EASR_Att_J-15_CSDR_Plan.xls

XLS spreadsheet 58 KB Posted

Attached to
Enterprise Air Surveillance Radar (EASR) Engineering and Manufacturing Development
Solicitation number
N0002415R5370
Issued by

About this file

EASR_Att_J-15_CSDR_Plan

View the file

Other files

File Type Posted
EASR_Amendment_08_Q As.pdf PDF
EASR_Solicitation_Amendment_08.pdf PDF
EASR_Solicitation_Amendment_07.pdf PDF
2015_10_21_1020_EASR_J-01_SOW.pdf PDF
EASR_Solicitation_Amendment_06.pdf PDF
EASR_Solicitation_Amendment_05.pdf PDF
EASR_RFP_Amendment_04.pdf PDF
EASR_Solicitation_Q As_Amendment_04.pdf PDF
15-R-5370_EASR_Solicitation_conformed_2015-10-07.pdf PDF
2015_10_02_1020_EASR_J-01_SOW_REDLINE.pdf PDF
15-R-5370_EASR_Solicitation_Amendment_03.pdf PDF
2015_10_02_1020_EASR_J-01_SOW_CLEAN.pdf PDF
Q As_Amendment_03.pdf PDF
EASR_RFP_Amendment_02_Q As.pdf PDF
EASR_RFP_Amendment_02.pdf PDF
EASR_Solicitation_Amendment_01.pdf PDF
EASR_Att_J-18_SLOC_Table.xls XLS spreadsheet
EASR_ATTACHMENT_L-P_PROPOSAL_SUMMARY.ppt PPT presentation
EASR_Att_J-03_GFI_NAVSEA_FORM_4340-2.pdf PDF
EASR_Att_J-14_GFF.pdf PDF
EASR_Att_J-06_WBS_Data_Dictionary.pdf PDF
EASR_Att_J-01_SOW.pdf PDF
EASR_Att_J-16_V1_LLM_LIST.xls XLS spreadsheet
EASR_Att_J-13A_SGFP_Appendix.pdf PDF
EASR_Att_J-13_SGFP.pdf PDF
EASR_ATTACHMENT_L-G_TO_L-N_COST_DATA_TABLES.xlsx XLSX spreadsheet
EASR_Att_J-19_CDRL_GLOSSARY.pdf PDF
N0002415R5370_EASR_Solicitation.pdf PDF
EASR_Att_J-17_V2_LLM_LIST.xls XLS spreadsheet
EASR_Pre-Sol_Qs_for_FBO_Release_2015-08-4.pdf PDF
Att 3 N0002415R5370 DD 254_4D.pdf PDF
Att 4 - N0002415R5370 4E Shipping.pdf PDF
Att 4 - N0002415R5370 4C EASR_J-01_SOW.pdf PDF
Att 4 - N0002415R5370 4A_4B 2015_03_30_EASR_SECTION_B_AND_C.pdf PDF
Att 6 - N0002415R5370 - Draft RFP Classified_Material_Request_Form.doc DOC document
Att 1 - N0002415R5370 - RFP Classified_Material_Request_Form.doc DOC document
Att 2 - N0002415R5370 - Classified Attachment Instructions.pdf PDF
Att 5 - N0002415R5370_EASR_Draft_RFP_Question_Comment_Template.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (CSDR Plan)

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:EASR - Enterprise Air Surveillance Radar
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
Pre-AXBC-FRPEnterprise Air Surveillance Radar (EASR)System of SystemsXINITIAL
AC-LRIPO&SCHANGE2015XXXX2015XXXX
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Program Executive Office for Integrated Warfare Systems,

Attn: Capt.X. XXXXX (PEO IWS 2.0) 1333 Issac Hull Avenue SE

WASHINGTON NAVY YARD, DC 20376-2318(202) 781-XXXX
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
XPROGRAMCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONXRDT&E
CONTRACT (SUB)NAVSEA IWS 2.0PROCUREMENT
O&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-4
(CSR)f. SRDR

