Exhibit_A_INS-R_Contract_Data_Requirements_List_(CDRL)_update_22JAN15.pdf
PDF 695 KB Posted
- Attached to
- Inertial Navigation System- Replacement Federal contract opportunity
- Solicitation number
- N00024-15-R-5226
About this file
Section J - Exhibit A - Contract Data Requirements List (CDRL) update 22 Jan 2015. Posted 27 Jan 2015.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modified 1/22/15
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
N00024-15-R-5226
F. CONTRACTOR
1. DATA ITEM NO
A001
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
ISM DRAWING TREE
4. AUTHORITY (Data Acquisition Doc. No)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW 3.2.2
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
F
10. FREQUENCY
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY. GOVERNMENT
RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION SHALL BE
CORRECTED AND RESUBMITTED WITHIN 30 CALENDAR DAYS OF THE DATE OF
REJECTION.
BLK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS
DIRECTED BY THE PROGRAM EXECUTIVE OFFICE, INTEGRATED WARFARE
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.
BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND PRR.
BLK 14: DELIVERY TO BE IN DIGITAL FORMAT TO THE GOVERNMENT’S SPECIFIED
WEBSITE.
SEE
ADDRESSEE
LIST
15. TOTAL
G. PREPARED BY
Barbie Fidura
H. DATE
22 Jan 15
I. APPROVED BY
J. DATE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A002
2. TITLE OF DATA ITEM
SPECIFICATION REQUIREMENT VERIFICATION
MATRIX
3. SUBTITLE
ISM REQUIREMENTS VERIFICATION MATRIX
4. AUTHORITY (Data Acquisition Doc. No)
DI-MISC-81283
5. CONTRACT REFERENCE
SOW 3.2.2, 3.8.4.3
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.
BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR AND AS UPDATES
ARE REQUIRED.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A003
2. TITLE OF DATA ITEM
SOFTWARE REQUIREMENTS SPECIFICATION (SRS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Doc. No)
DI-IPSC-81433A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.1
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 DAYS PRIOR TO PDR.
BLK 13: NLT 45 DAYS PRIOR TO CDR AND PRR.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A004
2. TITLE OF DATA ITEM
SOFTWARE DESIGN DESCRIPTION (SDD)
DI-IPSC-81435A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.1
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 DAYS PRIOR TO PDR.
BLK 13: NLT 45 DAYS PRIOR TO CDR. FINAL DELIVERED WITH THE TDP.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A005
2. TITLE OF DATA ITEM
SOFTWARE DEVELOPMENT PLAN (SDP)
DI-IPSC-81427A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.2
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
AS REQ
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 DAYS PRIOR TO PDR.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A006
2. TITLE OF DATA ITEM
CONTRACTOR’S CONFIGURATION MANAGEMENT
PLAN
DI-CMAN-80858B
5. CONTRACT REFERENCE
SOW 3.2.3.2, 3.8.1, 3.8.2, 3.8.3
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
60 DAC
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
ASREQ
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A007
2. TITLE OF DATA ITEM
SOFTWARE VERSION DESCRIPTION (SVD)
DI-IPSC-81442A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.2
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: CONCURRENT WITH INITIAL TDP DELIVERY.
BLK 13: CONCURRENT WITH TDP DELIVERIES AND AS UPDATES ARE REQUIRED.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A008
2. TITLE OF DATA ITEM
SOFTWARE TEST PLAN (STP)
DI-IPSC-81438A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.
BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 9 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A009
2. TITLE OF DATA ITEM
SOFTWARE TEST DESCRIPTION (STD)
DI-IPSC-81439A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.
BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR, EACH TRR AND PRR.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 10 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A010
2. TITLE OF DATA ITEM
SOFTWARE TEST REPORT (STR)
DI-IPSC-81440A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 30 CALENDAR DAYS AFTER THE CONCLUSION OF THE TEST EVENT.
BLK 13: NLT 30 CALENDAR DAYS AFTER THE CONCLUSION OF THE TEST EVENT.-.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 11 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A011
2. TITLE OF DATA ITEM
SOFTWARE PRODUCT SPECIFICATION (SPS)
DI-IPSC-81441A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.5
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: CONCURRENT WITH INITIAL TDP DELIVERY, 45 CALENDAR DAYS PRIOR
TO PDR
BLK 13: NLT 30 CALENDAR DAYS AFTER APPROVED CHANGES THAT AFFECT THIS
DATA ITEM. SUBSEQUENT DELIVERIES OF S/W DOCUMENTATION SHALL
PARALLEL PHASED DEVELOPMENT OF OPERATING ENVIRONMENTS THAT
SUPPORT HARDWARE DEVELOPMENT. AFTER FINAL DELIVERY OF EDMs, SUBSEQUENT DELIVERIES OF APPLICABLE SOFTWARE AND ITS ASSOCIATED
DOCUMENTATION SHALL FOLLOW THE APPROVED CM PROCESS AND
PROCEDURES. ALL DOCUMENTS THAT SUPPORT A SOFTWARE RELEASE SHALL
BE DELIVERED AT THE SAME TIME.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 12 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A012
2. TITLE OF DATA ITEM
COMPUTER SOFTWARE PRODUCT
DI-IPSC-81488
5. CONTRACT REFERENCE
SOW 3.2.3.5
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
AS REQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 10: DELIVERY SHALL ACCOMPANY EACH SOFTWARE/FIRMWARE PRODUCT
RELEASED TO THE GOVERNMENT.
BLK 12: FIRST SOFTWARE/FIRMWARE PRODUCT RELEASE, CONCURRENT WITH
INITIAL TDP DELIVERY.
BLK 13: EACH SUBSEQUENT SOFTWARE/FIRMWARE PRODUCT RELEASE, AND
CONCURRENT WITH EACH TDP DELIVERY.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 13 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A013
2. TITLE OF DATA ITEM
FIRMWARE SUPPORT MANUAL (FSM)
3. SUBTITLE
SOFTWARE/FIRMWARE SUPPORT MANUAL
4. AUTHORITY (Data Acquisition Doc. No)
DI-IPSC-81448B
5. CONTRACT REFERENCE
SOW 3.2.3.6
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
AS REQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 10: DELIVERY SHALL ACCOMPANY EACH SOFTWARE/FIRMWARE PRODUCT
RELEASED TO THE GOVERNMENT.
BLK 12: FIRST SOFTWARE/FIRMWARE PRODUCT RELEASE AND CONCURRENT
WITH INITIAL TDP DELIVERY.
BLK 13: EACH SUBSEQUENT SOFTWARE/FIRMWARE PRODUCT RELEASE,
CONCURRENT WITH EACH TDP DELIVERY AND CONCURRENT WITH THE STRP.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 14 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A014
2. TITLE OF DATA ITEM
SOFTWARE TRANSITION PLAN (STRP)
DI-IPSC-81429A NOT 1
5. CONTRACT REFERENCE
SOW 3.2.3.6
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
N/A Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 180 CALENDAR DAYS PRIOR TO THE END OF THE PERIOD OF
PERFORMANCE
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 15 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A015
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
OPEN SYSTEM MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Doc. No)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW 3.2.3.7
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
N/A Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 16 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP X TM OTHER 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A016
2. TITLE OF DATA ITEM
TECHNICAL DATA PACKAGE (TDP)
DI-SESS-80776A
5. CONTRACT REFERENCE
SOW 3.2.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
BLK 4: MIL-STD-31000A, MIL-STD-961E(2), MIL-STD-2073-1E(1), DI-SESS-81000E, DI-
SESS-81002F, DI-SESS-81003E, DI-SESS-81004E, DI-SESS-81008E, ASME-Y14.3M.
REQUIRED TDP ELEMENTS ARE IDENTIFIED IN THE ATTACHED MIL-STD-31000A
FIGURE.
BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY. GOVERNMENT
RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION SHALL BE
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: A DRAFT TDP THAT REFLECTS THE INITIAL SYSTEM CONFIGURATION IS
REQUIRED 45 CALENDAR DAYS PRIOR TO PDR. PLEASE NOTE: THE
GOVERNMENT IS NOT TAKING CONFIGURATION CONTROL AT THIS TIME.
BLK 13: A DRAFT TDP THAT REFLECTS CURRENT SYSTEM CONFIGURATION IS
REQUIRED 45 CALENDAR DAYS PRIOR TO CDR. A DRAFT TDP SHALL BE
DELIVERED NLT 45 CALENDAR DAYS PRIOR TO FCA. PLEASE NOTE: THE
GOVERNMENT IS NOT TAKING CONFIGURATION CONTROL AT THIS TIME. AN
INITIAL TDP SHALL BE DELIVERED NLT 45 CALENDAR DAYS PRIOR TO PCA. THE
FINAL, VALIDATED TDP PACKAGE MUST BE SUBMITTED NLT 60 CALENDAR DAYS
AFTER THE PCA.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 17 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A017
2. TITLE OF DATA ITEM
INSTALLATION CONTROL DRAWINGS
3. SUBTITLE
SOURCE DATA
4. AUTHORITY (Data Acquisition Doc. No)
DI-DRPR-81242
5. CONTRACT REFERENCE
SOW 3.2.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: DRAFT NLT 45 CALENDAR DAYS PRIOR TO CDR.
