Enclosure_D_-_Notional_32_Month_Cyclical_Schedule_-_Typical_Mandays.pdf
PDF 149 KB Posted
- Attached to
- LCS Sustainment East Coast Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ)
- Solicitation number
- N00024-16-R-4319
About this file
Notional 32 month
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure D 13 Oct 2015
Type of Availability Typical Duration Frequency Mandays Per Year Per Ship Planned Maintenance Avail (PMAV) Five(5) days Once per month 6,400 * & Continuous Maintenance Avail (CMAV) 2 Weeks ## Every four months 5,000 * CNO Avail (SRA(d))# 12 Weeks Once every 32 months 9,000 * **
Drydock period 3‐6 Weeks Facilities Maintenance ( (FM Lite & Deep) and Corrosion Control)
As Required As Required 3,700 *
* Mandays are based on OPNAV 4700 Representative Intervals, Durations, and Repair Mandays for Depot Level Maintenance Availabilities of U.S. Navy Ships
** Does not include Ship Change Documents (SCDs)/Modernization
# SRA(d) is defined in OPNAV 4700 as: A labor‐intensive industrial period assigned to LCS class for the accomplishment of maintenance and selected modernization which includes an approximately 12‐14 day docking period intended for inspection of water jets, seals, and underwater running gear. LCS class is maintained through SRA(d)s in lieu of overhauls.
& PMAVs will only contain PM work items and are typically accomplished during the PMAVs. However, PMS may also be accomplished during CMAVs or Windows Of Opportunity (WOO).
## Continuous Maintenance Availabilities (CMAV) are availabilities that occur three times per year/every four months, and are two weeks in duration. CMAVs could include corrective/emergent maintenance, Planned Maintenance, and modernization alterations.
OPS
PM
A
V
MONTH 1
DEP
OPS PM
A V
MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6 MONTH 7 MONTH 8
MONTH 9 MONTH 10 MONTH 11 MONTH 12 MONTH 13 MONTH 14 MONTH 15 MONTH 16
Overseas
TRANSIT
DEPLOYED
OPS PM
A V
PM
A
V
MONTH 17 MONTH 18 MONTH 19 MONTH 20 MONTH 21 MONTH 22 MONTH 23 MONTH 24
MONTH 25 MONTH 26 MONTH 28 MONTH 29 MONTH 30 MONTH 31 MONTH 32 MONTH 27
CNO Avail (DSRA) (12 weeks)
DEP
OPS PM
A
V DEPLOYED
OPS PM
A
V DEPLOYED
OPS PM
A
V DEPLOYED
OPS PM
A V
CM
A
V
DEPLOYED
OPS PM
A
V DEPLOYED
OPS PM
A
V DEPLOYED
OPS PM
A
V DEP
OPS PM
A
V DEPLOYED
OPS PM
A
V DEPLOYED
OPS PM
A
V
Predeployment
CMAV
CM
A
V
CM
A
V
HOMEPORT
OPS PM
A
V
DEPLOYED
OPS PM
A
V
Return TRANSIT
PM
A
V
HOMEPORT OPS PM
A
V
HOMEPORT
OPS PM
A
V HOMEPORT
OPS PM
A
V HOMEPORT
OPS PM
A V
HOMEPORT
OPS PM
A V
OPS
PM
A
V HOMEPORT
OPS PM
A
V HOMEPORT
OPS PM
A
V HOMEPORT
OPS PM
A V
CM
A
V
Notional 32 Month Cyclical Schedule (2 Ships/3 Crews*)
HOMEPORT OPS PM
A
V
HOMEPORT OPS CMAV
DEPLOYED
OPS PM
A V
CM
A
V DEPLOYED
OPS
CNO Avail (SRA(d)) (6 wks)
CREW 1
CREW 2
CREW 1 CREW 3
CREW 2
CREW 2 CREW 1
CREW 3
*3 crews rotate between 2 hulls on opposite deployment schedules. (Second hull not shown.)
Crew Turnover
| Sources Sought Enclosure D.pdf |
| Notional 32 Month Cyclical Schedule (2 Ships/3 Crews*) |
| LCS Wholeness CONOPs Notional Schedule�(Showing 2 hulls over 8 months) |