Amendment_6_-_Modification_Copy.pdf
PDF 312 KB Posted
- Attached to
- USS MITSCHER (DDG 57) FY15 ESRA(d) Execution
- Solicitation number
- N00024-15-R-4406
About this file
Amendment 6 Modification Copy
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP-RFQ_Q_AND_A_-__130-131.pdf | ||
| Amendment_8_-_MOD.pdf | ||
| Amendment_8_-_Conformed.pdf | ||
| RFP-RFQ_Q_AND_A_-__129.pdf | ||
| RFP-RFQ_Q_AND_A_-__127-128.pdf | ||
| MITSCHER_RFP_Conformed_Amendment_7.pdf | ||
| Amendment_7.pdf | ||
| RFP-RFQ_Q_AND_A_-__122-126.pdf | ||
| J-4_Work_Item_Index_-_3_MAR_2015.xlsx | XLSX spreadsheet | |
| Amendment_6_-_Conformed_Copy.pdf | ||
| Attachment_J-8_Award_Fee_Intra-Availability_Milestones.docx | DOCX document | |
| 0005_-_Conformed.pdf | ||
| J-4_Work_Item_Index_-_2_MAR_2015.xlsx | XLSX spreadsheet | |
| 0005.pdf | ||
| RFP-RFQ_Q_AND_A_-__97-121.pdf | ||
| 0004-_Conformed.pdf | ||
| 0004-_MOD.pdf | ||
| N00024-15-R-4406-0003.pdf | ||
| RFP-RFQ_Q_AND_A_-__91-96.pdf | ||
| N00024-15-R-4406-0002.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__46-90.pdf | ||
| RFP-RFQ_Q_AND_A_-__1-45.pdf | ||
| N00024-15-R-4406-0001.pdf | ||
| MITSCHER_RFP.zip | ZIP file |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
CLIN 0005 updated to "Aw ard Fee". See Attachments J-4, J-6, and J-8 and Erratas 5 and 6. To request a copy, please email Brian Kimm
(PCO) at brian.kimm@navy.mil and LT Danilo Meulener at danilo.meulener@navy.mil.
1. CONTRACT ID CODE PAGE OF PAGES
1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Mar-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-15-R-4406
X 9B. DATED (SEE ITEM 11)
16-Jan-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Mar-2015
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-15-R-4406
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0005
The CLIN description has changed from RESERVED to Award Fee.
The MDAP/MAIS Code 180 has been added.
CLIN 0009
The CLIN extended description has changed from Specification 631-11-001;
Accomplish Underwater Hull Preservation to Specification 631-31-001; Accomplish Underwater
Hull Preservation.
The following have been added by full text:
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SCOPE OF WORK
1. GENERAL REQUIREMENTS
1.1 The Contractor under the direction of the Regional Maintenance Center (RMC) and as an independent Contractor and not as an agent of the Government, shall furnish the material, support
(electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repair and alteration of the FY15 USS MITSCHER ESRA(d) in accordance with the requirements stated in this
Section, the Work Item Specifications and Work Item Plans, Drawings, and Other References, the
Delivery Schedule, and all other terms and conditions set forth in this contract. Category I NAVSEA
FY15 CHG_1 or latest revision Standard Items are applicable to all items without further reference.
Category II FY15 CHG_1 or latest revision Standard Items are applicable when invoked and/or referenced in individual work items specified in NSSARM-501-15. NAVSEA Standard items may be found at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/default.aspx http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/default.aspx
1.2 The Contractor shall accomplish planning and scheduling to ensure a rational, integrated and timely plan for receipt, storage and installation of Government Furnished Material as identified in work item specifications, and for accomplishment of production work.
1.3 The Contractor shall provide an integrated milestone plan for the availability. These milestones will include a schedule of key events necessary to meet the contract delivery dates. A critical path analysis (if required) and a milestone schedule shall be used to measure schedule accomplishment of the functions and elements required to successfully complete the repair and alteration of FY15 USS
MITSCHER ESRA(d) within the availability dates herein.
1.4 Reserved
1.5 The Contractor shall completely and thoroughly check and review for technical accuracy and compliance with the provisions of specifications and assignments all drawings, data and other work products created by the contractor in the course of completing the FY15 USS MITSCHER ESRA(d).
Any corrections to drawings or other work products found necessary due to error or omission by the contractor shall be promptly accomplished by the contractor. The Government is the ultimate approval authority for specifications and drawings. The Contractor shall account for government approval in their scheduling time line. The contractor shall be responsible for ensuring that interference-free, technically accurate drawings are received and for calling to the attention of the
Supervisor, orally and in writing, any interface and interference problems requiring revision to drawings.
1.6 The Contractor shall report and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the work specifications. As found conditions, needed repairs and corrective action reports will be submitted to the Government in the form of a
Condition Found Report (CFR). The Contractor's conditions found reporting shall be in accordance with that set forth in Standard Item 009-01.
1.7 Provide the data in accordance with 009-99, to close all completed 2-Kilos and generate the Ship
Departure Report.
1.8 GOVERNMENT FURNISHED MATERIAL: Government Furnished Material (GFM) cited in the solicitation will be shipped to the contractor’s facility. The successful offeror is to coordinate delivery of Government Furnished Material with the Project Manager. Government property permanently removed from a vessel that requires a Property Administrator's disposition instructions shall be properly prepared for shipment and be delivered as directed by the Property Administrator.
GFM will be listed in paragraph 5 of the Work Item(s).
1.9 QUALITY ASSURANCE PROGRAM - The Contractor shall provide and maintain a quality assurance program acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. The Contractor's quality assurance program shall be in accordance with that set forth in Standard Item 009-04. In addition to its rights under Clause 252.217-7005, the
Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the
Contractor's failure to comply with the requirements of its quality assurance program and, as such, the Contractor shall not be entitled to progress payments for said work and material.
1.10 REQUEST FOR CONTRACT CHANGES (RCC) TIMELINE - The contractor shall provide all
Change Order Price Analysis (COPA) proposals in response to Request for Contract Changes (RCC) within three business days. If circumstances arise where the contractor is unable to submit a COPA within three business days, the contractor shall notify the Government in writing of the specific circumstances and provide a date in which a COPA will be submitted. The contractor’s timeliness in submitting COPAs in response to RCCs will be evaluated in CPARS and utilized for past performance ratings on future proposal evaluations. Notification of late submission of COPA does not exempt the contractor from meeting the three business day requirement, but will be considered by the Government when conducting a CPARS evaluation. In addition, pricing of contractor proposals submitted in response to RCCs shall not expire for a period of less than two business days after submission to the Government to allow sufficient time for evaluation and if required negotiations.
1.11 AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER – No order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the
Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer's. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
1.12 NAVY MAINTENANCE DATABASE (NMDr): The Contractor shall use NMDr for the submission of Condition Found Reports throughout the administration of this contract.
1.13 ORGANIZATION CHART AND EMPLOYEE ROSTER:
1.13.1 ORGANIZATION CHART - Within 30 days of contract award, submit a chart detailing each management, technical, engineering and production position from the highest company level to the lowest supervisory level. Include descriptions of each position describing the duties, responsibilities, authority and names of the individuals filling the positions. The organizational chart must represent the facility that will perform the work.
1.13.2 EMPLOYEE ROSTER: After receipt of award and prior to starting work aboard the vessel, the contractor must submit a list of employees who will work aboard ship to the
Commanding Officer of the ship via the NSA Security Office. The list should be on company letterhead, include each employee's name and security clearance when required, and bear the signature of a company official.
2. LOCATION: Government facilities are not available for this requirement. All work shall be completed at the contractor’s facilities.
2.1 DRYDOCK CERTIFICATION - The dry-docking of all vessels shall be accomplished in dry docks certified in accordance with MIL-STD-1625D(SH) dated 27 August 2009.
3. SCHEDULE: USS MITSCHER must be delivered, mission-ready, no later than 15 Jul 2016.
3.1: MILESTONES: In addition to the contract completion date of 15 Jul 2016, the Government has established execution dates for the following milestones:
EVENT A + DAY DATE WEEKDAY REMARKS
Enter Dock *** *** *** ***
EVENT A + DAY DATE WEEKDAY REMARKS
25% CONFERENCE *** *** *** ***
50% CONFERENCE *** *** *** ***
VCHT *** *** *** ***
Undock *** *** *** ***
FIREMAIN/AFFF/HALON *** *** *** ***
SEA WATER SERVICE *** *** *** ***
75% CONFERENCE *** *** *** ***
POTABLE WATER *** *** *** ***
LP/HP AIR *** *** *** ***
VENT SYSTEM *** *** *** ***
CHILL WATER/AIR CONDITIONING PLANTS *** *** *** ***
400HZ AVAILABLE *** *** *** ***
Start testing of 77052 temp ac Fwd aft IC *** *** *** ***
Turnover 1 *** *** *** ***
Fiber Testing begins *** *** *** ***
Turnover 2 *** *** *** ***
Turnover 3 *** *** *** ***
Turnover 4 *** *** *** ***
HABTURNOVER / MOVE ABOARD
COMMENCE
Turnover 5 *** *** *** ***
AEGIS LIGHT OFF *** *** *** ***
PCD *** *** *** ***
SHIP LOA PREP *** *** *** ***
LOA *** *** *** ***
DOCK TRIALS *** *** *** ***
FAST CRUISE *** *** *** ***
HM&E SEA TRIALS *** *** *** ***
END OF AVAIL *** *** *** ***
3.1.1 - ***Offerors (Prime Contractors) shall contact to Brian Kimm, Contracting Officer, and LT
Danilo Meulener, Contract Specialist, at brian.kimm@navy.mil and danilo.meulener@navy.mil to mailto:brian.kimm@navy.mil receive the established dates, included as Attachment J-6. These milestones will not be distributed publically on NECO or FBO.
3.1.2 - If any milestone event is not accomplished by the date provided, and the failure to accomplish any such milestone event does not arise from a cause beyond the control and without fault or negligence of the Contractor, such failure may be deemed to constitute a failure to perform this contract in accordance with its terms within the meaning of subparagraph (a)(1)(ii) of the clause of this contract entitled "DEFAULT” (DFARS 252.217-7009).
3.2. DELAYS / DISRUPTIONS: The contractor shall coordinate the work effort with the NSA Project
Manager on a daily basis to prevent changing situations from causing delays and disruptions. Disruption due to minor delays in obtaining access to spaces and operation of equipment are to be expected. A minor delay is defined as eight hours or less. These disruptions are considered normal rather than unusual occurrences during the performance of tasks ordered under this contract. If, during contract performance, delays greater than those indicated above are encountered, the Contractor shall immediately verbally notify the Project Manager and Contracting Officer, followed by a written statement within 24 hours after occurrence of delay, stating time of impact, reason for delay, duration of impact, number of people affected, action taken to properly schedule the work, action taken to minimize impact, and the names of the
Government person(s) contacted.
3.3 - SCHEDULE AND ASSOCIATED REPORTS: The report provided by the Contractor in accordance with Standard Item 009-60 shall match the Schedule and Associated Reports provided in the Contractor’s technical proposal in response to Factor 4 – Resource Capacity. While the report provided by the contractor in accordance with Standard Item 009-60 may provide additional detail, it shall not be materially different from the Schedule and Associated Reports provided in the Contractor's proposal in accordance with Factor
4 - Resource Capacity at the level of detail required by Factor 4.
4. SAFETY:
4.1 SAFETY INSPECTOR / FIRE MARSHALL: In addition to the safety standards provided in the specifications, the contractor is responsible for providing an experienced Safety Inspector/Fire Marshall who will accomplish daily inspections of the Contractor's entire work area on the ship, together with the
Contracting Office’s Safety Representative. This Inspector or Fire Marshall shall not be one of the
Contractor's supervisors or superintendents normally assigned to the ship and shall be identified in the contractor’s approved Safety Plan.
4.2 PERSONAL PROTECTIVE EQUIPMENT: Whenever work is performed aboard U.S. Naval Ships or vessels at piers or dry docks of a Naval Shipyard or Naval Station, Contractor employees (including management personnel) shall have and use at all times the following personal protective equipment:
(a) Protective hard hats that meet the following specifications:
(1) Protective helmets purchased after July 5, 1994 shall comply with ANSI Z89.1-1986, "American National Standard for Personnel Protection-Protective Headwear for Industrial Workers-
Requirements," or shall be demonstrated to be equally effective.
(2) Protective helmets purchased before July 5, 1995 shall comply with ANSI Standard
"American National Standard Safety requirements for Industrial Head Protection," Z89.1-1969, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CFR 1910.135 Head Protection]
(b) Approved type Plano or prescription glasses meeting the following specifications:
(1) Protective eye and face devices purchased after July 5, 1994 shall comply with ANSI standard Z87.1-1989, "American National Standard Practice for Occupational and Educational Eye and
Face Protection", or shall be demonstrated by the employer to be equally effective.
(2) Protective eye and face devices purchased before July 5, 1994 shall comply with
ANSI "USA standard for Occupational and Educational Eye and Face Protection", Z87.1-1968, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CRF 1910.133 Protective eye and face devices.]
(c) Safety toe shoes, with built-in protective toe box that meet the following specifications:
(1) Protective footwear purchased after July 5, 1994 shall comply with ANSI Standard
Z41-1991, "American National Standard for Personal Protection-Protective Footwear", or shall be demonstrated by the employer to be equally effective.
(2) Protective footwear purchased before July 5, 1994 shall comply with the ANSI standard "USA Standard for Men's Safety Toe Footwear", Z41.1 1967, or shall be demonstrated by the employer to be equally effective [Ref. 29 CFR 1910.136 Protective eye and face devices.]
4.3 BLACK OXIDE COATED THREADED FASTENERS (BOCTFs): Due to safety concerns, use of
BOCTFs is not authorized when installing or replacing threaded fasteners in the accomplishment of any work required by any Work Item in this contract.
5. OTHER REQUIREMENTS
5.1 USE/POSSESSION OF PERSONAL ELECTRONIC DEVICES (PED'S) - The possession and use of portable electronic devices (PED's) within the confines of any naval vessel, or in the contractor's facility where equipment removed from the vessel is being worked, is strictly controlled. Cellular phones with digital imaging capabilities are strictly prohibited. PED's may not be connected to any Navy-owned or controlled network. PED's may not be used to store or process any digital information associated with the conduct of the contract without written authorization from the Naval Supervising Activity (NSA). PED's include:
mobile computing devices such as personal digital assistants (PDA's);
hand-held or laptop computers;
mobile telephone devices such as data-enabled cellular telephones;
two-way pagers, including those with e-mail capability;
analog and digital sound recorders; and digital cameras, including cellular phones with digital imaging capabilities.
5.2 NON SMOKING POLICY - For bidding purposes, contractors are advised that in light of the Navy's policy regarding smoke-free facilities, the entire vessel, topside and below decks, is to be considered a "No
Smoking Area" unless otherwise indicated by shipboard policy.
5.3. CITIZENSHIP REQUIREMENTS - The contractor shall comply with the Department of Defense
Industrial Security Manual (DoD 5220.22), and any revisions to that manual as of the Bid Opening Date prescribed, for verification of all U. S. Citizens. Prospective offerors shall refer all questions pertaining to the above to MARMC, Security Manager ( Code 1123, 757-443-3872, ext 1013).
CLIN DESCRIPTIONS
0001 PREPARE FOR AND ACCOMPLISH TYCOM REPAIR AND (TITLE D) ALTERATIONS ONBOARD
USS MITSCHER (DDG 57) DURING FY15 EXTENDED SELECTED RESTRICTED AVAILABILITY WITH
DOCKING (ESRA(d)) SSP NSSARM-501-15
The Contractor shall prepare for and accomplish TYCOM repair and (Title D) alterations during the Extended
Selected Restricted Availability with docking (ESRA(d)) onboard USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP
NSSARM-501-15 drawings, test procedures, and other detailed data as included in the following specifications:
042-11-002 General Requirements for Work Within Naval Station Norfolk and Joint Expeditionary
Base (JEB) Little Creek - Fort Story; accomplish
042-11-003 Accountability of Manhour and Material Reservation; accomplish
042-67-001 Work Completion Certification Data; provide
113-11-001 Bilge Drain Well; repair and preserve
123-11-001 Fuel Oil Tank, Group One, 2, 3, 4, 5, and 6; repair and preserve
123-11-002 Contaminated Oil and Waste Water Tanks; inspect, repair and preserve
123-11-003 JP-5 Service Tanks; inspect, repair and preserve
123-11-004 Chain Lockers; repair and preserve
123-11-005 Machinery Room Structural Repair; accomplish
123-11-006 Fan Room Structure; repair and preserve
123-11-007 Engine Rm. No. 2 Stack Structure; repair and preserve
123-11-008 Engine Rm. No. One Stack Structure; repair and preserve
123-11-009 Fuel Oil Tank; repair
131-11-001 Platform; replace
136-11-001 Radar Cross Section (RCS) Plating; replace and preserve
150-11-001 04, 05, 06 Level Deck and Bulwark; Repair and Preserve
150-11-002 Waterway Bar Coaming and Deck; repair and preserve
150-11-004 Deck Coaming; replace and preserve
150-11-005 Exhaust Trunk Structure; repair
150-11-006 Bulkhead Paint Repair; accomplish
150-11-007 Harpoon Blast Pad Corrosion; repair
150-11-008 Escape Truck Structural Longitudinal; repair and preserve
150-11-009 04 Level Coaming and Bulwark; repair
150-11-010 Bulkhead Plating; repair
150-80-001 ShipAlt DDG51-64214D (Partial), Torpedo Tube, Corrosion Modifications; accomplish
167-11-001 Bolted Equipment Removal Plate (BERP) Repair; accomplish
167-80-001 ShipAlt DDG51-72424D, MAFO-Holtkamp Door Installation; accomplish
167-80-002 ShipAlt DDG51-76258D, MAFO-Holtkamp Door Installation (Partial); accomplish
167-80-003 ShipAlt DDG51-64162D, Raised Scuttle, Corrosion Modification; accomplish
167-80-004
SHIPALT DDG51-79662D 1A and 1B Gas Turbine Module (GTM) Access Manhole
Relocation; accomplish
180-11-001 Communications Box Foundation; replace
259-11-001 Gas Turbine (GTRB) Exhaust Duct Collector; repair
259-80-001 ShipAlt DDG51-76087D, GTRB & SS GTRB Bliss Cap Modification; accomplish
259-80-002
SHIPALT DDG-51-79474D, Install Rain Caps on Engine Room Number One and Number
2 Uptakes; accomplish
262-11-001 Main Reduction Gear (MRG) Lube Oil Cooler; open, clean and inspect
311-31-001 Ship Service Gas Turbine Generator (SSGTG) Air Cooler; clean and inspect
320-80-001 ShipAlt DDG51-64231D, Automatic Bus Transfer (ABT) Relocation; accomplish
321-11-001 Shore Power Trunk, Receptacles and Indicator Lights; repair, replace and preserve
321-80-001 DDG51 Class AER 64201D, Stuffing Tube Replacement (Partial); accomplish
324-11-002 Automatic Bus Transfer (ABT) Switch; repair
436-80-001 ShipAlt DDG-51-83419D, Removal Halocarbon Monitoring System; accomplish
437-21-001
Fuel Oil Service and Waste Water Drain Tank Level Indicating (TLI) Systems Cabling and
Bushings; replace and test
442-11-001 TR-232(B)/WQC-2A, Low Frequency (LF) Transducer; replace
452-11-001 Dry Air Layup for All Pressurized Waveguide and Transmission Lines; provide