FORMATS

1.01.0Enterprise Air Surveillance Radar (EASR)Enterprise Air Surveillance Radar (EASR)Enterprise Air Surveillance Radar (EASR)Enterprise Air Surveillance Radar (EASR)Enterprise Air Surveillance Radar (EASR)Enterprise Air Surveillance Radar (EASR)XXXX
1.11.1Prime Mission Product (PMP)Prime Mission Product (PMP)Prime Mission Product (PMP)Prime Mission Product (PMP)Prime Mission Product (PMP)Prime Mission Product (PMP)XXXX
1.1.11.1.1Radome / RF RadiatorRadome / RF RadiatorRadome / RF RadiatorRadome / RF RadiatorRadome / RF RadiatorRadome / RF RadiatorXXX
1.1.21.1.2Non-LRU RF HardwareNon-LRU RF HardwareNon-LRU RF HardwareNon-LRU RF HardwareNon-LRU RF HardwareNon-LRU RF HardwareXXX
1.1.31.1.3T/R Line Replaceable Units (LRUs)T/R Line Replaceable Units (LRUs)T/R Line Replaceable Units (LRUs)T/R Line Replaceable Units (LRUs)T/R Line Replaceable Units (LRUs)T/R Line Replaceable Units (LRUs)XXX
1.1.3.11.1.3.1T/R ModulesT/R ModulesT/R ModulesT/R ModulesT/R ModulesT/R ModulesXXX
1.1.3.1.11.1.3.1.1GaN MMICsGaN MMICsGaN MMICsGaN MMICsGaN MMICsGaN MMICsXXX
1.1.3.1.21.1.3.1.2GaAs MMICsGaAs MMICsGaAs MMICsGaAs MMICsGaAs MMICsGaAs MMICsXXX
1.1.3.1.31.1.3.1.3Misc. TR Module HWMisc. TR Module HWMisc. TR Module HWMisc. TR Module HWMisc. TR Module HWMisc. TR Module HWXXX
1.1.3.1.41.1.3.1.4T/R Module Assembly and TestT/R Module assembly and testT/R Module assembly and testT/R Module assembly and testT/R Module assembly and testT/R Module assembly and testXXXX
1.1.3.21.1.3.2DC-to-DC ConvertersDC-to-DC ConvertersDC-to-DC ConvertersDC-to-DC ConvertersDC-to-DC ConvertersDC-to-DC ConvertersXXX
1.1.3.31.1.3.3Other LRU AssemblyOther LRU AssemblyOther LRU AssemblyOther LRU AssemblyOther LRU AssemblyOther LRU AssemblyXXX
1.1.3.3.11.1.3.3.1LRU Other Misc. HWLRU Other Misc. HWLRU Other Misc. HWLRU Other Misc. HWLRU Other Misc. HWLRU Other Misc. HWXXX
1.1.3.3.21.1.3.3.2LRU Integration, Assembly, Test and CheckoutLRU Integration. Assembly. Test and CheckoutLRU Integration. Assembly. Test and CheckoutLRU Integration. Assembly. Test and CheckoutLRU Integration. Assembly. Test and CheckoutLRU Integration. Assembly. Test and CheckoutXXX
1.1.41.1.4Receiver/ExcitersReceiver/ExcitersReceiver/ExcitersReceiver/ExcitersReceiver/ExcitersReceiver/ExcitersXXX
1.1.51.1.5Digital BeamformerDigital BeamformerDigital BeamformerDigital BeamformerDigital BeamformerDigital BeamformerXXX
1.1.61.1.6Beam Steering ControllerBeam Steering ControllerBeam Steering ControllerBeam Steering ControllerBeam Steering ControllerBeam Steering ControllerXXXX
1.1.71.1.7Data/Signal Processing EquipmentData/Signal Processing EquipmentData/Signal Processing EquipmentData/Signal Processing EquipmentData/Signal Processing EquipmentData/Signal Processing EquipmentXXX
1.1.7.11.1.7.1Radar Control ProcessorRadar Control ProcessorRadar Control ProcessorRadar Control ProcessorRadar Control ProcessorRadar Control ProcessorXXX
1.1.7.21.1.7.2Radar Signal ProcessorRadar Signal ProcessorRadar Signal ProcessorRadar Signal ProcessorRadar Signal ProcessorRadar Signal ProcessorXXX
1.1.81.1.8Mechanical StructureMechanical StructureMechanical StructureMechanical StructureMechanical StructureMechanical StructureXXX
1.1.8.1Variant 1 Mechanical StructureXXX
1.1.8.1.1AntennaXXX
1.1.8.1.2PedestalXXX
1.1.8.1.3Rotary JointXXX
1.1.8.1.4Drive Motor(s)XXX
1.1.8.1.5EnclosureXXX
1.1.8.1.6OtherXXX
1.1.8.21.1.9Variant 2 Mechanical StructureArray Power SystemArray Power SystemArray Power SystemArray Power SystemArray Power SystemXXX
1.1.8.2.11.1.10AntennaArray Cooling SystemArray Cooling SystemArray Cooling SystemArray Cooling SystemArray Cooling SystemXXX
1.1.8.2.21.1.11Deckhouse MountingInertial Navigation UnitInertial Navigation UnitInertial Navigation UnitInertial Navigation UnitInertial Navigation UnitXXX
1.1.8.2.31.1.12OtherOther EquipmentOther EquipmentOther EquipmentOther EquipmentOther EquipmentXXX
1.1.91.1.9Array Power SystemArray Power SystemArray Power SystemArray Power SystemArray Power SystemArray Power SystemXXX
1.1.101.1.10Array Cooling SystemArray Cooling SystemArray Cooling SystemArray Cooling SystemArray Cooling SystemArray Cooling SystemXXX
1.1.111.1.11Inertial Navigation UnitInertial Navigation UnitInertial Navigation UnitInertial Navigation UnitInertial Navigation UnitInertial Navigation UnitXXX
1.1.121.1.12Other EquipmentOther EquipmentOther EquipmentOther EquipmentOther EquipmentOther EquipmentXXX
1.1.13PMP Applications SoftwareXXX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-4
(CSR)f. SRDR