BLK 13: FINAL NLT 45 CALENDAR DAYS PRIOR TO PCA.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 18 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A018
2. TITLE OF DATA ITEM
MANAGEMENT PLAN
3. SUBTITLE DIMINISHING MANUFACTURING
SOURCES AND MATERIAL SHORTAGES (DMSMS)
MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Doc. No)
DI-MGMT-80004A
5. CONTRACT REFERENCE
SOW 3.2.5
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
60 DAC
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 13: GENERATE CHANGES NLT 60 DAYS AFTER APPROVED PROGRAM OR
DESIGN CHANGES THAT AFFECT THIS DATA ITEM.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 19 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A019
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
PRODUCT RECALL, DMSMS, OBSOLESCENCE
IDENTIFICATION & VENDOR CHANGE NOTICES
4. AUTHORITY (Data Acquisition Doc. No)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW 3.2.5.1
6. REQUIRING OFFICE
PEO IWS6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
SEE BLK 16
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
BLK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS
DIRECTED BY THE PROGRAM EXECUTIVE OFFICE, INTEGRATED WARFARE
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: DELIVERY OF THIS REPORT TO BEGIN AFTER PDR. NLT 5 BUSINESS DAYS
AFTER THE CONTRACTOR RECEIVES NOTIFICATION OF A PRODUCT RECALL,
OBSOLESCENCE ISSUE, OR EMERGENT VENDOR IMPLEMENTED CHANGE.
BLK 13: ANALYSIS AND RECOMMENDATIONS NLT 45 CALENDAR DAYS AFTER
GOVERNMENT DIRECTION.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 20 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A020
2. TITLE OF DATA ITEM
SOURCE DATA FOR FORECASTING DIMINISHING
MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS)
DI-SESS-81656
5. CONTRACT REFERENCE
SOW 3.2.5.2
6. REQUIRING OFFICE
PEO IWS6.0
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1st SUBMISSION
60 DAC
14. DISTRIBUTION
SEE BLK 16
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
CORRECTED AND RESUBMITTED WITHIN 30 CALENDAR DAYS OF THE DATE OF
REJECTION.
BLK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS
DIRECTED BY THE PROGRAM EXECUTIVE OFFICE, INTEGRATED WARFARE
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 10: AN E-BILL OF MATERIAL (BOM) SHALL BE SUBMITTED FOR EACH
CONFIGURATION UNDER THIS CONTRACT.
BLK 13: GENERATE CHANGES NLT 30 DAYS AFTER APPROVED PROGRAM OR
DESIGN CHANGES THAT AFFECT THIS DATA ITEM.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 21 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A021
2. TITLE OF DATA ITEM
TEST PLAN
3. SUBTITLE
MASTER TEST PLAN (MTP)
4. AUTHORITY (Data Acquisition Doc. No)
DI-NDTI-80566A
5. CONTRACT REFERENCE
SOW 3.2.7, 3.2.7.1, 3.2.7.5, 3.6.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.
BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 22 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A022
2. TITLE OF DATA ITEM
TEST PROCEDURE
3. SUBTITLE
MASTER TEST PROCEDURE
4. AUTHORITY (Data Acquisition Doc. No)
DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW 3.2.7, 3.2.7.1, 3.2.7.5, 3.6.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 CALENDAR DAYS PRIOR TO CDR.
BLK 13: NLT 45 CALENDAR DAYS PRIOR EACH TRR.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 23 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A023
2. TITLE OF DATA ITEM
TEST/INSPECTION REPORT
DI-NDTI-80809B NOT 1
5. CONTRACT REFERENCE
SOW 3.2.7, 3.2.7.1, 3.2.7.3, 3.2.7.5, 3.6.4
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
AS REQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 30 CALENDAR DAYS AFTER EACH TEST EVENT.
BLK 13: NLT 30 CALENDAR DAYS AFTER EACH TEST EVENT.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 24 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A024
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
MODELING AND SIMULATION PLAN
4. AUTHORITY (Data Acquisition Doc. No)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW 3.2.7.2
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ONE/R
12. DATE OF 1st SUBMISSION
60DAC
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.
BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 25 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A025
2. TITLE OF DATA ITEM DEPARTMENT OF DEFENSE (DOD)
MODELING AND SIMULATION (M&S) VERIFICATION
AND VALIDATION (V&V) REPORT
DI –MSSM-81752 NOT 1
5. CONTRACT REFERENCE
SOW 3.2.7.2.1
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
SUBMISSION
SEE BLK 16
Draft
Final
SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.
BLK 12: NLT 30 CALENDAR DAYS AFTER VERIFICATION AND VALIDATION OF
MODEL.
BLK 13: NLT 30 CALENDAR DAYS AFTER VERIFICATION AND VALIDATION OF ANY
CHANGES TO PREVIOUSLY VALIDATED MODELING AND SIMULATION.
Barbie Fidura
H. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 26 of 80 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0004
B. EXH/ATCH NO.
A
C. CATEGORY
TDP TM OTHER X 1
D. SYSTEM/ITEM
INERTIAL NAVIGATION SENSOR –
REPLACEMENT (INS-R) INERTIAL
SENSOR MODULE (ISM)
E. CONTRACT/PR NO.
A026
2. TITLE OF DATA ITEM DEPARTMENT OF DEFENSE (DOD)
MODELING AND SIMULATION (M&S) ACCREDITATION
REPORT
DI- –MSSM-81753 NOT 1
5. CONTRACT REFERENCE
SOW 3.2.7.2.1
6. REQUIRING OFFICE
PEO IWS 6.0
7. DD 250 REQ
LT
ASREQ
12. DATE OF 1st SUBMISSION
SEE BLK 16
14.…