F 99 - 104

105 - 117 X H 118 bran.sherman@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A3 1 123

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See SECTION L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

BRAN M SHERMAN 202-781-2894

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 33

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

34 - 63 64 - 65

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

66 - 67

68 - 70 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 71 - 74 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 75 - 81 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

82 - 97

PART II - CO NTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0002417PR93057

5. DATE ISSUED

14 Aug 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002417R4428

Section SF 30 - BLOCK 14 CONTINUATION PAGE

AMENDMENT 1

The purpose of Amendment 1 is the following:

- Section L and M. Update to Inter-port Differential

AMENDMENT 2

The purpose of Amendment 2 is as follows:

- Section B. Added CLIN 0042.

- Incorporated Errata 1 into Attachment J-1 and J-2.

- Revised Attachment J-4.

AMENDMENT 3

The purpose of Amendment 3 is as follows:

- Revised Section C paragraph 3. and Table 3.4.

- Incorporated Errata 2 into Attachment J-1 and J-2.

- Revised Attachment J-3 and J-4.

AMENDMENT 4

The purpose of Amendment 4 is as follows:

- Incorporate Errata 3 and 4 into Attachment J-1 and J-2.

- Revise Attachment J-4 Pricing Workbook to version 3 (v3).

AMENDMENT 5

Amendment 5 revises the following:

- Section B. B-1 Performance Incentive clause.

- Section I. 52.211-11 Liquidated Damages clause.

- Section L and M. Inter-port Differential.

AMENDMENT 6

The purpose of Amendment 6 is to extend the proposal submission date from 29 September 2017 at 03:00 PM EST to 10 October 2017 at 12:00 PM (noon) EST. SECTION A and L are hereby revised accordingly.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

USS OSCAR AUSTIN DMP - Non Prorated WIs

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS OSCAR AUSTIN (DDG 79) DURING FY18 DEPOT MODERNIZATION

PERIOD (DMP) CNO AVAILABILITY (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) Availability onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 CNO1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A and C.

PURCHASE REQUEST NUMBER: N0002417PR93057

NET AMT

0001AA

Funding in support of CLIN 0001

1 Lot

Non Prorated Work Items NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

0001BA

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a

0001CA

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING

OPTION CLINS, IF EXERCISED

The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.

Not Separately Priced (NSP). Incorporated into the price of CLINs 0001, and 0003 through 0015.

Performance Incentive

The amount of any incentive payable to the Contractor, pursuant to the clause "B-1 Performance Incentive," shall be determined in accordance with the procedures set forth in paragraph E of the clause using the evaluation factors set forth in paragraph C in the clause. The total maximum incentive available pursuant to this clause is $2,000,000. See clause for further details.

See Notes A and C.

USS OSCAR AUSTIN DMP - Prorated WIs

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS OSCAR AUSTIN (DDG 79) DURING FY18 DEPOT MODERNIZATION

PERIOD (DMP) CNO AVAILABILITY (Prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) CNO Availability onboard USS OSCAR AUSTIN (DDG

79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A and C.

0004BA

Funding in support of CLIN 0004

Prorated Work Items

0004CA

Funding in support of CLIN 0004

Prorated Work Items

PEO IWS 2 WIs

Work Items: See attachment J-4 for list The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A and C.

PEO IWS 6 WIs

Work Items: See attachment J-4 for list The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A and C.

TYCOM WIs

OPTION Work Items: See attachment J-4 for list The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, & C.

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

NAVSUP WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

SPAWAR WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

PEO IWS 5 WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

PEO IWS 2 WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

PEO IWS 1IT3 WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

PEO IWS 3C WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

PEO IWS 5 WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

NAVSEA 05 WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

PMA 280 WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

MDA WIs

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS OSCAR AUSTIN (DDG 79) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes

NOTE A: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW

WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully loaded ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of man hours included in its price proposal for contract modifications shall include only direct production man hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 1 above shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production man hour functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production man hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Material handling & Warehousing Safety/Environmental

3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.

5. Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

6. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs

(ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a Request for Contract Change (RCC) issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, Government authorized vendors, or any other work at the sole discretion of the Administrative Contracting Officer. RCC’s that are for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate.

7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth and new work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated.

Fully burdened Ship Repair Labor Rate TBD Material Burden Rate TBD

NOTE B: Option item to which the option clause FAR 52.217-7 applies and which is to be supplied only if and to the extent said option is exercised.

NOTE C: GROWTH RESERVATION

The growth reservation manhours and material dollar requirements listed in the individual Work Items are a part of this contract under the original solicitation and award. The manhour reservation shall include both prime contractor and subcontractor efforts. The balance of hours and material remaining in the reservation items after negotiations have concluded, and when it is evident that no additional work will be tasked, is subject to a decrease change order.

Only actual production manhours expended will be considered towards the contractor’s obligation to provide the defined reservation manhour effort. While supervision, quality assurance, and other nonproduction labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor’s obligation to provide reserved manhours. The manhour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual Work Item. Material dollars shall be based on actual costs to the Contractor of acquiring the materials provided.

Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the actual cost of materials expended toward the reservation. The information received in the consolidated final report required by Section C Paragraph 6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all reservation Work Items. The reservations listed in the individual Work Items are not to be considered Time and Material or a Level of Effort. Once the scope of work for a task has been listed and a mutually agreeable number of manhours or materials has been agreed to, neither party will be entitled to an adjustment based on actual manhours or material dollars required. Each task shall receive approval by, the Navy Project Manager and the Administrative Contracting Officer (ACO).

B-1 PERFORMANCE INCENTIVE

A. General

As it is in the Government’s interest to complete the USS OSCAR AUSTIN (DDG-79) DMP (inclusive of base and all option CLINs) ahead of schedule to allow the early delivery of the ship back to the Fleet, the Government is interested in incentivizing the early completion of the Key Events within the contractor’s control that the Government expects should be reasonably expected to lead to this outcome.

Key Event Milestones

Milestone # Milestone Milestone Completion Date Source

1 HM&E Turnover 4 to AIT PM_2017-0003_TPPC 2 HM&E Turnover 5 to AIT PM_2017-0003_TPPC 3 Combat Systems Turnover 1 to AIT PM_2017-0003_TPPC 4 Combat Systems Turnover 2 to AIT PM_2017-0003_TPPC 5 Combat Systems Turnover 3 to AIT PM_2017-0003_TPPC 6 Combat Systems Turnover 4 to AIT PM_2017-0003_TPPC

All work required by Section C and Work Package SSP # TPPC-DDG79-MARMCN18-CN01associated with the Key Event milestones listed in the table above must be completed to be eligible for any incentive herein.

B. Available Incentive

The amount of any incentive payable to the Contractor, pursuant to this clause, shall be determined in accordance with the procedures set forth in paragraph E using the evaluation factors set forth in paragraph C below. The total maximum incentive available pursuant to this clause is $2,000,000.00.

C. Incentive Evaluation

The milestone schedule in Reference PM_2017-0003_TPPC, including the schedule of milestones (1 through 6), reflect the Government’s critical path to complete the Availability. The Contractor shall complete all work required by Section C and Work Package SSP # TPPC-DDG79-MARMCN18-CN01 associated with the Key Event milestones listed above to be eligible for any incentive herein.

Award of this performance incentive will be determined in the following two step process:

For Milestones (1 through 6), the contractor must complete the work associated with each of the compartments associated with that milestone early to the specific compartment turnover to AIT date provided in Reference “PM_2017-0003_TPPC” to be considered early for the milestone overall.

To determine the extent that each Milestone (1 through 6) is completed early (D(x)), the number of days early that each compartment is completed must first be computed, using the following formula:

D(c)(x) = P(c)(x) – A(c)(x)

Where:

A(c)(x) = Actual completion date for compartment (c) within the milestone (x) P(c)(x) = Planned completion date for compartment (c) within the milestone (x), as provided in Reference

“PM_2017-0003_TPPC”

D(c)(x) = Days early completion for compartment (c) within the milestone (x) D(x) = The smallest value of D(c)(x) across all the compartments associated with that milestone.

Note 1: A(x) shall be based on the Government’s acceptance of the contractor meeting the requirements of Section C paragraph 3.5.

Table 1: Milestones Completion Table to Calculate D(x)

Planned

Completion Date P(c)(x)

Actual Completion Date A(c)(x)

Days Early Completion D(c)(x)

D(x)

Compartment / Milestone HM&E TURNOVER 4 to AIT 7

Electric Plant DIU 1 AUX 1 6/25/2018 6/17/2018 8 Propulsion DIU 4 MER 1 6/25/2018 6/14/2018 11

UCC 3 MER 1 6/25/2018 6/18/2018 7

ECU 1A and 1B MER 1 6/25/2018 6/16/2018 9 Repair 2 foundations installed, equipment loaded and painted iaw spec item

6/25/2018 6/17/2018 8

F/O, L/O & CRP valves associated with SA71604K in MER1. 1A/1B F/O Filt/Sep Outlet, #1MRG Pur Suct/Fill, #1CRP Pur Suct/Fill

6/25/2018 6/18/2018 7

SA 71605 Galley foundations, piping and electrical complete that impact MER 1 overhead

6/25/2018 6/17/2018 8

2 Fuel banks closed & ready to test (any two from groups 1 through 6).

Includes requirements of SA70403K and SA77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, TDRs

6/13/2018 6/4/2018 9

HM&E TURNOVER 5 10

All Compartments 7/30/2018 2/1/2017 12

Combat Systems Turnover 1 to AIT 7 IC & Gyro Room #1 (FWD) 7/27/2018 7/19/2018 8 IC & Gyro Room #2 (AFT) 7/27/2018 7/16/2018 11 Power Supply/Conversion Room 10/19/2018 10/12/2018 7

Power Conversion Room 10/19/2018 10/10/2018 9 Sonar Cooling Equipment Room 10/19/2018 10/11/2018 8 Auxiliary Machinery Room #1 10/19/2018 10/12/2018 7

Combat Systems Turnover 2 to AIT 8 SNAP II Computer Room (LAN R )

8/24/2018 8/16/2018 8

CSER #2 8/31/2018 8/22/2018 9

CSER #3 8/31/2018 8/23/2018 8

Combat Information Center (CIC) 8/31/2018 8/22/2018 9 Radar Room #1 9/7/2018 8/30/2018 8 Communications Center (Radio) 9/7/2018 8/29/2018 9 Radar Room #2 9/14/2018 9/4/2018 10

CSER #1 9/14/2018 9/5/2018 9

Sonar Equipment Room #1 9/28/2018 9/20/2018 8 Sonar Equipment Room #2 9/28/2018 9/19/2018 9 Sonar Equipment Room #3 9/28/2018 9/20/2018 8 Sonar Control Room 9/28/2018 9/18/2018 10 Tomahawk Equipment Room 9/28/2018 9/20/2018 8 VLS Magazine #2 (AFT) 9/28/2018 9/19/2018 9 VLS Magazine #1 (FWD) 9/28/2018 9/19/2018 9

Combat Systems Turnover 3 to AIT 6 Mast and Access Trunk 10/5/2018 9/27/2018 8 Pilot House 10/5/2018 9/28/2018 7 Director Equipment Room #1 10/5/2018 9/27/2018 8 Radar Room #3 10/12/2018 10/3/2018 9 Combat Systems Maintenance Central

10/12/2018 10/4/2018 8

CSER #4 10/19/2018 10/10/2018 9

SPY Array Room #1

(FWD/STBD)

10/19/2018 10/10/2018 9

SPY Array Room #2

(FWD/PORT)

10/19/2018 10/11/2018 8

SPY Array Room #3 (AFT/STBD) 10/19/2018 10/11/2018 8 SPY Array Room #4 (AFT/PORT) 10/19/2018 10/12/2018 7 CIWS Workshop #1 10/19/2018 10/11/2018 8 MFTA Winch Room 10/19/2018 10/13/2018 6 CIWS Control Room #1 10/19/2018 10/11/2018 8 5"/54 Loader Drum & Fan Room 10/19/2018 10/10/2018 9

SSES 10/19/2018 10/10/2018 9

CSER 3 Annex 10/19/2018 10/13/2018 6

Combat Systems Turnover 4 to AIT 7 VLS Fan Room fwd 10/26/2018 10/18/2018 8

VLS Fan Room fwd 10/26/2018 10/19/2018 7 VLS Fan Room aft 10/26/2018 10/18/2018 8 Chart Room (w/4) 10/26/2018 10/17/2018 9 CCS (VLS Alarms) 10/26/2018 10/18/2018 8 Radio Transmitter Room 11/2/2018 10/24/2018 9 CIWS Wpn & Avn Ord Eqpt Wks 11/2/2018 10/24/2018 9 CIWS Control Room#2 11/2/2018 10/25/2018 8 Electric Load Center #1 11/2/2018 10/24/2018 9 AN/SPY-1 Antenna Arrays 11/2/2018 10/26/2018 7 Director Equipment Room #2 11/2/2018 10/25/2018 8 Director Equipment Room #3 11/2/2018 10/26/2018 7 VLS Service Interface Room

(FWD)

11/2/2018 10/25/2018 8

The Step 1 incentive will be determined as follows:

For Milestones 1 through 6, the incentive earned for each milestone is computed using the following formula:

Milestone 1 D(x) * $15,000 (with a maximum D(x) of 10 days; Max incentive earned = $150,000) Milestone 2 D(x) * $15,000 (with a maximum D(x) of 10 days; Max incentive earned = $150,000) Milestone 3 D(x) * $15,000 (with a maximum D(x) of 10 days; Max incentive earned = $150,000) Milestone 4 D(x) * $15,000 (with a maximum D(x) of 10 days; Max incentive earned = $150,000) Milestone 5 D(x) * $15,000 (with a maximum D(x) of 10 days; Max incentive earned = $150,000) Milestone 6 D(x) * $15,000 (with a maximum D(x) of 10 days; Max incentive earned = $150,000)

The Step 2 incentive will be determined as follows:

The Smallest Value of D(x) across milestones (1 through 6) * $140,000, for a maximum D(x) value of 10 days. The total maximum incentive the contractor can earn under Step 2 is $1,100,000 ($110,000 * 10).

The contractor shall only receive an incentive under Step 2 if all milestones (1 through 6) dates are early. If at least one milestone is on time or late, the contactor shall not be afforded any incentive under Step 2. The incentive will not be compounded between milestones– the contractor shall only receive an incentive for the milestone with the smallest value of D(x).

Example incentive earned (based on Table 1 above):

Step 1: Milestone 1 (7 days * $15,000)

+ Milestone 2 (10 days * $15,000) + Milestone 3 (7 days * $15,000) + Milestone 4 (8 days * $15,000) + Milestone 5 (6 days * $15,000) + Milestone 6 (7 days * $15,000)

= $675,000

[note, all Milestones are capped at maximum of 10 days, therefore, milestone 2 value is capped at 10 days]

Step 2: = (6 days * $110,000) = $660,000

Total = $675,000 + $660,000 = $1,335,000

D. Performance Incentive Determining Official (PIDO)

The PIDO will be the Administrative Contracting Officer (ACO). The ACO will determine the Performance Incentive due to the Contractor.

E. Performance Incentive Determination and Reclama Procedures

1. Within fifteen (15) working days after the end of the availability, the Contractor shall furnish to the PIDO written documentation and such other information as may be reasonably required to assist the PIDO in its evaluation of the contractor’s performance for the factors listed in paragraph (C).

2. The PIDO will provide a final incentive determination and the contractor will be notified as provided in paragraph E.5 of this clause.

3. If the PIDO does not concur with the contractor’s letter, disagreements shall be expressed in a performance evaluation letter to the contractor. The Contractor shall submit written comments and any supporting documentation to the PIDO within five (5) working days of receiving the performance evaluation letter.

4. Based on Contractor comments or reclama, the PIDO shall make a final determination of the performance incentive earned.

5. The PIDO will notify the Contractor, in writing, of the final determination and the Contracting Officer will issue a unilateral modification to the contract to provide the Performance Incentive.

F. Finality of Incentive Determining Official's Determination of the Performance Incentive

The determinations of the amount of the Performance Incentive, if any, to be paid to the Contractor is a unilateral decision made solely at the discretion of the PIDO.

Section C - Descriptions and Specifications

SCOPE OF WORK

1. GENERAL REQUIREMENTS:

1.1 The Contractor under the direction of the Regional Maintenance Center (RMC) and as an independent Contractor and not as an agent of the Government, shall furnish the material, support (electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repair and alteration of the FY18 USS OSCAR AUSTIN (DDG 79) Depot Modernization Period (DMP) Chief of Naval Operations (CNO) Availability in accordance with the requirements stated in this Section, the Work Item Specifications and Work Item Plans, Drawings, and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract. Category I NAVSEA FY17 Standard Items through CHG 1 identified under Attachment J-1 are applicable to all items without further reference. Category II NAVSEA FY17 Standard Items through CHG 1 are applicable when invoked and/or referenced in individual work items specified in Attachment J-1.

NAVSEA Standard items may be found at:

http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI.aspx

1.2 The Contractor shall accomplish planning and scheduling to ensure a rational, integrated and timely plan for receipt, storage and installation of Government Furnished Material as identified in work item specifications, and for accomplishment of production work.

1.3 The Contractor shall provide an integrated milestone plan for the availability. These milestones will include a schedule of key events necessary to meet the contract delivery dates. A critical path analysis and a milestone schedule shall be used to measure schedule accomplishment of the functions and elements required to successfully complete the repair and alteration of FY18 USS OSCAR AUSTIN (DDG 79) DMP within the availability dates herein.

1.4 INTEGRATED PRODUCTION SCHEDULE DEVELOPMENT, UPDATE, AND REVIEWS – In support of NAVSEA Standard Item requirements and to confirm the contractor has all available input for development of the Integrated Production Schedule, including the development of the Integrated Work Package, Production Schedule, Integration of O, I and D level Work, Integration of AIT and SHIPALT requirements and any other contractor assigned or Third Party work scheduled for accomplishment concurrent with the CNO availability, the contractor shall, with the Regional Maintenance Center (RMC), conduct the Work Package Execution Review (WPER). The WPER will take place at the RMC located at the vessel’s homeport. The RMC will schedule the WPER per the Joint Fleet Maintenance Manual (JFMM) Milestones either as a separate event or concurrent with an Integrated Project Team Development (IPTD) event no later than A-30 for CNO availabilities. This review shall be accomplished following the JFMM, Volume II, Integrated Fleet Maintenance requirements including the Critical Time Period, First 100 Hour Plan. Final 100 Hour plan and identify any schedule or scope impact. See Appendix E of the JFMM II-I-2E-1. The JFMM can be found at https://www.submepp.csd.disa.mil/JFMM/index.htm.

The Contractor shall formally present its Integrated Production Schedule to the Navy Supervisory Authority (NSA) at the WPER, Start of the Availability, 25% complete conference, 50% complete conference, 75% complete conference, production completion meetings, and for pre Sea Trials requirements. The Integrated Production Schedule shall include Alteration Installation Teams (AIT), Government-Contracted Third Party Maintenance Providers, Ship's Force, Commercial Industrial Services (CIS), and Fleet Maintenance Activity (FMA) work to the maximum extent this information is available. At each meeting, the contractor shall present and explain, at minimum, the following information:

1.4.1 The Contractor's latest, Government approved, Integrated Production Schedule created in full compliance with Standard Item 009-60.

1.4.2 The Contractor's current progress in preparing for and/or executing the Availability in accordance with their Integrated Production Schedule. The Contractor shall provide an explanation and mitigation plan for any preparation or execution delays in comparison to their Integrated Production Schedule.

1.4.2.1 The Contractor's plan shall describe opportunities for schedule acceleration (at no cost to the Government unless directly related to a Government caused delay) and potential risks and mitigations to remaining schedule attainment.

1.5 Wherever the term “Job Order” is used in this solicitation/award, it also means “Contract.”

1.6 The Contractor shall report and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the work specifications. As found conditions, needed repairs and corrective action reports will be submitted to the Government in the form of a Condition Found Report (CFR). The Contractor's conditions found reporting shall be in accordance with that set forth in Standard Item 009-01.

1.7 The Government may send a site inspection team to perform an inspection of the contractor's facility prior to arrival of the vessel.

1.8 GOVERNMENT FURNISHED MATERIAL: Government Furnished Material (GFM) cited in the solicitation will be shipped to the contractor’s facility. The successful offeror is to coordinate delivery of Government Furnished Material with the Project Manager. Government property permanently removed from a vessel that requires a Property Administrator's disposition instructions shall be properly prepared for shipment and be delivered as directed by the Property Administrator.

GFM will be listed in paragraph 5 of the Work Item(s).

1.9 QUALITY ASSURANCE

1.9.1 QUALITY ASSURANCE PROGRAM - The Contractor shall provide and maintain a quality assurance program acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. The Contractor's quality assurance program shall be in accordance with that set forth in Standard Item 009-04. In addition to its rights under clause 252.217-7005, INSPECTION AND MANNER OF DOING WORK (JUL 2009), the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality assurance program and, as such, the Contractor shall not be entitled to progress payments for said work and material.

1.9.2 Quality Assurance Surveillance Plan (QASP) - The Contractor shall meet the performance/acceptable quality level requirements for each deliverable/assessment area in the QASP, Attachment J-5. There will be monetary deductions based on unfavorable contractor performance as stated in the QASP. There is no maximum dollar limit to the deductions which can be assessed against the Contractor for failing to meet the performance/acceptable quality level requirements.

1.10 IDENTIFICATION OF CONDITION FOUND - In accordance with the requirements of NAVSEA

Standard Item 009-01, the contractor shall identify needed repairs and recommend corrective action during contract performance for work/deficiencies discovered which are not covered by the existing work package. For conditions to impact the critical path(s) /controlling item(s), the contractor shall notify the government via electronic media within 24-hours of discovery. This initial notification need not include all content required for a Condition Found Report (CFR), but must include a description of the condition/deficiency and an estimated timeframe for the offeror's professional recommendation for resolution, which shall not exceed five (5) working days as specified below.

Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR (intended to represent the "Work Request" described in DFARS 252.217-7028, OVER AND ABOVE WORK (DEC 1991)) per CDRL A002.

1.10.1 CONDITION FOUND NOTIFICATION TO GOVERNMENT

CFRs shall be submitted through the Navy Maintenance Database Re-platform (NMDR) within five (5) working days of discovery of the condition. At a minimum, the CFR will include the following:

(1) Identify contract, ship, and hull number

(2) Serialized by CFR number

(3) Identification of the applicable Work Item number

(4) Date requirement was discovered

(5) Description of the work requirement

(6) Specific location of the work

(7) Recommendation for corrective action

(8) Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability). Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.

(9) Identification of related changes, if any, to the internal milestones and production and contract completion dates.

Note: The prime contractor shall integrate work scope identified in a CFR into the Integrated Master Schedule (IMS) to the maximum extent possible. This includes work scope identified in a CFR by subcontractors submitted to the prime.

1.10.2 GOVERNMENT REVIEW AND RESPONSE TO CFR

The Maintenance Team will review the CFR. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to five (5) working day requirement). As appropriate, the Government and contractor will need to meet, conduct ship checks and/or discuss the recommendation for corrective action further to determine the full scope of work required prior to final approval of the CFR. The contractor's accuracy reflected in the CFRs submitted may be evaluated in CPARS and utilized for past performance ratings on future requirements. Additionally, deductions may be assessed in accordance with Attachment J-5, QASP.

1.11 REQUEST FOR CONTRACT CHANGE (RCC)

In the event a growth requirement or new work is validated and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .