Exhibit_A_INS-R_Contract_Data_Requirements_List_(CDRL)_update_22JAN15.pdf

PDF 695 KB Posted

Attached to
Inertial Navigation System- Replacement Federal contract opportunity
Solicitation number
N00024-15-R-5226
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Section J - Exhibit A - Contract Data Requirements List (CDRL) update 22 Jan 2015. Posted 27 Jan 2015.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modified 1/22/15

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

N00024-15-R-5226

F. CONTRACTOR

1. DATA ITEM NO

A001

2. TITLE OF DATA ITEM

TECHNICAL REPORT – STUDY/SERVICES

3. SUBTITLE

ISM DRAWING TREE

4. AUTHORITY (Data Acquisition Doc. No)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW 3.2.2

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

F

10. FREQUENCY

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION SHALL BE

CORRECTED AND RESUBMITTED WITHIN 30 CALENDAR DAYS OF THE DATE OF

REJECTION.

BLK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS

DIRECTED BY THE PROGRAM EXECUTIVE OFFICE, INTEGRATED WARFARE

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.

BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND PRR.

BLK 14: DELIVERY TO BE IN DIGITAL FORMAT TO THE GOVERNMENT’S SPECIFIED

WEBSITE.

SEE

ADDRESSEE

LIST

15. TOTAL

G. PREPARED BY

Barbie Fidura

H. DATE

22 Jan 15

I. APPROVED BY

J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A002

2. TITLE OF DATA ITEM

SPECIFICATION REQUIREMENT VERIFICATION

MATRIX

3. SUBTITLE

ISM REQUIREMENTS VERIFICATION MATRIX

4. AUTHORITY (Data Acquisition Doc. No)

DI-MISC-81283

5. CONTRACT REFERENCE

SOW 3.2.2, 3.8.4.3

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.

BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR AND AS UPDATES

ARE REQUIRED.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A003

2. TITLE OF DATA ITEM

SOFTWARE REQUIREMENTS SPECIFICATION (SRS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Doc. No)

DI-IPSC-81433A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.1

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 DAYS PRIOR TO PDR.

BLK 13: NLT 45 DAYS PRIOR TO CDR AND PRR.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A004

2. TITLE OF DATA ITEM

SOFTWARE DESIGN DESCRIPTION (SDD)

DI-IPSC-81435A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.1

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 DAYS PRIOR TO PDR.

BLK 13: NLT 45 DAYS PRIOR TO CDR. FINAL DELIVERED WITH THE TDP.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A005

2. TITLE OF DATA ITEM

SOFTWARE DEVELOPMENT PLAN (SDP)

DI-IPSC-81427A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.2

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

AS REQ

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 DAYS PRIOR TO PDR.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A006

2. TITLE OF DATA ITEM

CONTRACTOR’S CONFIGURATION MANAGEMENT

PLAN

DI-CMAN-80858B

5. CONTRACT REFERENCE

SOW 3.2.3.2, 3.8.1, 3.8.2, 3.8.3

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

60 DAC

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

ASREQ

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A007

2. TITLE OF DATA ITEM

SOFTWARE VERSION DESCRIPTION (SVD)

DI-IPSC-81442A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.2

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: CONCURRENT WITH INITIAL TDP DELIVERY.

BLK 13: CONCURRENT WITH TDP DELIVERIES AND AS UPDATES ARE REQUIRED.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A008

2. TITLE OF DATA ITEM

SOFTWARE TEST PLAN (STP)

DI-IPSC-81438A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.

BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 9 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A009

2. TITLE OF DATA ITEM

SOFTWARE TEST DESCRIPTION (STD)

DI-IPSC-81439A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.

BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR, EACH TRR AND PRR.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 10 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A010

2. TITLE OF DATA ITEM

SOFTWARE TEST REPORT (STR)

DI-IPSC-81440A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 30 CALENDAR DAYS AFTER THE CONCLUSION OF THE TEST EVENT.