FORMATS

1.1.13.11.1.13.1Control Processor - SoftwareControl Processor - SoftwareControl Processor - SoftwareControl Processor - SoftwareControl Processor - SoftwareControl Processor - SoftwareXXX
1.1.13.2Signal Processor- SoftwareXXX
1.1.13.3Digital Beamformer- SoftwareXXX
1.1.13.4OtherXXX
1.1.14PMP System SoftwareXXX
1.1.14.11.1.14.1Operating SystemsOperating SystemsOperating SystemsOperating SystemsOperating SystemsOperating SystemsXXX
1.1.14.21.1.14.2Licenses for SoftwareLicenses for SoftwareLicenses for SoftwareLicenses for SoftwareLicenses for SoftwareLicenses for SoftwareXXX
1.1.14.31.1.14.3Maintenance AgreementsMaintenance AgreementsMaintenance AgreementsMaintenance AgreementsMaintenance AgreementsMaintenance AgreementsXX
1.1.14.41.1.14.4OtherOtherOtherOtherOtherOtherXXX
1.1.151.1.15Integration, Assembly, Test and CheckoutIntegration, Assembly, Test and CheckoutIntegration, Assembly, Test and CheckoutIntegration, Assembly, Test and CheckoutIntegration, Assembly, Test and CheckoutIntegration, Assembly, Test and CheckoutXX
1.2Platform IntegrationPlatform IntegrationPlatform IntegrationPlatform IntegrationPlatform IntegrationPlatform IntegrationXX
1.31.3Systems Engineering/Program ManagementSystems Engineering/Program ManagementSystems Engineering/Program ManagementSystems Engineering/Program ManagementSystems Engineering/Program ManagementSystems Engineering/Program ManagementXXX
1.3.11.3.1Program ManagementProgram ManagementProgram ManagementProgram ManagementProgram ManagementProgram ManagementXX
1.3.21.3.2System EngineeringSystem EngineeringSystem EngineeringSystem EngineeringSystem EngineeringSystem EngineeringXX
1.41.4System Test and EvaluationSystem Test and EvaluationSystem Test and EvaluationSystem Test and EvaluationSystem Test and EvaluationSystem Test and EvaluationXXX
1.4.11.4.1Development Test and EvaluationIntegration and TestingIntegration and TestingIntegration and TestingIntegration and TestingIntegration and TestingXXX
1.4.1.11.4.1.1T&E SoftwareT&E SoftwareT&E SoftwareT&E SoftwareT&E SoftwareT&E SoftwareXXX
1.4.1.1.11.4.1.1.1SimulationsSimulationsSimulationsSimulationsSimulationsSimulationsXXX
1.4.1.1.21.4.1.1.2Test Control SoftwareTest Control SoftwareTest Control SoftwareTest Control SoftwareTest Control SoftwareTest Control SoftwareXXX
1.4.1.21.4.1.2Data Analysis ToolsData Analysis ToolsData Analysis ToolsData Analysis ToolsData Analysis ToolsData Analysis ToolsXX
1.4.1.31.4.1.3Testing at Contractor FacilityTesting at Contractor FacilityTesting at Contractor FacilityTesting at Contractor FacilityTesting at Contractor FacilityTesting at Contractor FacilityXX
1.4.1.3.11.4.1.3.1Test Plan DevelopmentTest Plan DevelopmentTest Plan DevelopmentTest Plan DevelopmentTest Plan DevelopmentTest Plan DevelopmentXX
1.4.1.3.21.4.1.3.2Analysis PlanningAnalysis PlanningAnalysis PlanningAnalysis PlanningAnalysis PlanningAnalysis PlanningXX
1.4.1.3.31.4.1.3.3Test Conduct and AnalysisTest Conduct and AnalysisTest Conduct and AnalysisTest Conduct and AnalysisTest Conduct and AnalysisTest Conduct and AnalysisXX
1.4.1.41.4.1.4Land Based TestingLand Based TestingLand Based TestingLand Based TestingLand Based TestingLand Based TestingXX
1.4.2Operational Test and EvaluationXX
1.4.3Mock-ups / System Integration Laboratories (SIL)XXX
1.4.4Test and Evaluation SupportXX
1.4.5Test FacilitiesXX
1.5TrainingXX
1.6DataXX
1.6.1Technical PublicationsXX
1.6.2Engineering DataXX
1.6.3Management DataXX
1.6.4Support DataXX
1.6.5Data DepositoryXX
1.7Peculiar Support EquipmentXX
1.8Common Support EquipmentXX
1.9Operational/Site ActivationXX
1.10Industrial FacilitiesXX
1.11Initial Spares and Repair PartsXXX
Subtotal CostX
Reporting Contractor G&AX
Reporting Contractor Undistributed BudgetX
Reporting Contractor Management ReserveX
Reporting Contractor FCCMX
Total CostX
Reporting Contractor Profit/Loss or FeeX
Total PriceX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (CSDR Plan)

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1CWBS DictionaryCWBS and data dictonary
2SRDR InitialInitial SRDR
31921, 1921-1Interm Report 1921 and 1921-1
41921, 1921-1Interm Report 1921 and 1921-1
51921, 1921-1Interm Report 1921 and 1921-1
6SRDR FinalFinal SRDR
71921, 1921-1Final Report 1921 and 1921-1
15. REMARKS
1. Recurring/Non-Recurring: Refer to the specific definitions and requirements in the CSDR Manual, DoD 5000.04-M-1 and the definitions in the DIDs for DD Forms 1921 and 1921-1.
2. Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
3. Contractor Business Data Report:
a. The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b. Reports are submitted annually at the end of the contractor's fiscal year.
c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
4. Provide detailed CSCI (SLOC, ESLOC, Productivity) breakouts within Initial Developer Report and Final Developer Report submissions for PMP.
DD FORM 2794 (PAGE 2), MAY 2011PREVIOUS EDITION IS OBSOLETE

File details come from the government source that posted it. Updated .