J-4_Work_Item_Index_-_3_MAR_2015.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- USS MITSCHER (DDG 57) FY15 ESRA(d) Execution
- Solicitation number
- N00024-15-R-4406
About this file
J-4 Work Item Index
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP-RFQ_Q_AND_A_-__130-131.pdf | ||
| Amendment_8_-_MOD.pdf | ||
| Amendment_8_-_Conformed.pdf | ||
| RFP-RFQ_Q_AND_A_-__129.pdf | ||
| RFP-RFQ_Q_AND_A_-__127-128.pdf | ||
| MITSCHER_RFP_Conformed_Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| RFP-RFQ_Q_AND_A_-__122-126.pdf | ||
| Amendment_6_-_Modification_Copy.pdf | ||
| Amendment_6_-_Conformed_Copy.pdf | ||
| Attachment_J-8_Award_Fee_Intra-Availability_Milestones.docx | DOCX document | |
| 0005_-_Conformed.pdf | ||
| J-4_Work_Item_Index_-_2_MAR_2015.xlsx | XLSX spreadsheet | |
| 0005.pdf | ||
| RFP-RFQ_Q_AND_A_-__97-121.pdf | ||
| 0004-_Conformed.pdf | ||
| 0004-_MOD.pdf | ||
| N00024-15-R-4406-0003.pdf | ||
| RFP-RFQ_Q_AND_A_-__91-96.pdf | ||
| N00024-15-R-4406-0002.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__1-45.pdf | ||
| N00024-15-R-4406-0001.pdf | ||
| MITSCHER_RFP.zip | ZIP file |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALL WORK
| Attachment J4 work Item Index | ||||||||||||||
| Work Item | Base/Option | COAR | CLIN | Item Description | SCLIN/Item Number | Prime | Subcontractor | |||||||
| 042-11-002 | Base | 16 | 0001 | General Requirements for Work Within Naval Station Norfolk and Joint Expeditionary Base (JEB) Little Creek - Fort Story; accomplish | ||||||||||
| 042-11-003 | Base | 16 | 0001 | Accountability of Manhour and Material Reservation; accomplish | ||||||||||
| 042-67-001 | Base | 16 | 0001 | Work Completion Certification Data; provide | ||||||||||
| 113-11-001 | Base | 16 | 0001 | Bilge Drain Well; repair and preserve | ||||||||||
| 123-11-001 | Base | 16 | 0001 | Fuel Oil Tank, Group One, 2, 3, 4, 5, and 6; repair and preserve | ||||||||||
| 123-11-002 | Base | 16 | 0001 | Contaminated Oil and Waste Water Tanks; inspect, repair and preserve | ||||||||||
| 123-11-003 | Base | 16 | 0001 | JP-5 Service Tanks; inspect, repair and preserve | ||||||||||
| 123-11-004 | Base | 16 | 0001 | Chain Lockers; repair and preserve | ||||||||||
| 123-11-005 | Base | 16 | 0001 | Machinery Room Structural Repair; accomplish | ||||||||||
| 123-11-006 | Base | 16 | 0001 | Fan Room Structure; repair and preserve | ||||||||||
| 123-11-007 | Base | 16 | 0001 | Engine Rm. No. 2 Stack Structure; repair and preserve | ||||||||||
| 123-11-008 | Base | 16 | 0001 | Engine Rm. No. One Stack Structure; repair and preserve | ||||||||||
| 123-11-009 | Base | 16 | 0001 | Fuel Oil Tank; repair | ||||||||||
| 131-11-001 | Base | 16 | 0001 | Platform; replace | ||||||||||
| 136-11-001 | Base | 16 | 0001 | Radar Cross Section (RCS) Plating; replace and preserve | ||||||||||
| 150-11-001 | Base | 16 | 0001 | 04, 05, 06 Level Deck and Bulwark; Repair and Preserve | ||||||||||
| 150-11-002 | Base | 16 | 0001 | Waterway Bar Coaming and Deck; repair and preserve | ||||||||||
| 150-11-004 | Base | 16 | 0001 | Deck Coaming; replace and preserve | ||||||||||
| 150-11-005 | Base | 16 | 0001 | Exhaust Trunk Structure; repair | ||||||||||
| 150-11-006 | Base | 16 | 0001 | Bulkhead Paint Repair; accomplish | ||||||||||
| 150-11-007 | Base | 16 | 0001 | Harpoon Blast Pad Corrosion; repair | ||||||||||
| 150-11-008 | Base | 16 | 0001 | Escape Truck Structural Longitudinal; repair and preserve | ||||||||||
| 150-11-009 | Base | 16 | 0001 | 04 Level Coaming and Bulwark; repair | ||||||||||
| 150-11-010 | Base | 16 | 0001 | Bulkhead Plating; repair | ||||||||||
| 150-80-001 | Base | 16 | 0001 | ShipAlt DDG51-64214D (Partial), Torpedo Tube, Corrosion Modifications; accomplish | ||||||||||
| 167-11-001 | Base | 16 | 0001 | Bolted Equipment Removal Plate (BERP) Repair; accomplish | ||||||||||
| 167-80-001 | Base | 16 | 0001 | ShipAlt DDG51-72424D, MAFO-Holtkamp Door Installation; accomplish | ||||||||||
| 167-80-002 | Base | 16 | 0001 | ShipAlt DDG51-76258D, MAFO-Holtkamp Door Installation (Partial); accomplish | ||||||||||
| 167-80-003 | Base | 16 | 0001 | ShipAlt DDG51-64162D, Raised Scuttle, Corrosion Modification; accomplish | ||||||||||
| 167-80-004 | Base | 16 | 0001 | SHIPALT DDG51-79662D 1A and 1B Gas Turbine Module (GTM) Access Manhole Relocation; accomplish | ||||||||||
| 180-11-001 | Base | 16 | 0001 | Communications Box Foundation; replace | ||||||||||
| 259-11-001 | Base | 16 | 0001 | Gas Turbine (GTRB) Exhaust Duct Collector; repair | ||||||||||
| 259-80-001 | Base | 16 | 0001 | ShipAlt DDG51-76087D, GTRB & SS GTRB Bliss Cap Modification; accomplish | ||||||||||
| 259-80-002 | Base | 16 | 0001 | SHIPALT DDG-51-79474D, Install Rain Caps on Engine Room Number One and Number 2 Uptakes; accomplish | ||||||||||
| 262-11-001 | Base | 16 | 0001 | Main Reduction Gear (MRG) Lube Oil Cooler; open, clean and inspect | ||||||||||
| 311-31-001 | Base | 16 | 0001 | Ship Service Gas Turbine Generator (SSGTG) Air Cooler; clean and inspect | ||||||||||
| 320-80-001 | Base | 16 | 0001 | ShipAlt DDG51-64231D, Automatic Bus Transfer (ABT) Relocation; accomplish | ||||||||||
| 321-11-001 | Base | 16 | 0001 | Shore Power Trunk, Receptacles and Indicator Lights; repair, replace and preserve | ||||||||||
| 321-80-001 | Base | 16 | 0001 | DDG51 Class AER 64201D, Stuffing Tube Replacement (Partial); accomplish | ||||||||||
| 324-11-002 | Base | 16 | 0001 | Automatic Bus Transfer (ABT) Switch; repair | ||||||||||
| 436-80-001 | Base | 16 | 0001 | ShipAlt DDG-51-83419D, Removal Halocarbon Monitoring System; accomplish | ||||||||||
| 437-21-001 | Base | 16 | 0001 | Fuel Oil Service and Waste Water Drain Tank Level Indicating (TLI) Systems Cabling and Bushings; replace and test | ||||||||||
| 442-11-001 | Base | 16 | 0001 | TR-232(B)/WQC-2A, Low Frequency (LF) Transducer; replace | ||||||||||
| 452-11-001 | Base | 16 | 0001 | Dry Air Layup for All Pressurized Waveguide and Transmission Lines; provide | ||||||||||
| 472-11-001 | Base | 16 | 0001 | CIWS Platform Composite Radar Cross Section (RCS) Plating; install | ||||||||||
| 512-11-001 | Base | 16 | 0001 | Medical Ventilation Cleaning; accomplish | ||||||||||
| 512-11-002 | Base | 16 | 0001 | Galley and Laundry Ventilation Cleaning; accomplish | ||||||||||
| 520-11-001 | Base | 16 | 0001 | Rodmeter Flange Cap; repair | ||||||||||
| 521-11-001 | Base | 16 | 0001 | Firemain Pressure Regulating Control Valve; replace and test | ||||||||||
| 521-80-001 | Base | 30 | 0001 | ShipAlt DDG51-76721D, TOTS Valves In Chilled Water System; Install | ||||||||||
| 521-80-002 | Base | 16 | 0001 | ShipAlt DDG51-73738, Installation of Additional Bulkhead Cutout Valves; accomplish | ||||||||||
| 523-80-001 | Base | 16 | 0001 | Shipalt DDG-51-79575D, Countermeasure Washdown (CMWD) Piping Relocation to Interior and ML; accomplish | ||||||||||
| 528-80-001 | Base | 16 | 0001 | ShipAlt DDG51-77691D, Weather Deck Drain and Trough Modifications; accomplish | ||||||||||
| 528-80-002 | Base | 16 | 0001 | ShipAlt DDG51-77690D, 02 Level Intake And Uptake Drains; accomplish | ||||||||||
| 529-11-001 | Base | 16 | 0001 | AFT VLS Eductor to Gage, Firemain Pressure, Gage Line; replace | ||||||||||
| 541-80-001 | Base | 16 | 0001 | ShipAlt DDG51-80246D, F-76 Small Boat Refueling Station Installation; accomplish | ||||||||||
| 551-51-001 | Base | 16 | 0001 | High Pressure Air Compressor; Overhaul Industrial Assist; accomplish | ||||||||||
| 551-60-001 | Base | 16 | 0001 | Bleed Air Check Valve; repair | ||||||||||
| 551-61-001 | Base | 16 | 0001 | Masker Air Emitter Belt Cleanout Cover Plate; repair | ||||||||||
| 551-61-002 | Base | 16 | 0001 | Masker Air Cooler Seawater Inlet Piping; replace | ||||||||||
| 562-11-001 | Base | 16 | 0001 | Rudder; repair and preserve | ||||||||||
| 562-11-002 | Base | 16 | 0001 | Rudder Stool Access Plates; repair | ||||||||||
| 582-80-001 | Base | 16 | 0001 | ShipAlt DDG51-76564D, AFT Capstan Controller Modification; accomplish | ||||||||||
| 583-80-001 | Base | 16 | 0001 | ShipAlt DDG51-81675D, Cres Dual and Single Liferaft Cradles; replace | ||||||||||
| 593-11-001 | Base | 16 | 0001 | Vacuum, Collecting, Holding, and Transfer (VCHT) and Plumbing Drain Tanks; repair and preserve | ||||||||||
| 593-11-002 | Base | 16 | 0001 | Vacuum, Collecting, Holding and Transfer (VCHT) Pump Motor Controller; repair | ||||||||||
| 593-11-003 | Base | 16 | 0001 | Plumbing Drains Waste, Soil and Vent Piping; replace | ||||||||||
| 612-21-001 | Base | 16 | 0001 | Helo Safety Nets Removal, Inspection and Load Testing; accomplish | ||||||||||
| 622-12-001 | Base | 16 | 0001 | Nomex Deck Panel; replace | ||||||||||
| 622-80-001 | Base | 16 | 0001 | ShipAlt DDG51-64143D, Relocate Pilot Ladder Station; accomplish | ||||||||||
| 623-21-001 | Base | 16 | 0001 | Accommodation Ladder and Stowage; Replace | ||||||||||
| 624-11-001 | Base | 16 | 0001 | Balanced Joiner Door; remove, store, repair and install | ||||||||||
| 624-11-002 | Base | 16 | 0001 | Metal Joiner Door; replace | ||||||||||
| 631-11-001 | Base | 16 | 0001 | Collective Protection System (CPS)and General Housekeeping; clean, inspect and preserve | ||||||||||
| 631-11-002 | Base | 16 | 0001 | Machinery Space Bilge; repair and preserve | ||||||||||
| 633-11-001 | Base | 16 | 0001 | Impressed Current Cathodic Protection (ICCP) System; inspect and repair | ||||||||||
| 634-21-001 | Base | 16 | 0001 | Flight Deck Nonskid; replace | ||||||||||
| 634-21-002 | Base | 16 | 0001 | Small Arms Magazine Nonskid Deck; replace | ||||||||||
| 643-11-001 | Base | 16 | 0001 | Berthing Habitability Project (HCPO-S0286) Installation; accomplish | ||||||||||
| 643-11-002 | Base | 16 | 0001 | Berthing Habitability Project (BCPO-S0276) Installation; accomplish | ||||||||||
| 644-11-001 | Base | 16 | 0001 | Ward Bath Corrosion Repairs; accomplish | ||||||||||
| 655-80-001 | Base | 16 | 0001 | ShipAlt DDG-51-79196D, Self Service Laundry Transition; Accomplish | ||||||||||
| 751-11-001 | Base | 16 | 0001 | Torpedo Loading Chalk Foundation Bolt Holes; repair | ||||||||||
| 837-11-001 | Base | 16 | 0001 | Antenna Photographs; provide | ||||||||||
| 838-11-001 | Base | 16 | 0001 | Combat Systems Waterfront Liaison Engineering Services (TYCOM); provide | ||||||||||
| 865-91-001 | Base | 16 | 0001 | Industrial Hygienist/Marine Chemist/Competent Person Support; provide | ||||||||||
| 868-71-001 | Base | 16 | 0001 | Work Authorization Form (WAF) Coordination Requirements; accomplish | ||||||||||
| 980-11-001 | Base | 16 | 0001 | Light-Off Assistance (LOA) Deficiency Corrections; provide | ||||||||||
| 980-11-002 | Base | 16 | 0001 | TYCOM and MARMC Office Space; provide | ||||||||||
| 982-11-001 | Base | 16 | 0001 | Machinery Trial Discrepancy Correction; accomplish | ||||||||||
| 982-31-001 | Base | 16 | 0001 | Dock Trial, Fast Cruise, and Sea Trial; accomplish | ||||||||||
| 992-11-002 | Base | 16 | 0001 | Temporary Air Conditioning; provide | ||||||||||
| 992-11-003 | Base | 16 | 0001 | Temporary Flammable Liquid Storage and Hazardous Material Storage Unit, 320 Square Feet per Unit; provide | ||||||||||
| 992-11-005 | Base | 82 | 0001 | Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor Plant, Barge; accomplish | ||||||||||
| 992-11-006 | Base | 16 | 0001 | Temporary Refrigerated Storage Facility, 7000 Cubic Feet; provide | ||||||||||
| 992-11-007 | Base | 16 | 0001 | Pierside T-1 Line; provide | ||||||||||
| 992-11-008 | Base | 82 | 0001 | Barge Tow Service; provide | ||||||||||
| 992-11-009 | Base | 16 | 0001 | Ship's Force Parking; provide | ||||||||||
| 992-11-010 | Base | 16 | 0001 | Ship's Force Security Support Services; provide | ||||||||||
| 992-12-001 | Base | 16 | 0001 | Hull, Mechanical and Electrical (HM&E) Discrepancy; correct | ||||||||||
| 992-12-002 | Base | 16 | 0001 | Hurricane Preparation; provide | ||||||||||
| 992-21-001 | Base | 16 | 0001 | Vertical Launcher System (VLS) Deck Resurfacing Support Services; provide | ||||||||||
| 992-31-001 | Base | 16 | 0001 | Cleaning and Pumping; accomplish | ||||||||||
| 992-31-002 | Base | 16 | 0001 | Off-Load and Testing of Ships Petroleum Fuels and Lubricants; accomplish | ||||||||||
| 992-31-003 | Base | 16 | 0001 | Routine Maintenance Standard; provide | ||||||||||
| 993-11-001 | Base | 16 | 0001 | Rigging, Crane and Transportation Service; provide | ||||||||||
| 993-11-002 | Base | 16 | 0001 | Ship's Force Warehouse Storage Space; provide | ||||||||||
| 993-31-001 | Base | 16 | 0001 | AN/SPY-1D Antenna Protective Cover; install | ||||||||||
| 993-31-003 | Base | 16 | 0001 | Temporary Main Reduction Gear (MRG) Dehumidifier System; provide | ||||||||||
| 997-11-001 | Base | 16 | 0001 | Drydocking and Undocking; accomplish | ||||||||||
| 264-90-001 | Base | 30 | 0002 | ShipAlt DDG51-85973K, DDG Lube Oil Purifier Heat Exchanger Modifications; accomplish | ||||||||||
| 411-90-001 | Base | 30 | 0002 | ShipAlt DDG51-78511K, AWS:ACB12/TI12 CIC Display Upgrade for DDGS; accomplish | ||||||||||
| 415-90-001 | Base | 30 | 0002 | SHIPALT DDG51-79526K, AN/USG-2B Installation; accomplish | ||||||||||
| 456-90-001 | Base | 30 | 0002 | ShipAlt DDG51-78512K, AWS:ACB12/TI12 MMSP Upgrade for DDGS; accomplish | ||||||||||
| 456-90-002 | Base | 30 | 0002 | ShipAlt DDG51-77615K, ACB12/TI12 OA Computing Plant Upgrade for DDG; accomplish | ||||||||||
| 456-90-003 | Base | 30 | 0002 | SHIPALT DDG51-78513K, ACB12/TI12 KAS WDRC Upgrades for DDGS; accomplish | ||||||||||
| 468-90-001 | Base | 30 | 0002 | ShipAlt DDG51-78391K, AN/SQQ-89A(V)15 for DDG Modernization; accomplish | ||||||||||
| 472-90-001 | Base | 30 | 0002 | Shipalt 80156K AN/SLQ-32(V)6 SEWIP BLOCK 2 UPGRADE W/ Shipalts | ||||||||||
| 512-90-001 | Base | 30 | 0002 | Shipalt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish | ||||||||||
| 522-90-001 | Base | 30 | 0002 | ShipAlt DDG51-80255, Replace Magazine Fire Detection System; accomplish | ||||||||||
| 721-90-001 | Base | 30 | 0002 | ShipAlt DDG51-79584K, ACB 12 Vertical Launching System (VLS) Upgrade; accomplish | ||||||||||
| 980-90-001 | Base | 30 | 0002 | SA DDG51-70430K MKXIIA Mode 5, Alteration Installation Team (AIT) Support Service; provide | ||||||||||
| 980-90-002 | Base | 30 | 0002 | SA 81443K/NMT AN/WSC-9(V)1-X/Ka, Alteration Installation Team (AIT) Support Service; provide | ||||||||||
| 980-90-005 | Base | 30 | 0002 | DDG-51 SCD-79813/BEWT ACB 12 Upgrade, Alteration Installation Team (AIT) Support Services; provide | ||||||||||
| 980-90-006 | Base | 30 | 0002 | OA and SA 79362 AWS Seawater Flow Meter, Alteration Installation Team (AIT) Support Service; provide | ||||||||||
| 980-90-007 | Base | 30 | 0002 | DDG 51 SCD-79975/BFTT Build 4.1 Alteration Installation Team (AIT) Support Services; provide | ||||||||||
| 980-90-008 | Base | 30 | 0002 | MK-45 GMT ORDALTS 70227, 70289 and 70920 Alteration Installation Team (AIT) Support Services; provide | ||||||||||
| 980-90-009 | Base | 30 | 0002 | NAVSEA (PHD) Office Space; provide | ||||||||||
| 980-90-010 | Base | 30 | 0002 | OA 74588 Mk99 FCS/KAS, Alteration Installation Team (AIT) Support | ||||||||||
| 980-90-011 | Base | 30 | 0002 | O/A 83135 CIWS BLK-1B, Cable Reliability Improvement, Alteration | ||||||||||
| 980-90-012 | Base | 30 | 0002 | SA-84134 K NIPR NCVI CLO, Alteration Installation Team (AIT) Support Service; provide | ||||||||||
| 980-90-014 | Base | 30 | 0002 | ShipAlt DDG51-00151.01K and DDG51-00151.02K, Air Conditioning Plants No. One, 2, 3 and 4 Upgrade Industrial Support; provide | ||||||||||
| 980-90-015 | Base | 30 | 0002 | ShipAlt DDG51-80315K Replace AFFF and CMWD SOPVS, Alteration Installation Team (AIT) Support Services; provide | ||||||||||
| 980-90-016 | Base | 30 | 0002 | SHIPALT 76829K, 78819K, 77052K, 76869K, 79256K, 82635K Industrial Support Services: provide | ||||||||||
| 980-90-017 | Base | 30 | 0002 | OA 74603, 78778 and 79024 Alteration Installation Team (AIT) Industrial | ||||||||||
| 980-90-018 | Base | 30 | 0002 | OA 74435, 79353 and 80083, AIT Industrial Support Services; accomplish | ||||||||||
| 042-11-001 | Base | 16 | 0003 | Marine Coatings Containing Heavy Metals Material; remove and dispose | ||||||||||
| 077-01-001 | Base | 16 | 0003 | Hazardous Waste Produced on Naval Vessels; control | ||||||||||
| 813-11-001 | Base | 16 | 0003 | Compartment Closeout Schedule; provide | ||||||||||
| 991-11-001 | Base | 16 | 0003 | Temporary Mast and Superstructure Staging; provide | ||||||||||
| 992-11-001 | Base | 16 | 0003 | Temporary Service; provide | ||||||||||
| 993-11-003 | Base | 16 | 0003 | Government Materials Warehouse Storage Space; provide | ||||||||||
| 993-31-002 | Base | 16 | 0003 | Temporary Deck Covering; install | ||||||||||
| 150-11-003 | Option | 90 | 0006 | MK 82 Director Foundations; replace | ||||||||||
| 165-11-001 | Option | 90 | 0007 | Sonar Dome Rubber Window (SDRW); inspect and repair | ||||||||||
| 630-80-001 | Option | 90 | 0008 | ShipAlt DDG51-64155D, VLS Fairing Plate Corrosion Modification, accomplish | ||||||||||
| 631-31-001 | Option | 90 | 0009 | Underwater Hull Preservation; accomplish | ||||||||||
| 992-11-004 | Option | 90 | 0010 | Oil Spillage and Floating Sandblasting Debris Boom; install | ||||||||||
| 123-11-010 | Option | 90 | 0011 | Fuel Oil Tank, Group 3 and 4; repair and preserve | ||||||||||
| 123-22-001 | Option | 90 | 0012 | Forepeak Tank, Accessible Void and Cofferdam; preserve | ||||||||||
| Labor Hours | Labor dollars | Material | Total dollars | Labor Hours | Labor dollars | Material | Total dollars | Price | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
&"Times New Roman,Bold"In Process Work Spec List &"Times New Roman,Bold"Business Sensitive &"Times New Roman,Bold"&D-&T
File details come from the government source that posted it. Updated .