N00024-16-R-4306_Attachment_J-6_Pre-Priced_Work_Item_List_Rev_1.pdf

PDF 60 KB Posted

Attached to
Mid-Atlantic CVN Private Sector Maintenance
Solicitation number
N00024-16-R-4306
Issued by

About this file

Revised Attachment J-6. Amendment 0002.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-14-R-4306

ATTACHMENT J-6

MID-ATLANTIC CVN PRIVATE SECTOR MAINTENANCE PRE-PRICED WORK

ITEM LIST

Rev 1

CVN PSM DPIA

Work Item Work Item Description Labor Hours

Material Dollars

042−02−001

Norfolk Naval Shipyard (NNSY) Work Authorization Form

(WAF)

Requirements; accomplish

6,255 $0

042−07−001 Nuclear Powered Ships/Nuclear

Support Ships; special requirements

$0

042−11−001

General Occupational Safety, Health and Environment (OSHE) Requirements for Work Within

Norfolk Naval Shipyard;

accomplish (PCP)

7,520 $0

042−22−001

General Requirements for Work Within Norfolk Naval Shipyard

(NNSY);

accomplish

3,333 $0

042−26−001

Security Requirements for Work Within Norfolk Naval Shipyard

(NNSY);

accomplish

128 $0

631-31-002 Drydock – Underwater Hull Low

Pressure Wash; accomplish 1,561 $10,978

631-31-001 Drydock – Underwater Hull

Preservation; accomplish 36,651 $1,670,605

633-21-001 Drydock – Impressed Cathodic Protection System; inspect and repair 48 $100

982-32-001 Sea Trials; accomplish 304 $6,425

992-11-001 Drydock Cleaning ; accomplish

7,319 $10,699

997-11-001 Ship’s Docking Report, Inspection and Services, provide 120 $0

N00024-14-R-4306

ATTACHMENT J-6

MID-ATLANTIC CVN PRIVATE SECTOR MAINTENANCE PRE-PRICED WORK

ITEM LIST

Rev 1

CVN PSM PIA

Work Item Work Item Description Labor Hours

Material Dollars

042−02−001

Norfolk Naval Shipyard (NNSY) Work Authorization Form

(WAF)

Requirements; accomplish

2,500 $0

042−07−001 Nuclear Powered Ships/Nuclear

Support Ships; special requirements

60 $0

042−11−001

General Occupational Safety, Health and Environment (OSHE) Requirements for Work Within

Norfolk Naval Shipyard;

accomplish (PCP)

2,820 $0

042−22−001

General Requirements for Work Within Norfolk Naval Shipyard

(NNSY);

accomplish

1,250 $0

042−26−001

Security Requirements for Work Within Norfolk Naval Shipyard

(NNSY);

accomplish

48 $0

513-11-001 Vent Plenum and Catapult Piping

Space; inspect and preserve 756 $3,750

581-11-001 Anchor an Anchor Chain; inspect and preserve 243 $7,713

612-01-001 Aircraft Elevator and Flight Deck Safety Net and Frame; remove, install, test 15,492 $44,308

982-32-001 Sea Trials; accomplish 304 $6,425

File details come from the government source that posted it. Updated .