BLK 13: NLT 30 CALENDAR DAYS AFTER THE CONCLUSION OF THE TEST EVENT.-.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 11 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A011

2. TITLE OF DATA ITEM

SOFTWARE PRODUCT SPECIFICATION (SPS)

DI-IPSC-81441A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.5

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: CONCURRENT WITH INITIAL TDP DELIVERY, 45 CALENDAR DAYS PRIOR

TO PDR

BLK 13: NLT 30 CALENDAR DAYS AFTER APPROVED CHANGES THAT AFFECT THIS

DATA ITEM. SUBSEQUENT DELIVERIES OF S/W DOCUMENTATION SHALL

PARALLEL PHASED DEVELOPMENT OF OPERATING ENVIRONMENTS THAT

SUPPORT HARDWARE DEVELOPMENT. AFTER FINAL DELIVERY OF EDMs, SUBSEQUENT DELIVERIES OF APPLICABLE SOFTWARE AND ITS ASSOCIATED

DOCUMENTATION SHALL FOLLOW THE APPROVED CM PROCESS AND

PROCEDURES. ALL DOCUMENTS THAT SUPPORT A SOFTWARE RELEASE SHALL

BE DELIVERED AT THE SAME TIME.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 12 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A012

2. TITLE OF DATA ITEM

COMPUTER SOFTWARE PRODUCT

DI-IPSC-81488

5. CONTRACT REFERENCE

SOW 3.2.3.5

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

AS REQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 10: DELIVERY SHALL ACCOMPANY EACH SOFTWARE/FIRMWARE PRODUCT

RELEASED TO THE GOVERNMENT.

BLK 12: FIRST SOFTWARE/FIRMWARE PRODUCT RELEASE, CONCURRENT WITH

INITIAL TDP DELIVERY.

BLK 13: EACH SUBSEQUENT SOFTWARE/FIRMWARE PRODUCT RELEASE, AND

CONCURRENT WITH EACH TDP DELIVERY.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 13 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A013

2. TITLE OF DATA ITEM

FIRMWARE SUPPORT MANUAL (FSM)

3. SUBTITLE

SOFTWARE/FIRMWARE SUPPORT MANUAL

4. AUTHORITY (Data Acquisition Doc. No)

DI-IPSC-81448B

5. CONTRACT REFERENCE

SOW 3.2.3.6

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

AS REQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 10: DELIVERY SHALL ACCOMPANY EACH SOFTWARE/FIRMWARE PRODUCT

RELEASED TO THE GOVERNMENT.

BLK 12: FIRST SOFTWARE/FIRMWARE PRODUCT RELEASE AND CONCURRENT

WITH INITIAL TDP DELIVERY.

BLK 13: EACH SUBSEQUENT SOFTWARE/FIRMWARE PRODUCT RELEASE,

CONCURRENT WITH EACH TDP DELIVERY AND CONCURRENT WITH THE STRP.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 14 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A014

2. TITLE OF DATA ITEM

SOFTWARE TRANSITION PLAN (STRP)

DI-IPSC-81429A NOT 1

5. CONTRACT REFERENCE

SOW 3.2.3.6

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

N/A Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 180 CALENDAR DAYS PRIOR TO THE END OF THE PERIOD OF

PERFORMANCE

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 15 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A015

2. TITLE OF DATA ITEM

TECHNICAL REPORT – STUDY/SERVICES

3. SUBTITLE

OPEN SYSTEM MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Doc. No)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW 3.2.3.7

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

N/A Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 16 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP X TM OTHER 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A016

2. TITLE OF DATA ITEM

TECHNICAL DATA PACKAGE (TDP)

DI-SESS-80776A

5. CONTRACT REFERENCE

SOW 3.2.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

BLK 4: MIL-STD-31000A, MIL-STD-961E(2), MIL-STD-2073-1E(1), DI-SESS-81000E, DI-

SESS-81002F, DI-SESS-81003E, DI-SESS-81004E, DI-SESS-81008E, ASME-Y14.3M.

REQUIRED TDP ELEMENTS ARE IDENTIFIED IN THE ATTACHED MIL-STD-31000A

FIGURE.

