EASR_ATTACHMENT_L-G_TO_L-N_COST_DATA_TABLES.xlsx

XLSX spreadsheet 335 KB Posted

Attached to
Enterprise Air Surveillance Radar (EASR) Engineering and Manufacturing Development
Solicitation number
N0002415R5370
Issued by

About this file

EASR_ATTACHMENT_L-G_TO_L-N_COST_DATA_TABLES

View the file

Other files

File Type Posted
EASR_Amendment_08_Q As.pdf PDF
EASR_Solicitation_Amendment_08.pdf PDF
EASR_Solicitation_Amendment_07.pdf PDF
2015_10_21_1020_EASR_J-01_SOW.pdf PDF
EASR_Solicitation_Amendment_06.pdf PDF
EASR_Solicitation_Amendment_05.pdf PDF
EASR_RFP_Amendment_04.pdf PDF
EASR_Solicitation_Q As_Amendment_04.pdf PDF
15-R-5370_EASR_Solicitation_conformed_2015-10-07.pdf PDF
2015_10_02_1020_EASR_J-01_SOW_REDLINE.pdf PDF
15-R-5370_EASR_Solicitation_Amendment_03.pdf PDF
2015_10_02_1020_EASR_J-01_SOW_CLEAN.pdf PDF
Q As_Amendment_03.pdf PDF
EASR_RFP_Amendment_02_Q As.pdf PDF
EASR_RFP_Amendment_02.pdf PDF
EASR_Solicitation_Amendment_01.pdf PDF
EASR_Att_J-18_SLOC_Table.xls XLS spreadsheet
EASR_ATTACHMENT_L-P_PROPOSAL_SUMMARY.ppt PPT presentation
EASR_Att_J-03_GFI_NAVSEA_FORM_4340-2.pdf PDF
EASR_Att_J-14_GFF.pdf PDF
EASR_Att_J-06_WBS_Data_Dictionary.pdf PDF
EASR_Att_J-01_SOW.pdf PDF
EASR_Att_J-16_V1_LLM_LIST.xls XLS spreadsheet
EASR_Att_J-13A_SGFP_Appendix.pdf PDF
EASR_Att_J-13_SGFP.pdf PDF
EASR_Att_J-15_CSDR_Plan.xls XLS spreadsheet
EASR_Att_J-19_CDRL_GLOSSARY.pdf PDF
N0002415R5370_EASR_Solicitation.pdf PDF
EASR_Att_J-17_V2_LLM_LIST.xls XLS spreadsheet
EASR_Pre-Sol_Qs_for_FBO_Release_2015-08-4.pdf PDF
Att 3 N0002415R5370 DD 254_4D.pdf PDF
Att 4 - N0002415R5370 4E Shipping.pdf PDF
Att 4 - N0002415R5370 4C EASR_J-01_SOW.pdf PDF
Att 4 - N0002415R5370 4A_4B 2015_03_30_EASR_SECTION_B_AND_C.pdf PDF
Att 6 - N0002415R5370 - Draft RFP Classified_Material_Request_Form.doc DOC document
Att 1 - N0002415R5370 - RFP Classified_Material_Request_Form.doc DOC document
Att 2 - N0002415R5370 - Classified Attachment Instructions.pdf PDF
Att 5 - N0002415R5370_EASR_Draft_RFP_Question_Comment_Template.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L-G