472-11-001 CIWS Platform Composite Radar Cross Section (RCS) Plating; install
512-11-001 Medical Ventilation Cleaning; accomplish
512-11-002 Galley and Laundry Ventilation Cleaning; accomplish
520-11-001 Rodmeter Flange Cap; repair
521-11-001 Firemain Pressure Regulating Control Valve; replace and test
521-80-001 ShipAlt DDG51-76721D, TOTS Valves In Chilled Water System; Install
521-80-002 ShipAlt DDG51-73738, Installation of Additional Bulkhead Cutout Valves; accomplish
523-80-001
Shipalt DDG-51-79575D, Countermeasure Washdown (CMWD) Piping Relocation to
Interior and ML; accomplish
528-80-001 ShipAlt DDG51-77691D, Weather Deck Drain and Trough Modifications; accomplish
528-80-002 ShipAlt DDG51-77690D, 02 Level Intake And Uptake Drains; accomplish
529-11-001 AFT VLS Eductor to Gage, Firemain Pressure, Gage Line; replace
541-80-001 ShipAlt DDG51-80246D, F-76 Small Boat Refueling Station Installation; accomplish
551-51-001 High Pressure Air Compressor; Overhaul Industrial Assist; accomplish
551-60-001 Bleed Air Check Valve; repair
551-61-001 Masker Air Emitter Belt Cleanout Cover Plate; repair
551-61-002 Masker Air Cooler Seawater Inlet Piping; replace
562-11-001 Rudder; repair and preserve
562-11-002 Rudder Stool Access Plates; repair
582-80-001 ShipAlt DDG51-76564D, AFT Capstan Controller Modification; accomplish
583-80-001 ShipAlt DDG51-81675D, Cres Dual and Single Liferaft Cradles; replace
593-11-001
Vacuum, Collecting, Holding, and Transfer (VCHT) and Plumbing Drain Tanks; repair and preserve
593-11-002 Vacuum, Collecting, Holding and Transfer (VCHT) Pump Motor Controller; repair
593-11-003 Plumbing Drains Waste, Soil and Vent Piping; replace
612-21-001 Helo Safety Nets Removal, Inspection and Load Testing; accomplish
622-12-001 Nomex Deck Panel; replace
622-80-001 ShipAlt DDG51-64143D, Relocate Pilot Ladder Station; accomplish
623-21-001 Accommodation Ladder and Stowage; Replace
624-11-001 Balanced Joiner Door; remove, store, repair and install
624-11-002 Metal Joiner Door; replace
631-11-001 Collective Protection System (CPS)and General Housekeeping; clean, inspect and preserve
631-11-002 Machinery Space Bilge; repair and preserve
633-11-001 Impressed Current Cathodic Protection (ICCP) System; inspect and repair
634-21-001 Flight Deck Nonskid; replace
634-21-002 Small Arms Magazine Nonskid Deck; replace
643-11-001 Berthing Habitability Project (HCPO-S0286) Installation; accomplish
643-11-002 Berthing Habitability Project (BCPO-S0276) Installation; accomplish
644-11-001 Ward Bath Corrosion Repairs; accomplish
655-80-001 ShipAlt DDG-51-79196D, Self Service Laundry Transition; Accomplish
751-11-001 Torpedo Loading Chalk Foundation Bolt Holes; repair
837-11-001 Antenna Photographs; provide
838-11-001 Combat Systems Waterfront Liaison Engineering Services (TYCOM); provide
865-91-001 Industrial Hygienist/Marine Chemist/Competent Person Support; provide
868-71-001 Work Authorization Form (WAF) Coordination Requirements; accomplish
980-11-001 Light-Off Assistance (LOA) Deficiency Corrections; provide
980-11-002 TYCOM and MARMC Office Space; provide
982-11-001 Machinery Trial Discrepancy Correction; accomplish
982-31-001 Dock Trial, Fast Cruise, and Sea Trial; accomplish
992-11-002 Temporary Air Conditioning; provide
992-11-003
Temporary Flammable Liquid Storage and Hazardous Material Storage Unit, 320 Square
Feet per Unit; provide
992-11-005
Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor
Plant, Barge; accomplish
992-11-006 Temporary Refrigerated Storage Facility, 7000 Cubic Feet; provide
992-11-007 Pierside T-1 Line; provide
992-11-008 Barge Tow Service; provide
992-11-009 Ship's Force Parking; provide
992-11-010 Ship's Force Security Support Services; provide
992-12-001 Hull, Mechanical and Electrical (HM&E) Discrepancy; correct
992-12-002 Hurricane Preparation; provide
992-21-001 Vertical Launcher System (VLS) Deck Resurfacing Support Services; provide
992-31-001 Cleaning and Pumping; accomplish
992-31-002 Off-Load and Testing of Ships Petroleum Fuels and Lubricants; accomplish
992-31-003 Routine Maintenance Standard; provide
993-11-001 Rigging, Crane and Transportation Service; provide
993-11-002 Ship's Force Warehouse Storage Space; provide
993-31-001 AN/SPY-1D Antenna Protective Cover; install
993-31-003 Temporary Main Reduction Gear (MRG) Dehumidifier System; provide
997-11-001 Drydocking and Undocking; accomplish
0002 PREPARE FOR AND ACCOMPLISH NAVSEA PROGRAM (TITLE K) ALTERATIONS ONBOARD
USS MITSCHER (DDG 57) DURING FY15 EXTENDED SELECTED RESTRICTED AVAILABILITY WITH
DOCKING (ESRA(d)) SSP NSSARM-501-15
The Contractor shall prepare for and accomplish NAVSEA Program (Title K) alterations during the Extended
Selected Restricted Availability with docking (ESRA(d)) onboard USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
NSSARM-501-15, drawings, test procedures, and other detailed data as included in the following specifications:
264-90-001
ShipAlt DDG51-85973K, DDG Lube Oil Purifier Heat Exchanger Modifications;
accomplish
411-90-001
ShipAlt DDG51-78511K, AWS:ACB12/TI12 CIC Display Upgrade for DDGS;
accomplish
415-90-001 SHIPALT DDG51-79526K, AN/USG-2B Installation; accomplish
456-90-001 ShipAlt DDG51-78512K, AWS:ACB12/TI12 MMSP Upgrade for DDGS; accomplish
456-90-002
ShipAlt DDG51-77615K, ACB12/TI12 OA Computing Plant Upgrade for DDG;
accomplish
456-90-003 SHIPALT DDG51-78513K, ACB12/TI12 KAS WDRC Upgrades for DDGS; accomplish
468-90-001 ShipAlt DDG51-78391K, AN/SQQ-89A(V)15 for DDG Modernization; accomplish
472-90-001 Shipalt 80156K AN/SLQ-32(V)6 SEWIP BLOCK 2 UPGRADE W/ Shipalts
512-90-001 Shipalt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish
522-90-001 ShipAlt DDG51-80255, Replace Magazine Fire Detection System; accomplish
721-90-001 ShipAlt DDG51-79584K, ACB 12 Vertical Launching System (VLS) Upgrade; accomplish
980-90-001
SA DDG51-70430K MKXIIA Mode 5, Alteration Installation Team (AIT) Support
Service; provide
980-90-002
SA 81443K/NMT AN/WSC-9(V)1-X/Ka, Alteration Installation Team (AIT) Support
Service; provide
980-90-005
DDG-51 SCD-79813/BEWT ACB 12 Upgrade, Alteration Installation Team (AIT) Support
Services; provide
980-90-006
OA and SA 79362 AWS Seawater Flow Meter, Alteration Installation Team (AIT) Support
Service; provide
980-90-007
DDG 51 SCD-79975/BFTT Build 4.1 Alteration Installation Team (AIT) Support Services;
provide
980-90-008
MK-45 GMT ORDALTS 70227, 70289 and 70920 Alteration Installation Team (AIT)
Support Services; provide
980-90-009 NAVSEA (PHD) Office Space; provide
980-90-010 OA 74588 Mk99 FCS/KAS, Alteration Installation Team (AIT) Support
980-90-011 O/A 83135 CIWS BLK-1B, Cable Reliability Improvement, Alteration
980-90-012
SA-84134 K NIPR NCVI CLO, Alteration Installation Team (AIT) Support Service;
provide
980-90-014
ShipAlt DDG51-00151.01K and DDG51-00151.02K, Air Conditioning Plants No. One, 2, 3 and 4 Upgrade Industrial Support; provide
980-90-015
ShipAlt DDG51-80315K Replace AFFF and CMWD SOPVS, Alteration Installation Team
(AIT) Support Services; provide
980-90-016
SHIPALT 76829K, 78819K, 77052K, 76869K, 79256K, 82635K Industrial Support
Services: provide
980-90-017 OA 74603, 78778 and 79024 Alteration Installation Team (AIT) Industrial
980-90-018 OA 74435, 79353 and 80083, AIT Industrial Support Services; accomplish
0003 PRORATED WORK ITEMS. ONBOARD USS MITSCHER (DDG 57) DURING FY15 EXTENDED
SELECTED RESTRICTED AVAILABILITY WITH DOCKING (ESRA(d)) SSP NSSARM-501-15
The Contractor shall prepare for and accomplish the following work items alterations during the Extended Selected
Restricted Availability with docking (ESRA(d)) onboard USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package NSSARM-501-15, drawings, test procedures, and other detailed data as included in the following specifications:
042-11-001 Marine Coatings Containing Heavy Metals Material; remove and dispose
077-01-001 Hazardous Waste Produced on Naval Vessels; control
813-11-001 Compartment Closeout Schedule; provide
991-11-001 Temporary Mast and Superstructure Staging; provide
992-11-001 Temporary Service; provide
993-11-003 Government Materials Warehouse Storage Space; provide
993-31-002 Temporary Deck Covering; install
0004 CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ITEM 0001 THROUGH 0003, AND (IF
EXERCISED) OPTION ITEMS 0006 THROUGH 0012 (SEE EXHIBITS A, B and C – CDRLs ATTACHED)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD
Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.
0005 AWARD FEE
The Government is interested in incentivizing change management performance, schedule integration, and communication while meeting the Intra-Availability milestones in accordance with Attachment J-8 Award Fee Intra-
Availability Milestones. The milestones included in Attachment J-8 are those the Government indentifies as most critical to the successful, timely completion of the availability linking to timely completion of the ship availability.
The total award fee that may be earned is $2,500,000, and is based on the various Intra-Availability milestones described in Attachment J-8.
Each milestone has a maximum award fee dollar amount that can be awarded based on accomplishing the work stated in Attachment J-8 for that specific milestone by the date specified for that milestone.
In order to be considered for earning of award fee, the Government Project Manager must verify that the contractor has completed all of the work for that milestone, accounting for Government approved exceptions and deferrals and inclusive of any growth work associated with the specification package, by the specific date provided for that milestone in Attachment J-8. The Government expects the contractor to complete each individual milestone’s work scope and up to a 25% increase (as measured by production man-days) in scope associated with that milestone without a change to the milestone completion date.
It is incumbent on the contractor to discover and identify potential growth as soon as possible to ensure that it can be integrated into their production schedule. Failure of the contractor to identify growth in a timely manner (as determined by the Fee Determining Official (FDO)) shall not constitute a valid excuse for missing a milestone for purposes of earning award fee.
0006 Through 0012 APPLICABLE TO ALL OPTION ITEMS
For each exercised option, the Contractor shall prepare for and accomplish the work set forth in the work specification(s) identified, during the Extended Selected Restricted Availability with docking (ESRA(d)) onboard
USS MITSCHER (DDG 57) as specified in the statement of work provided herein and in accordance with standard items, work item specification package NSSARM-501-15, drawings, test procedures, and other detailed data as provided within the following specification:
150-11-003 MK 82 Director Foundations; replace *CLIN 0006
165-11-001 Sonar Dome Rubber Window (SDRW); inspect and repair *CLIN 0007
630-80-001 ShipAlt DDG51-64155D, VLS Fairing Plate Corrosion Modification, accomplish
*CLIN 0008
631-31-001 Underwater Hull Preservation; accomplish *CLIN 0009
992-11-004 Oil Spillage and Floating Sandblasting Debris Boom; install *CLIN 0010
123-11-010 Fuel Oil Tank, Group 3 and 4; repair and preserve *CLIN 0011
123-22-001 Forepeak Tank, Accessible Void and Cofferdam; preserve *CLIN 0012
HQ B-2-0003 DETERMINATION OF FEE (NAVSEA) (DEC 2010)
(a) Award Fee
In addition to the contract’s firm fixed-price to be paid, the Contractor may earn an award fee as determined by the Fee Determining Official (FDO). The Government's purpose in granting an award fee is to encourage and reward superior Contracting effort directed toward performance of this contract. The specifics for evaluation are set forth in paragraphs that follow.
(b) Award Fee Board
The Contractor's performance evaluation for each period will be conducted by an Award Fee Board (AFB) consisting of:
(1) Chairperson (NAVSEA 21 Representative)
(2) Waterfront Operations (Code 300 Representative)
(3) Procuring Contracting Officer (SEA 0244)
(c) Fee Determining Official
The FDO, PMS 400F Deputy Program Manager, shall make determinations of the award fee due to the
Contractor based upon the performance evaluation conducted by the Award Fee Board established pursuant to paragraph (c) above.
(d) Award Fee Determination and Reclama Procedures
(1) Within thirty (30) days after the end of the availability, the Contractor shall furnish to the AFB such information as may be reasonably required, including a statement of milestones met, to assist the AFB in evaluating the
Contractor’s performance during the evaluation period. The information provided shall not exceed 15 pages.
(2) Performance evaluations will commence not later than forty-five (45) calendar days following the end of the availability. The AFB shall receive reports, oral and/or written, as considered necessary, from Navy performance monitors designated by the Chairperson of the Board.
(3) Within five (5) calendar days, after the AFB meeting, the Chairperson shall advise the FDO of the AFB’s recommended grades and Award Fee amounts and summary rationales.
(4) Within five (5) calendar days following the AFB’s recommendation, the FDO will provide the Award Fee determination in writing to the Contractor with a copy to the Contracting Officer setting forth the Award Fee determination, with summary rationale.
(5) Within five (5) calendar days of receipt of the FDO’s final determination and the Procurement Request
(PR), the Contracting Officer shall issue a unilateral modification to the contract to provide for the award fee earned.
(e) Fee Determination Official’s Determination
Determinations of the FDO with respect to the amount of the award fee to be paid to the Contractor and the methodology for determining the award fee are unilateral decisions made solely at the discretion of the Government
(FAR 16.401(e)(2)).
(f) Evaluation Criteria
The Contractor's performance during the evaluation period will be judged in the criteria listed below.
o Timely provision of Condition Found Reports o Timely provision of Change Order Price Analysis (COPA) proposals in response to Request for Contract Changes (RCC), with all COPAs submitted providing sufficient detail to support timely negotiated settlement.
o Timely provision of original production schedules, submitted IAW Standard Item 009-60, integrated with the requirements of the total ship test requirements in SI 009-67, provided in electronic and fully traceable Microsoft Project format, and of sufficient quality and detail to allow the Government to provide oversight to the Availability. Timely provision of revisions to production schedules, reflecting contract changes, upon request. Revisions must also be submitted IAW SI 009-60, integrated with the requirements of the total ship test requirements in SI 009-67, be provided in electronic and fully traceable Microsoft Project format, and of sufficient quality and detail to allow the Government to provide oversight to the Availability.
o Integration of Ship's force and AIT work packages with no impact to Availability milestones.
o Timely and pro-active communication of any issues or concerns that could affect schedule compliance.
(g) Evaluation Periods/Award Fee Pool
(1) The Award Fee evaluation period is as set forth below:
Evaluation Period: Contract Award through End of Availability
(2) The Award Fee Pool for the evaluation period is $2,500,000, divided across 6 individual milestones as described in Attachment J-8.
(h) Performance Ratings
(1) In evaluating Contractor performance for the individual milestones, the following adjective and numerical ratings will be used:
Award-Fee
Adjectival Rating
Award-Fee Pool
Available To Be
Earned Description
Excellent 91%-100% Contractor has met the milestone completion date and has provided superior performance in almost all of the significant award-fee criteria (HQ B-2-0003(f)).
Very Good 76%-90% Contractor has met the milestone completion date and has provided superior performance in many of the significant award-fee criteria.
Good 51%-75% Contractor has met the milestone completion date and has provided superior performance in some of the significant award-fee criteria.
Satisfactory No Greater Than 50% Contractor has met the milestone completion date.
Unsatisfactory 0% Contractor has failed to meet the milestone completion date.
(i) Payment of Award Fee
The Contractor shall be paid award fee, if any, upon submittal of a proper invoice or voucher to the cognizant Payment Office, together with a copy of the unilateral modification to the contract authorizing payment of award fee for the Evaluation Period. There will be no provisional, interim or advance billing of award fee prior to a final determination of the FDO and execution by the contracting officer of a contract modification authorizing payment.
(j) Overall Performance
In accordance with FAR 16.401(e)(2), award fee shall not be earned if the contractor’s overall cost, schedule, and technical performance in the aggregate is below satisfactory (less than 50%).
(k) Rollover of Unearned Award Fee, In accordance with FAR 16.401(e)(4), the use of rollover of unearned award fee is prohibited.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
252.216-7004 Award Fee Reduction or Denial for Jeopardizing the Health or Safety of Government Personnel.
SEP 2011
252.216-7005 Award Fee FEB 2011
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
EXHIBITS AND ATTACHMENTS
LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Any contract awarded as a result of this solicitation shall consist of the following sections of this solicitation, and the documents, exhibits, and attachments described below:
Part I – The Schedule (Sections A through H)
Part II – Contract Clauses (Section I)
Part III – List of Documents, Exhibits and Other Attachments (Section J)
Part IV – Representations and Instructions
Part IV of the solicitation will not be physically incorporated into the resulting Contract. However, Section K, “Representations, Certifications and Other Statements of Offerors” will be retained in the contract file, and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract.
(FAR 15.406-2(a)(1))
The following documents form a part of this solicitation:
S-1 Request for Information Form
S-2 Dry-Dock & Pier Facilities Data Sheet
S-3 Corporate Experience Data Sheets;
S-4 Past Performance Questionnaire
Documents, exhibits and other attachments that are part of the solicitation and will be part of the contract are as follows:
J-1 Conformed Specification Package No. SSP NSSARM-501-15
J-2 Work Item Plans, Drawings, and Other References
J-3 RESERVED
J-4 Work Item Index *Amendment 6
J-5 Labor and Material Burden Rates Spreadsheet
J-6
USS MITSCHER (DDG-57) Execution Milestone and Key Event
Dates *Amendment 6
J-7 RESERVED
J-8 Award Fee Intra-Availability Milestones *Amendment 6
Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423)
Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423)
Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423)
In addition to the documents listed above, the Successful Offeror’s accepted/approved Small Business Sub-contracting plan will be incorporated at contract award.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price with Award Fee contract resulting from this solicitation.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .