Solicitation_Attachment_1_Cost_Summary_Worksheet.xls

XLS spreadsheet 152 KB Posted

Attached to
Inertial Navigation System- Replacement Federal contract opportunity
Solicitation number
N00024-15-R-5226
Issued by
Department of the Navy Naval Sea Systems Command

About this file

N00024-15-R-5226_SolictiationAttachment1_CostSummary

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Summary Matrix)

INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1
CLINDescription2a (CLIN Summary by FY)2b (CLIN Breakout)2c (Breakout by CY)2d (Eng Svcs Breakout)2e (WBS Breakout)2f (Rate Summary)
CLIN summary
0001ISM Design (PDR)
0002EDM Build (Surface)
0003EDM Build (Submarine)
0004Data
0005Other Direct Costs (ODCs)
0006Design (CDR) (Surface)
0007Design (CDR) (Submarine)
0008Engineering Support Services Yr 1
0009Data Rights
1001ISM Testing (Including TRR)
1002PPU Build (Surface)
1003PPU Build (Submarine)
1004Reserved
1005Other Direct Costs (ODCs)
1006Modeling & Simulation
1007Reserved
1008Engineering Support Services Yr 2
2001Production Readiness Review (PRR)
2002LRIP (Surface)
2003LRIP (Submarine)
2004Reserved
2005Other Direct Costs (ODCs)
2006Modeling & Simulation
2007PIO
2008Depot Spares (Surface)
2009Depot Spares (Submarine)
2010INCO Spares (Surface)
2011INCO Spares (Submarine)
2012OBRP Spares (Surface)
2013OBRP Spares (Submarine)
3001Reserved
3002Production (Surface)
3003Production (Submarine)
3004
3005Other Direct Costs (ODCs)
3006Reserved
3007Reserved
3008Engineering Support Services Yr 4
3009Depot Spares (Surface)
3010Depot Spares (Submarine)
3011INCO Spares (Surface)
3012INCO Spares (Submarine)
3013OBRP Spares (Surface)
3014OBRP Spares (Submarine)
4001Reserved
4002Production (Surface)
4003Production (Submarine)
4004Reserved
4005Other Direct Costs (ODCs)
4006Reserved
4007Reserved
4008Engineering Support Services Yr 5
4009Depot Spares (Surface)
4010Depot Spares (Submarine)
4011INCO Spares (Surface)
4012INCO Spare (Submarine)
4013OBRP Spares (Surface)
4014OBRP Spares (Submarine)
INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1

&CDRAFT

2a (CLIN Summary by FY)

INS-R ISM SECTION L - COST TABLE SOLICITATION ATTACHMENT 1 2a
FY Cost Summary Detail for Priced CLINs
CLINFY15FY16FY17FY18FY18FY19FY20FY21FY22FY23TOTAL Proposed CLIN Amount
0001
0002
0003
0004
0005
0006
0007
0008
0009
1001
1002
1003
1004
1005
1006
1007
1008
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
3001
3002
3003
3004
3005
3006
3007
3008
3009
3010
3011
3012
3013
3014
4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
Total

2b (CLIN Breakout)

INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1 2b
Cost Summary Table By CLIN/SLIN
Major Cost ElementCLIN 0001CLIN 0002CLIN 0003CLIN 0005CLIN 0006CLIN 0007CLIN 0008CLIN 0009CLIN 1001CLIN 1002CLIN 1003CLIN 1005CLIN 1006CLIN 1008CLIN 2001CLIN 2002CLIN 2003CLIN 2005CLIN 2006CLIN 2007CLIN 2008CLIN 3002CLIN 3003CLIN 3005CLIN 3008CLIN 4002CLIN 4003CLIN 4005CLIN 4008Total
Purchase Parts ($)
Material Overhead ($)
Major SubContracts ($)
Other SubContracts ($)
Interorganizational Transfer ($)
Total Material ($)
Direct Program Management Labor (Hours)
Direct Program Management Labor ($)
Program Management Overhead ($)
Total Program Management ($)
Direct Engineering Labor (Hours)
Direct Engineering Labor ($)
Engineering Overhead ($)
Total Engineering ($)
Direct Manufacturing Labor (Hours)
Direct Manufacturing Labor ($)
Manufacturing Overhead ($)
Total Manufacturing ($)
Subtotal Labor ($)
Subtotal Material, Labor, and ODC ($)
G&A Expense ($)
Subtotal Estimated Costs less FCCM ($)
Facilities Capital Cost of Money (FCCM) ($)
Total Target Cost ($)
Target Fee/Profit ($)
Target Fee/Profit (%)
CLIN TypeCPIFCOSTCOSTCPIFCPIFCPIFCPIFCPFFCPIFCOSTCOSTCPIFCPIFCPFFCPIFCPIFCPIFCPFFCPFFFPIFFPIFCPFFFPIFFPIFCPFFN/A
TOTAL ($)
Round cost values to whole dollars.
Link each cell in this form with the appropriate cells in the Worsheet 2f for each of the CLIN. Do not just paste values where value can be linked to another form.
INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1 2b

2c (Breakout by CY)

INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1 2c
Cost Summary Detail by Calendar Year For CLINs 0001, 0002, 0003, 0005, 0006, 0007, 0008, 0009, 1001, 1002, 1003, 1005, 1006, 1008, 2001, 2002, 2003, 2005, 2006, 2007, 2008, 3002, 3003, 3005, 3008, 4002, 4003, 4005, 4008 (Offeror shall provide a separate sheet for each CLIN)
Major Cost ElementBaseYear 2Year 3Year 4Year 5Total $
Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $
Material Non-Recurring
Purchase Parts
Material Overhead ($)
Major Subs
*
*
Other Subs
Interorganizational Transfer
Total Material Non-Recurring
Material Recurring
Purchase Parts
Material Overhead ($)
Major Subs
*
*
Other Subs
Interorganizational Transfer
Total Material Recurring
Labor Non-Recurring
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor Non-Recurring
Labor Recurring
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor Recurring
SUBTOTAL COSTS ($)
G&A Expense ($)
Type
*
*
SUBTOTAL COSTS ($)
Facilities Capital Cost of Money (FCCM) ($)
Type
*
*
TOTAL ESTIMATED COSTS ($)
Fee/Profit ($)
Fee/Profit (%)
TOTAL ($)
Offeror to fill out this template in accrodance with the CLIN breakout in the Summary Matrix.
Round cost values to whole dollars.
Link values on this form with values/equations on Worksheet 2f. Do not just paste values where value can be linked to another form.
Sub totals must calculate within this form and not be linked to other forms
Link each cell containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Interorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs with the unburdened values in Form L-I or L-J. Link each cell containing rates to appropriate cells in Form L-L.
INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1 2c

2d (Eng Svcs Breakout)

INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1 2d
Cost Summary Detail for CLINs 0008, 1008, 2008, 3008, and 4008 (Offeror shall provide a separate sheet for each CLIN)
Major Cost ElementBaseYear 2Year 3Year 4Year 5TOTAL
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateTotal $
Labor
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor
SUBTOTAL COSTS ($)
G&A Expense ($)
SUBTOTAL COSTS ($)
Facilities Capital Cost of Money (FCCM) ($)
TOTAL ESTIMATED COSTS ($)
Fee ($)
Fee (%)
TOTAL ESTIMATED COSTS ($) Plus Fixed Fee
** Shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)
Major Cost ElementBaseYear 2Year 3Year 4Year 5
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
Total Labor (Hours)
TOTAL Estimated COSTS ($) Plus Fixed Fee
Composite Rate through Fee
Labor CategoryCLIN 0010CLIN 1010CLIN 2010CLIN 3010CLIN 4010Total Hours
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
Program Manager
Senior Engineer
Engineer
Senior Production Manager
Senior Logistician
Admin
TOTAL CLIN COST
Prepare one of these forms for each CLIN
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Link values on this form with values/equations on other forms. Do not just paste values where value can be linked to another form.
Categories provided are for example only, link categories to actual categories listed on Worksheet 2f.
Total values shall be computed in this form.
Provide equations for Total Cost computation.

2e (WBS )

INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1 2e
TotalBase
Line Item *DescriptionMaterial CostsMajor Sub Ktr CostsOther Sub Ktr CostsInterorganizational Transfer CostsCost of MaterialLabor Category CostsOther Direct CostsTotal CostsMaterial 1 CostsMaterial 2 CostsMaterial N CostsMaterial Costs TotalMajor Sub Ktr 1 CostsMajor Sub Ktr 2 CostsMajor Sub Ktr N CostsMajor Sub Ktr Costs TotalOther Sub Ktr 1 CostsOther Sub Ktr 2 CostsOther Sub Ktr N CostsOther Sub Ktr Costs TotalInterorganizational Transfer 1 Costs
Line ItemNRERENRERENRERENRERENRERENRERENRERENRERERateNRERERateNRERERateNRERENRERERateNRERERateNRERERateNRERENRERERateNRERERateNRERERateNRERENRE
1.0INS-R ISM
1.1* Sample WBS Structure
1.1.1
1.1.1.1
1.1.1.2
1.1.1.3
1.1.1.3.1
1.1.1.3.2
1.1.1.3.3
1.1.1.4
1.1.1.5
1.1.1.6
1.1.1.7
1.1.1.7.1
1.1.1.7.2
1.1.1.8
1.1.1.9
1.1.1.10
1.1.1.11
1.1.1.12
1.1.1.13
1.1.1.13.1
1.1.1.13.2
1.1.1.13.3
1.1.1.14
1.1.1.14.1
1.1.1.14.2
1.1.1.14.3
1.1.1.15
1.1.2
1.1.3
1.1.4
1.1.4.1
1.1.4.1.1
1.1.4.1.1.1
1.1.4.1.1.2
1.1.4.1.2
1.1.4.1.3
1.1.4.1.3.1
1.1.4.1.3.2
1.1.4.1.3.3
1.1.4.1.4
1.1.4.1.4.1
1.1.4.1.4.2
1.1.4.1.4.3
1.1.4.2
1.1.4.3
1.1.4.4
1.1.4.5
1.1.5
1.1.5.1
1.1.5.2
1.1.5.3
1.1.6
1.1.6.1
1.1.6.2
1.1.6.3
1.1.6.4
1.1.6.5
1.1.7
1.1.7.1
1.1.7.2
1.1.8
1.1.8.1
1.1.8.2
1.1.9
1.1.10
1.1.11
1.2
Totals
Prepare one of these forms for each CLIN.
Round cost values to whole dollars.
Rate cells should be linked to the rates Worksheet 2f. Total values shall be computed in the form.
Cells containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Interorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs in this form are industry inputs.
Link each cell containing rates to appropriate cells in Worksheet 2f. Displayed rate shall be through G&A.
Provide equations for Total Cost computation. Costs shall be through G&A.
Add additional columns for additional labor, material and sub-contractor costs as required.
The formulas in this form shall compute the appropriate parent/child cost roll up relationships.
INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1 2e

2f (Rate Summary)

INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1
Cost Category
Rates by Calendar Year
Rates CategoryBaseYear 2Year 3Year 4Year 5
Material Overhead
Category 1
Category 2
Category n
Direct Labor Rate
Category 1
Category 2
Category n
Indirect Rate
Category 1
Category 2
Category n
General & Adminstrative Rate
Category 1
Category 2
Category n
Facility Capital Cost of Money Rate
Category 1
Category 2
Category n
Other Rate
Category 1
Category 2
Category n
*
*
*
Category N
Prepare one of these forms as needed for each CLIN as applicable
These rates will be used in rates cells in Worksheets 2a, 2b, 2c, 2d, 2e.
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Rate categories shall include all rates used in this proposal.
Categories listed are for example only, provide actual categories included in the proposal.
INS-R ISM SECTION L COST TABLE SOLICITATION ATTACHMENT 1