EASR SECTION L COST TABLE ATTACHMENT G

Cost Summary Table By CLIN/SLIN

Major Cost ElementCLIN 0001CLIN 0006*CLIN 0101CLIN 0102CLIN 0201CLIN 0202CLIN 0301CLIN 0302CLIN 0303CLIN 0304CLIN 0401CLIN 0402CLIN 0403CLIN 0404CLIN 0405CLIN 0406CLIN 0407CLIN 0408CLIN 0501CLIN 0502CLIN 0503CLIN 0504CLIN 0505CLIN 0506CLIN 0507CLIN 0508CLIN 0601CLIN 0602CLIN 0603CLIN 0604CLIN 0605CLIN 0606CLIN 0701CLIN 0702CLIN 0703CLIN 0704CLIN 0705CLIN 0706
SLIN 0006AASLIN 0006XX…CLIN 0401AACLIN 0401ABCLIN 0402AACLIN 0402ABCLIN 0402ACCLIN 0402ADCLIN 0404AACLIN 0404ABCLIN 0502AACLIN 0502ABCLIN 0504AACLIN 0504ABCLIN 0602AACLIN 0602ABCLIN 0702AACLIN 0702ABCLIN 0704AACLIN 0704AB
Purchase Parts ($)
Material Overhead ($)
Major SubContracts ($)
Other SubContracts ($)
Interorganizational Transfer ($)
Total Material ($)
Direct Program Management Labor (Hours)
Direct Program Management Labor ($)
Program Management Overhead ($)
Total Program Management ($)
Direct Engineering Labor (Hours)
Direct Engineering Labor ($)
Engineering Overhead ($)
Total Engineering ($)
Direct Manufacturing Labor (Hours)
Direct Manufacturing Labor ($)
Manufacturing Overhead ($)
Total Manufacturing ($)

Subtotal Labor ($)

Other Direct Costs ($)

Subtotal Material, Labor, and ODC ($)

G&A Expense ($)
Subtotal Costs ($)
Facilities Capital Cost of Money (FCCM) ($)
Total Estimated Cost ($)
Fee/Profit ($)
Fee/Profit (%)
CLIN Type
TOTAL ($)
Ceiling Price
Prepare one of these forms for each CLIN as specified on Form L-N Instructions.
Round cost values to whole dollars.
Link each cell in this form with the appropriate cells in the Form L-H for each of the CLIN. Do not just paste values where value can be linked to another form.
* Offeror shall provide/insert for each SLIN. Under CLIN 0006, Offeror shall include a SLIN Column for each Enhanced Data Rights Item priced option offered in section B.

EASR SECTION L COST TABLE ATTACHMENT G

L-H

EASR SECTION L COST TABLE ATTACHMENT H

Cost Summary Detail for CLIN/SLIN **** entitled *****

Major Cost ElementCY16CY17CY18CY19CY20CY21CY22CY23CY24CY25CY26Total $
Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $
Material Non-Recurring
Purchase Parts
Material Overhead ($)
Major Subs
*
*
Other Subs
Cross Organizational Transfer
Total Material Non-Recurring
Material Recurring
Purchase Parts
Material Overhead ($)
Major Subs
*
*
Other Subs
Cross Organizational Transfer
Total Material Recurring
Labor Non-Recurring
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor Non-Recurring
Labor Recurring
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor Recurring
Other Direct Costs Non-Recurring
Type
*
*
Total Other Direct Costs Non-Recurring
Other Direct Costs Recurring
Type
*
*
Total Other Direct Costs Recurring

SUBTOTAL COSTS ($)

G&A Expense ($)
Type
*
*

SUBTOTAL COSTS ($)

Facilities Capital Cost of Money (FCCM) ($)
Type
*
*

TOTAL ESTIMATED COSTS ($)

Fee/Profit ($)
Fee/Profit (%)
TOTAL ($)
Prepare one of these forms for each CLIN/SLIN as specified on Form L-N Instructions.
Round cost values to whole dollars.
Link values on this form with values/equations on other forms Do not just paste values where value can be linked to another form.
Sub totals must calculate within this form and not be linked to other forms
Link each cell containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Cross Oorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs with the unburdened values in Form L-I or L-J. Link each cell containing rates to appropriate cells in Form L-L.
Calculations with rates computed on this form shall link to rates from Form L-L and material and labor costs from Form L-J.
Cost basis for application of Material Overhead, Indirect Labor Rates, G&A and FCCM must link to value(s) contained in Form L-H, not Form L-J.
For CLIN/SLINs which do not have a required Form L-I or L-J, contractor shall enter costs directly onto this form.
Categories provided are for example only, link categories to actual categories listed on Form L-L.
All values shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)

EASR SECTION L COST TABLE ATTACHMENT H

L-I

EASR SECTION L COST TABLE ATTACHMENT I

Cost Summary Detail for CLIN/SLIN **** entitled *****

Major Cost ElementCY16CY17CY18CY19CY20CY21CY22CY23CY24Total $
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
LaborLabor Category Allocation Table
Program ManagementLabor CategoryCLINs 0101, 0201, 0301, 0405, 0505, 0603, 0705, 0803CLINs 0507, 0605, 0707, & 0805
Category/Personnel%%
*Program Manager0.050.05
*
*Senior Engineer0.200.20
Program Management Indirect Rates
*Engineer0.500.45
*
*Site Support / Technician0.100.20
Engineering
Category/PersonnelSenior Logistician0.050.05
*
*Logistician0.050.00
*
Engineering Indirect RatesAdmin0.050.05
*
*Total1.001.00
*
Manufacturing
Category/PersonnelInstructions for Engineering Services Composite Labor Rate BOE
*
*1The Offeror shall utilize the breakdown percentage by general labor category and CLIN in the Labor Category Allocation Table.
*
Manufacturing Indirect Rates
*2In column A, the offeror shall identify the specific labor categories to be used in the CLIN. The Offeror may list more than one specific labor category for each general category provided in the Labor Category Allocation Table. The Offeror shall insert additional rows as required.
*
*
Total Labor
3In Columns B through Z, the Offeror shall identify the Labor Hours and Rate for each Contractor labor category listed in Column A. The total labor contribution of all Contractor proposed labor under a single labor category shall equal the percentage specified in the Labor Category Allocation Table.
SUBTOTAL COSTS ($)
G&A Expense ($)
SUBTOTAL COSTS ($)
4The Offeror shall compute the composite rates through Fee for each calendar year by dividing each calendar year TOTAL ESTIMATED COST by calendar year Total Labor (Hours). Decimals shall be rounded at the second significant digit.
Facilities Capital Cost of Money (FCCM) ($)
TOTAL ESTIMATED COSTS ($)
Fee ($)
Fee (%)5The Offeror shall identify all required labor categories.
TOTAL ESTIMATED COSTS ($) Plus Fixed Fee
** Shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)6The Offeror shall link all rates used to the Rates Worksheet (L-L).
Labor CategoryCY16CY17CY18CY19CY20CY21CY22CY23CY24Total Hours7For pricing purposes, the Offeror shall assume that hours will be expended at the appropriate rate denoted in Section H clause "5252.216-9122 LEVEL OF EFFORT ".
Hours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total Hours
Program Manager
Senior Engineer
Engineer
Site Support / Technician
Senior Logistician
Logistician
Admin
Major Cost ElementCY16CY17CY18CY19CY20CY21CY22CY23CY24
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
Total Labor (Hours)
TOTAL Estimated COSTS ($) Plus Fixed Fee
Composite Rate through Fee
Prepare one of these forms for each CLIN as specified on Form L-N Instructions.
See Instructions for Engineering Services Composite Labor Rate BOE to the right of the table.
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Link values on this form with values/equations on other forms. Do not just paste values where value can be linked to another form.
Categories provided are for example only, link categories to actual categories listed on Form L-L.
Rate cells should be linked to the rates Form L-L. Total values shall be computed in this form.
Provide equations for Total Cost computation.

EASR SECTION L COST TABLE ATTACHMENT I

L-J

EASR SECTION L COST TABLE ATTACHMENT J

Cost Summary Table by Contract WBS for CLIN/SLIN **** entitled *****

TotalCY16
Line ItemDescriptionMaterial CostsMajor Sub Ktr CostsOther Sub Ktr CostsCross Organizational Transfer CostsCost of MaterialLabor Category CostsOther Direct CostsTotal CostsMaterial 1 CostsMaterial 2 CostsMaterial N CostsMaterial Costs TotalMajor Sub Ktr 1 CostsMajor Sub Ktr 2 CostsMajor Sub Ktr N CostsMajor Sub Ktr Costs TotalOther Sub Ktr 1 CostsOther Sub Ktr 2 CostsOther Sub Ktr N CostsOther Sub Ktr Costs TotalCross Organizational Transfer 1 Costs
Line ItemNRERENRERENRERENRERENRERENRERENRERENRERERateNRERERateNRERERateNRERENRERERateNRERERateNRERERateNRERENRERERateNRERERateNRERERateNRERENRE
1.0Enterprise Air Surveillance Radar (EASR)
1.1Prime Mission Product (PMP)
1.1.1Radome / RF Radiator
1.1.2Non-LRU RF Hardware
1.1.3T/R Line Replaceable Units (LRUs)
1.1.3.1T/R Modules
1.1.3.1.1GaN MMICs
1.1.3.1.2GaAs MMICs
1.1.3.1.3Misc. TR Module HW
1.1.3.1.4T/R Module Assembly and Test
1.1.3.2DC-to-DC Converters
1.1.3.3Other LRU Assembly
1.1.3.3.1LRU Other Misc. HW
1.1.3.3.2LRU Integration, Assembly, Test and Checkout
1.1.4Receiver/Exciters
1.1.5Digital Beamformer
1.1.6Beam Steering Controller
1.1.7Data/Signal Processing Equipment
1.1.7.1Radar Control Processor
1.1.7.2Radar Signal Processor
1.1.8Mechanical Structure
1.1.8.1Variant 1 Mechanical Structure
1.1.8.1.1Antenna
1.1.8.1.2Pedestal
1.1.8.1.3Rotary Joint
1.1.8.1.4Drive Motor(s)
1.1.8.1.5Enclosure
1.1.8.1.6Other
1.1.8.2Variant 2 Mechanical Structure
1.1.8.2.1Antenna
1.1.8.2.2Deckhouse Mounting
1.1.8.2.3Other
1.1.9Array Power System
1.1.10Array Cooling System
1.1.11Inertial Navigation Unit
1.1.12Other Equipment
1.1.13PMP Applications Software
1.1.13.1Control Processor - Software
1.1.13.2Signal Processor- Software
1.1.13.3Digital Beamformer- Software
1.1.13.4Other
1.1.14PMP System Software
1.1.14.1Operating Systems
1.1.14.2Licenses for Software
1.1.14.3Maintenance Agreements
1.1.14.4Other
1.1.15Integration, Assembly, Test and Checkout
1.2Platform Integration
1.3Systems Engineering/Program Management
1.3.1Program Management
1.3.2System Engineering
1.4System Test and Evaluation
1.4.1Development Test and Evaluation
1.4.1.1T&E Software
1.4.1.1.1Simulations
1.4.1.1.2Test Control Software
1.4.1.2Data Analysis Tools
1.4.1.3Testing at Contractor Facility
1.4.1.3.1Test Plan Development
1.4.1.3.2Analysis Planning
1.4.1.3.3Test Conduct and Analysis
1.4.1.4Land Based Testing
1.4.2Operational Test and Evaluation
1.4.3Mock-ups / System Integration Laboratories (SIL)
1.4.4Test and Evaluation Support
1.4.5Test Facilities
1.5Training
1.6Data
1.6.1Technical Publications
1.6.2Engineering Data
1.6.3Management Data
1.6.4Support Data
1.6.5Data Depository
1.7Peculiar Support Equipment
1.8Common Support Equipment
1.9Operational/Site Activation
1.10Industrial Facilities
1.11Initial Spares and Repair Parts
Totals
Prepare one of these forms for each CLIN as specified on Form L-N Instructions.
Round cost values to whole dollars.
Rate cells should be linked to the rates Form L-L. Total values shall be computed in the form.
Cells containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Cross Organizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs in this form are industry inputs.
Link each cell containing rates to appropriate cells in Form L-L. Displayed rate shall be through G&A.
Provide equations for Total Cost computation. Costs shall be through G&A.
Add additional columns for additional labor, material and sub-contractor costs as required.
The formulas in this form shall compute the appropriate parent/child cost roll up relationships.
EASR SECTION L COST TABLE ATTACHMENT J

L-K

EASR SECTION L COST TABLE ATTACHMENT K

Recurring Cost Summary Table for CLIN/SLIN **** entitled *****
System ElementUnit CostQuantityTotal CostSystem ElementUnit CostQuantityTotal Cost
Array SubsystemArray Subsystem
T/R LRUCost Contributor 1
LRU 2Cost Contributor 2
LRU NCost Contributor 3
Subsystem 2Cost Contributor 4
LRU 1Cost Contributor 5
LRU 2Cost Contributor 6
LRU NCost Contributor 7
Subsystem 3Cost Contributor 8
LRU 1Cost Contributor 9
LRU 2Cost Contributor 10
LRU NT/R LRU
*Cost Contributor 1
*Cost Contributor 2
*Cost Contributor 3
*Cost Contributor 4
Subsystem NCost Contributor 5
LRU 1Cost Contributor 6
LRU 2Cost Contributor 7
LRU NCost Contributor 8
Cost Contributor 9
Cost Contributor 10
Prepare one of these forms for each CLIN as specified on Form L-N Instructions.
Round cost values to whole dollars.
Provide equation in total cost cells.
Total Cost should be provided through FCCM.

EASR SECTION L COST TABLE ATTACHMENT K

L-L

EASR SECTION L COST TABLE ATTACHMENT L

Cost Category

Rates (Contractor Calendar Year)
Rates Category20162017201820192020202120222023202420252026
Material Overhead
Category 1
Category 2
Category n
Direct Labor Rate
Category 1
Category 2
Category n
Indirect Rate
Category 1
Category 2
Category n
General & Adminstrative Rate
Category 1
Category 2
Category n
Facility Capital Cost of Money Rate
Category 1
Category 2
Category n
Other Rate
Category 1
Category 2
Category n
*
*
*
Category N
Prepare one of these forms for each CLIN as specified on Form L-N Instructions.
These rates will be used in rates cells in Forms L-H, L-I, and L-J.
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Rate categories shall include all rates used in this proposal.
Categories listed are for example only, provide actual categories included in the proposal.

EASR SECTION L COST TABLE ATTACHMENT L

Cost Information Breakout for EASR EDM. (Recurring Costs Only)

1. Provide the unit cost of each separate subsystem of your proposed EASR EDM (e.g. array, receiver/exciter, signal processor, etc.)

2. For the array, provide the cost of each of the top ten contributors to the array cost excluding the array LRUs. (Examples of items that might be included are the array face plate, radome, beamformer assemblies, etc.)

3. Provide the unit cost of each unique LRU in your proposed EASR (e.g. T/R LRU, receiver LRU, etc.)

4. Provide details for the T/R LRU which show the cost for at least the top ten contributors to the T/R LRU cost.

Assemble the cost data for all items requested above, the quantities of each needed for the EASR EDM, and shows the total cost of the EDM along with the cost breakdown to the level requested above.

The use of identical spreadsheet structure and line items shall be used for both EDM and LRIP Recurring Cost Tables.

L-M

EASR SECTION L COST TABLE ATTACHMENT M

FY Cost Summary Detail for CLIN/SLIN **** entitled *****

CLINFY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26Total $
CostCostCostCostCostCostCostCostCostCostCost
CLIN 0001
CLIN 0006 *
CLIN 0101
CLIN 0102
CLIN 0201
CLIN 0202
CLIN 0301
CLIN 0302
CLIN 0303
CLIN 0304
CLIN 0401 *
CLIN 0402 *
CLIN 0403
CLIN 0404 *
CLIN 0405
CLIN 0406
CLIN 0407
CLIN 0408
CLIN 0501
CLIN 0502 *
CLIN 0503
CLIN 0504 *
CLIN 0505
CLIN 0506
CLIN 0507
CLIN 0508
CLIN 0601
CLIN 0602 *
CLIN 0603
CLIN 0604
CLIN 0605
CLIN 0606
CLIN 0701
CLIN 0702 *
CLIN 0703
CLIN 0704 *
CLIN 0705
CLIN 0706
CLIN 0707
CLIN 0708
CLIN 0801
CLIN 0802 *
CLIN 0803
CLIN 0804
CLIN 0805
CLIN 0806
Total
Prepare one of these forms for each CLIN as specified on Form L-N Instructions.
* Offeror shall provide/insert for each SLIN. Under CLIN 0006, Offeror shall include a SLIN Row for each Enhanced Data Rights Item priced option offered in section B. Under CLIN 0402, 0404, 0502, 0504, 0602, 0702, 0704, and 0802, Offeror shall include SLIN Rows for each LRIP unit in a given option.
Round cost values to whole dollars.
The cells on this form do not need to be linked to any other form.
Cost should be through FCCM

EASR SECTION L COST TABLE ATTACHMENT M

L-N Instructions

EASR SECTION L COST TABLE ATTACHMENT N

CLINDescriptionForm L-GForm L-HForm L-IForm L-JForm L-KForm L-LForm L-M
CLIN summarySummary data including all CLINS excluding 0002 through 0005XXX
0001Engineering and Manufacturing Development (RDT&E) *XXX
0002Data
0003Deliveries in Support of CLIN 0001
0004Provisioned Items Order
0005Reserved
0006Option-Enhanced Data Rights **X
0101Option-Engineering Services (FY 17)XX
0102Option-Travel in Support of CLIN 0101X
0201Option-Engineering Services (FY 18)XX
0202Option-Travel in Support of CLIN 0201X
0301Option-Engineering Services (FY 19)XX
0302Option-Travel in Support of CLIN 0301X
0303Option-Variant 1 Production Long Lead Material (First Unit)XXX
0304Option-Variant 2 Production Long Lead Material (First Unit)XXX
0401Option-Variant 1 Production w/ LLM (1 unit, FY 20)XXX
0402Option-Variant 1 Production w/ LLM (2 units, FY 20) **XXX
0403Option-Variant 2 Production w/ LLM (1 unit, FY 20)XXX
0404Option-Variant 2 Production w/ LLM (2 units, FY 20) **XXX
0405Option-Production Engineering Services (FY 20)XX
0406Option-Travel in Support of CLIN 0409X
0407Option-EASR Variant 1 Non-Recurring Engineering Effort For EASR Transition to Production, First Article Testing, and Physical Configuration AuditXX
0408Option-Variant 2 Non-Recurring Engineering Effort For ProductionXX
0501Option-Variant 1 Production (1 unit, FY 21)XXX
0502Option-Variant 1 Production (2 units, FY 21) **XXX
0503Option-Variant 2 Production (1 unit, FY 21/22)XXX
0504Option-Variant 2 Production (2 units, FY 21/22) **XXX
0505Option-Production Engineering Services (FY 21)XX
0506Option-Travel in Support of CLIN 0505X
0507Option-Field Engineering Services (FY 21)XX
0508Option-Travel in Support of CLIN 0507X
0601Option-Variant 1 Production (1 unit, FY 22)XXX
0602Option-Variant 1 Production (2 units, FY 22) **XXX
0603Option-Production Engineering Services (FY 22)XX
0604Option-Travel in Support of CLIN 0605X
0605Option- Field Engineering Services (FY 22)XX
0606Option- Travel in Support of CLIN 0607X
0701Option-Variant 1 Production (1 unit, FY 23)XXX
0702Option-Variant 1 Production (2 units, FY 23) **XXX
0703Option-Variant 2 Production (1 unit, FY 23/24)XXX
0704Option-Variant 2 Production (2 units, FY 23/24) **XXX
0705Option-Production Engineering Services (FY 23)XX
0706Option-Travel in Support of CLIN 0705X
0707Option- Field Engineering Services (FY 23)XX
0708Option- Travel in Support of CLIN 0707X
0801Option-Variant 1 Production (1 unit, FY 24)XXX
0802Option-Variant 1 Production (2 units, FY 24) **XXX
0803Option-Production Engineering Services (FY 24)XX
0804Option-Travel in Support of CLIN 0805X
0805Option- Field Engineering Services (FY 24)XX
0806Option- Travel in Support of CLIN 0807X

* Indicates that the Offeror shall provide/insert a form for each variant.

** Indicates that the Offeror shall provide/insert multiple forms, one for each SLIN for each form marked with an "X".

EASR SECTION L COST TABLE ATTACHMENT N

image1.emf

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .