Attachment_J-8_Award_Fee_Intra-Availability_Milestones.docx
DOCX document 38 KB Posted
- Attached to
- USS MITSCHER (DDG 57) FY15 ESRA(d) Execution
- Solicitation number
- N00024-15-R-4406
About this file
J-8
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP-RFQ_Q_AND_A_-__130-131.pdf | ||
| Amendment_8_-_MOD.pdf | ||
| Amendment_8_-_Conformed.pdf | ||
| RFP-RFQ_Q_AND_A_-__129.pdf | ||
| RFP-RFQ_Q_AND_A_-__127-128.pdf | ||
| MITSCHER_RFP_Conformed_Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| RFP-RFQ_Q_AND_A_-__122-126.pdf | ||
| J-4_Work_Item_Index_-_3_MAR_2015.xlsx | XLSX spreadsheet | |
| Amendment_6_-_Modification_Copy.pdf | ||
| Amendment_6_-_Conformed_Copy.pdf | ||
| 0005_-_Conformed.pdf | ||
| J-4_Work_Item_Index_-_2_MAR_2015.xlsx | XLSX spreadsheet | |
| 0005.pdf | ||
| RFP-RFQ_Q_AND_A_-__97-121.pdf | ||
| 0004-_Conformed.pdf | ||
| 0004-_MOD.pdf | ||
| N00024-15-R-4406-0003.pdf | ||
| RFP-RFQ_Q_AND_A_-__91-96.pdf | ||
| N00024-15-R-4406-0002.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__1-45.pdf | ||
| N00024-15-R-4406-0001.pdf | ||
| MITSCHER_RFP.zip | ZIP file |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-8 – Award Fee Intra-Availability Milestones Attachment J-8 – Award Fee Intra-Availability Milestones
Required completion date
Maximum Award Fee
A+144
$500,000
Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.
Undocking This milestone is considered complete when all work and testing is complete, OQE is completely reviewed and is on file and all work has been properly certified, as described in the Work Items listing below. All MSR contractor related production work must be complete (and satisfactorily tested with required OQE submitted certified and accepted by the SUPERVISOR in accordance with NSSAINST 5400.1). The term complete is defined to mean the accomplishment of contractor responsible work that makes it possible to safely undock the vessel in accordance with the NSA approved plan and MIL-STD-1625D. The MSR shall certify by signature and serialized letter to the PCO that all work specification requirements (production, checkpoints, inspections, testing reports, WAFs) associated with the Key Event milestone have been satisfactorily completed. The availability Event Readiness List (ERL) shall be used to associate work specifications and testing to the specific Undocking Key Event.
Undocking Work Items
| 113-11-001 |
| Bilge Drain Well; repair and preserve |
| 123-11-001 |
| Fuel Oil Tank, Group One, 2, 3, 4, 5, and 6; repair and preserve |
| 123-11-002 |
| Contaminated Oil and Waste Water Tanks; inspect, repair and preserve |
| 123-11-003 |
| JP-5 Service Tanks; inspect, repair and preserve |
| 123-11-004 |
| Chain Lockers; repair and preserve |
| 123-11-009 |
| Fuel Oil Tank; repair |
| 123-11-010 |
| Fuel Oil Tank Group 3 and 4;repair and preserve |
| 123-22-001 |
| Accessible Void and Cofferdam; preserve |
| 150-11-001 |
| 04, 05, 06 Level Deck and Bulwark; Repair and Preserve |
| 150-11-002 |
| Waterway Bar Coaming and Deck; repair and preserve |
| 150-11-003 |
| MK-82 Director Foundations; replace |
| 150-11-004 |
| Coaming and Structural Bulkhead; repair |
| 150-11-008 |
| Escape Truck Structural Longitudinal;repair |
| 150-11-009 |
| 04 Level Coaming and Bulwark; repair |
| 165-11-001 |
| Sonar Dome Rubber Window (SDRW); inspect and repair |
| 259-80-001 |
| ShipAlt DDG51-76087D, GTRB & SS GTRB Bliss Cap Modification; accomplish |
| 259-80-002 |
| SHIPALT DDG-51-79474D, Install Rain Caps on Engine Room Number One and Number 2 Uptakes; accomplish |
| 437-21-001 |
| Fuel Oil Service and Waste Water Drain Tank Level Indicating (TLI) Systems Cabling and Bushings; replace and test |
| 442-11-001 |
| TR-232(B)/WQC-2A Low Frequency (LF), AN/SQS-53C(V)1 SonarTransducers; |
| 520-11-001 |
| Rodmeter Flange Cap; repair |
| 523-80-001 |
| Shipalt DDG-51-79575D, WDCM Piping Relocation to Interior and ML; accomplish |
| 528-80-001 |
| ShipAlt DDG51-77691D, Weather Deck Drain and Trough Modifications; accomplish |
| 528-80-002 |
| ShipAlt DDG51-77690D, 02 Level Intake And Uptake Drains; accomplish |
| 541-80-001 |
| ShipAlt DDG51-80246D, F-76 Small Boat Refueling Station Installation; accomplish |
| 551-61-001 |
| Masker Air emitter Belt Cleanout Cover Plate; repair |
| 562-11-001 |
| Rudder; repair and preserve |
| 562-11-002 |
| Rudder Stool Access Plates; repair |
| 593-11-001 |
| Vacuum, Collecting, Holding, and Transfer (VCHT) and Plumbing Drain Tanks; repair and preserve |
| 622-80-001 |
| ShipAlt DDG51-64143D, Relocate Pilot Ladder Station; accomplish |
| 623-21-001 |
| Accommodation Ladder and Stowage; Replace |
| 633-11-001 |
| Impressed Current Cathodic Protection (ICCP) System; inspect and repair |
| 631-31-001 |
| Underwater Hull Preservation; Accomplish |
| 997-11-001 |
| Drydocking and Undocking; accomplish |
Required completion date
Maximum Award Fee
A+216
$500,000
Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.
