Attachment_2_Bidders_Question_response_4.pdf
PDF 215 KB Posted
- Attached to
- Inertial Navigation System- Replacement Federal contract opportunity
- Solicitation number
- N00024-15-R-5226
About this file
Attachment 2 Bidders Questions response 4
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE
QUESTION
NO.
RFP REFERENCE/DISCUSSION (if necessary) QUESTION government response
12/12/2014 1
Section B, Note A: Spares CLINS contain Note A (2009-14; 3009-14; 4009-
14). These CLINS are for various spares. Note A states “The CLINs are unpriced at award. Following delivery of the TDP the spares list will be finalized and priced. Section B prices will be established prior to option exercise.”
Does this mean we are not supposed to price these under this competitive procurement?
Do not price spares under this competitive procurement.
12/12/2014 2
Section B, CLIN 2007, Provisioned Item Order: There is no SOW Reference.
The only place in the SOW that references CLIN 2007 is under 3.2.5
Obsolescence and Diminishing Manufacturing Sources and Material
Shortages (DMSMS) Management and Support. There are many CLINS referenced under this SOW paragraph as well. DFARs PGI 217.7601 states that Provisioned Items Order means an undefinitized order issued under a contract that includes the Government’s requirements for provisioned items. (Provisioned items with firm prices are acquired by supplemental agreement or by separate contract).
Please advise what is expected to be bid here.
Do not price the PIO line under this competitive procurement.
12/12/2014 3
Page 141 of RFP, paragraphs b- f: Rates Summary (Worksheet 2f), there are conflicts between the information contained in this paragraph and what is identified in notation at the bottom of Worksheet 2f included in
Attachment 1.
See 3A and 3B answers.
12/12/2014 3A
A) RFP states in paragraphs b-e on page 141 that “All rates must be linked to a single source (Solicitation Attachment, Worksheet 2f) so that an adjustment of the rates stated in the source worksheet 2f will automatically result in an adjustment to all the cost summaries.” However in Attachment 1, Worksheet 2f at the bottom it states “Prepare one of these forms as needed for each CLIN as applicable” indicating that separate rate worksheets are required.
May we provide one consolidated rate worksheet?
Yes, please submit one consolidated rate worksheet for all CLINs. Ensure that any adjustments of the rates in the source worksheet
2f will automatically result in an adjustment to all the cost summaries.
12/12/2014 3B
B) RFP states in paragraph f that “Offerors shall round direct labor rates
($) to two (2) decimals to the right of the decimal point (hundredths position). Offerors shall round ratios and factors to no more than five (5) decimal places to the right of the decimal point (billionths position)”.
However in Attachment 1, Worksheet 2f at the bottom it states “Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.”
Please advise if we are required to round factors other than direct labor rates to three or five decimal places.
Please round factors other than direct labor to three decimal places. The RFP will be revised.
12/12/2014 4
Section L, Clause HQ L-2-0017 SOFTWARE DEVELOPMENT AND CMMI OR
EQUIVALENT EXPERIENCE (Page 151 of RFP): Number of months for software experience is blank.
Is there a time frame within which cited experience must fall? The offeror shall provide SW Development and
CMMI or equivalent experience for five (5) years or 60 months. The solicitation will be revised.
12/12/2014 5
Section L, Clause HQ L-2-0017 SOFTWARE DEVELOPMENT AND CMMI OR
EQUIVALENT EXPERIENCE (Page 151 of RFP): Page count limit for CMMI® or equivalent model-based process maturity appraisals performed is blank.
Is there a page-count limit beyond the technical volume page-count limit?
No, the page count limit is included as part of the technical volume page count limit.
12/12/2014 6 Section L, Clause HQ L-2-0016 SOFTWARE DEVELOPMENT PLAN (Page 151 of RFP): Page count limit for SDP rationale is left blank.
Is there a page-count limit beyond the technical volume page-count limit?
No
12/12/2014 7
Section L, paragraph L.1.5 (page 127) and Section L, Clause HQ L-2-0013
SPECIAL PROPOSAL RECEIPT REQUIREMENTS (NAVSEA) (ALTERNATE I)
(page 150): These state, respectively, "Only hand delivered...proposals...will be accepted" and "It is recommended that proposals be mailed in accordance with RFP instructions.
Which paragraph is correct? Follow L.1.5.
12/12/2014 8
SOW 3.2.6.1 states "After successful completion of PDR, the Contractor shall fabricate EDMs with associated …." There is no mention of limitations on EDM material procurement (long lead or otherwise) prior or post
PDR.RFP.
Can EDM material (long lead or otherwise) be procured prior to PDR?
Offeror shall use their discretion.
12/12/2014 9 Section C, 2.1: Section references MIL-STD-881C, Work Breakdown
Structures for Defense Materiel Items, 03 Oct 2011.
Does the Government have a standard
WBS it wishes to use or shall
Contractor's develop their own in accordance with MIL-STD-881C, and if so, which appendix?
The offeror shall use their discretion when developing their own WBS. Please be cognizant of
MIL-STD-881C Appendix B and the CSDR manual
(http://dcarc.cape.osd.mil/Files/Policy/500004m1
.pdf).
INS-R ISM Solicitation N00024-15-R-5226 Questions
12/12/2014 10 Section F, CLIN 3003: Section lists production submarine LRIP units as 4 and an additional 4 units appeared to be listed.
Please confirm that this is a typo since
Section B appears to show only 4 units.
CLIN 3003 is for four (4) Submarine Production
Units. The solicitation will be revised accordingly.
12/12/2014 11 Section B: CLIN 3003 and 3008 are not listed as optional in Section B. Please confirm this omission as a typo.
Yes, this omission is a typo. The solicitation will be revised.
12/12/2014 12 Section F (CLIN 0002, 1002, 1003, etc.): Delivery of units (EDMs, PPUs, etc.) have one delivery date per CLIN.
Are all units ordered to be delivered by the stated CLIN date, or is the date specified for the first unit?
The RFP will be revised as follows: CLIN 0002 QTY changes from 7 to 3; CLIN 0002 Delivery changes to 12 months ADC; CLIN 0003 Delivery changes to
12 months ADC; CLIN 0010 "EDM" Option is added with a QTY of 4; CLIN 0010 Delivery is 9 months ADOE; CLIN 1003 Delivery changes from 6 months ADOE to 9 months ADOE. All units are to be delivered by the stated CLIN date.
12/12/2014 13 SOW 3.2.7.4 requests contractor support for the EQT.
For proposal pricing and scheduling purposes, what is the USG’s anticipated duration of EQT?
The anticipated duration of EQT is 12 months.
Support is level of effort.
12/12/2014 14
SOW 3.2.8 desires the FCA 30 days prior to the TRR. NAVSEA Technical
Review Manual implies a sequence of an FCA following a TRR.
Furthermore, SOW para 3.2.9 indicates the PCA is 30d prior to PRR. PRR is subsequent to EQT. Hence, the FCA is conducted on a pre-production baseline and the PCA is conducted on a Post EQT baseline.
Is this the USN intent? yes.
12/12/2014 15 Section H 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT
(MAR 2000)
For proposal pricing and scheduling purposes, can the Government provide anticipated option exercise dates?
See Section F of the Solicitation
12/12/2014 16
Section L, L.4.1 Volume I: Offer/Administrative (11) states that one complete unclassified copy of proposal in .pdf format must be submitted with Volume 1.
Is this a copy of the Prime proposal or subcontractor proposal(s)? If the Prime
Proposal, will this be one .pdf file containing all 5 volumes?
The Government does not understand this question.
12/12/2014 17
Section L, L.4.1 Volume I: Offer/Administrative (12) states that one complete copy of classified annex in .pdf format (if required) must be submitted with Volume 1.
How can this be done and keep Volume
I unclassified?
Please submit on two separate CDs.
12/12/2014 18 SOW 3.2.14.1 indicates that the USG will provide written approval after the
PDR before the contractor can commence fabrication of the ten EDMs.
How much time is anticipated for the written approval to be provided?
The TRM (GFI) states 5 days max.
12/12/2014 19 Section L, L.4.4 Volume IV: Cost Summary requires a Small Business
Subcontracting Plan.
Is this the same item as required under
L.4.1 (8)?
yes
12/12/2014 20 SOW 3.2.14.2 indicates that the USG will provide written approval after the
CDR before the contractor can commence fabrication of the PPUs.
How much time is anticipated for the written approval to be provided?
The TRM (GFI) states 5 days max.
12/12/2014 21
Section L, L.4.1 Volume I: Offer/Administrative & L.4.4 Volume IV: Cost
Summary: RFP requests Section B to be included in three separate sections of the proposal Volume I (4), RFP pg 132; Volume IV (1.1), RFP pg 139; and
Volume IV (3.1), RFP pg 142.
Are these all duplicates?
Please submit Section B with Volume IV RFP pg
139. The solicitation will be revised accordingly.
12/12/2014 22 Section L, L.4.4 Volume IV Solicitation Package 1.3 requires a "Staffing Plan
(same as Volume III)". Vol. III is Past Performance.
Is this a typo? There is staffing information identified under Volume II
Technical Factor 3. Request clarification as to if these are the same?
Section L.4.4 Volume IV, 1.3 title will be revised to
"Staffing Plan (same as Volume II, Factor 3 Section
F" in the solicitation amendment.
12/12/2014 23 Section L, L.4.4 Volume IV, Cost Summary, para. 3.8, references an
Attachment J-10, which was not found with the RFP.
Please provide Attachment J-10.
This is a typo. The solicitation will be revised from
Attachment J-10 to Solicitation Attachment 1
12/12/2014 24 SOW 3.2.14.3 states that the TEMP is exit criteria for the TRR.
Is the TEMP equivalent to the Master
Test Plan of CDRL A0021 (since there is no TEMP identified in the RFP)?
The Master Test Plan identified in CDRL A0021 is not equivalent to the TEMP.
12/12/2014 25 SOW 3.2.6.1 indicates that “one EDM H/W & S/W element will be delivered in place.”
Is this intended to mean one EDM unit in each the surface and subsurface configuration will be retained by the contractor? If not, which configuration makes up the remaining nine units delivered to the TDA?
Yes.
12/12/2014 26
SOW 3.2.14.1 indicates the contractor may not start fabricating the EDMs until at least the completion of the PDR. Then Paragraph 3.2.6.1 indicates that the EDM must meet the requirements of the TRD before delivery of the balance of the EDMs to the TDA. CLINs 0002 and 0003 indicates that the EDMs will be delivered at 9 months after contract award. This implies that 10 units will be fabricated and all TRD requirements will be satisfied in a maximum of 6 months for two different application configurations
(Surface and subsurface).
Is this a correct interpretation of the
RFP expectations?
Please see the modified CLIN Structure discussed in the Question 12 answer and the revised RFP.
The Government's expectation is that 6 units will be fabricated and all TRD requirements will be satisfied in a maximum of 9 months for two different application configurations.
12/12/2014 27
SOW 3.2.6.1: The SOW uses the term “functional and performance requirements of the TRD.” Section 3.2 of the TRD list “Functional
Characteristics” requirements. Section 3.3 list “Navigation Performance” requirements.
Do these two sections embrace the complete understanding of the
“functional and performance” requirements indicated through the
SOW? If not, what requirements in the
TRD are not considered functional or performance requirements?
Yes.
12/12/2014 28
The TRD does not distinguish between requirements to be met for the
EDM or for the PPUs or for the LRIP configurations. Yet there will be at least three developmental configurations of both surface and subsurface configurations of presumable maturing design compliance. Additionally, Para 3.2.6.2 indicates the USN will conduct Environment Qualification
Testing (EQT) on the PPU configuration. These environmental requirements are presumed to be section 3.10 of the TRD. It appears that at least the TRD requirements of para 3.10 are not compliance criteria for at least the EDM.
Are there any other requirements of the TRD whose compliance before the
Post-EQT configurations will be relaxed?
The contractor shall address the requirements outlined in the SOW and the TRD as stated at each stage of this procurement.
12/12/2014 29
Technical Requirements Document paragraph 3.6.1 states “The ISM HW element primary input power shall accept 48 VDC, and require no more than 500 watts.”. However, INS-R Navigation Processor Module Data
Sheet paragraph 4.1 states “The NPM Power Distribution Assembly shall distribute 200 Watts (W) at 48 VDC to the ISM HW Element.”
Which is correct? 500 watts peak. 200 watts nominal.
12/12/2014 30
Technical Requirements Document paragraph 3.5.2 regarding size refers to
NAVSEA drawings 807-7100685, 807-7100696 and TRD Appendices B (ISM, Surface, Mounting and Space Requirements Sheets 1 and 2) and C ISM, Submarine, Mounting and Space Requirements Sheets 1, 2, AND 3. The
NAVSEA drawings appear not to be included in the bidder’s library and the appendices embedded in the TRD PDF file provided in the library cannot be opened.
Will the cited NAVSEA drawings be provided to bidders? Will viewable versions of the cited appendices be provided to bidders?
Please use the INS-R ICDs vs the NAVSEA drawings. TRD appendices will be emailed to
Offerors which requested the competition library on 12-23-2014. These files should be handled in accordance with the terms of use letter. Any discrepencies between the Appendices and the
INS-R ICDs, the INS-R ICDs take presidence.
12/12/2014 31
Section F CLIN 2001 is the successful completion of the Production
Readiness Review (PRR). CLINs 2002 and 2003 are for the delivery of Low
Rate Initial Production (LRIP) units. SOW Para 3.2.14.4 indicates that PRR will be considered successful when the contractor demonstrates a
Manufacturing Readiness Level (MRL) of 9 or above. The Department of
Defense defines MRL level 9 (nine) in association with authorization for Full
Rate Production including the LRIP cost targets have been met. The
Department of Defense definition of MRL Level 8 (eight) is associated with
LRIP authorization and readiness for a Milestone C decision.
Is SOW Para 3.2.14.4 reference to MRL
9 the intention of the RFP?
The requirement is MRL 8. SOW paragraph will be changed accordingly.