N00024-16-R-2211 Amendment 0003
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002416NR53033
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
Respond to Bidder's Questions (See Attachment 12) Section H: Update Contracting Financing Clause Section J: Update Attachment 1, Attachment 6, Attachment 9, Attachment 12 Section L: Update text See Continuation Page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-16-R-2211
X 9B. DATED (SEE ITEM 11)
23-Mar-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Apr-2016
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-16-R-2211
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES (REVISED)
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is for the following:
Section H
‐ Update Contracting Financing Clause Payment Events #1, #2, #3a, and #4
Section J ‐ Replace Attachment 1-Work Boat Medium Specification REV A with Attachment 1-Work Boat Medium
Specification REV B ‐ Replace Attachment 6- Identification and Assertion of Use, Release, or Disclosure Restrictions of
Technical Data Non-Commercial Technical Data with Attachment 6 - Identification and Assertion of Use, Release, or Disclosure Restrictions of Technical Data Non-Commercial Technical Data REV 1
‐ Replace Attachment 9-ELIN Pricing Chart REV 2 with Attachment 9-ELIN Pricing Chart REV 3 ‐ Replace Attachment 12-Bidder’s Questions and Answers with Attachment 12-Bidder’s Questions and
Answers REV 1
Section L ‐ Update Volume I, 2. Feasibility and Practicability of the Proposed Design, Paragraph e
SECTION SF 1449 - CONTINUATION SHEET
Section H – Special Contract Requirements
The following have been modified:
CONTRACTING FINANCING CLAUSE
From:
EVENT #1
The Government will provide a single interim payment, 5% of the total delivery order Boat CLIN value upon delivery of purchase order of major components and raw material applicable to the delivery order to the WAWF primary POC.
EVENT #2
Upon completion and acceptance of the progress report (proving the start of production of the ordered boats) by the Government program office (PMS 325G) and submitting invoices from major components and raw material suppliers to the WAWF primary POC, the Government will provide a single interim payment, 25% of the total delivery order Boat CLIN value.
EVENT #3a Upon delivery by the Contractor and receipt by the Government of draft drawings that are submitted 45 days prior to the official scheduling of Pre-Delivery Inspection and Boat Trials, the Government will provide a single interim payment, 5% of the total delivery order Boat CLIN value.
EVENT #4
Upon acceptance of each craft and all deliverables at destination by the Government program office (PMS 325G), the Government will provide an interim payment on a per craft basis until all of the craft in the delivery order are accepted. All discrepancies must be resolved before invoicing. This event is 50% of the total delivery order Boat CLIN value, but it is further calculated on a per boat basis for payment purposes.
To:
EVENT #1
Upon completion and acceptance of Post Award Conference (PAC) minutes by the Government program office (PMS 325G), the Government will provide a single interim payment, 5% of the total delivery order Boat CLIN value.
EVENT #2
Upon delivery by the Contractor of the progress report validating the start of production of the ordered boats and acceptance by the Government program office (PMS 325G) and submission of purchase orders from major component and raw material suppliers to the WAWF primary POC, the Government will provide a single interim payment, 20% of the total delivery order Boat CLIN value.
EVENT #3a
Upon delivery by the Contractor of the preliminary Technical Data Package (TDP) (i.e., the TDP submission required 45 days prior to the official scheduled dates of Pre-Delivery Inspection and Boat Trials) and review by the Government, the Government will provide a single interim payment, 15% of the total delivery order Boat CLIN value.
Note pertaining to completeness of the TDP's Bill of Materials (BOM): The BOM as defined by Attachment 1 must have minimal errors or omissions for payment.
EVENT #4
Upon acceptance of each boat and all deliverables at destination by the Government program office (PMS 325G), the Government will provide an interim payment on a per boat basis until all of the boats in the delivery order are accepted. All discrepancies must be resolved before invoicing. This event is 45% of the total delivery order Boat CLIN value, but it is further calculated on a per boat basis for payment purposes.
Section J – Exhibits and Other Attachments
LIST OF ATTACHMENTS
Attachment 1 – Work Boat Medium Specification REV B Attachment 6 – Identification and Assertion of Use, Release, or Disclosure Restrictions of Technical Data Non-
Commercial Technical Data Attachment 9 – ELIN Pricing Chart REV 3 Attachment 12 – Bidder’s Questions and Answers REV 1
Section L – Instructions to Offerors
VOLUME I: Technical Proposal (Non-Price factors)
Factor 1: Technical Approach:
2. Feasibility and Practicability of the Proposed Design:
From:
e. Documentation that the proposed designs are based upon similar craft design(s) which has been built and demonstrated to be safe and suitable in actual service in a comparable mission profile in military or heavy duty commercial applications. Similar craft design documentation to include the following: Example scale weight report for actual parent craft built in the proposed production facility, with Longitudinal Center of Gravity (LCG); example photographs of previous craft;
product specification sheet listing vital characteristics for similar craft (providing minimum characteristics listed in Specification Item 070-1); a specific list of modifications to the previous craft design required to achieve the requirements of this solicitation;
To:
e. Documentation that the proposed designs are based upon similar craft design(s) which has been built and demonstrated to be safe and suitable in actual service in a comparable mission profile in military or heavy duty commercial applications. Similar craft design documentation to include the following: Example scale weight report for actual parent craft with Longitudinal Center of Gravity (LCG); example photographs of previous craft; product specification sheet listing vital characteristics for similar craft (providing minimum characteristics listed in Specification Item 070-1); a specific list of modifications to the previous craft design required to achieve the requirements of this solicitation;
(End of Summary of Changes)