Production Completion Date (PCD) All Prime contractor related production work, as described in the Work Items listing below, must be complete (and satisfactorily tested with required OQE submitted certified and accepted by the SUPERVISOR (in accordance with NSSAINST 5400.1), in the main propulsion machinery spaces, steering gear rooms, shaft alleys, pump rooms, auxiliary machinery rooms; government designated fuel tanks. The term complete is defined to mean the accomplishment of contractor responsible work that makes it possible to light off the boilers, gas turbine engines, ship’s service diesel and/or/ steam generators, propulsion steam turbines, and/or propulsion diesel engines. The Prime Contractor shall certify by signature and serialized letter to the PCO that all work specification requirements (production, checkpoints, inspections, testing reports, WAFs) associated with the Key Event milestone have been satisfactorily completed. The availability Event Readiness List (ERL) shall be used to associate work specifications and testing to the specific PCD Key Event.
Production Completion Date (PCD) Work Items
| 123-11-005 |
| Machinery Room Structural Repair; accomplish |
| 123-11-006 |
| Fan Room Structure; repair and preserve |
| 123-11-007 |
| Engine Rm. No. 2 Stack Structure; repair and preserve |
| 123-11-008 |
| Engine Rm. No. One Stack Structure; repair and preserve |
| 150-11-004 |
| Coaming and Structural Bulkhead; repair |
| 150-11-005 |
| Exhaust Truck Structure; repair |
| 167-11-001 |
| Bolted Equipment Removal Plate (BERP) Repair; accomplish |
| 167-80-001 |
| ShipAlt DDG51-72424D, MAFO-Holtkamp Door Installation; accomplish |
| 167-80-002 |
| ShipAlt DDG51-76258D, MAFO-Holtkamp Door Installation (Partial); accomplish |
| 167-80-004 |
| SHIPALT DDG51-79662D 1A and 1B Gas Turbine Module (GTM) Access Manhole Relocation; accomplish |
| 259-11-001 |
| Gas Turbine (GTRB) Exhaust Duct Collector; repair |
| 262-11-001 |
| Main Reduction Gear (MRG) Lube Oil Cooler; open, clean and inspect |
| 264-90-001 |
| ShipAlt DDG51-85973K, DDG Lube Oil Purifier Heat Exchanger Modifications; accomplish |
| 311-31-001 |
| Ship Service Gas Turbine Generator (SSGTG) Air Cooler; clean and inspect |
| 321-11-001 |
| Shore Power Trunk, Receptacles and Indicator Lights; repair, replace and preserve |
| 324-11-002 |
| Automatic Bus Transfer (ABT) Switch; repair |
| 436-80-001 |
| ShipAlt DDG-51-83419D, Removal Halocarbon Monitoring System; accomplish |
| 512-11-002 |
| Galley and Laundry Ventilation Cleaning; accomplish |
| 521-11-001 |
| Firemain Pressure Regulating Control Valve; replace and test |
| 521-80-001 |
| ShipAlt DDG51-76721D, TOTS Valves In Chilled Water System; Install |
| 521-80-002 |
| ShipAlt DDG51-73738, Installation of Additional Bulkhead Cutout Valves; accomplish |
| 551-51-001 |
| High Pressure Air Compressor; Overhaul Industrial Assist; accomplish |
| 551-60-001 |
| Bleed Air Check Valve; repair |
| 551-61-002 |
| Masker Air Cooler Seawater inlet piping; replace |
| 582-80-001 |
| ShipAlt DDG51-76564D, AFT Capstan Controller Modification; accomplish |
| 583-80-001 |
| ShipAlt DDG51-81675D, Cres Dual and Single Liferaft Cradles; replace |
| 624-11-001 |
| Balanced Joiner Door; remove, store, repair and install |
| 631-31-002 |
| Machinery Space Bilge; repair and preserve |
| 992-31-002 |
| Off-Load and Testing of Ships Petroleum Fuels and Lubricants; accomplish |
| 992-31-003 |
| Routine Maintenance Standard; provide |
| 993-31-003 |
| Temporary Main Reduction Gear (MRG) Dehumidifier System; provide |
Required completion date
Maximum Award Fee
See Below
$250,000
Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.
Required Reports Complete
1) This incentive is considered complete when all Required Reports, that could result in a change in work to be accomplished or additional material to be procured, are accepted and approved by the Supervisor. The contractor shall complete the preliminary work and submit one legible copy of all Required Reports, in approved transferrable media no later than the first 25 percent point of the availability (A+52).
2) Dry dock and Tank related required inspection reports shall be submitted no later than the first 30 days of the scheduled docking period.
3) Dry dock related reports which contain readings (final, thickness, etc.), clearances, alignments, paint data sheets, or other such data for work certification must be submitted and approved by the Supervisor prior to pre-flood/undocking (A+144).
All reports across paragraphs 1, 2 and 3 above must be provided by their associated due dates to successfully complete this milestone.
Required completion date
Maximum Award Fee
A+129
$250,000
Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.
In the following Compartments:
· 2-53-1-C; Combat Systems Equipment Room #1
· 03-140-0-C; Radar Room #2
Complete the following contractor responsible work, in accordance with the work item listed below:
· Installation of equipment onto foundations (except AIT installed equipment less than 75lbs).
· Installation and Hydrostatic testing of ECW piping.
· Installation and welding of all permanent false deck cribbing.
· Installation and welding complete of new cableways to include cable trays / ladders.
· Installation of temporary plywood deck; plywood shall have finger holes and be left unsecured.
· Paint out of space complete.
IAW the following work items:
411-90-001; 78511K, CIC Display Upgrade 456-90-001; 78512K, ACB12/TI12 MMSP Upgrade for DDGs 456-90-002; 77615K, ACB12/TI12 OA Computing Plant Upgrade for DDGs 456-90-003; 78513K, ACB12/TI12 KAS WDRC Upgrades for DDGs 468-90-001; 78391K, AN/SQQ-89A(V)15 for DDG Modernization 721-90-001; 79584K, ACB 12 Vertical Launching System (VLS) Upgrade
Required completion date
Maximum Award Fee
A+136
$500,000
Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.
In the following Compartments:
· 1-126-0-C; Combat Information Center (CIC)
· 2-126-2-C; Combat Systems Equipment Room #2
· 1-300-0-C; Combat Systems Equipment Room #3
Complete the following contractor responsible work, in accordance with the work item listed below:
· Installation of equipment onto foundations (except AIT installed equipment less than 75lbs).
· Installation and Hydrostatic testing of ECW piping.
· Installation and welding of all permanent false deck cribbing.
· Installation and welding complete of new cableways to include cable trays / ladders.
· Installation of temporary plywood deck; plywood shall have finger holes and be left unsecured.
· Paint out of space complete.
IAW the following work items:
411-90-001; 78511K, CIC Display Upgrade 456-90-001; 78512K, AWS:ACB12/TI12 MMSP Upgrade for DDGs 456-90-002; 77615K, ACB12/TI12 OA Computing Plant Upgrade for DDGs 468-90-001; 78391K, AN/SQQ-89A(V)15 for DDG Modernization 721-90-001; 79584K, ACB 12 Vertical Launching System (VLS) upgrade
Required completion date
Maximum Award Fee
A+194
$500,000
Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.
Complete requirements of 009-117, AEGIS Light-Off (ALO) Support for AEGIS Weapons Systems Assessments (AWSA) as out lined in the AEGIS Compartment Release Schedule (CSR). Obtain Combat Systems Compartment Release Schedule (CSR) from the SUPERVISOR. The Combat Systems Compartment Release Schedule (CRS), indicating compartments, A + days when required, and Combat Systems Support Equipment (CSSE) required in support of AEGIS Light-Off (ALO) in each compartment.
File details come from the government source that posted it. Updated .