BLK 8: APPROVAL IS FOR TECHNICAL CONTENT AND ACCURACY. GOVERNMENT

RESPONSE TIME IS 30 CALENDAR DAYS. ANY REJECTED SUBMISSION SHALL BE

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: A DRAFT TDP THAT REFLECTS THE INITIAL SYSTEM CONFIGURATION IS

REQUIRED 45 CALENDAR DAYS PRIOR TO PDR. PLEASE NOTE: THE

GOVERNMENT IS NOT TAKING CONFIGURATION CONTROL AT THIS TIME.

BLK 13: A DRAFT TDP THAT REFLECTS CURRENT SYSTEM CONFIGURATION IS

REQUIRED 45 CALENDAR DAYS PRIOR TO CDR. A DRAFT TDP SHALL BE

DELIVERED NLT 45 CALENDAR DAYS PRIOR TO FCA. PLEASE NOTE: THE

GOVERNMENT IS NOT TAKING CONFIGURATION CONTROL AT THIS TIME. AN

INITIAL TDP SHALL BE DELIVERED NLT 45 CALENDAR DAYS PRIOR TO PCA. THE

FINAL, VALIDATED TDP PACKAGE MUST BE SUBMITTED NLT 60 CALENDAR DAYS

AFTER THE PCA.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 17 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A017

2. TITLE OF DATA ITEM

INSTALLATION CONTROL DRAWINGS

3. SUBTITLE

SOURCE DATA

4. AUTHORITY (Data Acquisition Doc. No)

DI-DRPR-81242

5. CONTRACT REFERENCE

SOW 3.2.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: DRAFT NLT 45 CALENDAR DAYS PRIOR TO CDR.

BLK 13: FINAL NLT 45 CALENDAR DAYS PRIOR TO PCA.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 18 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A018

2. TITLE OF DATA ITEM

MANAGEMENT PLAN

3. SUBTITLE DIMINISHING MANUFACTURING

SOURCES AND MATERIAL SHORTAGES (DMSMS)

MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Doc. No)

DI-MGMT-80004A

5. CONTRACT REFERENCE

SOW 3.2.5

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

60 DAC

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 13: GENERATE CHANGES NLT 60 DAYS AFTER APPROVED PROGRAM OR

DESIGN CHANGES THAT AFFECT THIS DATA ITEM.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 19 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A019

2. TITLE OF DATA ITEM

TECHNICAL REPORT – STUDY/SERVICES

3. SUBTITLE

PRODUCT RECALL, DMSMS, OBSOLESCENCE

IDENTIFICATION & VENDOR CHANGE NOTICES

4. AUTHORITY (Data Acquisition Doc. No)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW 3.2.5.1

6. REQUIRING OFFICE

PEO IWS6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

SEE BLK 16

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS

DIRECTED BY THE PROGRAM EXECUTIVE OFFICE, INTEGRATED WARFARE

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: DELIVERY OF THIS REPORT TO BEGIN AFTER PDR. NLT 5 BUSINESS DAYS

AFTER THE CONTRACTOR RECEIVES NOTIFICATION OF A PRODUCT RECALL,

OBSOLESCENCE ISSUE, OR EMERGENT VENDOR IMPLEMENTED CHANGE.

BLK 13: ANALYSIS AND RECOMMENDATIONS NLT 45 CALENDAR DAYS AFTER

GOVERNMENT DIRECTION.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 20 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A020

2. TITLE OF DATA ITEM

SOURCE DATA FOR FORECASTING DIMINISHING

MANUFACTURING SOURCES AND MATERIAL

SHORTAGES (DMSMS)

DI-SESS-81656

5. CONTRACT REFERENCE

SOW 3.2.5.2

6. REQUIRING OFFICE

PEO IWS6.0

7. DD 250 REQ

LT

SEE BLK 16

12. DATE OF 1st SUBMISSION

60 DAC

14. DISTRIBUTION

SEE BLK 16

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

CORRECTED AND RESUBMITTED WITHIN 30 CALENDAR DAYS OF THE DATE OF

REJECTION.

BLK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS

DIRECTED BY THE PROGRAM EXECUTIVE OFFICE, INTEGRATED WARFARE

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 10: AN E-BILL OF MATERIAL (BOM) SHALL BE SUBMITTED FOR EACH

CONFIGURATION UNDER THIS CONTRACT.

BLK 13: GENERATE CHANGES NLT 30 DAYS AFTER APPROVED PROGRAM OR

DESIGN CHANGES THAT AFFECT THIS DATA ITEM.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 21 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A021

2. TITLE OF DATA ITEM

TEST PLAN

3. SUBTITLE

MASTER TEST PLAN (MTP)

4. AUTHORITY (Data Acquisition Doc. No)

DI-NDTI-80566A

5. CONTRACT REFERENCE

SOW 3.2.7, 3.2.7.1, 3.2.7.5, 3.6.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.

BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 22 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A022

2. TITLE OF DATA ITEM

TEST PROCEDURE

3. SUBTITLE

MASTER TEST PROCEDURE

4. AUTHORITY (Data Acquisition Doc. No)

DI-NDTI-80603A

5. CONTRACT REFERENCE

SOW 3.2.7, 3.2.7.1, 3.2.7.5, 3.6.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 CALENDAR DAYS PRIOR TO CDR.

BLK 13: NLT 45 CALENDAR DAYS PRIOR EACH TRR.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 23 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A023

2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

DI-NDTI-80809B NOT 1

5. CONTRACT REFERENCE

SOW 3.2.7, 3.2.7.1, 3.2.7.3, 3.2.7.5, 3.6.4

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

AS REQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 30 CALENDAR DAYS AFTER EACH TEST EVENT.

BLK 13: NLT 30 CALENDAR DAYS AFTER EACH TEST EVENT.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 24 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A024

2. TITLE OF DATA ITEM

TECHNICAL REPORT – STUDY/SERVICES

3. SUBTITLE

MODELING AND SIMULATION PLAN

4. AUTHORITY (Data Acquisition Doc. No)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW 3.2.7.2

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ONE/R

12. DATE OF 1st SUBMISSION

60DAC

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 45 CALENDAR DAYS PRIOR TO PDR.

BLK 13: NLT 45 CALENDAR DAYS PRIOR TO CDR AND EACH TRR.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 25 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A025

2. TITLE OF DATA ITEM DEPARTMENT OF DEFENSE (DOD)

MODELING AND SIMULATION (M&S) VERIFICATION

AND VALIDATION (V&V) REPORT

DI –MSSM-81752 NOT 1

5. CONTRACT REFERENCE

SOW 3.2.7.2.1

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

SUBMISSION

SEE BLK 16

Draft

Final

SYSTEMS (IWS6.0), (27 JUNE 2011) OR HIGHER AUTHORITY.

BLK 12: NLT 30 CALENDAR DAYS AFTER VERIFICATION AND VALIDATION OF

MODEL.

BLK 13: NLT 30 CALENDAR DAYS AFTER VERIFICATION AND VALIDATION OF ANY

CHANGES TO PREVIOUSLY VALIDATED MODELING AND SIMULATION.

Barbie Fidura

H. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 26 of 80 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXH/ATCH NO.

A

C. CATEGORY

TDP TM OTHER X 1

D. SYSTEM/ITEM

INERTIAL NAVIGATION SENSOR –

REPLACEMENT (INS-R) INERTIAL

SENSOR MODULE (ISM)

E. CONTRACT/PR NO.

A026

2. TITLE OF DATA ITEM DEPARTMENT OF DEFENSE (DOD)

MODELING AND SIMULATION (M&S) ACCREDITATION

REPORT

DI- –MSSM-81753 NOT 1

5. CONTRACT REFERENCE

SOW 3.2.7.2.1

6. REQUIRING OFFICE

PEO IWS 6.0

7. DD 250 REQ

LT

ASREQ

12. DATE OF 1st SUBMISSION

SEE BLK 16

14.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .