Enclosure_D_-_Notional_32_Month_Cyclical_Schedule_-_Typical_Mandays.pdf

PDF 149 KB Posted

Attached to
LCS Sustainment East Coast Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ)
Solicitation number
N00024-16-R-4319
Issued by

About this file

Notional 32 month

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure D 13 Oct 2015

Type of Availability Typical Duration Frequency Mandays Per Year Per Ship Planned Maintenance Avail (PMAV) Five(5) days Once per month 6,400 * & Continuous Maintenance Avail (CMAV) 2 Weeks ## Every four months 5,000 * CNO Avail (SRA(d))# 12 Weeks Once every 32 months 9,000 * **

Drydock period 3‐6 Weeks Facilities Maintenance ( (FM Lite & Deep) and Corrosion Control)

As Required As Required 3,700 *

* Mandays are based on OPNAV 4700 Representative Intervals, Durations, and Repair Mandays for Depot Level Maintenance Availabilities of U.S. Navy Ships

** Does not include Ship Change Documents (SCDs)/Modernization

# SRA(d) is defined in OPNAV 4700 as: A labor‐intensive industrial period assigned to LCS class for the accomplishment of maintenance and selected modernization which includes an approximately 12‐14 day docking period intended for inspection of water jets, seals, and underwater running gear. LCS class is maintained through SRA(d)s in lieu of overhauls.

& PMAVs will only contain PM work items and are typically accomplished during the PMAVs. However, PMS may also be accomplished during CMAVs or Windows Of Opportunity (WOO).

## Continuous Maintenance Availabilities (CMAV) are availabilities that occur three times per year/every four months, and are two weeks in duration. CMAVs could include corrective/emergent maintenance, Planned Maintenance, and modernization alterations.

OPS

PM

A

V

MONTH 1

DEP

OPS PM

A V

MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6 MONTH 7 MONTH 8

MONTH 9 MONTH 10 MONTH 11 MONTH 12 MONTH 13 MONTH 14 MONTH 15 MONTH 16

Overseas

TRANSIT

DEPLOYED

OPS PM

A V

PM

A

V

MONTH 17 MONTH 18 MONTH 19 MONTH 20 MONTH 21 MONTH 22 MONTH 23 MONTH 24

MONTH 25 MONTH 26 MONTH 28 MONTH 29 MONTH 30 MONTH 31 MONTH 32 MONTH 27

CNO Avail (DSRA) (12 weeks)

DEP

OPS PM

A

V DEPLOYED

OPS PM

A

V DEPLOYED

OPS PM

A

V DEPLOYED

OPS PM

A V

CM

A

V

DEPLOYED

OPS PM

A

V DEPLOYED

OPS PM

A

V DEPLOYED

OPS PM

A

V DEP

OPS PM

A

V DEPLOYED

OPS PM

A

V DEPLOYED

OPS PM

A

V

Predeployment

CMAV

CM

A

V

CM

A

V

HOMEPORT

OPS PM

A

V

DEPLOYED

OPS PM

A

V

Return TRANSIT

PM

A

V

HOMEPORT OPS PM

A

V

HOMEPORT

OPS PM

A

V HOMEPORT

OPS PM

A

V HOMEPORT

OPS PM

A V

HOMEPORT

OPS PM

A V

OPS

PM

A

V HOMEPORT

OPS PM

A

V HOMEPORT

OPS PM

A

V HOMEPORT

OPS PM

A V

CM

A

V

Notional 32 Month Cyclical Schedule (2 Ships/3 Crews*)

HOMEPORT OPS PM

A

V

HOMEPORT OPS CMAV

DEPLOYED

OPS PM

A V

CM

A

V DEPLOYED

OPS

CNO Avail (SRA(d)) (6 wks)

CREW 1

CREW 2

CREW 1 CREW 3

CREW 2

CREW 2 CREW 1

CREW 3

*3 crews rotate between 2 hulls on opposite deployment schedules. (Second hull not shown.)

Crew Turnover

Sources Sought Enclosure D.pdf
Notional 32 Month Cyclical Schedule (2 Ships/3 Crews*)
LCS Wholeness CONOPs Notional Schedule�(Showing 2 hulls over 8 months)

File details come from the government source that posted it. Updated .